Sign in

Onyx

CONCEPT DESIGN DEVELOPERS · Medchal-Malkajgiri · RERA P02200003012

ONYX is a residential apartment project in Kompally, Kompally Mandal, Medchal-Malkajgiri District, developed by the registered promoter CONCEPT DESIGN DEVELOPERS. The registered site extent is 2,023.42 sq. m, and the project comprises one residential building with 1 Stilt + 5 upper floors and 40 apartments: 25 2BHK and 15 3BHK units. Its TG-RERA registration number is P02200003012, and the promoter’s declared completion date is 31STDECEMBER, 2026.

01What we found

RegisteredTG-RERA - valid till 31 Dec 2026
16documents on file - each fact links to its page
4court cases on this project's land (survey 124, 125, Kompally)
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameONYX RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionA single registered project is identified; a separate phase name is not disclosed. The filed approval describes one residential building. RERA filing
TG-RERA registrationP02200003012 RERA record
Registration validity17/06/2021 to 31/12/2026; certificate states a period of 5 years. Validity is not the same as the completion deadline. RERA record
Registered promoterCONCEPT DESIGN DEVELOPERS (also styled M/S CONCEPT DESIGN DEVELOPERS in the Form B declaration) RERA record Corporate record
RERA statusNew Project; the supplied certificate records registration granted under section 5. RERA record

Land and geographic identity

ItemRecord
LocalityKompally / KOMPALLY MUNICIPALITY RERA record RERA filing
Revenue villageKompally (also rendered “Kompalle” in the HMDA technical approval) RERA record
MandalNot disclosed in the project identity record. The technical approval describes “Kompally Muncipality Mandal.” Land records
DistrictMedchal-Malkajgiri RERA record
PIN500100 RERA record
Project survey numbersSY NO 124 PART AND 125 PART RERA record RERA filing
Registered site extent2,023.42 sq. m (the filing gives 2,023.42 sq. m as both total and net area; affected area recorded as 0) RERA filing
BoundariesNorth: ROAD WIDTH - 9; South: EXISTING BUILDING; East: EXISTING BUILDING; West: CTS NO. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval directs that the building plans be sanctioned and released by the Executive Authority, identified as Kompally Municipality. Approvals record
Principal approvalTechnical approval 039165/MED/R1/U6/HMDA/17092020, dated 31/12/2020. Approvals record
Approved built-up area4,334.77 sq. m (as stated in the project filing and sanctioned parameters). The approval extraction separately lists “Total Built up Area (In Sq.mts) 5459.84”; the scope labels are retained as recorded. RERA filing
Building count and configurationOne residential building; 1 Stilt + 5 upper floors. RERA filing
Basement / parking levelsNo basement is specified in the extracted building configuration. The technical approval states that cellar and stilt approved for parking must be used exclusively for parking; the extracted floor configuration identifies a stilt but does not specify a cellar level.
Units40 units are recorded in the RERA unit data; the project filing records one building unit. RERA unit table RERA filing

Offering and status

ItemRecord
RERA-filed configurations25 2BHK units and 15 3BHK units. RERA unit table RERA unit details
RERA-filed saleable area2BHK: 116.32 sq. m; 3BHK: 155.3 sq. m. RERA unit table RERA unit details
Booked / availablePortal-derived counts are 40 booked and 0 available (25 2BHK and 15 3BHK); the portal record has no as-of date, so counts are indicative. RERA unit table
Construction stageNot established by the supplied evidence; no independently verified site-progress measurement is provided. Document index RERA amenities
Completion deadlineThe promoter’s Form B declaration undertakes completion by 31STDECEMBER, 2026; the RERA certificate is valid through 31/12/2026.
Occupancy certificate statusAn HMDA occupancy certificate is present in the supplied filing for a residential building in Survey Nos. 124 PART and 125 PART at Kompally. The evidence does not establish the certificate’s relationship to the registered ONYX project as a project-wide or unit-specific OC; scope requires confirmation.

2. The project story

ONYX is registered as a residential apartment project in Kompally, Medchal-Malkajgiri District, on Survey Nos. 124 PART and 125 PART, with a filed site extent of 2,023.42 sq. m. The RERA record describes a single residential building and offers 2BHK and 3BHK apartments. RERA record RERA filing RERA unit table

The filed HMDA technical approval describes a building with 1 stilt + 5 upper floors and identifies the same survey portions and site extent. The promoter’s Form B declaration states a completion undertaking of 31STDECEMBER, 2026. The supplied records do not establish current construction progress through an independent site inspection or dated progress certification.

An HMDA occupancy certificate for a building on Survey Nos. 124 PART and 125 PART is included in the filing. Its project linkage and coverage of ONYX’s registered units are not established by the supplied evidence, so it is not treated here as confirmation that the entire registered project or all units are occupancy-certified.

3. Master plan, architecture & building design

The filed technical approval identifies a residential apartment building on 2,023.42 sq. m in Survey Nos. 124 Part and 125 Part, with 1 stilt + 5 upper floors. The project filing records one building unit. No drawing-derived information is supplied for the building footprint, flats per floor, entrances, stairs, lift cores, internal circulation, landscaping plan, or residential/common-area distribution. RERA filing

The RERA filing states an approved built-up area of 4,334.77 sq. m. The technical approval extraction also records “Total Built up Area (In Sq.mts) 5459.84”; the available evidence does not explain that figure’s measurement scope, so it is not substituted for the filed approved built-up area. RERA filing

The approval lists a building height of 14.95 (unit not stated in the extracted field), and identifies a mortgage area of 437.33 sq. m in its sanctioned parameters; the project filing records 437.34 sq. m as mortgage area. The approval describes the mortgaged area as flats 202, 203, 204, 205 and 206 on the second floor. RERA filing

Two floor-plan drawings are listed, but neither has been measured: both are scans pending review. Consequently, no drawing-based carpet-area or room-layout measurements are reported. Floor plans

4. Homes, configurations & floor plans

The RERA unit record identifies 40 apartments across two configurations. The portal-derived booking counts are indicative because no as-of date is provided. Saleable area below is RERA-filed; no measured carpet area or loading figure is available. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK25250116.32 sq. mNot measuredNot supplied
3BHK15150155.3 sq. mNot measuredNot supplied

Saleable area and carpet area are distinct measures; the supplied drawing record notes that saleable area includes a home’s share of common areas. The two floor-plan drawings remain unmeasured scans, so room dimensions, balconies, utility areas and floor arrangements cannot be reported from drawing measurement. Floor plans

5. Parking & vehicle circulation

The HMDA technical approval states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. It also lists a stilt in the building configuration. The supplied evidence does not establish the approved parking-space count, visitor or accessible provision, parking allocation to individual units, ramp arrangement, or EV charging. A drawn or designated parking area would not by itself establish exclusive ownership.

The technical approval also directs provision for a transformer within the premises; it does not provide parking circulation details.

6. Amenities, recreation & open spaces

The RERA amenity record lists facilities as available or proposed in the filing, but records 0% progress for each listed item. That progress figure is a filing entry, not independent verification of construction or delivery. RERA amenities

Green strip / tot lot / park
Description / sizeSize not supplied
Evidence sourceRERA amenity record; HMDA technical approval also lists a tot-lot RERA amenities
Declared progress / verified statusRERA record: available “YES”; 0% progress. Completion not independently verified.
Aggregate recreational open space
Description / sizeSize not supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusAvailable “YES”; 0% progress. Completion not independently verified.
Community buildings
Description / sizeDetails and size not supplied
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0% progress; no completion verification supplied.

The technical approval requires rainwater-harvesting structures and provision for a garbage house; these are addressed as infrastructure/service provisions below. No RERA-filed clubhouse or indoor/sports amenity detail is established in the supplied project records.

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting, fire protection and safety, and an electrical meter room/sub-station/receiving station as available “YES,” while recording 0% progress for the listed items. These entries do not independently verify installation or completion. RERA amenities

The HMDA technical approval specifically requires rainwater-harvesting structures, a transformer and a garbage house within the premises, and states that an occupancy certificate is compulsory before occupation. It also requires structural and construction-worker safety measures and specified clearances from high- and low-tension electrical lines.

The supplied project evidence does not state water sources or storage capacities, sewerage treatment capacity, reuse arrangements, electrical backup capacity, lift count or capacity, fire-system specifications, waste-segregation arrangements, CCTV/access-control systems, or accessible circulation. These details are therefore not stated as provided facilities here.

8. Location, access & connectivity

The RERA project identity places ONYX in Kompally / KOMPALLY MUNICIPALITY, revenue village Kompally, Medchal-Malkajgiri District, PIN 500100. The filed site boundaries identify the north side as “ROAD WIDTH - 9,” with existing buildings to the east and south and “CTS NO” to the west. The supplied evidence does not identify the approach-road name or provide verified distances to transport, services or landmarks. RERA record RERA filing

9. Developer & development status

The registered promoter is CONCEPT DESIGN DEVELOPERS, identified in the RERA record as a partnership. The supplied corporate record does not establish a company-registration number or other corporate identifier; a masked identifier is present in the filed fields but is not identified by label. Corporate record RERA filing

The RERA filing lists the promoter’s address as USHODAYA SIGNATURE, DEEPTHISREENAGAR COLONY, KOMPALLY, KOMPALLY MUNICIPALITY, Medchal-Malkajgiri, 500100. The Form B declaration is made by PADIRE VENUCHANDER REDDY as authorized signatory and states that the promoter has legal title and that the land is free from encumbrances; these are promoter declarations, not independently established title findings. Corporate record

The promoter’s declared completion date is 31STDECEMBER, 2026. The supplied evidence does not provide a dated, independently verified construction-progress assessment. The registration certificate remains valid through 31/12/2026, which is a separate registration-validity matter.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for ONYX, registration P02200003012, issued 17/06/2021 and valid through 31/12/2026.
Principal building approvalHMDA technical approval 039165/MED/R1/U6/HMDA/17092020, dated 31/12/2020, for a residential building on Survey Nos. 124 Part and 125 Part; the approval directs sanction/release by the Kompally Municipality Executive Authority.
Approved layout recordA layout-plan document is listed in the RERA filing, but extraction is unavailable; no layout content is established here. Document index HMDA
Occupancy certificate on fileHMDA OC 002767/OC/HMDA/MED/2023, dated 01 May, 2023, for a residential building on Survey Nos. 124 PART and 125 PART at Kompally. Its scope linkage to ONYX and its registered units is not established by the supplied evidence.
Form B declarationPromoter declaration dated 28 May, 2021, including the stated title, encumbrance and completion undertakings.
Other completion certificate in filingA Karimnagar Municipal Corporation OC for IRA RESIDENCY, Survey No. 145, Rekurthi (Part), is also present in the documents, but it identifies a different project and location; it is not an ONYX approval.
Environmental recordThe supplied search result is a promoter-name-only “no EC found” entry, explicitly not matched to this project. It does not establish project-specific environmental status. Regulatory record

The HMDA technical approval identifies construction, occupancy, parking-use and other site conditions; this Overview lists only the design and service requirements relevant to the project profile.

Frequently asked questions

Is ONYX registered with Telangana RERA?

Yes. ONYX is registered with the Telangana Real Estate Regulatory Authority as P02200003012; the registration status is New Project.

Who is the developer of ONYX?

The promoter named in the RERA registration is CONCEPT DESIGN DEVELOPERS.

Where is ONYX located?

ONYX is in KOMPALLY MUNICIPALITY, Medchal-Malkajgiri, Telangana (500100).

When will ONYX be completed?

The promoter's proposed date of completion filed with RERA is 31/12/2026. This is the promoter's declaration, not a guarantee.

More projects in Medchal-Malkajgiri