Kjr Residency
HARDHIK CONSTRUCTIONS PVT LTD · Hyderabad · RERA P02500000047
KJR RESIDENCY is a residential apartment project in Barkatpura, Hyderabad district; the mandal is not disclosed. The registered promoter is HARDHIK CONSTRUCTIONS PVT LTD. The project has a site area of 687.39 sq. m and one building, Building A, with a sanctioned configuration of Stilt + 5; TG-RERA records 10 3BHK apartments, each with a saleable area of 105.91 sq. m. Its TG-RERA registration number is P02500000047, and its proposed completion date is 30/08/2019.
More from Hardhik Constructions Pvt Ltd · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | KJR RESIDENCY RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Not separately identified in the supplied record; the sanction describes one building, Building A |
| TG-RERA registration | P02500000047 Approvals record |
| Registration validity | 30/11/2018 to 30/08/2019; certificate states it was not extended Approvals record |
| Registered promoter | HARDHIK CONSTRUCTIONS PVT LTD RERA record Corporate record |
| RERA status | Recorded as an ongoing project; the registration validity above is separate from its completion undertaking and occupancy-certificate status RERA record RERA filing |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Barkatpura; GHMC permit locality is recorded as “BARKATPURA -20” RERA record RERA filing |
| Revenue village | Barkatpura (also spelled Barkathpura in title-report material) Land records |
| Mandal | Not disclosed Land records |
| District | Hyderabad RERA record Land records |
| PIN | 500027 RERA record |
| Project survey number(s) / subdivision(s) | Survey No. 0, as recorded in the TG-RERA project and land fields and registration certificate. The supplied GHMC building-permit extraction separately identifies survey/plan reference 200/49; it is not listed as a RERA project survey number RERA filing Land records |
| Plot / municipal identifiers | H.No. 3-4-526/1 & 3-4-526/1/A/1 RERA filing |
| Registered/site extent | Site area 687.39 sq. m; road-affected area 128.4 sq. m; net area 558.99 sq. m RERA filing |
| Boundaries recorded in RERA fields | East: “100 FEET ROAD PROPOSED”; west, north and south: neighbours’ property RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Approval No. 1/C20/06872/2017, dated 25 July, 2017; file No. 1/C20/03640/2017 Approvals record |
| Approved built-up area | 1,470.90 sq. m recorded as upper-floors area in the permit extraction and as approved built-up area in the RERA fields RERA filing |
| Building count / configuration | One building, identified in the permit as Building A; sanctioned configuration Stilt + 5 |
| Sanctioned height | 14.95 m |
| Parking level / provision | The permit conditions state that cellar and stilt areas approved for parking are to be used exclusively for parking; the extracted parameters record “Cellar 0.00” and “Stilt 280.39”. A parking-space count is not supplied |
| Approved versus RERA-declared units | Permit condition: sanctioned unit count must not be increased without prior GHMC approval. A numerical sanctioned-unit count is not extracted in the supplied permit data. TG-RERA unit records show 10 apartments RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 3BHK RERA unit table RERA unit details |
| RERA-filed saleable area | 105.91 sq. m per apartment RERA unit table RERA unit details |
| Booked / available | 10 booked; 0 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative RERA unit table |
| Construction stage | TG-RERA records the project as ongoing. No independently verified site-progress figure is supplied RERA record RERA filing |
| Original / revised completion date | 30/08/2019 / 30/08/2019 RERA record RERA filing |
| Promoter’s completion undertaking | Form B declares completion on or before 30th August 2019 |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied in the reviewed project documents. The GHMC permit states that an occupancy certificate is compulsory before occupation Document index |
2. The project story
KJR RESIDENCY is registered with TG-RERA as a residential apartment project in Barkatpura, Hyderabad. The RERA filing identifies Survey No. 0 and plot/municipal numbers 3-4-526/1 & 3-4-526/1/A/1; the GHMC permit identifies Building A at plan reference 200/49. These identifiers are retained as recorded in their respective documents RERA record RERA filing.
The GHMC permit describes one residential building, Stilt + 5, on a site recorded as 687.39 sq. m, with 128.4 sq. m road-affected and 558.99 sq. m net area. TG-RERA’s unit record describes ten 3BHK apartments, all shown as booked. The supplied evidence does not establish a current construction stage through independent site verification, nor does it include an occupancy or completion certificate. The promoter’s completion undertaking and the RERA completion date are both 30/08/2019; these dates do not establish completion or occupation certification RERA unit table RERA record.
3. Master plan, architecture & building design
The GHMC building permit records a single residential building, Building A, with a sanctioned Stilt + 5 configuration and height of 14.95 m. It records an upper-floors area of 1,470.90 sq. m, a stilt area of 280.39 sq. m, and “Cellar 0.00.” The supplied extraction does not provide a floor-by-floor plan description, flat count per floor, lift or stair details, building footprint, or a quantified open-space area.
The permit records setbacks of Front 2.5, Rear 10, Side I 2.5 and Side II 2.5; the extracted data does not state units for these figures. It also lists a tot-lot, 30 Trees, transformer space, a garbage house and a rainwater-harvesting structure (percolation pit).
Site-area figures in the permit are 687.39 sq. m total and 558.99 sq. m net, with 128.4 sq. m identified as road-affected. The permit records surrender of the road-affected portion to GHMC without compensation. No FSI-counted area or separate gross built-up-area figure is supplied. The 1,470.90 sq. m figure is reported as approved built-up area in the RERA fields and as upper-floors area in the permit extraction; it should not be treated as saleable or carpet area RERA filing.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 105.91 sq. m | 102.9 sq. m (software-measured from drawing; needs review) | Not supplied |
TG-RERA records ten 3BHK apartments, each with a filed saleable area of 105.91 sq. m; the booking counts have no stated as-of date RERA unit table RERA unit details. A software measurement of the supplied second-floor plan drawing gives a carpet-area median of 102.9 sq. m (1,107 sq. ft.), based on one measured flat design. This is a drawing-based measurement, not a TG-RERA carpet-area disclosure, and the extraction says it needs review RERA unit details Floor plans.
The drawing extraction identifies a living/dining room, kitchen, three bedrooms, three toilets, a balcony and a utility area. The measured balcony is 12.56 sq. m and utility is 4.24 sq. m; both are marked excluded from the software-measured carpet calculation. The drawing lists room dimensions in its extraction, but no independent site measurement is supplied RERA unit details. Carpet area, balcony/utility areas and RERA saleable area are distinct measures; the supplied records do not provide a loading figure.
5. Parking & vehicle circulation
The GHMC permit conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The extracted permit parameters record Cellar 0.00 and Stilt 280.39; no sanctioned number of car or two-wheeler spaces, visitor or accessible parking count, or parking-allocation schedule is supplied.
The RERA fields record a mortgage area of 148.62 sq. m RERA filing. The permit also records a mortgaged second-floor area of 151.05 in its extracted details; neither entry establishes an individual buyer’s parking allocation. No parking plan, ramp or driveway arrangement, EV charging provision, or registered unit-specific parking allocation is available in the supplied evidence.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | Listed in the GHMC permit; size field is blank in the extraction. Permit condition says it is to be fenced and maintained as greenery before issue of an occupancy certificate | Permit condition; completion not independently verified | |
| Trees | 30 Trees listed | Permit-listed; planting/completion not independently verified | |
| Rainwater harvesting | Structure identified as a percolation pit | Permit-listed; completion not independently verified | |
| Transformer space | Space to be provided on site, with resident safety noted in the permit | Permit condition; installation not independently verified | |
| Garbage house | Listed in the permit’s amenities/utilities | Permit-listed; completion not independently verified |
TG-RERA’s amenity record lists 14 infrastructure or common-facility categories, including internal roads and footpaths, water supply, sewerage, storm-water drains, a green strip/tot-lot/park, street lighting, community buildings, sewage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, an electrical meter room/sub-station/receiving station and recreational open space. Each category is recorded at 0% in the supplied amenity data; no independently verified completion status is provided RERA amenities.
7. Utilities, building services & safety
| Evidence in the supplied record | TG-RERA lists “Water Supply” as an amenity category RERA amenities |
|---|---|
| Status / limitation | No source, storage capacity or treatment details supplied; progress is recorded as 0% RERA amenities |
| Evidence in the supplied record | TG-RERA lists sewerage, sewage and sullage treatment/disposal, and storm-water drains RERA amenities |
|---|---|
| Status / limitation | No system design, treatment capacity, reuse details or verified completion supplied; progress is recorded as 0% RERA amenities |
| Evidence in the supplied record | Permit requires transformer space; TG-RERA lists an electrical meter room/sub-station/receiving station RERA amenities |
|---|---|
| Status / limitation | No supply, substation capacity or backup details supplied; installation not independently verified |
| Evidence in the supplied record | No lift count, capacity or service-lift details supplied Document index |
|---|---|
| Status / limitation | Not established by the available plan extraction |
| Evidence in the supplied record | TG-RERA lists fire protection and fire-safety requirements RERA amenities |
|---|---|
| Status / limitation | The category is recorded at 0%; no fire-system specification or clearance is supplied RERA amenities |
| Evidence in the supplied record | Permit lists a garbage house; TG-RERA lists solid-waste management and disposal RERA amenities |
|---|---|
| Status / limitation | No waste-handling specification or verified completion supplied |
| Evidence in the supplied record | No accessibility features or pedestrian-circulation details supplied Document index |
|---|---|
| Status / limitation | Not established by the available evidence |
The GHMC permit requires a transformer space, an ETP as per standard specification, and adherence to the sanctioned plan. These are permit requirements, not evidence that the facilities have been completed or commissioned.
8. Location, access & connectivity
The registered location is Barkatpura, Hyderabad, Telangana, PIN 500027. The RERA fields describe the eastern boundary as “100 FEET ROAD PROPOSED”; the other three recorded boundaries are neighbours’ property RERA record RERA filing. The supplied evidence does not provide a verified approach-road description, public-transport route or measured distance to local landmarks for this registered location.
The available vendor listing describes the property as being in Narayanguda, but the Overview uses the registered Barkatpura location and does not adopt that listing’s location or connectivity claims Promoter website.
9. Developer & development status
The registered promoter is HARDHIK CONSTRUCTIONS PVT LTD, a private limited company. Its GSTIN is 36AAACH7882E1ZG RERA record Corporate record. The RERA-filed promoter address is FORTUNE CHAMBERS, PLOT NO 8 TO 11 SILICON VALLEY, BARKATPURA, BARKATPURA, Hyderabad, 500027 Parties record.
The TG-RERA record identifies K RAM REDDY as authorized signatory and director, and SHOBHA RANI KASIREDDY as director. The RERA filing also lists three landowners—K SURENDER REDDY, K RAVINDER REDDY and K NARENDER REDDY—under an AreaShare arrangement Parties record. The Form B affidavit is dated 03 November 2018 and records the promoter’s undertaking to complete by 30th August 2019.
The project is recorded as ongoing, with a proposed and revised completion date of 30/08/2019. The supplied documents do not establish current construction progress or an occupancy/completion certificate. The TG-RERA portal’s unit record shows all ten units booked, but has no as-of date RERA record RERA unit table Document index.
10. Approvals, official records & documents
| Identifier / date | P02500000047; issued 30/11/2018; valid to 30/08/2019 |
|---|---|
| Scope and evidence | FORM ‘C’ for KJR RESIDENCY; certificate states it was not extended |
| Identifier / date | Approval No. 1/C20/06872/2017; 25 July, 2017 |
|---|---|
| Scope and evidence | Building A, Stilt + 5; permit extraction also records file No. 1/C20/03640/2017 |
| Identifier / date | Plan reference 1/C20/06872/2017; drawing stamp dated 26-07-2017 |
|---|---|
| Scope and evidence | Drawing text layer; marked as needing review Approvals record |
| Identifier / date | 03 November 2018 |
|---|---|
| Scope and evidence | Promoter declaration covering title, encumbrance, project funds, approvals and completion undertaking |
| Identifier / date | Partially completed form |
|---|---|
| Scope and evidence | Proposed allottee, unit, dates and other transaction particulars are blank in the supplied extraction |
| Identifier / date | Partially completed template |
|---|---|
| Scope and evidence | Allottee particulars are blank in the supplied extraction |
| Identifier / date | Legal title report dated 15-11-2018; supporting records include Development Agreement-cum-GPA and older title instruments |
|---|---|
| Scope and evidence | Filed title material; full title-chain review belongs in the title section |
No occupancy or completion certificate is present in the supplied project-document set. The GHMC permit states that a completion notice and occupancy certificate are required after building completion and that an occupancy certificate is compulsory before occupation Document index.
1. Project at a glance
Project identity
Registered project name: KJR RESIDENCY
Project type: Residential apartment project
Phase / registered portion: Not separately identified in the supplied record; the sanction describes one building, Building A
TG-RERA registration: P02500000047
Registration validity: 30/11/2018 to 30/08/2019; certificate states it was not extended
Registered promoter: HARDHIK CONSTRUCTIONS PVT LTD
RERA status: Recorded as an ongoing project; the registration validity above is separate from its completion undertaking and occupancy-certificate status
Land and geographic identity
Locality: Barkatpura; GHMC permit locality is recorded as “BARKATPURA -20”
Revenue village: Barkatpura (also spelled Barkathpura in title-report material)
Mandal: Not disclosed
District: Hyderabad
PIN: 500027
Project survey number(s) / subdivision(s): Survey No. 0, as recorded in the TG-RERA project and land fields and registration certificate. The supplied GHMC building-permit extraction separately identifies survey/plan reference 200/49; it is not listed as a RERA project survey number
Plot / municipal identifiers: H.No. 3-4-526/1 & 3-4-526/1/A/1
Registered/site extent: Site area 687.39 sq. m; road-affected area 128.4 sq. m; net area 558.99 sq. m
Boundaries recorded in RERA fields: East: “100 FEET ROAD PROPOSED”; west, north and south: neighbours’ property
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Approval No. 1/C20/06872/2017, dated 25 July, 2017; file No. 1/C20/03640/2017
Approved built-up area: 1,470.90 sq. m recorded as upper-floors area in the permit extraction and as approved built-up area in the RERA fields
Building count / configuration: One building, identified in the permit as Building A; sanctioned configuration Stilt + 5
Sanctioned height: 14.95 m
Parking level / provision: The permit conditions state that cellar and stilt areas approved for parking are to be used exclusively for parking; the extracted parameters record “Cellar 0.00” and “Stilt 280.39”. A parking-space count is not supplied
Approved versus RERA-declared units: Permit condition: sanctioned unit count must not be increased without prior GHMC approval. A numerical sanctioned-unit count is not extracted in the supplied permit data. TG-RERA unit records show 10 apartments
Offering and status
RERA-filed configuration: 3BHK
RERA-filed saleable area: 105.91 sq. m per apartment
Booked / available: 10 booked; 0 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative
Construction stage: TG-RERA records the project as ongoing. No independently verified site-progress figure is supplied
Original / revised completion date: 30/08/2019 / 30/08/2019
Promoter’s completion undertaking: Form B declares completion on or before 30th August 2019
Occupancy / completion certificate: No occupancy or completion certificate is supplied in the reviewed project documents. The GHMC permit states that an occupancy certificate is compulsory before occupation
2. The project story
KJR RESIDENCY is registered with TG-RERA as a residential apartment project in Barkatpura, Hyderabad. The RERA filing identifies Survey No. 0 and plot/municipal numbers 3-4-526/1 & 3-4-526/1/A/1; the GHMC permit identifies Building A at plan reference 200/49. These identifiers are retained as recorded in their respective documents.
The GHMC permit describes one residential building, Stilt + 5, on a site recorded as 687.39 sq. m, with 128.4 sq. m road-affected and 558.99 sq. m net area. TG-RERA’s unit record describes ten 3BHK apartments, all shown as booked. The supplied evidence does not establish a current construction stage through independent site verification, nor does it include an occupancy or completion certificate. The promoter’s completion undertaking and the RERA completion date are both 30/08/2019; these dates do not establish completion or occupation certification.
3. Master plan, architecture & building design
The GHMC building permit records a single residential building, Building A, with a sanctioned Stilt + 5 configuration and height of 14.95 m. It records an upper-floors area of 1,470.90 sq. m, a stilt area of 280.39 sq. m, and “Cellar 0.00.” The supplied extraction does not provide a floor-by-floor plan description, flat count per floor, lift or stair details, building footprint, or a quantified open-space area.
The permit records setbacks of Front 2.5, Rear 10, Side I 2.5 and Side II 2.5; the extracted data does not state units for these figures. It also lists a tot-lot, 30 Trees, transformer space, a garbage house and a rainwater-harvesting structure (percolation pit).
Site-area figures in the permit are 687.39 sq. m total and 558.99 sq. m net, with 128.4 sq. m identified as road-affected. The permit records surrender of the road-affected portion to GHMC without compensation. No FSI-counted area or separate gross built-up-area figure is supplied. The 1,470.90 sq. m figure is reported as approved built-up area in the RERA fields and as upper-floors area in the permit extraction; it should not be treated as saleable or carpet area.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 105.91 sq. m | 102.9 sq. m (software-measured from drawing; needs review) | Not supplied |
TG-RERA records ten 3BHK apartments, each with a filed saleable area of 105.91 sq. m; the booking counts have no stated as-of date. A software measurement of the supplied second-floor plan drawing gives a carpet-area median of 102.9 sq. m (1,107 sq. ft.), based on one measured flat design. This is a drawing-based measurement, not a TG-RERA carpet-area disclosure, and the extraction says it needs review.
The drawing extraction identifies a living/dining room, kitchen, three bedrooms, three toilets, a balcony and a utility area. The measured balcony is 12.56 sq. m and utility is 4.24 sq. m; both are marked excluded from the software-measured carpet calculation. The drawing lists room dimensions in its extraction, but no independent site measurement is supplied. Carpet area, balcony/utility areas and RERA saleable area are distinct measures; the supplied records do not provide a loading figure.
5. Parking & vehicle circulation
The GHMC permit conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted to another use. The extracted permit parameters record Cellar 0.00 and Stilt 280.39; no sanctioned number of car or two-wheeler spaces, visitor or accessible parking count, or parking-allocation schedule is supplied.
The RERA fields record a mortgage area of 148.62 sq. m. The permit also records a mortgaged second-floor area of 151.05 in its extracted details; neither entry establishes an individual buyer’s parking allocation. No parking plan, ramp or driveway arrangement, EV charging provision, or registered unit-specific parking allocation is available in the supplied evidence.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | Listed in the GHMC permit; size field is blank in the extraction. Permit condition says it is to be fenced and maintained as greenery before issue of an occupancy certificate | Permit condition; completion not independently verified | |
| Trees | 30 Trees listed | Permit-listed; planting/completion not independently verified | |
| Rainwater harvesting | Structure identified as a percolation pit | Permit-listed; completion not independently verified | |
| Transformer space | Space to be provided on site, with resident safety noted in the permit | Permit condition; installation not independently verified | |
| Garbage house | Listed in the permit’s amenities/utilities | Permit-listed; completion not independently verified |
TG-RERA’s amenity record lists 14 infrastructure or common-facility categories, including internal roads and footpaths, water supply, sewerage, storm-water drains, a green strip/tot-lot/park, street lighting, community buildings, sewage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, an electrical meter room/sub-station/receiving station and recreational open space. Each category is recorded at 0% in the supplied amenity data; no independently verified completion status is provided.
7. Utilities, building services & safety
| Evidence in the supplied record | TG-RERA lists “Water Supply” as an amenity category |
|---|---|
| Status / limitation | No source, storage capacity or treatment details supplied; progress is recorded as 0% |
| Evidence in the supplied record | TG-RERA lists sewerage, sewage and sullage treatment/disposal, and storm-water drains |
|---|---|
| Status / limitation | No system design, treatment capacity, reuse details or verified completion supplied; progress is recorded as 0% |
| Evidence in the supplied record | Permit requires transformer space; TG-RERA lists an electrical meter room/sub-station/receiving station |
|---|---|
| Status / limitation | No supply, substation capacity or backup details supplied; installation not independently verified |
| Evidence in the supplied record | No lift count, capacity or service-lift details supplied |
|---|---|
| Status / limitation | Not established by the available plan extraction |
| Evidence in the supplied record | TG-RERA lists fire protection and fire-safety requirements |
|---|---|
| Status / limitation | The category is recorded at 0%; no fire-system specification or clearance is supplied |
| Evidence in the supplied record | Permit lists a garbage house; TG-RERA lists solid-waste management and disposal |
|---|---|
| Status / limitation | No waste-handling specification or verified completion supplied |
| Evidence in the supplied record | No accessibility features or pedestrian-circulation details supplied |
|---|---|
| Status / limitation | Not established by the available evidence |
The GHMC permit requires a transformer space, an ETP as per standard specification, and adherence to the sanctioned plan. These are permit requirements, not evidence that the facilities have been completed or commissioned.
8. Location, access & connectivity
The registered location is Barkatpura, Hyderabad, Telangana, PIN 500027. The RERA fields describe the eastern boundary as “100 FEET ROAD PROPOSED”; the other three recorded boundaries are neighbours’ property. The supplied evidence does not provide a verified approach-road description, public-transport route or measured distance to local landmarks for this registered location.
The available vendor listing describes the property as being in Narayanguda, but the Overview uses the registered Barkatpura location and does not adopt that listing’s location or connectivity claims.
9. Developer & development status
The registered promoter is HARDHIK CONSTRUCTIONS PVT LTD, a private limited company. Its GSTIN is 36AAACH7882E1ZG. The RERA-filed promoter address is FORTUNE CHAMBERS, PLOT NO 8 TO 11 SILICON VALLEY, BARKATPURA, BARKATPURA, Hyderabad, 500027.
The TG-RERA record identifies K RAM REDDY as authorized signatory and director, and SHOBHA RANI KASIREDDY as director. The RERA filing also lists three landowners—K SURENDER REDDY, K RAVINDER REDDY and K NARENDER REDDY—under an AreaShare arrangement. The Form B affidavit is dated 03 November 2018 and records the promoter’s undertaking to complete by 30th August 2019.
The project is recorded as ongoing, with a proposed and revised completion date of 30/08/2019. The supplied documents do not establish current construction progress or an occupancy/completion certificate. The TG-RERA portal’s unit record shows all ten units booked, but has no as-of date.
10. Approvals, official records & documents
| Identifier / date | P02500000047; issued 30/11/2018; valid to 30/08/2019 |
|---|---|
| Scope and evidence | FORM ‘C’ for KJR RESIDENCY; certificate states it was not extended |
| Identifier / date | Approval No. 1/C20/06872/2017; 25 July, 2017 |
|---|---|
| Scope and evidence | Building A, Stilt + 5; permit extraction also records file No. 1/C20/03640/2017 |
| Identifier / date | Plan reference 1/C20/06872/2017; drawing stamp dated 26-07-2017 |
|---|---|
| Scope and evidence | Drawing text layer; marked as needing review |
| Identifier / date | 03 November 2018 |
|---|---|
| Scope and evidence | Promoter declaration covering title, encumbrance, project funds, approvals and completion undertaking |
| Identifier / date | Partially completed form |
|---|---|
| Scope and evidence | Proposed allottee, unit, dates and other transaction particulars are blank in the supplied extraction |
| Identifier / date | Partially completed template |
|---|---|
| Scope and evidence | Allottee particulars are blank in the supplied extraction |
| Identifier / date | Legal title report dated 15-11-2018; supporting records include Development Agreement-cum-GPA and older title instruments |
|---|---|
| Scope and evidence | Filed title material; full title-chain review belongs in the title section |
No occupancy or completion certificate is present in the supplied project-document set. The GHMC permit states that a completion notice and occupancy certificate are required after building completion and that an occupancy certificate is compulsory before occupation.
Frequently asked questions
Is KJR RESIDENCY registered with Telangana RERA?
Yes. KJR RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02500000047; the registration status is On-Going Project.
Who is the developer of KJR RESIDENCY?
The promoter named in the RERA registration is HARDHIK CONSTRUCTIONS PVT LTD.
Where is KJR RESIDENCY located?
KJR RESIDENCY is in BARKATPURA, Hyderabad, Telangana (500027).
When will KJR RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 30/08/2019. This is the promoter's declaration, not a guarantee.