Vivanta Central Court Annex
NIKHILA CONSTRUCTIONS AND DEVELOPERS · Rangareddy · RERA P02400002450
VIVANTA CENTRAL COURT ANNEX is a residential apartment project in Mokila, Shankarpalle mandal, Ranga Reddy district, developed by NIKHILA CONSTRUCTIONS AND DEVELOPERS. The registered site extent is 4,052.52 sq. m, and the project comprises one building with 1 Cellar + 1 Ground + 5 Upper floors and 77 apartments: 50 2BHK and 27 3BHK. It is registered under TG-RERA number P02400002450, with a proposed completion date of 22/11/2023.
More from Nikhila Constructions And Developers · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | VIVANTA CENTRAL COURT ANNEX RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No phase name or phase-wise split is disclosed in the supplied record. The registration is for the project under the name above. |
| TG-RERA registration | P02400002450 |
| Registration validity | 11/01/2021–22/11/2023; the certificate says “2 years.” No extension is recorded on the supplied certificate. This is the registration-validity period, not the construction completion date or an OC date. |
| Registered promoter | NIKHILA CONSTRUCTIONS AND DEVELOPERS |
| RERA status in supplied record | Registered under section 5. The supplied certificate does not record an extension. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Mokila RERA record RERA filing |
| Revenue village | Mokila RERA record RERA filing |
| Mandal | Shankarpalle RERA record RERA filing |
| District | Ranga Reddy RERA record |
| PIN | 501203 RERA record |
| Project survey number / subdivision | 105/A/2 RERA filing |
| Registered site extent | 4,052.52 sq. m as recorded in the RERA project fields and technical-approval document. RERA filing |
| Total / net area | Total area 4,052.52 sq. m; net area 4,052.52 sq. m; road-widening/FTL/nala-widening area recorded as 0 in the project fields. RERA filing |
| Boundaries filed with TG-RERA | East: OTHERS; West: ROAD; North: OTHERS; South: OTHERS. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval records delegation to Shankarpalle Municipality for local plan sanction. |
| Principal technical approval | 037839/SKP/R1/U6/HMDA/04082020, dated 11/12/2020 in the approval extraction. The project fields list plan approval number 037839/SKP/R1/U6/HMD as filed. RERA filing |
| Building configuration in technical approval | 1 Cellar + 1 Ground + 5 Upper floors for the proposed residential building. |
| Building configuration in OC extraction | 1 Ground Floor + 5 Upper Floor for the residential building covered by the extracted OC. |
| Building count | One building/unit is recorded in the project fields; one residential building is identified in the OC extraction. RERA filing |
| Approved built-up area | Technical-approval extraction lists Built up Area 9419.91 and Total Built up Area 9425.45; the supplied project fields list approved built-up area 9419.91 sq. m. These are kept as separately labelled record figures. RERA filing |
| Parking / mortgage provision in technical approval | Cellar and stilt areas are to be used exclusively for vehicle parking. The approval records Provided Mortgage area 983.95 sq. m; the project fields record mortgage area 945 sq. m. The approval also describes the mortgage as 10% of built-up area in favor of MC, HMDA, under document no. 6891, dated 18/11/2020. RERA filing |
| Approved versus RERA-declared units | The project fields state 1 total building unit and 1 proposed building unit; the RERA configuration schedule records 77 apartments: 50 2BHK and 27 3BHK. The supplied data does not explain the “building unit” field’s relationship to apartment inventory. RERA filing RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 50 units, saleable area 39.42 sq. m each as recorded; 3BHK: 27 units, saleable area 120.11 sq. m each as recorded. RERA unit table RERA unit table |
| Booked / available | 7 booked and 70 available in total: 2BHK 0 booked / 50 available; 3BHK 7 booked / 20 available. These are portal figures with no supplied as-of date and should be treated as indicative, not a current inventory confirmation. RERA unit table RERA unit table |
| Construction stage | HMDA OC extraction records completion of the residential building; an architect’s Form-1A also certifies overall project completion. These are document-record assertions, not an independent current site inspection. |
| Promoter’s completion undertaking | 22/11/2023, stated in the RERA Form-B declaration. This is distinct from registration validity and from the OC record. |
| Occupancy certificate | HMDA OC 052859/OC/U6/HMDA/02032022, approved 25/3/2022, for the residential building identified at Survey No. 105/A/2, Mokila. The architect’s Form-1A also identifies this OC and certifies overall completion. |
2. The project story
- VIVANTA CENTRAL COURT ANNEX is registered as a residential apartment project at Mokila, in Mokila revenue village, Shankarpalle mandal, Ranga Reddy district. Its RERA-filed project land is Survey No. 105/A/2, with a site extent of 4,052.52 sq. m. RERA record RERA filing
- The HMDA technical-approval extraction describes a proposed residential building with one cellar, a ground floor and five upper floors. The later OC extraction identifies a residential building with one ground floor and five upper floors and records an occupancy certificate for Survey No. 105/A/2. An architect’s Form-1A states that the registered project was completed in all aspects. These records document approval and completion claims; no independent site inspection is supplied here.
- The RERA configuration schedule lists 50 2BHK and 27 3BHK apartments. Booked and available counts are portal figures without a supplied capture date, so a buyer should confirm current inventory and unit status directly before relying on them. RERA unit table
3. Master plan, architecture & building design
- The project fields record 4,052.52 sq. m as both total and net land area, and 9419.91 sq. m as approved built-up area. The technical-approval extraction separately lists Total Built up Area 9425.45. The supplied material does not define whether these built-up figures use different measurement bases, so they should not be treated as interchangeable. RERA filing RERA filing
- HMDA’s technical approval describes a proposed apartment building with 1 Cellar + 1 Ground + 5 Upper floors. It requires the cellar and approved stilt parking to remain exclusively for vehicle parking, and identifies provision for a tot-lot, transformer space, garbage house, rainwater-harvesting structures and a septic tank. The extracted OC describes the completed residential building as 1 Ground Floor + 5 Upper Floor. The supplied record does not provide a drawing-derived building footprint, floor-by-floor apartment count, lift or stair configuration, internal circulation plan, or a verified open-space schedule.
- The technical-approval extraction records a Height of the building 17.71; the extracted OC also records height 17.71 m. The technical approval states that plan changes require separate prior approval.
4. Homes, configurations & floor plans
RERA’s filed configuration data is the source for unit counts, bookings and saleable areas. Separately, software measurements from the filed plan drawings provide carpet-area estimates for some layouts; they are drawing measurements, not RERA-filed area disclosures, and the supplied extraction says they need review. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 50 | 0 | 50 | 39.42 sq. m | Not measured from the supplied drawings | Not supplied |
| 3BHK | 27 | 7 | 20 | 120.11 sq. m | Software-measured median 105.1 sq. m; range 105.0–105.5 sq. m across 3 measured designs | Not supplied |
The drawing extraction labels 3BHK rooms including living, dining, kitchen, master bedroom, other bedrooms, lobby and toilets; balcony and utility are excluded from its measured carpet area. The plan record does not establish each unit’s final contractual area. Carpet area, exclusive balcony/utility area and saleable area (which may include a share of common areas) are different measures; buyers should verify the chosen unit’s registered agreement and approved plan. RERA unit details Floor plans
5. Parking & vehicle circulation
The HMDA technical approval requires the cellar and approved stilt area to be used exclusively for vehicle parking and not converted to another use. It also records the provided mortgage area as 983.95 sq. m and references mortgage document 6891, dated 18/11/2020. The project fields list mortgage area 945 sq. m. RERA filing
The extracted OC records Parking Area (m2): 2369.75 480, but the supplied extraction does not explain the two figures or identify the number of parking bays. No reliable counts for car or two-wheeler spaces, visitor or accessible parking, parking allocation by apartment, ramp arrangement, or EV charging are supplied. A drawn or sanctioned parking provision does not by itself establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The RERA project amenities schedule records the following status percentages. These are filed status fields, not independent confirmation that facilities have been delivered or are operating. The HMDA technical approval separately identifies certain required site provisions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Size not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified RERA amenities |
| Water supply | Capacity/source not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified RERA amenities |
| Sewerage (chamber, lines, septic tank, STP) | Capacity not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified RERA amenities |
| Storm-water drains | Size/details not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified RERA amenities |
| Green strip / tot-lot / park | Size not supplied | RERA amenities schedule; HMDA technical approval | Declared YES, 100% in the RERA schedule; approval requires a fenced tot-lot maintained as greenery before OC. Delivery not independently verified. RERA amenities |
| Street lighting | Details not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified RERA amenities |
| Water conservation / rainwater harvesting | Capacity/details not supplied | RERA amenities schedule; HMDA technical approval | Declared YES, 100% in the RERA schedule; technical approval requires rainwater-harvesting structures. Not independently verified. RERA amenities |
| Electrical meter room / sub-station / receiving station | Details not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified RERA amenities |
| Community buildings | Size/details not supplied | RERA amenities schedule | Listed YES, 0% RERA amenities |
| Treatment and disposal of sewage and sullage water | Capacity/details not supplied | RERA amenities schedule | Listed YES, 0% RERA amenities |
| Solid-waste management and disposal | Details not supplied | RERA amenities schedule | 0% recorded RERA amenities |
| Energy management | Details not supplied | RERA amenities schedule | 0% recorded RERA amenities |
| Fire protection and fire-safety requirements | Details not supplied | RERA amenities schedule | 0% recorded RERA amenities |
| Aggregate recreational open space | Area not supplied | RERA amenities schedule | 0% recorded RERA amenities |
The vendor list names additional facilities—including a clubhouse, gym, swimming pool, tennis and basketball courts, indoor games, spa/steam/sauna, power backup, CCTV and security—but these are vendor-reported, not established as RERA-filed, sanctioned or delivered in the supplied project record. Promoter website
7. Utilities, building services & safety
The RERA amenities schedule records water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES” at 100%. These are declared schedule entries; capacities, operating status and independent commissioning evidence are not supplied. RERA amenities
HMDA’s technical approval requires rainwater-harvesting structures, transformer space, a garbage house and a septic tank. It also states that the building must obtain an occupancy certificate before occupation. The extracted OC records rainwater harvesting as an amenity. The supplied documents do not establish water source or storage capacity, STP capacity and reuse arrangements, backup-power capacity, lift numbers or capacity, fire-system specifications, CCTV/access-control arrangements, or accessibility provisions such as ramps.
The RERA schedule records fire protection and fire-safety requirements at 0%. The supplied record does not include a fire-clearance certificate or detailed fire/life-safety drawings, so no broader compliance conclusion is made here. RERA amenities
8. Location, access & connectivity
The registered location is Mokila village, Shankarpalle mandal, Ranga Reddy district, Telangana, PIN 501203, at Survey No. 105/A/2. The project fields identify the west boundary as ROAD; the other three boundary entries are OTHERS. RERA record RERA filing RERA filing
The supplied location data gives these approximate distances: Outer Ring Road (nearest sampled interchange, approx): 12.4 km; ICFAI Bussiness School: 2.2 km; and (unnamed park): 1.3 km. The supplied records do not identify the approach-road name, public-transport services, or the park’s name. Location record
9. Developer & development status
The registered promoter is NIKHILA CONSTRUCTIONS AND DEVELOPERS, identified in the RERA filing as a partnership. The project record lists its address as Rajitha Nilayam, Sathavahana Nagar Colony, Mokila, Shankarpalle, Ranga Reddy, PIN 501203. The registration certificate separately gives a promoter-office address in Shathavahana Nagar, Kukatpally mandal, Medchal-Malkajgiri district, PIN 500072. No official contact number, email or promoter website is supplied in the project record. Corporate record Parties record
The RERA Form-B declaration, dated 30 November 2020, states that the promoter would complete the project by 22/11/2023 and declares the land free from encumbrances. Those statements are promoter declarations. The extracted HMDA OC is dated 25/3/2022, and the architect’s Form-1A certifies overall completion; these are document-recorded completion evidence, not independent site verification.
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA Form C registration certificate | Registers VIVANTA CENTRAL COURT ANNEX, registration P02400002450, under section 5, for 11/01/2021–22/11/2023; no extension is recorded on this certificate. |
| HMDA technical approval | Technical approval 037839/SKP/R1/U6/HMDA/04082020, dated 11/12/2020, for a proposed residential building at Survey No. 105/A/2, Mokila; records 1 Cellar + 1 Ground + 5 Upper floors and conditions including local plan sanction, parking use, rainwater harvesting and other site provisions. |
| HMDA Occupancy Certificate | OC 052859/OC/U6/HMDA/02032022, approved 25/3/2022, for the residential building at Survey No. 105/A/2. The extraction records completion as 02 March, 2022. |
| Architect’s Form-1A | Identifies the project and OC number 052859/OC/U6/HMDA/0203 2022 and certifies that the project was completed in all aspects. |
| RERA Form-B declaration | Promoter declaration dated 30 November 2020, including the completion undertaking and encumbrance statement. |
| Approved floor-plan drawing | Drawing document 142170 was used for software measurements of selected layouts. Those measurements are not RERA disclosures and require review against the drawing. Floor plans |
The supplied project record does not include a separate local-authority building-plan release document beyond the referenced technical-approval and OC records. The technical-approval document states that plans were to be sanctioned by the delegated Executive Authority; this overview does not infer any unprovided approval instrument.
1. Project at a glance
Project identity
Registered project name: VIVANTA CENTRAL COURT ANNEX
Project type: Residential apartment project
Phase / registered portion: No phase name or phase-wise split is disclosed in the supplied record. The registration is for the project under the name above.
TG-RERA registration: P02400002450
Registration validity: 11/01/2021–22/11/2023; the certificate says “2 years.” No extension is recorded on the supplied certificate. This is the registration-validity period, not the construction completion date or an OC date.
Registered promoter: NIKHILA CONSTRUCTIONS AND DEVELOPERS
RERA status in supplied record: Registered under section 5. The supplied certificate does not record an extension.
Land and geographic identity
Locality: Mokila
Revenue village: Mokila
Mandal: Shankarpalle
District: Ranga Reddy
PIN: 501203
Project survey number / subdivision: 105/A/2
Registered site extent: 4,052.52 sq. m as recorded in the RERA project fields and technical-approval document.
Total / net area: Total area 4,052.52 sq. m; net area 4,052.52 sq. m; road-widening/FTL/nala-widening area recorded as 0 in the project fields.
Boundaries filed with TG-RERA: East: OTHERS; West: ROAD; North: OTHERS; South: OTHERS.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval records delegation to Shankarpalle Municipality for local plan sanction.
Principal technical approval: 037839/SKP/R1/U6/HMDA/04082020, dated 11/12/2020 in the approval extraction. The project fields list plan approval number 037839/SKP/R1/U6/HMD as filed.
Building configuration in technical approval: 1 Cellar + 1 Ground + 5 Upper floors for the proposed residential building.
Building configuration in OC extraction: 1 Ground Floor + 5 Upper Floor for the residential building covered by the extracted OC.
Building count: One building/unit is recorded in the project fields; one residential building is identified in the OC extraction.
Approved built-up area: Technical-approval extraction lists Built up Area 9419.91 and Total Built up Area 9425.45; the supplied project fields list approved built-up area 9419.91 sq. m. These are kept as separately labelled record figures.
Parking / mortgage provision in technical approval: Cellar and stilt areas are to be used exclusively for vehicle parking. The approval records Provided Mortgage area 983.95 sq. m; the project fields record mortgage area 945 sq. m. The approval also describes the mortgage as 10% of built-up area in favor of MC, HMDA, under document no. 6891, dated 18/11/2020.
Approved versus RERA-declared units: The project fields state 1 total building unit and 1 proposed building unit; the RERA configuration schedule records 77 apartments: 50 2BHK and 27 3BHK. The supplied data does not explain the “building unit” field’s relationship to apartment inventory.
Offering and status
RERA-filed configurations: 2BHK: 50 units, saleable area 39.42 sq. m each as recorded; 3BHK: 27 units, saleable area 120.11 sq. m each as recorded.
Booked / available: 7 booked and 70 available in total: 2BHK 0 booked / 50 available; 3BHK 7 booked / 20 available. These are portal figures with no supplied as-of date and should be treated as indicative, not a current inventory confirmation.
Construction stage: HMDA OC extraction records completion of the residential building; an architect’s Form-1A also certifies overall project completion. These are document-record assertions, not an independent current site inspection.
Promoter’s completion undertaking: 22/11/2023, stated in the RERA Form-B declaration. This is distinct from registration validity and from the OC record.
Occupancy certificate: HMDA OC 052859/OC/U6/HMDA/02032022, approved 25/3/2022, for the residential building identified at Survey No. 105/A/2, Mokila. The architect’s Form-1A also identifies this OC and certifies overall completion.
2. The project story
- VIVANTA CENTRAL COURT ANNEX is registered as a residential apartment project at Mokila, in Mokila revenue village, Shankarpalle mandal, Ranga Reddy district. Its RERA-filed project land is Survey No. 105/A/2, with a site extent of 4,052.52 sq. m.
- The HMDA technical-approval extraction describes a proposed residential building with one cellar, a ground floor and five upper floors. The later OC extraction identifies a residential building with one ground floor and five upper floors and records an occupancy certificate for Survey No. 105/A/2. An architect’s Form-1A states that the registered project was completed in all aspects. These records document approval and completion claims; no independent site inspection is supplied here.
- The RERA configuration schedule lists 50 2BHK and 27 3BHK apartments. Booked and available counts are portal figures without a supplied capture date, so a buyer should confirm current inventory and unit status directly before relying on them.
3. Master plan, architecture & building design
- The project fields record 4,052.52 sq. m as both total and net land area, and 9419.91 sq. m as approved built-up area. The technical-approval extraction separately lists Total Built up Area 9425.45. The supplied material does not define whether these built-up figures use different measurement bases, so they should not be treated as interchangeable.
- HMDA’s technical approval describes a proposed apartment building with 1 Cellar + 1 Ground + 5 Upper floors. It requires the cellar and approved stilt parking to remain exclusively for vehicle parking, and identifies provision for a tot-lot, transformer space, garbage house, rainwater-harvesting structures and a septic tank. The extracted OC describes the completed residential building as 1 Ground Floor + 5 Upper Floor. The supplied record does not provide a drawing-derived building footprint, floor-by-floor apartment count, lift or stair configuration, internal circulation plan, or a verified open-space schedule.
- The technical-approval extraction records a Height of the building 17.71; the extracted OC also records height 17.71 m. The technical approval states that plan changes require separate prior approval.
4. Homes, configurations & floor plans
RERA’s filed configuration data is the source for unit counts, bookings and saleable areas. Separately, software measurements from the filed plan drawings provide carpet-area estimates for some layouts; they are drawing measurements, not RERA-filed area disclosures, and the supplied extraction says they need review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 50 | 0 | 50 | 39.42 sq. m | Not measured from the supplied drawings | Not supplied |
| 3BHK | 27 | 7 | 20 | 120.11 sq. m | Software-measured median 105.1 sq. m; range 105.0–105.5 sq. m across 3 measured designs | Not supplied |
The drawing extraction labels 3BHK rooms including living, dining, kitchen, master bedroom, other bedrooms, lobby and toilets; balcony and utility are excluded from its measured carpet area. The plan record does not establish each unit’s final contractual area. Carpet area, exclusive balcony/utility area and saleable area (which may include a share of common areas) are different measures; buyers should verify the chosen unit’s registered agreement and approved plan.
5. Parking & vehicle circulation
The HMDA technical approval requires the cellar and approved stilt area to be used exclusively for vehicle parking and not converted to another use. It also records the provided mortgage area as 983.95 sq. m and references mortgage document 6891, dated 18/11/2020. The project fields list mortgage area 945 sq. m.
The extracted OC records Parking Area (m2): 2369.75 480, but the supplied extraction does not explain the two figures or identify the number of parking bays. No reliable counts for car or two-wheeler spaces, visitor or accessible parking, parking allocation by apartment, ramp arrangement, or EV charging are supplied. A drawn or sanctioned parking provision does not by itself establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The RERA project amenities schedule records the following status percentages. These are filed status fields, not independent confirmation that facilities have been delivered or are operating. The HMDA technical approval separately identifies certain required site provisions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Size not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified |
| Water supply | Capacity/source not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | Capacity not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified |
| Storm-water drains | Size/details not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified |
| Green strip / tot-lot / park | Size not supplied | RERA amenities schedule; HMDA technical approval | Declared YES, 100% in the RERA schedule; approval requires a fenced tot-lot maintained as greenery before OC. Delivery not independently verified. |
| Street lighting | Details not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified |
| Water conservation / rainwater harvesting | Capacity/details not supplied | RERA amenities schedule; HMDA technical approval | Declared YES, 100% in the RERA schedule; technical approval requires rainwater-harvesting structures. Not independently verified. |
| Electrical meter room / sub-station / receiving station | Details not supplied | RERA amenities schedule | Declared YES, 100%; not independently verified |
| Community buildings | Size/details not supplied | RERA amenities schedule | Listed YES, 0% |
| Treatment and disposal of sewage and sullage water | Capacity/details not supplied | RERA amenities schedule | Listed YES, 0% |
| Solid-waste management and disposal | Details not supplied | RERA amenities schedule | 0% recorded |
| Energy management | Details not supplied | RERA amenities schedule | 0% recorded |
| Fire protection and fire-safety requirements | Details not supplied | RERA amenities schedule | 0% recorded |
| Aggregate recreational open space | Area not supplied | RERA amenities schedule | 0% recorded |
The vendor list names additional facilities—including a clubhouse, gym, swimming pool, tennis and basketball courts, indoor games, spa/steam/sauna, power backup, CCTV and security—but these are vendor-reported, not established as RERA-filed, sanctioned or delivered in the supplied project record.
7. Utilities, building services & safety
The RERA amenities schedule records water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES” at 100%. These are declared schedule entries; capacities, operating status and independent commissioning evidence are not supplied.
HMDA’s technical approval requires rainwater-harvesting structures, transformer space, a garbage house and a septic tank. It also states that the building must obtain an occupancy certificate before occupation. The extracted OC records rainwater harvesting as an amenity. The supplied documents do not establish water source or storage capacity, STP capacity and reuse arrangements, backup-power capacity, lift numbers or capacity, fire-system specifications, CCTV/access-control arrangements, or accessibility provisions such as ramps.
The RERA schedule records fire protection and fire-safety requirements at 0%. The supplied record does not include a fire-clearance certificate or detailed fire/life-safety drawings, so no broader compliance conclusion is made here.
8. Location, access & connectivity
The registered location is Mokila village, Shankarpalle mandal, Ranga Reddy district, Telangana, PIN 501203, at Survey No. 105/A/2. The project fields identify the west boundary as ROAD; the other three boundary entries are OTHERS.
The supplied location data gives these approximate distances: Outer Ring Road (nearest sampled interchange, approx): 12.4 km; ICFAI Bussiness School: 2.2 km; and (unnamed park): 1.3 km. The supplied records do not identify the approach-road name, public-transport services, or the park’s name.
9. Developer & development status
The registered promoter is NIKHILA CONSTRUCTIONS AND DEVELOPERS, identified in the RERA filing as a partnership. The project record lists its address as Rajitha Nilayam, Sathavahana Nagar Colony, Mokila, Shankarpalle, Ranga Reddy, PIN 501203. The registration certificate separately gives a promoter-office address in Shathavahana Nagar, Kukatpally mandal, Medchal-Malkajgiri district, PIN 500072. No official contact number, email or promoter website is supplied in the project record.
The RERA Form-B declaration, dated 30 November 2020, states that the promoter would complete the project by 22/11/2023 and declares the land free from encumbrances. Those statements are promoter declarations. The extracted HMDA OC is dated 25/3/2022, and the architect’s Form-1A certifies overall completion; these are document-recorded completion evidence, not independent site verification.
10. Approvals, official records & documents
TG-RERA Form C registration certificate: Registers VIVANTA CENTRAL COURT ANNEX, registration P02400002450, under section 5, for 11/01/2021–22/11/2023; no extension is recorded on this certificate.
HMDA technical approval: Technical approval 037839/SKP/R1/U6/HMDA/04082020, dated 11/12/2020, for a proposed residential building at Survey No. 105/A/2, Mokila; records 1 Cellar + 1 Ground + 5 Upper floors and conditions including local plan sanction, parking use, rainwater harvesting and other site provisions.
HMDA Occupancy Certificate: OC 052859/OC/U6/HMDA/02032022, approved 25/3/2022, for the residential building at Survey No. 105/A/2. The extraction records completion as 02 March, 2022.
Architect’s Form-1A: Identifies the project and OC number 052859/OC/U6/HMDA/0203 2022 and certifies that the project was completed in all aspects.
RERA Form-B declaration: Promoter declaration dated 30 November 2020, including the completion undertaking and encumbrance statement.
Approved floor-plan drawing: Drawing document 142170 was used for software measurements of selected layouts. Those measurements are not RERA disclosures and require review against the drawing.
The supplied project record does not include a separate local-authority building-plan release document beyond the referenced technical-approval and OC records. The technical-approval document states that plans were to be sanctioned by the delegated Executive Authority; this overview does not infer any unprovided approval instrument.
Frequently asked questions
Is VIVANTA CENTRAL COURT ANNEX registered with Telangana RERA?
Yes. VIVANTA CENTRAL COURT ANNEX is registered with the Telangana Real Estate Regulatory Authority as P02400002450; the registration status is New Project.
Who is the developer of VIVANTA CENTRAL COURT ANNEX?
The promoter named in the RERA registration is NIKHILA CONSTRUCTIONS AND DEVELOPERS.
Where is VIVANTA CENTRAL COURT ANNEX located?
VIVANTA CENTRAL COURT ANNEX is in MOKILA, Shankarpalle, Rangareddy, Telangana (501203).
When will VIVANTA CENTRAL COURT ANNEX be completed?
The promoter's proposed date of completion filed with RERA is 22/11/2023. This is the promoter's declaration, not a guarantee.