Radha Krishna Towers
SREE RAMA DEVELOPERS · Rangareddy · RERA P02400004729
RADHA KRISHNA TOWERS is a residential apartment project in Miyapur, Serilingampally Mandal, Ranga Reddy District. The registered promoter is SREE RAMA DEVELOPERS. The project has a site extent of 1633.99 sq. m and two residential blocks: Block A has 1 Cellar + 1 Stilt + 5 upper floors, and Block B has 1 Stilt + 5 upper floors; the RERA filing records 40 2BHK units. It is registered under TG-RERA number P02400004729, with a proposed completion date of 15 March 2025.
More from Sree Rama Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project | RADHA KRISHNA TOWERS |
| Project type / registered portion | Residential apartment project; registration is for the project identified with Survey Nos. 20 and 28/1. A separate phase name or phase-wise scope is not disclosed. |
| TG-RERA registration | P02400004729 |
| Registration validity | 19 July 2022 to 15 March 2025; the supplied certificate records no extension. Registration validity is distinct from the completion deadline and from occupancy certification. |
| Registered promoter | SREE RAMA DEVELOPERS (also stated as M/s. SREE RAMA DEVELOPERS) |
| RERA status in supplied record | Registered; the recorded validity ended on 15 March 2025. The current status beyond that recorded period is not established by the supplied registration certificate. |
RERA record RERA filing
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Miyapur |
| Revenue village | Miyapur |
| Mandal | Serilingampally |
| District | Ranga Reddy |
| PIN | 500049 |
| Project survey numbers | Survey No. 20 and Survey No. 28/1; no further subdivision is specified for the project parcel in the RERA filing. |
| Site extent | 1633.99 sq. m total plot area and 1633.99 sq. m net plot area; road-affected and nala-affected area are each recorded as 0.0 sq. m in the building-permit extraction. |
| Boundaries | East: 12 meters wide road; West: Block No XIX GH; North: LIG plots; South: MIG plots. |
RERA record RERA filing Land records
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | 0566/GHMC/SLP/2022-BP, dated 15 March 2022; building-permit file no. 001809/GHMC/0933/SLP1/2022-BP. |
| Approved built-up area | The RERA filing records 5298.45 sq. m approved built-up area. The permit extraction separately lists residential upper-floor areas of 1,857.50 sq. m for Block A and 1,850.00 sq. m for Block B; these are not presented as the same area measure. |
| Buildings / blocks | Two residential blocks: Building Block A and Building Block B. |
| Sanctioned floors | Block A: 1 Cellar + 1 Stilt + 5 upper floors. Block B: 1 Stilt + 5 upper floors. |
| Parking provision in approval | The permit records cellar and stilt areas approved for parking and Total Parking Area 1583.5; a sanctioned parking-space count is not supplied. |
| Unit count | The RERA filing records 40 2BHK units. The building permit states two residential blocks; a block-wise unit count is not supplied. |
RERA filing RERA filing RERA unit table RERA unit table
Offering and status
| Field | Record |
|---|---|
| Unit type | 2BHK |
| RERA-filed saleable area | 636.67 sq. m per listed unit configuration; the filing supplies no carpet-area figure. |
| Booked / available | 0 booked / 40 available in the portal-derived record. The booking count has no as-of date in the supplied data and is indicative. |
| Construction stage | No independently verified current site-stage report is supplied. The RERA-filed architect’s Form 1A certifies overall project completion in all aspects, dated 15 March 2025. |
| Completion deadline | Promoter’s Form B and the project record state 15 March 2025 as the completion date. |
| Occupancy certificate | The supplied Form 1A documents identify GHMC occupancy certificate 002633/GHMC/1265/SLP1/2024-OC, dated 22 March 2024, for the building. The extracts do not specify separate block-by-block OC scope. |
RERA unit table RERA unit table Approvals record
The project story
RADHA KRISHNA TOWERS is a registered residential apartment development in Miyapur, Serilingampally Mandal, on the RERA-identified site in Survey Nos. 20 and 28/1. GHMC’s building-permit record sanctions two residential blocks: Block A with a cellar and stilt, and Block B with a stilt, each with five upper floors. RERA record
The RERA filing lists 40 2BHK units. Its portal-derived booking snapshot shows all 40 as available and none booked, but it carries no as-of date, so it should not be treated as a current sales position. RERA unit table RERA unit table
The project’s Form 1A architect certificate states that the project was completed in all aspects and identifies a GHMC occupancy certificate dated 22 March 2024. This is a filed certification and certificate reference; no independent site inspection or current construction-status verification is supplied. The project completion deadline in the promoter’s Form B was 15 March 2025, while the RERA certificate’s registration validity also ended on that date. These are separate milestones.
Master plan, architecture & building design
The GHMC permit covers a 1633.99 sq. m plot and records a net plot area of the same amount. It identifies two residential blocks. Block A is sanctioned as 1 Cellar + 1 Stilt + 5 upper floors; Block B as 1 Stilt + 5 upper floors. The permit extraction gives upper-floor areas of 1,857.50 sq. m for Block A and 1,850.00 sq. m for Block B, while the RERA filing records an approved built-up area of 5298.45 sq. m. These are retained as separately labelled figures; the supplied material does not provide a floor-by-floor area schedule or a building-footprint breakdown. RERA filing
The permit records a Total Parking Area 1583.5 and requires the cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. It also lists a tot-lot, a rainwater-harvesting pit, transformer space and a garbage house. Detailed sanctioned drawings showing internal circulation, landscaping/open-space areas, lift and stair arrangements, or the location of these facilities are not supplied in the extracted material.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 0 | 40 | 636.67 sq. m | Not supplied | Not supplied |
The RERA record supplies unit counts and saleable area but no carpet-area measurement or loading figure. Although two floor-plan drawings are recorded as measured, no 2BHK flat design or software-measured carpet-area result is supplied. The measured drawing figures are therefore not available to report here. Saleable area and carpet area are distinct measures; the supplied evidence does not give a project-specific breakdown of carpet area, balconies or utility areas, or any common-area loading. RERA unit table RERA unit table Floor plans RERA unit details
Parking & vehicle circulation
The GHMC permit records cellar and stilt space approved for parking and a Total Parking Area 1583.5. Its stated condition is that approved cellar and stilt parking be used exclusively for vehicle parking. Block A has one cellar and one stilt; Block B has one stilt. The supplied records do not give the number of car or two-wheeler bays, visitor or accessible parking provision, a parking-space allocation for particular units, or details of ramps, vehicle entry/exit routes, pedestrian separation or EV charging. A drawn or approved parking area does not by itself establish exclusive ownership or a unit-specific allocation. RERA filing
Amenities, recreation & open spaces
| Description / size | Permit extraction records Tot Lot 82; the permit condition says the tot-lot is to be fenced and maintained as greenery. The unit attached to “82” is not stated in the supplied extract. |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | Sanctioned condition; completion is not independently verified. |
| Description / size | Listed in third-party vendor amenity data. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Vendor-listed; not established by the supplied sanctioned-permit extract as delivered. |
| Description / size | Listed in third-party vendor amenity data. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Vendor-listed; not independently verified. |
| Description / size | Listed in third-party vendor amenity data. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Vendor-listed; not established as sanctioned or delivered by the supplied project documents. |
The RERA amenities record marks “Green Strip/TOT LOT/Park” as available, but records 0% progress for the listed amenity items. This is a portal declaration, not independent verification of current completion. RERA amenities
Utilities, building services & safety
The GHMC permit requires one rainwater-harvesting structure (percolation pit), space for a transformer, and a garbage house within the premises. It also requires an occupancy fire NOC from the Director (EV&DM) before issue of the occupancy certificate and says an occupancy certificate is compulsory before occupation. The supplied extracts do not provide capacities or independent completion evidence for these systems.
The RERA amenities record marks water supply, sewerage (including STP), storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as available; each listed amenity has 0% recorded progress. The vendor separately lists 24×7 water supply, sewage treatment plant, storm-water drains, water conservation, rainwater harvesting, power backup, fire safety, CCTV and lifts. These vendor-listed items are not, on this evidence alone, proof of sanctioned design or delivery. No system capacities, lift specifications, backup capacity, waste-segregation arrangements, security-system details, accessibility provisions or independent life-safety compliance verification are supplied. RERA amenities Promoter website
Location, access & connectivity
The project’s registered location is Miyapur, Serilingampally Mandal, Ranga Reddy District, Telangana, 500049, on Survey Nos. 20 and 28/1. The permit records the eastern boundary as a 12 meters wide road. The supplied location record gives a cadastral parcel-centroid coordinate of 17.513432524111227, 78.3671314574563; this is a software/geospatial reference point, not a surveyed project entrance. RERA record RERA filing Cadastral map
The supplied connectivity distances are: GHMC Park 0.4 km; TGSRTC Bus Building Unit Depot 0.8 km; GRIET and GRIET College 0.8 km; HDFC Bank 1.0 km; Arunodaya Hospital 1.4 km; CMR Shopping Mall 1.8 km; and Miyapur Metro 2.0 km. No travel times or route-specific measurements are provided. Location record
Developer & development status
The TG-RERA-registered promoter is SREE RAMA DEVELOPERS, recorded as a partnership. Its GSTIN is 36ADEFS6856R1Z2. The RERA filing lists its address as Meridian Enclave, Prasanth Nagar, Group Housing of Miyapur Residential Complex, Miyapur, Serilingampally, Ranga Reddy, 500049. The supplied registration certificate separately gives a promoter-office address in Kukatpally, Medchal-Malkajgiri District, PIN 500072; the certificate’s address is reproduced as recorded and is not used here to alter the project’s revenue location. Corporate record Parties record
The promoter’s Form B, dated 14 June 2022, declares a completion period ending 15 March 2025 and includes declarations concerning project title, encumbrances, approvals and the separate account. The supplied Form 1A architect certificate, dated 15 March 2025, certifies overall completion in all aspects and identifies the GHMC occupancy certificate. These are promoter/architect-filed statements and records; no independent construction inspection is included.
Approvals, official records & documents
| Identifier / date | P02400004729; issued 19 July 2022; validity recorded to 15 March 2025 |
|---|---|
| What the supplied record establishes | Registers RADHA KRISHNA TOWERS and identifies Survey Nos. 20 and 28/1. |
| Identifier / date | 0566/GHMC/SLP/2022-BP; 15 March 2022; file no. 001809/GHMC/0933/SLP1/2022-BP |
|---|---|
| What the supplied record establishes | Building-permit extraction sanctions two residential blocks on 1633.99 sq. m in Miyapur and lists permit conditions. |
| Identifier / date | 002633/GHMC/1265/SLP1/2024-OC; 22 March 2024 |
|---|---|
| What the supplied record establishes | Form 1A identifies the certificate for the building; the supplied extracts do not specify separate block-by-block OC scope. |
| Identifier / date | Dated 15 March 2025 |
|---|---|
| What the supplied record establishes | Certifies completion in all aspects of RADHA KRISHNA TOWERS and cites the GHMC occupancy certificate. |
| Identifier / date | 14 June 2022 |
|---|---|
| What the supplied record establishes | Contains the promoter’s completion-period and other statutory declarations. |
| Identifier / date | Title reports 242657–242663; encumbrance statement 239915 |
|---|---|
| What the supplied record establishes | Listed as available project-filed materials; detailed title and encumbrance analysis belongs in the relevant report sections. Document index |
The supplied evidence does not include an extracted approved-layout plan, detailed floor-plan measurements, or a complete current-stage/site-inspection record.
Project at a glance
Project identity
Registered project: RADHA KRISHNA TOWERS
Project type / registered portion: Residential apartment project; registration is for the project identified with Survey Nos. 20 and 28/1. A separate phase name or phase-wise scope is not disclosed.
TG-RERA registration: P02400004729
Registration validity: 19 July 2022 to 15 March 2025; the supplied certificate records no extension. Registration validity is distinct from the completion deadline and from occupancy certification.
Registered promoter: SREE RAMA DEVELOPERS (also stated as M/s. SREE RAMA DEVELOPERS)
RERA status in supplied record: Registered; the recorded validity ended on 15 March 2025. The current status beyond that recorded period is not established by the supplied registration certificate.
Land and geographic identity
Locality: Miyapur
Revenue village: Miyapur
Mandal: Serilingampally
District: Ranga Reddy
PIN: 500049
Project survey numbers: Survey No. 20 and Survey No. 28/1; no further subdivision is specified for the project parcel in the RERA filing.
Site extent: 1633.99 sq. m total plot area and 1633.99 sq. m net plot area; road-affected and nala-affected area are each recorded as 0.0 sq. m in the building-permit extraction.
Boundaries: East: 12 meters wide road; West: Block No XIX GH; North: LIG plots; South: MIG plots.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 0566/GHMC/SLP/2022-BP, dated 15 March 2022; building-permit file no. 001809/GHMC/0933/SLP1/2022-BP.
Approved built-up area: The RERA filing records 5298.45 sq. m approved built-up area. The permit extraction separately lists residential upper-floor areas of 1,857.50 sq. m for Block A and 1,850.00 sq. m for Block B; these are not presented as the same area measure.
Buildings / blocks: Two residential blocks: Building Block A and Building Block B.
Sanctioned floors: Block A: 1 Cellar + 1 Stilt + 5 upper floors. Block B: 1 Stilt + 5 upper floors.
Parking provision in approval: The permit records cellar and stilt areas approved for parking and Total Parking Area 1583.5; a sanctioned parking-space count is not supplied.
Unit count: The RERA filing records 40 2BHK units. The building permit states two residential blocks; a block-wise unit count is not supplied.
Offering and status
Unit type: 2BHK
RERA-filed saleable area: 636.67 sq. m per listed unit configuration; the filing supplies no carpet-area figure.
Booked / available: 0 booked / 40 available in the portal-derived record. The booking count has no as-of date in the supplied data and is indicative.
Construction stage: No independently verified current site-stage report is supplied. The RERA-filed architect’s Form 1A certifies overall project completion in all aspects, dated 15 March 2025.
Completion deadline: Promoter’s Form B and the project record state 15 March 2025 as the completion date.
Occupancy certificate: The supplied Form 1A documents identify GHMC occupancy certificate 002633/GHMC/1265/SLP1/2024-OC, dated 22 March 2024, for the building. The extracts do not specify separate block-by-block OC scope.
The project story
RADHA KRISHNA TOWERS is a registered residential apartment development in Miyapur, Serilingampally Mandal, on the RERA-identified site in Survey Nos. 20 and 28/1. GHMC’s building-permit record sanctions two residential blocks: Block A with a cellar and stilt, and Block B with a stilt, each with five upper floors.
The RERA filing lists 40 2BHK units. Its portal-derived booking snapshot shows all 40 as available and none booked, but it carries no as-of date, so it should not be treated as a current sales position.
The project’s Form 1A architect certificate states that the project was completed in all aspects and identifies a GHMC occupancy certificate dated 22 March 2024. This is a filed certification and certificate reference; no independent site inspection or current construction-status verification is supplied. The project completion deadline in the promoter’s Form B was 15 March 2025, while the RERA certificate’s registration validity also ended on that date. These are separate milestones.
Master plan, architecture & building design
The GHMC permit covers a 1633.99 sq. m plot and records a net plot area of the same amount. It identifies two residential blocks. Block A is sanctioned as 1 Cellar + 1 Stilt + 5 upper floors; Block B as 1 Stilt + 5 upper floors. The permit extraction gives upper-floor areas of 1,857.50 sq. m for Block A and 1,850.00 sq. m for Block B, while the RERA filing records an approved built-up area of 5298.45 sq. m. These are retained as separately labelled figures; the supplied material does not provide a floor-by-floor area schedule or a building-footprint breakdown.
The permit records a Total Parking Area 1583.5 and requires the cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. It also lists a tot-lot, a rainwater-harvesting pit, transformer space and a garbage house. Detailed sanctioned drawings showing internal circulation, landscaping/open-space areas, lift and stair arrangements, or the location of these facilities are not supplied in the extracted material.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 0 | 40 | 636.67 sq. m | Not supplied | Not supplied |
The RERA record supplies unit counts and saleable area but no carpet-area measurement or loading figure. Although two floor-plan drawings are recorded as measured, no 2BHK flat design or software-measured carpet-area result is supplied. The measured drawing figures are therefore not available to report here. Saleable area and carpet area are distinct measures; the supplied evidence does not give a project-specific breakdown of carpet area, balconies or utility areas, or any common-area loading.
Parking & vehicle circulation
The GHMC permit records cellar and stilt space approved for parking and a Total Parking Area 1583.5. Its stated condition is that approved cellar and stilt parking be used exclusively for vehicle parking. Block A has one cellar and one stilt; Block B has one stilt. The supplied records do not give the number of car or two-wheeler bays, visitor or accessible parking provision, a parking-space allocation for particular units, or details of ramps, vehicle entry/exit routes, pedestrian separation or EV charging. A drawn or approved parking area does not by itself establish exclusive ownership or a unit-specific allocation.
Amenities, recreation & open spaces
| Description / size | Permit extraction records Tot Lot 82; the permit condition says the tot-lot is to be fenced and maintained as greenery. The unit attached to “82” is not stated in the supplied extract. |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | Sanctioned condition; completion is not independently verified. |
| Description / size | Listed in third-party vendor amenity data. |
|---|---|
| Declared progress / verified status | Vendor-listed; not established by the supplied sanctioned-permit extract as delivered. |
| Description / size | Listed in third-party vendor amenity data. |
|---|---|
| Declared progress / verified status | Vendor-listed; not independently verified. |
| Description / size | Listed in third-party vendor amenity data. |
|---|---|
| Declared progress / verified status | Vendor-listed; not established as sanctioned or delivered by the supplied project documents. |
The RERA amenities record marks “Green Strip/TOT LOT/Park” as available, but records 0% progress for the listed amenity items. This is a portal declaration, not independent verification of current completion.
Utilities, building services & safety
The GHMC permit requires one rainwater-harvesting structure (percolation pit), space for a transformer, and a garbage house within the premises. It also requires an occupancy fire NOC from the Director (EV&DM) before issue of the occupancy certificate and says an occupancy certificate is compulsory before occupation. The supplied extracts do not provide capacities or independent completion evidence for these systems.
The RERA amenities record marks water supply, sewerage (including STP), storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as available; each listed amenity has 0% recorded progress. The vendor separately lists 24×7 water supply, sewage treatment plant, storm-water drains, water conservation, rainwater harvesting, power backup, fire safety, CCTV and lifts. These vendor-listed items are not, on this evidence alone, proof of sanctioned design or delivery. No system capacities, lift specifications, backup capacity, waste-segregation arrangements, security-system details, accessibility provisions or independent life-safety compliance verification are supplied.
Location, access & connectivity
The project’s registered location is Miyapur, Serilingampally Mandal, Ranga Reddy District, Telangana, 500049, on Survey Nos. 20 and 28/1. The permit records the eastern boundary as a 12 meters wide road. The supplied location record gives a cadastral parcel-centroid coordinate of 17.513432524111227, 78.3671314574563; this is a software/geospatial reference point, not a surveyed project entrance.
The supplied connectivity distances are: GHMC Park 0.4 km; TGSRTC Bus Building Unit Depot 0.8 km; GRIET and GRIET College 0.8 km; HDFC Bank 1.0 km; Arunodaya Hospital 1.4 km; CMR Shopping Mall 1.8 km; and Miyapur Metro 2.0 km. No travel times or route-specific measurements are provided.
Developer & development status
The TG-RERA-registered promoter is SREE RAMA DEVELOPERS, recorded as a partnership. Its GSTIN is 36ADEFS6856R1Z2. The RERA filing lists its address as Meridian Enclave, Prasanth Nagar, Group Housing of Miyapur Residential Complex, Miyapur, Serilingampally, Ranga Reddy, 500049. The supplied registration certificate separately gives a promoter-office address in Kukatpally, Medchal-Malkajgiri District, PIN 500072; the certificate’s address is reproduced as recorded and is not used here to alter the project’s revenue location.
The promoter’s Form B, dated 14 June 2022, declares a completion period ending 15 March 2025 and includes declarations concerning project title, encumbrances, approvals and the separate account. The supplied Form 1A architect certificate, dated 15 March 2025, certifies overall completion in all aspects and identifies the GHMC occupancy certificate. These are promoter/architect-filed statements and records; no independent construction inspection is included.
Approvals, official records & documents
| Identifier / date | P02400004729; issued 19 July 2022; validity recorded to 15 March 2025 |
|---|---|
| What the supplied record establishes | Registers RADHA KRISHNA TOWERS and identifies Survey Nos. 20 and 28/1. |
| Identifier / date | 0566/GHMC/SLP/2022-BP; 15 March 2022; file no. 001809/GHMC/0933/SLP1/2022-BP |
|---|---|
| What the supplied record establishes | Building-permit extraction sanctions two residential blocks on 1633.99 sq. m in Miyapur and lists permit conditions. |
| Identifier / date | 002633/GHMC/1265/SLP1/2024-OC; 22 March 2024 |
|---|---|
| What the supplied record establishes | Form 1A identifies the certificate for the building; the supplied extracts do not specify separate block-by-block OC scope. |
| Identifier / date | Dated 15 March 2025 |
|---|---|
| What the supplied record establishes | Certifies completion in all aspects of RADHA KRISHNA TOWERS and cites the GHMC occupancy certificate. |
| Identifier / date | 14 June 2022 |
|---|---|
| What the supplied record establishes | Contains the promoter’s completion-period and other statutory declarations. |
| Identifier / date | Title reports 242657–242663; encumbrance statement 239915 |
|---|---|
| What the supplied record establishes | Listed as available project-filed materials; detailed title and encumbrance analysis belongs in the relevant report sections. |
The supplied evidence does not include an extracted approved-layout plan, detailed floor-plan measurements, or a complete current-stage/site-inspection record.
Frequently asked questions
Is RADHA KRISHNA TOWERS registered with Telangana RERA?
Yes. RADHA KRISHNA TOWERS is registered with the Telangana Real Estate Regulatory Authority as P02400004729; the registration status is New Project.
Who is the developer of RADHA KRISHNA TOWERS?
The promoter named in the RERA registration is SREE RAMA DEVELOPERS.
Where is RADHA KRISHNA TOWERS located?
RADHA KRISHNA TOWERS is in MIYAPUR, Serilingampally, Rangareddy, Telangana (500049).
When will RADHA KRISHNA TOWERS be completed?
The promoter's proposed date of completion filed with RERA is 15/03/2025. This is the promoter's declaration, not a guarantee.
More projects in Miyapur