Kinetic Palazzo

KINETIC HOMES · Hyderabad · RERA P02500004198

KINETIC PALAZZO is a residential apartment project in Nallagandla Village, Hyderabad district; the mandal is not disclosed in the supplied project record. The registered promoter is KINETIC HOMES, recorded as a partnership. The project covers 6171.46 sq. m and has two residential blocks—Block A with 1 Cellar + Stilt + 8 upper floors and Block B with 1 Stilt + 8 upper floors—plus an amenities building with Ground + 3 upper floors; it lists 156 homes: 99 2BHK and 57 3BHK. Its TG-RERA registration is P02500004198, and the project header records proposed completion as 02/01/2028.

01What we found

RegisteredTG-RERA - valid till 2 Sep 2027
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameKINETIC PALAZZO RERA record
Project type / statusResidential apartment project; recorded as “New Project” RERA record RERA filing
Phase / registered portionThe record identifies this registration as a project, but does not separately name a phase. The approved plan identifies two residential blocks and an amenities building. RERA record
TG-RERA registrationP02500004198 RERA record
Registration validity14 March 2022 to 2 September 2027; certificate says five years, unless extended by the Authority. This is the registration-validity period, not the project completion deadline. RERA record
Registered promoterKINETIC HOMES, recorded as a partnership; GSTIN 36AARFK0897Q1Z8. RERA filing Corporate record
RERA record statusRegistration certificate issued under section 5. The supplied record does not show an extension.

Land and geographic identity

FieldProject record
Locality / revenue villageNallagandla; the registered village is recorded as NALLAGANDLA VILLAGE. RERA record Land records
MandalNot disclosed in the supplied project record. Land records
District / PINHyderabad / 500019 in the project header and RERA project fields. The registration certificate separately prints district as Ranga Reddy and locality as Hyderabad. RERA record RERA filing
All project survey numbers and subdivisions398/A, 398/AA, 398/E, 398/EE, 398/VU, 398/VUU and 398/RU. RERA record Land records
Site extent6171.46 sq. m total/site area and 6171.46 sq. m net area in the building permit extraction; RERA land details also record total and net area as 6171.46 sq. m. RERA filing
Boundaries as filedEast: Survey No. 396; west: Survey No. 398 part; north: Survey No. 397 part; south: road width 18. Land records
Road-affected / nala-affected area in the permit extractionRoad affected area: 0; nala affected area: 0.

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building-permit number / approval date1/C20/09440/2021, approved 02 September, 2021. The permit also records file number 1/C20/15040/2020. Approvals record
Approved built-up areaRERA project fields record approved built-up area as 26930.55 sq. m. RERA filing
Residential buildings and approved floorsBlock A: 1 Cellar + Stilt + 8 upper floors; Block B: 1 Stilt + 8 upper floors. The permit extraction gives each residential block a height of 23.59 m.
Amenities buildingGround + 3 upper floors; height 12.44 m.
Parking levelsThe permit approves Block A cellar and both blocks’ stilts for parking; it does not provide a parking-space count in the supplied extraction.
Unit count156 units in total: 3 total building units in the RERA land details and 3 proposed building units as per agreement. The permit states that sanctioned unit numbers must not be increased without prior GHMC approval, but the supplied extraction does not state the number of apartments. RERA filing

Offering and status

FieldProject record
RERA-filed configurations2BHK: 99 units, saleable area 116.91 sq. m each as recorded; 3BHK: 57 units, saleable area 166.3 sq. m each as recorded. RERA unit table RERA unit table
Booked / availablePortal data last read shows 0 booked and 156 available (99 2BHK and 57 3BHK). The portal record supplies no as-of date, so these counts are indicative. RERA unit table
Completion datesThe Form-B declaration states a completion undertaking of 31-12-2025; the project header records proposed completion as 02/01/2028. RERA record
Construction stageNot established by the supplied project data; no independently verified site-progress information is provided. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The permit says an occupancy certificate is compulsory before occupation. Document index

2. The project story

  • KINETIC PALAZZO is registered with TG-RERA as a residential apartment project on 6171.46 sq. m in Nallagandla Village, Hyderabad, covering survey subdivisions 398/A, 398/AA, 398/E, 398/EE, 398/VU, 398/VUU and 398/RU. The GHMC building permit provides for two residential blocks—Block A and Block B—and a separate amenities building. RERA record Land records
  • The RERA filing lists 99 two-bedroom and 57 three-bedroom homes. The permit extraction establishes the approved building form and includes conditional requirements concerning construction, parking use, site services and an occupancy certificate before occupation. The record does not establish actual construction progress or that any building or facility is complete; approval and registration should not be read as evidence of completion. RERA unit table RERA amenities

3. Master plan, architecture & building design

The GHMC building-permit extraction records a site and net area of 6171.46 sq. m, including a 671.88 sq. m “Tot-lot” entry. It identifies Block A, Block B and an amenities building, with the following floor arrangements and heights:

Approved buildingUseSanctioned floor configurationHeight
BLDG-1 (BLOCK A)Residential1 Cellar + Stilt + 8 upper floors23.59 m
BLDG-1 (BLOCK B)Residential1 Stilt + 8 upper floors23.59 m
BLDG-1 (AMENITIES)AmenitiesGround + 3 upper floors12.44 m
  • The permit extraction itemizes 10,249.09 sq. m for Block A residential upper floors, 4,032.40 sq. m for its cellar and 1,384.20 sq. m for its stilt; for Block B it lists 8,639.28 sq. m for residential upper floors and 1,175.10 sq. m for the stilt. For the amenities building, it lists 175.80 sq. m at ground-floor level and 527.40 sq. m for upper floors. Separately, the RERA project fields state an approved built-up area of 26930.55 sq. m. These figures are presented as recorded; the supplied material does not define all area categories sufficiently to treat them as interchangeable. RERA filing
  • The permit lists setbacks of 8 m for each residential block and 2 m for the amenities building. Plot setbacks are recorded as front 8.00 m, rear 2.00 m, side I 8.00 m and side II 2.00 m. The supplied drawing record is not extracted in enough detail to establish building footprints, flats per floor, lift and stair arrangements, internal circulation, or a detailed residential/common-area split. Document index

4. Homes, configurations & floor plans

The TG-RERA filing lists two configurations. Its saleable-area figures are RERA-filed values. Separate software measurements of the plan drawing provide carpet-area estimates; the drawing-based measurements are not RERA disclosures, and the measurement record says they need review. Saleable area and carpet area are distinct: saleable area includes a share of common areas, while the drawing-based carpet measurement does not. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK99099116.91 sq. mMedian 74.6 sq. m; measured range 63.3–104.0 sq. m36%
3BHK57057166.3 sq. mMedian 91.2 sq. m; measured range 83.8–94.8 sq. m45%

The drawing extraction shows living, dining, kitchen, bedrooms and toilets in the measured examples. It also labels balconies and, for the measured 2BHK example, a 1.70 m wide utility; balconies and utility areas are excluded from the software-measured carpet figures. The example room dimensions are drawing measurements rather than RERA-filed specifications. RERA unit details

5. Parking & vehicle circulation

The GHMC permit identifies Block A’s cellar and the stilt levels as approved for vehicle parking, and states that the cellar and stilts are to be used exclusively for parking without partition walls or rolling shutters. The supplied permit extraction gives no number of parking spaces, visitor or accessible-space provision, parking-allocation schedule, or ramp and driveway details. A drawn or approved parking area does not by itself establish an exclusive parking allocation to a particular unit.

The project’s RERA unit records mark both configurations as mortgaged; they do not establish a unit-by-unit parking arrangement. RERA unit table

6. Amenities, recreation & open spaces

The permit records an amenities building and identifies a tot-lot and site provisions. The TG-RERA amenities record shows listed progress as 0% for each of its 14 items; the supplied information does not independently verify completion. RERA amenities

Landscape / open space
FacilityTot-lot
Description / sizePermit extraction lists 671.88 sq. m; it requires fencing and maintenance as greenery before issue of an occupancy certificate.
Evidence sourceGHMC permit
Declared progress / verified statusApproved/required by permit; completion not verified.
Landscape / open space
FacilityGreen strip / tot-lot / park
Description / sizeNo separate size stated in the RERA amenities record.
Evidence sourceTG-RERA amenities record
Declared progress / verified statusListed at 0%; completion not verified. RERA amenities
Sports / recreation
FacilityRecreational open space
Description / sizeNo size stated in the supplied amenities record.
Evidence sourceTG-RERA amenities record
Declared progress / verified statusListed at 0%; completion not verified. RERA amenities
Convenience / community
FacilityAmenities building
Description / sizeGround + 3 upper floors; permit extraction lists 175.80 sq. m at ground level and 527.40 sq. m for upper floors.
Evidence sourceGHMC permit
Declared progress / verified statusApproved building; facility fit-out or completion not established.
Convenience / community
FacilityCommunity buildings
Description / sizeNo further description or size supplied.
Evidence sourceTG-RERA amenities record
Declared progress / verified statusListed at 0%; completion not verified. RERA amenities

The vendor record also lists a club house, jogging and strolling track, park, kids’ play area and landscape garden, but these are vendor-supplied claims rather than confirmation of sanctioned or delivered facilities. Promoter website

7. Utilities, building services & safety

  • The GHMC permit lists 9 RWHPs, 305 trees, space for a transformer, a garbage house and an ETP. It also requires the project to follow the services, utilities, storm-water disposal, sewerage, rainwater-harvesting pits and garbage-disposal arrangements in the plans submitted to GHMC. These are permit-recorded provisions/conditions; the supplied evidence does not verify installation, capacity or operation.
  • The TG-RERA amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES”, while recording 0% progress for the listed items. It does not supply water-source or storage capacities, STP/ETP capacity, reuse arrangements, backup-power details, lift specifications, fire-system specifications, CCTV/access-control details or accessibility arrangements. RERA amenities
  • The permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of an occupancy certificate, and requires an occupancy certificate before occupation. The supplied documents do not establish that either has been obtained.

8. Location, access & connectivity

  • The registered location is Nallagandla Village, Hyderabad, Telangana, PIN 500019. The permit identifies the site’s south boundary as a road width of 18, and refers to an existing 60 feet road and an 80 feet road; the supplied information does not establish the project’s precise access arrangement to those roads. RERA record RERA filing Land records
  • The supplied location data places the cadastral parcel centroid at 17.41528, 78.35459 and records the Financial District (Nanakramguda) as 1.2 km away. This is a recorded distance, not a travel-time estimate. Location record

9. Developer & development status

  • The registered promoter is KINETIC HOMES, identified in the RERA record as a partnership with GSTIN 36AARFK0897Q1Z8. The registered address shown in the project record is Prime Splendour, Masjid Banda Road, Nallagandla, Hyderabad, PIN 500019. The supplied information does not provide an official project website or contact details. RERA filing RERA filing Corporate record
  • The RERA party record names Alla Venkata Subba Reddy as authorised signatory and lists seven landowners under area-share agreements. The building-permit extraction names R C CONSTRUCTIONS as developer/builder. These are roles recorded in the supplied documents, not separate evidence of project completion. Parties record
  • The Form-B affidavit dated 28 Feb. 2022 states a completion undertaking of 31-12-2025. The project header separately records proposed completion as 02/01/2028. No construction-progress percentage, independently verified site inspection, or occupancy/completion certificate is supplied; the registration remains recorded as valid through 2 September 2027, subject to any extension by the Authority. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500004198; issued 14/03/2022, valid to 02/09/2027 unless extended
What the supplied record establishesRegistration of KINETIC PALAZZO under section 5 and its recorded conditions.
GHMC building permit order
Identifier / date1/C20/09440/2021; approved 02 September, 2021; file no. 1/C20/15040/2020
What the supplied record establishesConditional building permission for Block A, Block B and the amenities building on the listed Nallagandla survey subdivisions. The permit states that it does not confer ownership rights.
Approved drawing record
Identifier / dateDrawing stamp recorded as 1/C20/09440/2021, dated 03-09-2021
What the supplied record establishesA drawing record is listed, but its supplied extraction is insufficient to confirm detailed layout or architectural features. Approvals record Document index
Form-B affidavit-cum-declaration
Identifier / date28 Feb. 2022
What the supplied record establishesPromoter declaration on title, encumbrances, project completion and fund-management undertakings.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesThe permit requires an occupancy certificate before occupation; the supplied records do not establish its issue. Document index
Project-specific progress / facility records
Identifier / dateTG-RERA amenities record; no progress documents supplied
What the supplied record establishesListed amenity progress is 0%; construction progress is not established by the supplied evidence. RERA amenities

Frequently asked questions

Is KINETIC PALAZZO registered with Telangana RERA?

Yes. KINETIC PALAZZO is registered with the Telangana Real Estate Regulatory Authority as P02500004198; the registration status is New Project.

Who is the developer of KINETIC PALAZZO?

The promoter named in the RERA registration is KINETIC HOMES.

Where is KINETIC PALAZZO located?

KINETIC PALAZZO is in NALLAGANDLA VILLAGE, Hyderabad, Telangana (500019).

When will KINETIC PALAZZO be completed?

The promoter's proposed date of completion filed with RERA is 02/01/2028. This is the promoter's declaration, not a guarantee.