Udaya Crystal
Udaya Heights Pvt. Ltd · Hyderabad · RERA P02500001207
UDAYA CRYSTAL is a residential apartment project in Jawahar Nagar, Hyderabad district; the mandal is not disclosed in the supplied project record. The registered promoter is Udaya Heights Pvt. Ltd. The project occupies 939.06 sq. m and has one building, Building A, with a Cellar + Stilt + 5 configuration and 15 3BHK apartments, each with a RERA-filed saleable area of 114.0 m². It is registered under TG-RERA number P02500001207, with a proposed completion date of 22/08/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | UDAYA CRYSTAL RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separately named phase is disclosed. The registration and building-permit record cover the project at Jawahar Nagar, including Building A. RERA record |
| TG-RERA registration | P02500001207 RERA record |
| Registration validity | 24/09/2019 through 22/08/2024; certificate states four years and says it may be extended by the Authority under the Act and Rules. |
| Registered promoter | Udaya Heights Pvt. Ltd RERA record |
| RERA status recorded | On-Going Project RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Jawahar Nagar RERA record RERA filing |
| Mandal | Not disclosed in the supplied project record. Land records |
| District | Hyderabad RERA record RERA filing |
| PIN | 500087 RERA record |
| Survey number(s) | 0 is the survey number recorded in the RERA identity fields. RERA filing Land records |
| Plot / house particulars | 1-1-549/1 (PORTION), 1-1-564/2, 1-1-564/2/1, 1-1-564/2/1/A & 1-1-564/2/1/B RERA filing |
| Registered site extent | 939.06 sq. m RERA filing |
| Total / net land area | Total: 939.06 sq. m; net: 939.06 sq. m; recorded road-widening/FTL/nala-affected area: 0 sq. m. RERA filing |
| Boundaries | North: Road; south, east and west: Existing Building. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit approval | 1/C15/13678/2018, approved 22 August, 2018 Approvals record |
| GHMC file number | 1/C9/06951/2018 |
| Approved built-up area | 1,856.90 m² residential upper floors; separately, the permit lists cellar 527.60 m² and stilt 398.52 m². RERA filing |
| Building / tower count | One building is identified in the RERA record; the permit names Building - A (UDAYA HEIGHTS PVT). RERA filing |
| Sanctioned floor configuration | Cellar + Stilt + 5; stated building height 14.99 m. |
| Parking levels | Cellar and stilt are approved for parking in the plan; the permit says they are to be used exclusively for vehicle parking. A space count is not supplied. |
| Unit counts | RERA fields record 1 total building unit and 1 proposed building unit; the RERA unit schedule separately records 15 3BHK apartments. The supplied material does not explain the “building units” field. RERA filing RERA unit table RERA unit details |
Offering and status
| Field | Project record |
|---|---|
| Unit type | 3BHK apartments RERA unit table RERA unit details |
| RERA-filed saleable area | 114.0 m² per unit; the filing lists 15 units. RERA unit table RERA unit details |
| Booked / available | 0 booked / 15 available, as read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table RERA unit details |
| Construction stage | RERA status is “On-Going Project”; the supplied record reports 90% completeness. This is a record value, not an independently verified site inspection. RERA filing RERA record |
| Completion dates | Original and revised proposed completion date: 22/08/2024. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied evidence; the reviewed permit requires an occupancy certificate before occupation. Document index |
Registration validity, the completion deadline and occupancy certification are distinct matters. The certificate records registration validity through 22/08/2024; the project record gives the same date as the proposed completion deadline; no extension order or occupancy certificate is supplied. RERA record Document index
2. The project story
UDAYA CRYSTAL is recorded with TG-RERA as a residential apartment project in Jawahar Nagar, Hyderabad, on a site of 939.06 m². Its GHMC building-permit record identifies one residential building, Building A, with a cellar, stilt and five upper floors. RERA record RERA filing
The RERA unit schedule records 15 3BHK apartments, with 114.0 m² saleable area per unit. The portal-derived booking figures show 0 booked and 15 available, but no as-of date is attached. The project record reports 90% completeness and “On-Going Project”; neither figure is an independent site verification. The proposed completion date is 22/08/2024, and no occupancy certificate is supplied. RERA unit table RERA unit details RERA record RERA filing Document index
The building permit includes a 47.2 m² tot-lot and refers to rainwater harvesting, greenery, a garbage house and transformer space. These are permit-record provisions or conditions; the supplied material does not establish that they are complete or operational.
3. Master plan, architecture & building design
The project site is recorded as 939.06 m², with 939.06 m² net area. The GHMC permit describes one residential building, Building A, and lists 1,856.90 m² of residential upper-floor area; it separately lists a 527.60 m² cellar and 398.52 m² stilt. These are the permit’s stated areas and are not interchangeable with apartment saleable or carpet area. RERA filing
The sanctioned configuration is Cellar + Stilt + 5, with a stated height of 14.99 m. The permit also lists a 47.2 m² tot-lot, 12 rainwater-harvesting pits and 45 trees. It requires a strip of peripheral greenery to be maintained.
The building-plan drawing is identified in the RERA record as document 14848, but the supplied record does not provide an extracted site layout or enough drawing detail to confirm the building footprint, flats per floor, lift and stair arrangements, entries, circulation, or open-space distribution beyond the permit particulars above. Document index Approvals record
4. Homes, configurations & floor plans
The RERA schedule records 15 3BHK apartments, each with a filed saleable area of 114.0 m². The portal-derived schedule shows 0 booked and 15 available, with no as-of date; treat the booking figures as indicative. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 0 | 15 | 114.0 m² | 81.8–101.5 m²; median 88.3 m² (software-measured from drawings; needs review) | 23% |
The carpet-area range and median were software-measured from the approved floor-plan drawing geometry in document 14848, across six measured flat designs. They are not RERA-filed figures and should be checked against the drawing. The drawing-derived schedule also gives a median of 951 sq. ft.; the measured range is 881–1,092 sq. ft. RERA unit details Floor plans
Carpet area describes the measured apartment interior; the RERA-filed saleable area is a separate figure that includes the home’s share of common areas. The drawing record identifies living/dining, bedrooms, kitchen, toilets and a utility in one first-floor flat plan; the utility is excluded from the stated carpet measurement. RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit lists a cellar and stilt approved for parking and states that these areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide the number of parking spaces, visitor or accessible-space allocations, or a unit-wise allotment schedule. No separate evidence establishes exclusive ownership of any drawn parking bay.
The permit refers to a service road “wherever required” and specifies that a front compound wall is not allowed along a site abutting an 18 mt. road. The supplied record does not establish ramp design, entry/exit arrangements, internal driveways, pedestrian separation or EV charging.
6. Amenities, recreation & open spaces
The permit and RERA amenity record identify the following provisions. The amenity schedule reports 0% progress for its listed items; those figures do not establish delivery or independent verification. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green space | 47.2 m² tot-lot; permit also requires it to be fenced and maintained as greenery before occupancy certification. | Permit provision/condition; completion not verified. | |
| Rainwater harvesting | 12 rainwater-harvesting pits listed in the permit. | Permit-listed; completion not verified. | |
| Trees / greenery | 45 trees listed; peripheral greenery is also required by the permit. | Permit-listed/condition; completion not verified. | |
| Community buildings | Listed in the RERA amenity schedule; no size or facility detail supplied. | RERA amenities | Schedule shows 0%; completion not verified. |
| Internal roads and footpaths | Listed in the RERA amenity schedule; no dimensions supplied. | RERA amenities | Schedule shows 0%; completion not verified. |
The supplied project-specific evidence does not establish a clubhouse or indoor recreation facility. Third-party amenity listings are not used here as evidence of sanctioned or delivered facilities.
7. Utilities, building services & safety
The GHMC permit requires construction of a rainwater-harvesting structure, space for a transformer, a garbage house within the premises, and an ETP to standard specification. The RERA amenity schedule marks water supply, sewerage (including chamber, lines, septic tank and STP), rainwater harvesting, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station as available; it does not give capacities or confirm operational status. RERA amenities
The permit requires sanitation, plumbing, fire-safety requirements and electrical installations to be executed under qualified technical supervision. It also states that an occupancy certificate is compulsory before occupation and assigns structural- and fire-safety responsibility to the owner, builder/developer, architect and structural engineer. These are permit conditions, not independent confirmation of compliance.
The supplied evidence does not specify water source or storage capacity, STP/ETP capacity or reuse arrangements, storm-water design, electrical backup, lift count or capacity, fire-system equipment details, CCTV, waste-segregation arrangements or accessibility provisions. RERA amenities Document index
8. Location, access & connectivity
The project is recorded in Jawahar Nagar revenue village, Hyderabad district, PIN 500087. The RERA land record gives the site’s north boundary as a road and its south, east and west boundaries as existing buildings. The building permit refers to an 18 mt. road and states that a front compound wall is not allowed along a site abutting a road of that width. RERA record RERA filing RERA filing
The supplied evidence does not provide a verified project-specific public-transport route, measured distance to landmarks, or travel times. A promoter/vendor location description and connectivity claims are not treated as established project-location measurements in this overview. Location record Promoter website
9. Developer & development status
The registered legal promoter is Udaya Heights Pvt. Ltd, a company. The RERA record gives the promoter address as Udaya's Suryodaya Apts., Street No. 9, jawaharnagar, jawahar nagar, Hyderabad, 500087. The supplied evidence identifies Mummalaneni Padmasree Veena as a director and Mummalaneni Raja Sekhar as authorized signatory. Corporate record Parties record RERA filing
The promoter’s Form B declaration, dated 26thday of November 2018, declares legal title, states that the land is free from encumbrances and undertakes completion by 22nd August,2024. These are promoter declarations in the registration file.
The project record reports 90% completeness and “On-Going Project”; the supplied material contains no independent inspection confirming construction progress. The filed original and revised proposed completion dates are both 22/08/2024. No extension order or occupancy certificate is supplied. RERA record RERA filing Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration certificate | Form C for UDAYA CRYSTAL, registration P02500001207, valid 24/09/2019–22/08/2024. |
| GHMC building permit | Building Permit Order 1/C15/13678/2018, approved 22 August, 2018; file number 1/C9/06951/2018. |
| Building-plan drawing | RERA filing identifies document 14848 as the layout-plan/building-plan document; the supplied extraction does not provide a complete drawing review. Document index Approvals record |
| Form B declaration | Promoter declaration by Mummalaneni Rajasekhar, dated 26thday of November 2018. |
| Occupancy / completion certificate | Not included in the supplied evidence. The permit states that an occupancy certificate is compulsory before occupation. Document index |
The permit lists the related numbers Contractor’s all Risk Policy No. 433702/44/2019/564, Notarised Affidavit No. 3017/18 and BK-1, CS No. 3038/2018. The supplied records do not include a separate extracted approved-layout certificate, occupancy certificate or completion certificate.
1. Project at a glance
Project identity
Registered name: UDAYA CRYSTAL
Project type: Residential apartment project
Phase / registered portion: No separately named phase is disclosed. The registration and building-permit record cover the project at Jawahar Nagar, including Building A.
TG-RERA registration: P02500001207
Registration validity: 24/09/2019 through 22/08/2024; certificate states four years and says it may be extended by the Authority under the Act and Rules.
Registered promoter: Udaya Heights Pvt. Ltd
RERA status recorded: On-Going Project
Land and geographic identity
Locality / revenue village: Jawahar Nagar
Mandal: Not disclosed in the supplied project record.
District: Hyderabad
PIN: 500087
Survey number(s): 0 is the survey number recorded in the RERA identity fields.
Plot / house particulars: 1-1-549/1 (PORTION), 1-1-564/2, 1-1-564/2/1, 1-1-564/2/1/A & 1-1-564/2/1/B
Registered site extent: 939.06 sq. m
Total / net land area: Total: 939.06 sq. m; net: 939.06 sq. m; recorded road-widening/FTL/nala-affected area: 0 sq. m.
Boundaries: North: Road; south, east and west: Existing Building.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit approval: 1/C15/13678/2018, approved 22 August, 2018
GHMC file number: 1/C9/06951/2018
Approved built-up area: 1,856.90 m² residential upper floors; separately, the permit lists cellar 527.60 m² and stilt 398.52 m².
Building / tower count: One building is identified in the RERA record; the permit names Building - A (UDAYA HEIGHTS PVT).
Sanctioned floor configuration: Cellar + Stilt + 5; stated building height 14.99 m.
Parking levels: Cellar and stilt are approved for parking in the plan; the permit says they are to be used exclusively for vehicle parking. A space count is not supplied.
Unit counts: RERA fields record 1 total building unit and 1 proposed building unit; the RERA unit schedule separately records 15 3BHK apartments. The supplied material does not explain the “building units” field.
Offering and status
Unit type: 3BHK apartments
RERA-filed saleable area: 114.0 m² per unit; the filing lists 15 units.
Booked / available: 0 booked / 15 available, as read from the TG-RERA portal; the record has no as-of date, so counts are indicative.
Construction stage: RERA status is “On-Going Project”; the supplied record reports 90% completeness. This is a record value, not an independently verified site inspection.
Completion dates: Original and revised proposed completion date: 22/08/2024.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied evidence; the reviewed permit requires an occupancy certificate before occupation.
Registration validity, the completion deadline and occupancy certification are distinct matters. The certificate records registration validity through 22/08/2024; the project record gives the same date as the proposed completion deadline; no extension order or occupancy certificate is supplied.
2. The project story
UDAYA CRYSTAL is recorded with TG-RERA as a residential apartment project in Jawahar Nagar, Hyderabad, on a site of 939.06 m². Its GHMC building-permit record identifies one residential building, Building A, with a cellar, stilt and five upper floors.
The RERA unit schedule records 15 3BHK apartments, with 114.0 m² saleable area per unit. The portal-derived booking figures show 0 booked and 15 available, but no as-of date is attached. The project record reports 90% completeness and “On-Going Project”; neither figure is an independent site verification. The proposed completion date is 22/08/2024, and no occupancy certificate is supplied.
The building permit includes a 47.2 m² tot-lot and refers to rainwater harvesting, greenery, a garbage house and transformer space. These are permit-record provisions or conditions; the supplied material does not establish that they are complete or operational.
3. Master plan, architecture & building design
The project site is recorded as 939.06 m², with 939.06 m² net area. The GHMC permit describes one residential building, Building A, and lists 1,856.90 m² of residential upper-floor area; it separately lists a 527.60 m² cellar and 398.52 m² stilt. These are the permit’s stated areas and are not interchangeable with apartment saleable or carpet area.
The sanctioned configuration is Cellar + Stilt + 5, with a stated height of 14.99 m. The permit also lists a 47.2 m² tot-lot, 12 rainwater-harvesting pits and 45 trees. It requires a strip of peripheral greenery to be maintained.
The building-plan drawing is identified in the RERA record as document 14848, but the supplied record does not provide an extracted site layout or enough drawing detail to confirm the building footprint, flats per floor, lift and stair arrangements, entries, circulation, or open-space distribution beyond the permit particulars above.
4. Homes, configurations & floor plans
The RERA schedule records 15 3BHK apartments, each with a filed saleable area of 114.0 m². The portal-derived schedule shows 0 booked and 15 available, with no as-of date; treat the booking figures as indicative.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 0 | 15 | 114.0 m² | 81.8–101.5 m²; median 88.3 m² (software-measured from drawings; needs review) | 23% |
The carpet-area range and median were software-measured from the approved floor-plan drawing geometry in document 14848, across six measured flat designs. They are not RERA-filed figures and should be checked against the drawing. The drawing-derived schedule also gives a median of 951 sq. ft.; the measured range is 881–1,092 sq. ft.
Carpet area describes the measured apartment interior; the RERA-filed saleable area is a separate figure that includes the home’s share of common areas. The drawing record identifies living/dining, bedrooms, kitchen, toilets and a utility in one first-floor flat plan; the utility is excluded from the stated carpet measurement.
5. Parking & vehicle circulation
The GHMC permit lists a cellar and stilt approved for parking and states that these areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide the number of parking spaces, visitor or accessible-space allocations, or a unit-wise allotment schedule. No separate evidence establishes exclusive ownership of any drawn parking bay.
The permit refers to a service road “wherever required” and specifies that a front compound wall is not allowed along a site abutting an 18 mt. road. The supplied record does not establish ramp design, entry/exit arrangements, internal driveways, pedestrian separation or EV charging.
6. Amenities, recreation & open spaces
The permit and RERA amenity record identify the following provisions. The amenity schedule reports 0% progress for its listed items; those figures do not establish delivery or independent verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green space | 47.2 m² tot-lot; permit also requires it to be fenced and maintained as greenery before occupancy certification. | Permit provision/condition; completion not verified. | |
| Rainwater harvesting | 12 rainwater-harvesting pits listed in the permit. | Permit-listed; completion not verified. | |
| Trees / greenery | 45 trees listed; peripheral greenery is also required by the permit. | Permit-listed/condition; completion not verified. | |
| Community buildings | Listed in the RERA amenity schedule; no size or facility detail supplied. | Schedule shows 0%; completion not verified. | |
| Internal roads and footpaths | Listed in the RERA amenity schedule; no dimensions supplied. | Schedule shows 0%; completion not verified. |
The supplied project-specific evidence does not establish a clubhouse or indoor recreation facility. Third-party amenity listings are not used here as evidence of sanctioned or delivered facilities.
7. Utilities, building services & safety
The GHMC permit requires construction of a rainwater-harvesting structure, space for a transformer, a garbage house within the premises, and an ETP to standard specification. The RERA amenity schedule marks water supply, sewerage (including chamber, lines, septic tank and STP), rainwater harvesting, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station as available; it does not give capacities or confirm operational status.
The permit requires sanitation, plumbing, fire-safety requirements and electrical installations to be executed under qualified technical supervision. It also states that an occupancy certificate is compulsory before occupation and assigns structural- and fire-safety responsibility to the owner, builder/developer, architect and structural engineer. These are permit conditions, not independent confirmation of compliance.
The supplied evidence does not specify water source or storage capacity, STP/ETP capacity or reuse arrangements, storm-water design, electrical backup, lift count or capacity, fire-system equipment details, CCTV, waste-segregation arrangements or accessibility provisions.
8. Location, access & connectivity
The project is recorded in Jawahar Nagar revenue village, Hyderabad district, PIN 500087. The RERA land record gives the site’s north boundary as a road and its south, east and west boundaries as existing buildings. The building permit refers to an 18 mt. road and states that a front compound wall is not allowed along a site abutting a road of that width.
The supplied evidence does not provide a verified project-specific public-transport route, measured distance to landmarks, or travel times. A promoter/vendor location description and connectivity claims are not treated as established project-location measurements in this overview.
9. Developer & development status
The registered legal promoter is Udaya Heights Pvt. Ltd, a company. The RERA record gives the promoter address as Udaya's Suryodaya Apts., Street No. 9, jawaharnagar, jawahar nagar, Hyderabad, 500087. The supplied evidence identifies Mummalaneni Padmasree Veena as a director and Mummalaneni Raja Sekhar as authorized signatory.
The promoter’s Form B declaration, dated 26thday of November 2018, declares legal title, states that the land is free from encumbrances and undertakes completion by 22nd August,2024. These are promoter declarations in the registration file.
The project record reports 90% completeness and “On-Going Project”; the supplied material contains no independent inspection confirming construction progress. The filed original and revised proposed completion dates are both 22/08/2024. No extension order or occupancy certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for UDAYA CRYSTAL, registration P02500001207, valid 24/09/2019–22/08/2024.
GHMC building permit: Building Permit Order 1/C15/13678/2018, approved 22 August, 2018; file number 1/C9/06951/2018.
Building-plan drawing: RERA filing identifies document 14848 as the layout-plan/building-plan document; the supplied extraction does not provide a complete drawing review.
Form B declaration: Promoter declaration by Mummalaneni Rajasekhar, dated 26thday of November 2018.
Occupancy / completion certificate: Not included in the supplied evidence. The permit states that an occupancy certificate is compulsory before occupation.
The permit lists the related numbers Contractor’s all Risk Policy No. 433702/44/2019/564, Notarised Affidavit No. 3017/18 and BK-1, CS No. 3038/2018. The supplied records do not include a separate extracted approved-layout certificate, occupancy certificate or completion certificate.
Frequently asked questions
Is UDAYA CRYSTAL registered with Telangana RERA?
Yes. UDAYA CRYSTAL is registered with the Telangana Real Estate Regulatory Authority as P02500001207; the registration status is On-Going Project.
Who is the developer of UDAYA CRYSTAL?
The promoter named in the RERA registration is Udaya Heights Pvt. Ltd.
Where is UDAYA CRYSTAL located?
UDAYA CRYSTAL is in jawahar nagar, Hyderabad, Telangana (500087).
When will UDAYA CRYSTAL be completed?
The promoter's proposed date of completion filed with RERA is 22/08/2024. This is the promoter's declaration, not a guarantee.
More projects in Hyderabad