Ssv Classic
SSV HOMES · Medchal-Malkajgiri · RERA P02200002459
SSV CLASSIC is a residential apartment project in Kapra, Kapra mandal, Medchal-Malkajgiri district. It is being developed by the registered promoter SSV HOMES. The project covers 332.05 m² and comprises one residential building, BLDG-1, with one stilt and five upper floors, and 10 2BHK apartments, each with a saleable area of 94.5 m². Its TG-RERA registration number is P02200002459, and its registered completion date is 05/02/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SSV CLASSIC RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration covers the project at the stated site RERA record |
| TG-RERA registration | P02200002459 |
| Registration validity | 11/01/2021 to 05/02/2026; the certificate records a five-year validity. Registration validity is distinct from the completion deadline. |
| RERA status | Registration certificate issued under section 5. The supplied record does not establish a later extension or current registration status. |
| Registered promoter | SSV HOMES; the RERA filing identifies the organization type as Partnership. RERA filing Corporate record |
| Registered project completion date | 05/02/2026, as stated in the RERA project information and promoter’s Form B declaration. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Kapra is stated as the revenue village in the project identity and title material; the building permit extraction describes the locality as “Kapra Village” and also lists the village as “Khapra.” RERA record |
| Mandal | Kapra RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500062 in the project filing RERA record. The registration-certificate extraction also records the promoter office PIN as 500056. |
| All project survey numbers and subdivisions | 180, 181, 182, 183, 184, 185, 186, 187, 188 (PART), 189 (PART), and 169 (PART). |
| Plot identifiers | Plot No.223 Southern Part and Plot No.224; the RERA filing also records “223 PART& 224.” RERA filing |
| Registered site extent | 332.05 m², stated in the building-permit extraction and RERA land details. RERA filing |
| Total / net area and affected area | Total and net area: 332.05 m²; road-affected area: 0 m²; nala-affected area: 0 m², as recorded in the permit extraction. RERA filing |
| Boundaries in RERA filing | East: ROAD WIDTH 12; West, North and South: OTHER LAND. RERA filing |
| Road-width figure in permit extraction | “40' WIDE ROAD.” |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order No. 1/C1/01516/2020, approved 05 February 2020; associated file No. 1/C1/18701/2019. Approvals record |
| Approved built-up area | 945.00 m² is listed among the sanctioned parameters in the permit extraction; the RERA filing separately records “Approved Built up Area” as 1143.01 m². These are retained as separately labelled record fields, not treated as interchangeable. RERA filing |
| Building count and configuration | One residential building, BLDG-1: 1 Stilt + 5 upper floors. |
| Height | 15 m, as listed in the permit extraction. |
| Parking levels / sanctioned parking count | One stilt level is identified. A sanctioned space count or detailed parking allocation is not established by the supplied records. RERA filing |
| Unit count | The RERA unit record lists 10 apartments; the land-details form separately records “Total Building Units (as per approved plan)” as 1 and “Proposed Building Units (as per agreement)” as 1. These fields are reported as filed, without interpreting the differing unit descriptions. RERA unit table RERA filing |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 2BHK; 10 units; saleable area 94.5 m² per unit. RERA unit table RERA unit details |
| Booked / available | 0 booked and 10 available in the portal-derived unit record; the record has no as-of date, so counts are indicative rather than a current inventory confirmation. RERA unit table RERA unit details |
| Construction stage | The supplied records contain the 2020 building permit and registration documents, but no verified current site-progress measurement or completion evidence. |
| Completion deadline | 05/02/2026, as recorded in the RERA filing and Form B declaration. RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied evidence; the permit states that an occupancy certificate is compulsory before occupation. The certificate status is therefore not established here. |
2. The project story
SSV CLASSIC is registered as a residential apartment project in Kapra, Medchal-Malkajgiri district. The RERA-filed site extent is 332.05 m², identified as Plot No.223 Southern Part and Plot No.224, with the project land listed across survey numbers 180–187, 188 (PART), 189 (PART) and 169 (PART). RERA record RERA filing
The GHMC permit extraction describes one residential building, BLDG-1, with one stilt and five upper floors, and a height of 15 m. The RERA unit record lists ten 2BHK apartments. The supplied evidence does not establish current construction progress, a completed portion, or an issued occupancy certificate; the project’s 05/02/2026 completion date is the promoter’s filed commitment, not independent confirmation of completion. RERA unit table
3. Master plan, architecture & building design
- The permit extraction describes a single residential building on a 332.05 m² site, with one stilt and five upper floors. It records a 15 m building height and identifies 945.00 m² among the sanctioned parameters. Separately, the RERA filing records an approved built-up area of 1143.01 m²; the supplied evidence does not define these two area fields as the same measurement. RERA filing
- The permit extraction lists setbacks of 3 m at the front and 2 m at the rear and on Side I and Side II. It also lists a 69.76 RM compound wall, 15 trees, three rainwater-harvesting pits, space for a transformer, a garbage house and an ETP. These are permit-recorded provisions; the supplied documents do not establish their construction or current condition. The permit lists tot-lot area as 0 m².
- Detailed floor layouts, apartment-per-floor arrangements, lift and stair locations, building footprint, internal circulation and a site landscape plan are not available in the supplied drawing-derived records. The floor-plan input records two drawings, neither with measured flats or layout sheets. Floor plans
4. Homes, configurations & floor plans
The RERA unit record lists ten 2BHK apartments, each with a filed saleable area of 94.5 m². The record shows none booked and ten available, but provides no inventory as-of date. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 94.5 m² | Not available | Not supplied |
No software-measured carpet area or room dimensions are available: the floor-plan record indicates that two drawings were received, but none had measured flats. RERA saleable area and carpet area are distinct measures; the supplied evidence does not provide a carpet-area figure or loading calculation for these units. Floor plans RERA unit table
5. Parking & vehicle circulation
The approved configuration identifies one stilt level, but the supplied permit extraction does not provide a car- or two-wheeler-space count, visitor or accessible parking provision, parking layout, ramp details, or parking allocation by apartment. The RERA filing records a mortgage area of 116.24 m²; the permit extraction describes the mortgaged area as the “SECOND FLOOR.” This does not establish individual parking rights or allocations. RERA filing
6. Amenities, recreation & open spaces
The following provisions are recorded in the GHMC building-permit extraction or the RERA amenities record. The records do not establish that these facilities have been completed or independently inspected. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | 0 m² recorded | GHMC permit extraction | Permit-recorded figure; completion not established. |
| Trees | 15 trees | GHMC permit extraction | Permit-recorded provision; planting status not established. |
| Rainwater harvesting | 3 RWHPs | GHMC permit extraction; RERA amenities record marks water conservation/rainwater harvesting “YES” | Proposed/recorded; completion not established. RERA amenities |
| Community buildings | No size or facility detail supplied | RERA amenities record | Listed; progress is recorded as 0%. RERA amenities |
| Green strip / tot-lot / park | No additional area supplied | RERA amenities record | Listed; progress is recorded as 0%. RERA amenities |
| Internal roads and footpaths | No dimensions supplied | RERA amenities record | Listed; progress is recorded as 0%. RERA amenities |
Third-party listing entries for facilities such as a clubhouse, pool, gym and play area are not used as project provisions in this Overview because the supplied RERA and approval records do not substantiate them. Promoter website
7. Utilities, building services & safety
- The GHMC permit extraction records an ETP, three rainwater-harvesting pits, transformer space and a garbage house within the premises. The RERA amenities record marks water supply, rainwater harvesting and electrical meter room/sub-station/receiving station as available, while listing sewerage, storm-water drains, sewage treatment, solid-waste management, energy management and fire-safety requirements with progress recorded as 0%. These are record entries, not confirmation of operating services or completed works. RERA amenities
- The permit also requires an occupancy Fire NOC before issue of the occupancy certificate and states that an occupancy certificate is compulsory before occupation. The supplied material does not establish an issued Fire NOC or occupancy certificate. Details of water source and storage, sewerage reuse, electrical backup, lift number or capacity, fire equipment, escape stairs, CCTV, access control and accessibility provisions are not available in the supplied project records.
8. Location, access & connectivity
The registered location is Kapra, Kapra mandal, Medchal-Malkajgiri district, Telangana, PIN 500062. The project filing identifies the locality as KHAPRA; the building-permit extraction describes the site as Kapra Village. RERA record RERA filing
The supplied location data gives these approximate sampled distances: Outer Ring Road nearest sampled interchange, 6.2 km; TGSRTC Bus Station, ECIL, 1.7 km; Neredmet railway station, 2.7 km; Asha Hospital, 0.3 km; St. Theresa High School, 0.5 km; Sai Sudhir Degree College, 1.5 km; Union Bank, 0.7 km; an unnamed mall, 0.7 km; Shank Colony Park, 0.1 km; and Vimukti Technologies Pvt. Ltd., 0.5 km. Location record
9. Developer & development status
The RERA-registered promoter is SSV HOMES, recorded as a partnership. The project filing identifies THUMMALA VENKATA PREETAM REDDY as authorized signatory and THUMMALA LAKSHMI and THUMMALA SREENIVASA REDDY as partners. A partners’ resolution filed for the project authorizes the managing partner to act in connection with its RERA registration. RERA filing Corporate record
The promoter’s Form B declaration states that the project would be completed by 05/02/2026. This is a promoter-declared deadline; no current construction progress or completion certification is established in the supplied evidence. No official project website or project contact details are identified in the supplied records. Corporate record
10. Approvals, official records & documents
| Reference / scope | P02200002459; SSV CLASSIC; valid from 11/01/2021 to 05/02/2026 as stated in the certificate |
|---|---|
| Supplied evidence | Form C registration certificate |
| Reference / scope | Building Permit Order No. 1/C1/01516/2020; file No. 1/C1/18701/2019; approved 05 February 2020 |
|---|---|
| Supplied evidence | Permit extraction for Plot Nos.223 Southern Part and 224, Kapra Village; one stilt plus five upper floors |
| Reference / scope | 02/LO/HMDA/2009 |
|---|---|
| Supplied evidence | Number cited in the building-permit extraction; the approved layout drawing itself is not included in the supplied material. |
| Reference / scope | SSV HOMES; completion undertaking 05/02/2026 |
|---|---|
| Supplied evidence | Promoter affidavit-cum-declaration |
| Reference / scope | SSV HOMES project registration authorization |
|---|---|
| Supplied evidence | Partners’ resolution |
The supplied evidence does not include an occupancy or completion certificate. The project record identifies the building permit and RERA registration, but does not provide detailed approved floor-plan sheets or a current site-progress certification. Floor plans
1. Project at a glance
Project identity
Registered project name: SSV CLASSIC
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration covers the project at the stated site
TG-RERA registration: P02200002459
Registration validity: 11/01/2021 to 05/02/2026; the certificate records a five-year validity. Registration validity is distinct from the completion deadline.
RERA status: Registration certificate issued under section 5. The supplied record does not establish a later extension or current registration status.
Registered promoter: SSV HOMES; the RERA filing identifies the organization type as Partnership.
Registered project completion date: 05/02/2026, as stated in the RERA project information and promoter’s Form B declaration.
Land and geographic identity
Locality / revenue village: Kapra is stated as the revenue village in the project identity and title material; the building permit extraction describes the locality as “Kapra Village” and also lists the village as “Khapra.”
Mandal: Kapra
District: Medchal-Malkajgiri
PIN: 500062 in the project filing. The registration-certificate extraction also records the promoter office PIN as 500056.
All project survey numbers and subdivisions: 180, 181, 182, 183, 184, 185, 186, 187, 188 (PART), 189 (PART), and 169 (PART).
Plot identifiers: Plot No.223 Southern Part and Plot No.224; the RERA filing also records “223 PART& 224.”
Registered site extent: 332.05 m², stated in the building-permit extraction and RERA land details.
Total / net area and affected area: Total and net area: 332.05 m²; road-affected area: 0 m²; nala-affected area: 0 m², as recorded in the permit extraction.
Boundaries in RERA filing: East: ROAD WIDTH 12; West, North and South: OTHER LAND.
Road-width figure in permit extraction: “40' WIDE ROAD.”
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order No. 1/C1/01516/2020, approved 05 February 2020; associated file No. 1/C1/18701/2019.
Approved built-up area: 945.00 m² is listed among the sanctioned parameters in the permit extraction; the RERA filing separately records “Approved Built up Area” as 1143.01 m². These are retained as separately labelled record fields, not treated as interchangeable.
Building count and configuration: One residential building, BLDG-1: 1 Stilt + 5 upper floors.
Height: 15 m, as listed in the permit extraction.
Parking levels / sanctioned parking count: One stilt level is identified. A sanctioned space count or detailed parking allocation is not established by the supplied records.
Unit count: The RERA unit record lists 10 apartments; the land-details form separately records “Total Building Units (as per approved plan)” as 1 and “Proposed Building Units (as per agreement)” as 1. These fields are reported as filed, without interpreting the differing unit descriptions.
Offering and status
RERA-filed configuration: 2BHK; 10 units; saleable area 94.5 m² per unit.
Booked / available: 0 booked and 10 available in the portal-derived unit record; the record has no as-of date, so counts are indicative rather than a current inventory confirmation.
Construction stage: The supplied records contain the 2020 building permit and registration documents, but no verified current site-progress measurement or completion evidence.
Completion deadline: 05/02/2026, as recorded in the RERA filing and Form B declaration.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied evidence; the permit states that an occupancy certificate is compulsory before occupation. The certificate status is therefore not established here.
2. The project story
SSV CLASSIC is registered as a residential apartment project in Kapra, Medchal-Malkajgiri district. The RERA-filed site extent is 332.05 m², identified as Plot No.223 Southern Part and Plot No.224, with the project land listed across survey numbers 180–187, 188 (PART), 189 (PART) and 169 (PART).
The GHMC permit extraction describes one residential building, BLDG-1, with one stilt and five upper floors, and a height of 15 m. The RERA unit record lists ten 2BHK apartments. The supplied evidence does not establish current construction progress, a completed portion, or an issued occupancy certificate; the project’s 05/02/2026 completion date is the promoter’s filed commitment, not independent confirmation of completion.
3. Master plan, architecture & building design
- The permit extraction describes a single residential building on a 332.05 m² site, with one stilt and five upper floors. It records a 15 m building height and identifies 945.00 m² among the sanctioned parameters. Separately, the RERA filing records an approved built-up area of 1143.01 m²; the supplied evidence does not define these two area fields as the same measurement.
- The permit extraction lists setbacks of 3 m at the front and 2 m at the rear and on Side I and Side II. It also lists a 69.76 RM compound wall, 15 trees, three rainwater-harvesting pits, space for a transformer, a garbage house and an ETP. These are permit-recorded provisions; the supplied documents do not establish their construction or current condition. The permit lists tot-lot area as 0 m².
- Detailed floor layouts, apartment-per-floor arrangements, lift and stair locations, building footprint, internal circulation and a site landscape plan are not available in the supplied drawing-derived records. The floor-plan input records two drawings, neither with measured flats or layout sheets.
4. Homes, configurations & floor plans
The RERA unit record lists ten 2BHK apartments, each with a filed saleable area of 94.5 m². The record shows none booked and ten available, but provides no inventory as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 94.5 m² | Not available | Not supplied |
No software-measured carpet area or room dimensions are available: the floor-plan record indicates that two drawings were received, but none had measured flats. RERA saleable area and carpet area are distinct measures; the supplied evidence does not provide a carpet-area figure or loading calculation for these units.
5. Parking & vehicle circulation
The approved configuration identifies one stilt level, but the supplied permit extraction does not provide a car- or two-wheeler-space count, visitor or accessible parking provision, parking layout, ramp details, or parking allocation by apartment. The RERA filing records a mortgage area of 116.24 m²; the permit extraction describes the mortgaged area as the “SECOND FLOOR.” This does not establish individual parking rights or allocations.
6. Amenities, recreation & open spaces
The following provisions are recorded in the GHMC building-permit extraction or the RERA amenities record. The records do not establish that these facilities have been completed or independently inspected.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot | 0 m² recorded | GHMC permit extraction | Permit-recorded figure; completion not established. |
| Trees | 15 trees | GHMC permit extraction | Permit-recorded provision; planting status not established. |
| Rainwater harvesting | 3 RWHPs | GHMC permit extraction; RERA amenities record marks water conservation/rainwater harvesting “YES” | Proposed/recorded; completion not established. |
| Community buildings | No size or facility detail supplied | RERA amenities record | Listed; progress is recorded as 0%. |
| Green strip / tot-lot / park | No additional area supplied | RERA amenities record | Listed; progress is recorded as 0%. |
| Internal roads and footpaths | No dimensions supplied | RERA amenities record | Listed; progress is recorded as 0%. |
Third-party listing entries for facilities such as a clubhouse, pool, gym and play area are not used as project provisions in this Overview because the supplied RERA and approval records do not substantiate them.
7. Utilities, building services & safety
- The GHMC permit extraction records an ETP, three rainwater-harvesting pits, transformer space and a garbage house within the premises. The RERA amenities record marks water supply, rainwater harvesting and electrical meter room/sub-station/receiving station as available, while listing sewerage, storm-water drains, sewage treatment, solid-waste management, energy management and fire-safety requirements with progress recorded as 0%. These are record entries, not confirmation of operating services or completed works.
- The permit also requires an occupancy Fire NOC before issue of the occupancy certificate and states that an occupancy certificate is compulsory before occupation. The supplied material does not establish an issued Fire NOC or occupancy certificate. Details of water source and storage, sewerage reuse, electrical backup, lift number or capacity, fire equipment, escape stairs, CCTV, access control and accessibility provisions are not available in the supplied project records.
8. Location, access & connectivity
The registered location is Kapra, Kapra mandal, Medchal-Malkajgiri district, Telangana, PIN 500062. The project filing identifies the locality as KHAPRA; the building-permit extraction describes the site as Kapra Village.
The supplied location data gives these approximate sampled distances: Outer Ring Road nearest sampled interchange, 6.2 km; TGSRTC Bus Station, ECIL, 1.7 km; Neredmet railway station, 2.7 km; Asha Hospital, 0.3 km; St. Theresa High School, 0.5 km; Sai Sudhir Degree College, 1.5 km; Union Bank, 0.7 km; an unnamed mall, 0.7 km; Shank Colony Park, 0.1 km; and Vimukti Technologies Pvt. Ltd., 0.5 km.
9. Developer & development status
The RERA-registered promoter is SSV HOMES, recorded as a partnership. The project filing identifies THUMMALA VENKATA PREETAM REDDY as authorized signatory and THUMMALA LAKSHMI and THUMMALA SREENIVASA REDDY as partners. A partners’ resolution filed for the project authorizes the managing partner to act in connection with its RERA registration.
The promoter’s Form B declaration states that the project would be completed by 05/02/2026. This is a promoter-declared deadline; no current construction progress or completion certification is established in the supplied evidence. No official project website or project contact details are identified in the supplied records.
10. Approvals, official records & documents
| Reference / scope | P02200002459; SSV CLASSIC; valid from 11/01/2021 to 05/02/2026 as stated in the certificate |
|---|---|
| Supplied evidence | Form C registration certificate |
| Reference / scope | Building Permit Order No. 1/C1/01516/2020; file No. 1/C1/18701/2019; approved 05 February 2020 |
|---|---|
| Supplied evidence | Permit extraction for Plot Nos.223 Southern Part and 224, Kapra Village; one stilt plus five upper floors |
| Reference / scope | 02/LO/HMDA/2009 |
|---|---|
| Supplied evidence | Number cited in the building-permit extraction; the approved layout drawing itself is not included in the supplied material. |
| Reference / scope | SSV HOMES; completion undertaking 05/02/2026 |
|---|---|
| Supplied evidence | Promoter affidavit-cum-declaration |
| Reference / scope | SSV HOMES project registration authorization |
|---|---|
| Supplied evidence | Partners’ resolution |
The supplied evidence does not include an occupancy or completion certificate. The project record identifies the building permit and RERA registration, but does not provide detailed approved floor-plan sheets or a current site-progress certification.
Frequently asked questions
Is SSV CLASSIC registered with Telangana RERA?
Yes. SSV CLASSIC is registered with the Telangana Real Estate Regulatory Authority as P02200002459; the registration status is New Project.
Who is the developer of SSV CLASSIC?
The promoter named in the RERA registration is SSV HOMES.
Where is SSV CLASSIC located?
SSV CLASSIC is in KHAPRA, Kapra, Medchal-Malkajgiri, Telangana (500062).
When will SSV CLASSIC be completed?
The promoter's proposed date of completion filed with RERA is 05/02/2026. This is the promoter's declaration, not a guarantee.