Moghal Magnus
MOHAMMED AMER AZIZ KHAN · Hyderabad · RERA P02500003325
MOGHAL MAGNUS is a residential apartment project in MALLEPALLY, Asif Nagar mandal, Hyderabad district. It is being developed by the registered promoter MOHAMMED AMER AZIZ KHAN. The project has a total site area of 2289.66 sq.m and one building with 1 Cellar + Stilt + 5 upper floors, comprising 15 apartments: 11 4BHK units of 158.53 sq.m each and 4 5BHK units of 166.42 sq.m each. It is registered with TG-RERA under P02500003325, and the promoter’s Form B gives 03/03/2023 as the completion target.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | MOGHAL MAGNUS RERA record |
| Project type | Residential apartment project; the TG-RERA record describes it as a new project. RERA record RERA filing |
| Phase / registered portion | Phase not disclosed. The registration is for MOGHAL MAGNUS; the certificate identifies the site as H.NO. 10-2-289/3 & 10-2-289/4. |
| TG-RERA registration | P02500003325, granted 25/08/2021; certificate validity ended 03/03/2023. The record says it was not extended. RERA record Approvals record |
| Registered promoter | MOHAMMED AMER AZIZ KHAN, recorded as a proprietorship. RERA record RERA filing |
| RERA status in supplied record | Registration validity has ended; the supplied record gives no extension. This is distinct from the building permit’s stated completion date and from occupancy-certificate status. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | MALLEPALLY; the RERA certificate also describes the locality as SHANTI NAGAR. RERA record RERA filing |
| Revenue village | Mallepally. The RERA land record gives this village; the building-permit extraction also names Mallepally. Land records |
| Mandal | Asif Nagar on the building-permit extraction; mandal is not disclosed in the RERA land identity fields. Land records |
| District / PIN | Hyderabad; 500001 in the RERA certificate. RERA record |
| Survey number / subdivision | RERA records SHANTI NAGAR as the survey identifier; the registered plot/house identifiers are H.NO. 10-2-289/3 & 10-2-289/4. The building permit identifies the premises as Mallepally; the title materials refer to TS No. 10, RS No. 10, Block-D, Ward-38, and Plot No. 3 / municipal No. 10-2-289/3. Land records |
| Registered site extent | 2289.66 sq.m total site area; RERA land details report 2279.73 sq.m net area and 9.93 sq.m affected area. The building-permit extraction reports net area as 2279.74 m2. RERA filing |
| Boundaries (RERA filing) | East: OTHER LAND; West: ROAD WIDTH; North: OTHER LAND; South: OTHER LAND. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal approval | Building Permit Order 1/C12/03178/2020, dated 03 March, 2020; file number 1/C12/20714/2019. Approvals record |
| Approved built-up area | 4162.94 sq.m in the RERA project fields. The permit extraction separately lists 2,757.50 m2 residential upper-floor area, 653.50 m2 cellar area and 452.22 m2 stilt area; these are the components stated in that extraction, not a replacement for the RERA-filed approved built-up area. RERA filing |
| Building arrangement | One building; permit configuration: 1 Cellar + Stilt + 5 upper floors. RERA filing |
| Height / permitted parking levels | Permit extraction states 14.79 m height and says cellar and stilt are approved for vehicle parking. |
| Unit count | 15 units in the RERA unit record: 11 4BHK and 4 5BHK. RERA unit table RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations and saleable areas | 4BHK: 11 units, 158.53 sq.m each. 5BHK: 4 units, 166.42 sq.m each. RERA unit table RERA unit table |
| Booked / available | Portal-derived counts show 0 booked / 11 available for 4BHK and 0 booked / 4 available for 5BHK. The portal record has no as-of date; treat these counts as indicative. RERA unit table RERA unit table |
| Construction stage | No independently verified site-progress measurement is supplied. The GHMC permit extraction says completion was not certified in the reviewed record. |
| Completion dates | Promoter’s Form B undertakes completion by 03/03/2023. The GHMC permit extraction states construction was to be completed before 03 March, 2026. |
| Occupancy / completion certificate | No completion certificate is recorded in the supplied permit extraction; it says the building was not completion-certified. An occupancy certificate is therefore not evidenced in the reviewed documents. |
2. The project story
MOGHAL MAGNUS is a single-building residential apartment project registered with TG-RERA at the Mallepally site identified by the RERA certificate as H.NO. 10-2-289/3 & 10-2-289/4. The RERA land record names Mallepally village and records SHANTI NAGAR as the survey identifier. RERA record Land records
The GHMC permit describes a residential building, Building A-1, with a cellar, stilt and five upper floors. The RERA unit inventory is 15 homes: eleven 4BHK and four 5BHK apartments. The supplied records do not establish present on-site construction progress or occupancy-certified portions; the permit extraction records no completion certification. RERA unit table
The promoter’s Form B undertaking gives 03/03/2023 as the project completion target. The permit extraction separately gives 03 March, 2026 as the permitted construction completion date. These are stated dates from different project records; neither by itself establishes completed construction or an occupancy certificate.
3. Master plan, architecture & building design
The GHMC permit extraction describes one residential building, Building A-1, on a 2289.66 m2 site, with 1 Cellar + Stilt + 5 upper floors and a stated height of 14.79 m. It reports 2,757.50 m2 for residential upper floors, 653.50 m2 for the cellar and 452.22 m2 for the stilt. Separately, the RERA filing records approved built-up area of 4162.94 sq.m. These figures are reported under their respective source labels and are not treated as interchangeable area measures. RERA filing
The permit extraction lists a 113.99 m2 tot-lot and states that the tot-lot is to be fenced and maintained as greenery. It also requires peripheral greenery and tree planting. The supplied material does not provide a verified building footprint, flats-per-floor schedule, lift or stair count, apartment entrance/circulation detail, or a complete measured open-space schedule.
The approved-plan document is identified as 173767. Its floor-plan geometry was software-measured for some apartment configurations; those measurements are drawing-based estimates, not RERA-filed carpet-area disclosures. Approvals record Floor plans RERA unit details
4. Homes, configurations & floor plans
The RERA filing lists 15 apartments: eleven 4BHK units and four 5BHK units. The filed saleable areas are 158.53 sq.m for 4BHK and 166.42 sq.m for 5BHK. Booking and availability counts have no supplied portal as-of date and should be treated as indicative. RERA unit table RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 11 | 0 | 11 | 158.53 sq.m | 152.8 sq.m software-measured from one drawing design; measurement needs review. Floor plans RERA unit details | Not supplied |
| 5BHK | 4 | 0 | 4 | 166.42 sq.m | Not supplied | Not supplied |
The 4BHK drawing measurement is from the “TYPICAL - 1, 3, 4& 5 FLOOR PLAN (SCALE=1:100),” flat 01, in document 173767. It is a software measurement of drawing geometry, not a RERA-filed carpet-area figure, and the measurement record says it needs review. RERA unit details Floor plans
The RERA saleable area and software-measured carpet area are different area concepts: the supplied drawing note says saleable area includes the home’s share of common areas and is larger than the measured carpet area. The supplied materials do not give a RERA-filed carpet area for the 5BHK configuration or a loading figure. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit extraction says the cellar and stilt are approved for parking and must be used exclusively for vehicle parking, without partition walls or rolling shutters and without conversion to another use. The supplied records do not state the number of sanctioned car or two-wheeler spaces, visitor or accessible-space provision, a parking allocation by apartment, or a verified spaces-per-home figure.
The permit also refers to an 18 mt. road width and requires a service road wherever required, but the supplied material does not describe the site’s internal driveway layout, parking ramp arrangement, pedestrian separation or EV charging. A drawn or permitted parking area does not, on this evidence alone, establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
| Description / size | 113.99 m2 tot-lot; permit requires fencing and maintenance as greenery. |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Required by permit; completion not established. |
| Description / size | Peripheral greenery and tree planting are required; permit extraction lists 110 Trees. |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Permit-stated requirement; planting and maintenance not independently verified. |
| Description / size | Permit specifies rainwater-harvesting structures (percolation pits) and lists 4 RWHPs. |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Permit-stated provision; installation and operation not verified. |
| Description / size | Space for a transformer is required within the site. |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Permit-stated provision; installation not verified. |
| Description / size | Permit requires a garbage house within the premises. |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Permit-stated provision; delivery not verified. |
| Description / size | RERA amenity schedule marks these as available “YES”; all listed progress percentages are 0. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | Promoter/RERA filing disclosure; the supplied record does not verify completion. |
| Description / size | Internal roads and footpaths; street lighting; community buildings; treatment and disposal of sewage and sullage water; solid-waste management and disposal; energy management; fire-protection and fire-safety requirements; aggregate recreational open space. The schedule gives no positive availability entry for these items and records 0 progress. |
|---|---|
| Evidence source | RERA amenity schedule RERA amenities |
| Declared progress / verified status | RERA schedule entries only; completion is not established. |
The supplied evidence does not establish a clubhouse, swimming pool, gym or children’s play area as sanctioned or delivered project facilities. No independent completion verification for the listed amenities is provided. RERA amenities
7. Utilities, building services & safety
The RERA amenity schedule marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES”; each has a recorded progress percentage of 0. The permit separately requires rainwater-harvesting structures, transformer space and a garbage house. These are filed or permit-stated provisions, not evidence of completed or operating services. RERA amenities
The permit requires sanitation, plumbing, fire-safety systems, lifts and electrical installations to be carried out under qualified technical supervision. It also states that an occupancy fire NOC is required before issue of an occupancy certificate, and places responsibility for structural safety and means-of-escape safety on the owner, builder/developer, architect and site engineer. The supplied evidence does not establish that the systems have been installed, inspected or cleared.
The supplied records do not specify water-source or storage capacity, STP capacity or reuse arrangements, electrical backup capacity, lift count or capacity, firefighting equipment details, CCTV/access-control systems, or accessible circulation provisions. The permit’s general requirements do not establish the project’s completed compliance status. RERA amenities
8. Location, access & connectivity
The registered project location is MALLEPALLY, revenue village Mallepally, Hyderabad district, PIN 500001. The registration certificate identifies locality SHANTI NAGAR and the site as H.NO. 10-2-289/3 & 10-2-289/4. RERA record Land records
The GHMC permit extraction identifies the site’s road width as 18 mt. and requires a service road wherever required. The supplied location record gives a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) — 1.2 km as a connectivity anchor. Location record
The reviewed evidence does not provide further measured distances, public-transport routes or travel times. Location record
9. Developer & development status
The TG-RERA registered promoter is MOHAMMED AMER AZIZ KHAN, recorded in the project fields as a Proprietorship. The RERA filing lists him as authorized signatory and gives the promoter address as B, BANU NAGAR, MALLEPALLY, MALLEPALLY, Hyderabad, 500001. A masked identifier is recorded as xxxxxx366R; the supplied record does not identify a corporate registration number. RERA filing Parties record Corporate record
The promoter’s Form B is a self-declaration that states legal title and supporting title authentication/development agreement were enclosed, declares the land free from encumbrances, and undertakes completion by 03/03/2023. These statements are the promoter’s declaration, not independent verification.
The building permit names MAPHAR CONSTRUCTIONS as developer/builder and names SYED MANZOOR MUSTAFA and MOHD MUTAHAR ALI KHAN as applicants. The supplied record does not identify an official promoter website or contact details.
10. Approvals, official records & documents
| Identifier / date | P02500003325, issued 25/08/2021; valid to 03/03/2023 |
|---|---|
| What the supplied record establishes | FORM ‘C’ registration certificate for MOGHAL MAGNUS, with stated registration conditions including a separate-account requirement. |
| Identifier / date | Permit 1/C12/03178/2020, dated 03 March, 2020; file 1/C12/20714/2019 |
|---|---|
| What the supplied record establishes | Conditional permit extraction for Building A-1: cellar, stilt and five upper floors; includes permit conditions and states that completion was not certified in the reviewed record. |
| Identifier / date | Document 173767, page 1 drawing stamp dated 03-03-2020 |
|---|---|
| What the supplied record establishes | Drawing record used for software measurement of some apartment layouts; the supplied extraction states that drawing-based measurements need review. |
| Identifier / date | Document 173764, page 1 |
|---|---|
| What the supplied record establishes | Promoter affidavit-cum-declaration, including the 03/03/2023 completion undertaking. |
| Identifier / date | Documents 173762, 173763, 173774 |
|---|---|
| What the supplied record establishes | GPA, advocate’s title search report and title-report copy; detailed title-chain review belongs in the Land & Title section. |
| Identifier / date | Document 173834 |
|---|---|
| What the supplied record establishes | Statement for the stated search period 01-01-1983 to 04-07-2021; the supplied extraction identifies one conveyance entry. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No occupancy certificate or completion certificate is evidenced in the documents reviewed for this overview. |
1. Project at a glance
Project identity
Registered project name: MOGHAL MAGNUS
Project type: Residential apartment project; the TG-RERA record describes it as a new project.
Phase / registered portion: Phase not disclosed. The registration is for MOGHAL MAGNUS; the certificate identifies the site as H.NO. 10-2-289/3 & 10-2-289/4.
TG-RERA registration: P02500003325, granted 25/08/2021; certificate validity ended 03/03/2023. The record says it was not extended.
Registered promoter: MOHAMMED AMER AZIZ KHAN, recorded as a proprietorship.
RERA status in supplied record: Registration validity has ended; the supplied record gives no extension. This is distinct from the building permit’s stated completion date and from occupancy-certificate status.
Land and geographic identity
Locality: MALLEPALLY; the RERA certificate also describes the locality as SHANTI NAGAR.
Revenue village: Mallepally. The RERA land record gives this village; the building-permit extraction also names Mallepally.
Mandal: Asif Nagar on the building-permit extraction; mandal is not disclosed in the RERA land identity fields.
District / PIN: Hyderabad; 500001 in the RERA certificate.
Survey number / subdivision: RERA records SHANTI NAGAR as the survey identifier; the registered plot/house identifiers are H.NO. 10-2-289/3 & 10-2-289/4. The building permit identifies the premises as Mallepally; the title materials refer to TS No. 10, RS No. 10, Block-D, Ward-38, and Plot No. 3 / municipal No. 10-2-289/3.
Registered site extent: 2289.66 sq.m total site area; RERA land details report 2279.73 sq.m net area and 9.93 sq.m affected area. The building-permit extraction reports net area as 2279.74 m2.
Boundaries (RERA filing): East: OTHER LAND; West: ROAD WIDTH; North: OTHER LAND; South: OTHER LAND.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal approval: Building Permit Order 1/C12/03178/2020, dated 03 March, 2020; file number 1/C12/20714/2019.
Approved built-up area: 4162.94 sq.m in the RERA project fields. The permit extraction separately lists 2,757.50 m2 residential upper-floor area, 653.50 m2 cellar area and 452.22 m2 stilt area; these are the components stated in that extraction, not a replacement for the RERA-filed approved built-up area.
Building arrangement: One building; permit configuration: 1 Cellar + Stilt + 5 upper floors.
Height / permitted parking levels: Permit extraction states 14.79 m height and says cellar and stilt are approved for vehicle parking.
Unit count: 15 units in the RERA unit record: 11 4BHK and 4 5BHK.
Offering and status
RERA-filed configurations and saleable areas: 4BHK: 11 units, 158.53 sq.m each. 5BHK: 4 units, 166.42 sq.m each.
Booked / available: Portal-derived counts show 0 booked / 11 available for 4BHK and 0 booked / 4 available for 5BHK. The portal record has no as-of date; treat these counts as indicative.
Construction stage: No independently verified site-progress measurement is supplied. The GHMC permit extraction says completion was not certified in the reviewed record.
Completion dates: Promoter’s Form B undertakes completion by 03/03/2023. The GHMC permit extraction states construction was to be completed before 03 March, 2026.
Occupancy / completion certificate: No completion certificate is recorded in the supplied permit extraction; it says the building was not completion-certified. An occupancy certificate is therefore not evidenced in the reviewed documents.
2. The project story
MOGHAL MAGNUS is a single-building residential apartment project registered with TG-RERA at the Mallepally site identified by the RERA certificate as H.NO. 10-2-289/3 & 10-2-289/4. The RERA land record names Mallepally village and records SHANTI NAGAR as the survey identifier.
The GHMC permit describes a residential building, Building A-1, with a cellar, stilt and five upper floors. The RERA unit inventory is 15 homes: eleven 4BHK and four 5BHK apartments. The supplied records do not establish present on-site construction progress or occupancy-certified portions; the permit extraction records no completion certification.
The promoter’s Form B undertaking gives 03/03/2023 as the project completion target. The permit extraction separately gives 03 March, 2026 as the permitted construction completion date. These are stated dates from different project records; neither by itself establishes completed construction or an occupancy certificate.
3. Master plan, architecture & building design
The GHMC permit extraction describes one residential building, Building A-1, on a 2289.66 m2 site, with 1 Cellar + Stilt + 5 upper floors and a stated height of 14.79 m. It reports 2,757.50 m2 for residential upper floors, 653.50 m2 for the cellar and 452.22 m2 for the stilt. Separately, the RERA filing records approved built-up area of 4162.94 sq.m. These figures are reported under their respective source labels and are not treated as interchangeable area measures.
The permit extraction lists a 113.99 m2 tot-lot and states that the tot-lot is to be fenced and maintained as greenery. It also requires peripheral greenery and tree planting. The supplied material does not provide a verified building footprint, flats-per-floor schedule, lift or stair count, apartment entrance/circulation detail, or a complete measured open-space schedule.
The approved-plan document is identified as 173767. Its floor-plan geometry was software-measured for some apartment configurations; those measurements are drawing-based estimates, not RERA-filed carpet-area disclosures.
4. Homes, configurations & floor plans
The RERA filing lists 15 apartments: eleven 4BHK units and four 5BHK units. The filed saleable areas are 158.53 sq.m for 4BHK and 166.42 sq.m for 5BHK. Booking and availability counts have no supplied portal as-of date and should be treated as indicative.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 11 | 0 | 11 | 158.53 sq.m | 152.8 sq.m software-measured from one drawing design; measurement needs review. | Not supplied |
| 5BHK | 4 | 0 | 4 | 166.42 sq.m | Not supplied | Not supplied |
The 4BHK drawing measurement is from the “TYPICAL - 1, 3, 4& 5 FLOOR PLAN (SCALE=1:100),” flat 01, in document 173767. It is a software measurement of drawing geometry, not a RERA-filed carpet-area figure, and the measurement record says it needs review.
The RERA saleable area and software-measured carpet area are different area concepts: the supplied drawing note says saleable area includes the home’s share of common areas and is larger than the measured carpet area. The supplied materials do not give a RERA-filed carpet area for the 5BHK configuration or a loading figure.
5. Parking & vehicle circulation
The GHMC permit extraction says the cellar and stilt are approved for parking and must be used exclusively for vehicle parking, without partition walls or rolling shutters and without conversion to another use. The supplied records do not state the number of sanctioned car or two-wheeler spaces, visitor or accessible-space provision, a parking allocation by apartment, or a verified spaces-per-home figure.
The permit also refers to an 18 mt. road width and requires a service road wherever required, but the supplied material does not describe the site’s internal driveway layout, parking ramp arrangement, pedestrian separation or EV charging. A drawn or permitted parking area does not, on this evidence alone, establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
| Description / size | 113.99 m2 tot-lot; permit requires fencing and maintenance as greenery. |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Required by permit; completion not established. |
| Description / size | Peripheral greenery and tree planting are required; permit extraction lists 110 Trees. |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Permit-stated requirement; planting and maintenance not independently verified. |
| Description / size | Permit specifies rainwater-harvesting structures (percolation pits) and lists 4 RWHPs. |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Permit-stated provision; installation and operation not verified. |
| Description / size | Space for a transformer is required within the site. |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Permit-stated provision; installation not verified. |
| Description / size | Permit requires a garbage house within the premises. |
|---|---|
| Evidence source | GHMC permit extraction |
| Declared progress / verified status | Permit-stated provision; delivery not verified. |
| Description / size | RERA amenity schedule marks these as available “YES”; all listed progress percentages are 0. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | Promoter/RERA filing disclosure; the supplied record does not verify completion. |
| Description / size | Internal roads and footpaths; street lighting; community buildings; treatment and disposal of sewage and sullage water; solid-waste management and disposal; energy management; fire-protection and fire-safety requirements; aggregate recreational open space. The schedule gives no positive availability entry for these items and records 0 progress. |
|---|---|
| Evidence source | RERA amenity schedule |
| Declared progress / verified status | RERA schedule entries only; completion is not established. |
The supplied evidence does not establish a clubhouse, swimming pool, gym or children’s play area as sanctioned or delivered project facilities. No independent completion verification for the listed amenities is provided.
7. Utilities, building services & safety
The RERA amenity schedule marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES”; each has a recorded progress percentage of 0. The permit separately requires rainwater-harvesting structures, transformer space and a garbage house. These are filed or permit-stated provisions, not evidence of completed or operating services.
The permit requires sanitation, plumbing, fire-safety systems, lifts and electrical installations to be carried out under qualified technical supervision. It also states that an occupancy fire NOC is required before issue of an occupancy certificate, and places responsibility for structural safety and means-of-escape safety on the owner, builder/developer, architect and site engineer. The supplied evidence does not establish that the systems have been installed, inspected or cleared.
The supplied records do not specify water-source or storage capacity, STP capacity or reuse arrangements, electrical backup capacity, lift count or capacity, firefighting equipment details, CCTV/access-control systems, or accessible circulation provisions. The permit’s general requirements do not establish the project’s completed compliance status.
8. Location, access & connectivity
The registered project location is MALLEPALLY, revenue village Mallepally, Hyderabad district, PIN 500001. The registration certificate identifies locality SHANTI NAGAR and the site as H.NO. 10-2-289/3 & 10-2-289/4.
The GHMC permit extraction identifies the site’s road width as 18 mt. and requires a service road wherever required. The supplied location record gives a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) — 1.2 km as a connectivity anchor.
The reviewed evidence does not provide further measured distances, public-transport routes or travel times.
9. Developer & development status
The TG-RERA registered promoter is MOHAMMED AMER AZIZ KHAN, recorded in the project fields as a Proprietorship. The RERA filing lists him as authorized signatory and gives the promoter address as B, BANU NAGAR, MALLEPALLY, MALLEPALLY, Hyderabad, 500001. A masked identifier is recorded as xxxxxx366R; the supplied record does not identify a corporate registration number.
The promoter’s Form B is a self-declaration that states legal title and supporting title authentication/development agreement were enclosed, declares the land free from encumbrances, and undertakes completion by 03/03/2023. These statements are the promoter’s declaration, not independent verification.
The building permit names MAPHAR CONSTRUCTIONS as developer/builder and names SYED MANZOOR MUSTAFA and MOHD MUTAHAR ALI KHAN as applicants. The supplied record does not identify an official promoter website or contact details.
10. Approvals, official records & documents
| Identifier / date | P02500003325, issued 25/08/2021; valid to 03/03/2023 |
|---|---|
| What the supplied record establishes | FORM ‘C’ registration certificate for MOGHAL MAGNUS, with stated registration conditions including a separate-account requirement. |
| Identifier / date | Permit 1/C12/03178/2020, dated 03 March, 2020; file 1/C12/20714/2019 |
|---|---|
| What the supplied record establishes | Conditional permit extraction for Building A-1: cellar, stilt and five upper floors; includes permit conditions and states that completion was not certified in the reviewed record. |
| Identifier / date | Document 173767, page 1 drawing stamp dated 03-03-2020 |
|---|---|
| What the supplied record establishes | Drawing record used for software measurement of some apartment layouts; the supplied extraction states that drawing-based measurements need review. |
| Identifier / date | Document 173764, page 1 |
|---|---|
| What the supplied record establishes | Promoter affidavit-cum-declaration, including the 03/03/2023 completion undertaking. |
| Identifier / date | Documents 173762, 173763, 173774 |
|---|---|
| What the supplied record establishes | GPA, advocate’s title search report and title-report copy; detailed title-chain review belongs in the Land & Title section. |
| Identifier / date | Document 173834 |
|---|---|
| What the supplied record establishes | Statement for the stated search period 01-01-1983 to 04-07-2021; the supplied extraction identifies one conveyance entry. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No occupancy certificate or completion certificate is evidenced in the documents reviewed for this overview. |
Frequently asked questions
Is MOGHAL MAGNUS registered with Telangana RERA?
Yes. MOGHAL MAGNUS is registered with the Telangana Real Estate Regulatory Authority as P02500003325; the registration status is New Project.
Who is the developer of MOGHAL MAGNUS?
The promoter named in the RERA registration is MOHAMMED AMER AZIZ KHAN.
Where is MOGHAL MAGNUS located?
MOGHAL MAGNUS is in MALLEPALLY, Hyderabad, Telangana (500001).
When will MOGHAL MAGNUS be completed?
The promoter's proposed date of completion filed with RERA is 03/03/2023. This is the promoter's declaration, not a guarantee.
More projects in Hyderabad