AS RAO ENCLAVE is a residential apartment project in SNEHA PURI COLONY, NACHARAM, Nacharam village; the mandal is not disclosed, and the RERA project identity gives Hyderabad district. The registered promoter is M/s. URVEE CONSTRUCTIONS. The project has a total site area of 591.43 m² and one residential building with 1 Stilt + 5 upper floors, comprising 10 3BHK units with a filed saleable area of 159.33 m² per unit. It is registered under TG-RERA no. P02500001244, and the promoter’s Form-B declaration undertakes completion by 18th JUNE 2025.

01What we found

Period endedTG-RERA registration ran to 18 Jun 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
9court cases on this project's land (survey 207, 208, 209, 229, Nacharam)
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered nameAS RAO ENCLAVE RERA record
Project typeResidential apartment project RERA record
Phase / registered portionA single residential building is identified in the supplied permit record; the registered scope is not separately labelled as a phase.
TG-RERA registrationP02500001244; Form C records registration from 05/10/2019 to 18/06/2025.
Registered promoterM/s. URVEE CONSTRUCTIONS; the filing identifies its organisation type as Proprietorship. RERA record RERA filing
RERA statusRegistration validity ended 18/06/2025; no extension is recorded in the supplied certificate, which states “extended: false.” This describes the recorded registration period, not an occupancy-certificate status.

Land and geographic identity

FieldProject record
Locality / addressNacharam; the permit identifies SNEHA PURI COLONY, NACHARAM. The RERA land record gives H.NO.4-1-32, PLOT.NO.16. RERA record RERA filing
Revenue villageNacharam village. Land records
MandalNot disclosed in the supplied project identity record. Land records
DistrictHyderabad in the RERA project identity. The supplied GHMC permit extraction also labels its district “MEDCHAL-MALKAJGIRI DIST.” RERA record
PIN500076. RERA record
Survey numbers / subdivisions207/2, 208/1, 208/2, 208/3, 209, 229/1 and 229/2. Land records
Site areaTotal site area: 591.43 m²; road-affected area: 68.91 m²; net area: 522.52 m². The permit records nala-affected area as 0.00 m². RERA filing
BoundariesEast: Neighbours House 1-32 by 1; West: 30 FEETROAD; North: House No 1-32 by 1; South: 40 FEET ROAD. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal approvalBuilding Permit Order approval no. 1/C1/09419/2019, approved 18 June, 2019; the permit also gives file no. 1/C1/07123/2019. Approvals record
Approved built-up area1,425.25 m² is recorded as “Ground floor area” in the permit extraction; the supplied record separately lists approved built-up area as 1,425.25 m². These labels are preserved as recorded. RERA filing
Building count / floor configurationOne residential building; 1 Stilt + 5 upper floors. Permit height: 15 m. The extracted sanctioned parameters list G/U Floors as 0.00 and Cellar as 0.00; no basement or podium is identified.
ParkingThe permit records cellar and stilts approved for parking and requires parking areas to be used exclusively for vehicle parking. It lists stilt area as 257.70 m²; no parking-space count is supplied.
Unit count10 units are shown in the TG-RERA unit record; the permit requires that the sanctioned number of units not be increased without prior GHMC approval. A separate approved-plan unit total is not stated in the extracted permit parameters. RERA unit table

Offering and status

FieldProject record
Unit type3BHK apartments. RERA unit table
RERA-filed saleable area159.33 m² per unit. RERA unit table RERA unit details
Booked / available0 booked and 10 available in the portal-derived record; no as-of date is supplied, so these counts are indicative rather than a live inventory confirmation. RERA unit table RERA unit details
Construction stageNo independently verified site-progress status is supplied. The RERA filing’s amenities record shows 0% for the listed works, with “YES” recorded for Water Supply and Water Conservation/Rain water Harvesting; this is a filing status, not independent site verification. RERA amenities
Completion deadlinePromoter’s Form-B declaration undertakes completion by 18th JUNE 2025.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. The permit states that an occupancy certificate is compulsory before occupation.

The project story

AS RAO ENCLAVE is registered as a residential apartment project on land identified in Nacharam village, at H.NO.4-1-32, PLOT.NO.16, across survey numbers 207/2, 208/1, 208/2, 208/3, 209, 229/1 and 229/2. The RERA record gives a total site area of 591.43 m², of which 68.91 m² is identified as road-affected and 522.52 m² as net area. RERA record Land records RERA filing

The GHMC permit describes one residential building with a stilt and five upper floors. The project filing lists ten 3BHK units, with zero booked and ten available in the portal-derived inventory record; that inventory has no recorded as-of date. The promoter’s Form-B declaration set 18th JUNE 2025 as the completion undertaking. The supplied evidence does not establish current construction progress or confirm that any portion is complete or occupied. RERA unit table

Master plan, architecture & building design

The approved permit record identifies one residential building, “Building - BLDG,” with a configuration of 1 Stilt + 5 upper floors and a recorded height of 15 m. It gives a site area of 591.43 m², road-affected area of 68.91 m², net area of 522.52 m² and a ground-floor area of 1,425.25 m². The permit extraction also lists 1,425.25 m² as ground floor area; it does not provide a separate FSI-counted area.

The sanctioned parameters identify no cellar (0.00) and no ground/upper floor entry under “G/U Floors” (0.00), alongside the separate description of one stilt and five upper floors. Stilt area is listed as 257.70 m². The supplied records do not specify flats per floor, lift or stair numbers, a building footprint, or detailed internal circulation and entrance arrangements.

The permit lists 25 trees, a tot-lot, space for a transformer, a garbage house, a rainwater-harvesting structure (percolation pit) and an ETP. The detailed conditions and completion requirements are indexed under Approvals; these are permit requirements, not evidence that the facilities have been completed.

Homes, configurations & floor plans

The TG-RERA unit record lists ten 3BHK units, each with a filed saleable area of 159.33 m². It records zero booked and ten available, but supplies no inventory “as of” date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010159.33 m²96.3–109.9 m²; median 105.6 m²34%

Carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures; four 3BHK flat designs were measured, and the measurements are marked as needing review. The drawing record also gives a median of 1,136 sq. ft. Floor plans

One measured first-floor plan shows a living room, dining area, kitchen, three bedrooms, three toilets, a wash area and a balcony. For that plan, the drawing-derived dimensions include living 4.0 × 4.83 m, dining 3.23 × 5.91 m, kitchen 2.5 × 3.5 m and balcony 1.32 × 3.23 m. These are software-measured drawing dimensions, not RERA-filed room specifications. RERA unit details

Carpet area describes the measured internal usable space; the filed saleable area is a separate figure and may include the unit’s proportionate common-area share. The supplied data does not provide a RERA-filed carpet-area figure. Floor plans RERA unit table

Parking & vehicle circulation

The GHMC permit states that the cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned, enclosed with rolling shutters or converted to another use. The permit extraction records cellar area as 0.00 and stilt area as 257.70 m². It does not give the number of car or two-wheeler spaces, identify visitor or accessible bays, or specify a parking-allocation arrangement for individual units.

No parking-space count, ramp detail, EV-charging provision or pedestrian/vehicle separation information is supplied. A parking area shown or required in the plan does not, by itself, establish an exclusive parking right for a particular apartment.

Amenities, recreation & open spaces

The RERA amenities record lists 14 development items. Its progress values are 0% for the listed items; Water Supply and Water Conservation/Rain water Harvesting are marked “YES,” which does not establish independent completion or operational status. RERA amenities

Landscape/open space
FacilityTot-lot / green strip / park
Description / sizePermit lists a tot-lot; no area is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusPermit condition requires the tot-lot to be fenced and maintained as greenery before issue of occupancy certificate; completion not independently verified. Amenity record: 0%.
Landscape/open space
FacilityAggregate recreational open space
Description / sizeNo area supplied.
Evidence sourceRERA amenities
Declared progress / verified status0%; not independently verified.
Landscape/open space
FacilityTrees
Description / size25 Trees in the permit extraction.
Declared progress / verified statusPermit-recorded quantity; planting/completion not independently verified.
Convenience/community
FacilityCommunity buildings
Description / sizeNo description or size supplied.
Evidence sourceRERA amenities
Declared progress / verified status0%; not independently verified.

The supplied RERA amenities list does not identify a clubhouse, indoor recreation facility or sports facility. The marketing-source amenity list is not treated as a RERA-declared or sanctioned provision in this overview.

Utilities, building services & safety

ServiceEvidence in the project record
WaterWater Supply is marked “YES” in the RERA amenities record, with 0% shown for that item. The permit requires a rainwater-harvesting structure (percolation pit). No water source, storage capacity or treatment capacity is supplied. RERA amenities
Sewerage / drainageThe RERA amenities record lists sewerage, storm-water drains, treatment and disposal of sewage and sullage water, and solid-waste management/disposal; each is shown at 0%. The permit also requires an ETP. No treatment capacity, reuse scheme or completion status is supplied. RERA amenities
ElectricalThe RERA amenities record lists an electrical meter room, sub-station/receiving station at 0%. The permit requires space for a transformer. No power-backup capacity is documented in the supplied project approval or RERA amenities record. RERA amenities
Lifts / vertical transportationLift count, type and capacity are not supplied. Document index
Fire / life safetyFire protection and fire-safety requirements appear in the RERA amenities record at 0%. The supplied permit extraction does not describe specific fire systems or provide a separate fire-clearance document. RERA amenities Document index
Waste / securityThe permit requires a garbage house; the RERA amenities record lists solid-waste management and disposal at 0%. CCTV or access-control details are not supplied. RERA amenities
AccessibilityNo accessible-circulation or accessibility specifications are supplied in the reviewed project data. Document index

These are recorded permit conditions or RERA filing entries; they do not establish that the relevant service has been installed, completed or independently verified.

Location, access & connectivity

The project’s registered location is Nacharam village, Hyderabad district, PIN 500076. The filed address identifies H.NO.4-1-32, PLOT.NO.16, with the GHMC permit describing the locality as SNEHA PURI COLONY, NACHARAM. The land record gives the site’s east, west, north and south boundaries as neighbours’ houses, a 30-foot road and a 40-foot road. RERA record RERA filing

A supplied cadastral-parcel centroid is recorded at 17.41528, 78.35459. The project data does not provide a verified public-transport description, measured distances to landmarks, or a project-specific road-access plan. Location record

Developer & development status

The registered promoter is M/s. URVEE CONSTRUCTIONS, identified in the RERA record as a Proprietorship. The project filing names Soni Mahesh as an authorized signatory; the Form-B declaration identifies Mahesh Soni as proprietor of the proposed project and authorized by M/s. URVEE CONSTRUCTIONS. RERA filing Parties record

The promoter address recorded in the project filing is SIRI SAMPADA RESIDENCY, O U ROAD, Snehapuri Colony, Nacharam, Hyderabad, 500076. The evidence supplied here does not establish a corporate registration number, official website, or project contact details beyond the named authorized signatory. Parties record RERA filing

The promoter’s Form-B declaration, dated 2 August 2019, undertakes completion by 18th JUNE 2025. The RERA certificate records validity through 18/06/2025 and no extension in the supplied certificate. No independently verified construction-progress update or occupancy/completion certificate is supplied.

Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C, registration no. P02500001244, issued 05/10/2019; recorded validity to 18/06/2025.
Scope / noteAS RAO ENCLAVE; surveys 207/2, 208/1, 208/2, 208/3, 209, 229/1, 229/2.
GHMC building permit
Supplied evidenceBuilding Permit Order, approval no. 1/C1/09419/2019; file no. 1/C1/07123/2019; approved 18 June, 2019.
Scope / noteResidential building at SNEHA PURI COLONY, NACHARAM; one building, 1 Stilt + 5 upper floors.
Permit conditions and parameters
Supplied evidencePermit extraction includes site/net/affected areas, height, stilt and ground-floor area, tot-lot, trees, transformer space, garbage house, rainwater harvesting and ETP requirements.
Scope / notePermit conditions include completion notice and obtaining an occupancy certificate before occupation.
Promoter declaration
Supplied evidenceForm-B affidavit-cum-declaration dated 2 August 2019.
Scope / noteNames the three landowners and records the promoter’s completion undertaking and other declarations.
Occupancy / completion certificate
Supplied evidenceNot present in the supplied documents. Document index
Scope / noteNo certificate status is established by the reviewed evidence.
Layout approval record
Supplied evidenceNo separately extracted approved layout document is supplied; the permit lists Layout / Sub Divn. No. BA/395/95-96.
Scope / noteThe project filing identifies plan approval no. 1/C1/09419/2019.

Frequently asked questions

Is AS RAO ENCLAVE registered with Telangana RERA?

Yes. AS RAO ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02500001244; the registration status is New Project.

Who is the developer of AS RAO ENCLAVE?

The promoter named in the RERA registration is M/s. URVEE CONSTRUCTIONS.

Where is AS RAO ENCLAVE located?

AS RAO ENCLAVE is in Nacharam, Hyderabad, Telangana (500076).

When will AS RAO ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 18/06/2025. This is the promoter's declaration, not a guarantee.