DLSK AVATAR is a residential apartment project in Shankarpally, Shankarpalle Mandal, Ranga Reddy District, developed by the registered promoter Avatar Infra Tech. The project occupies 2,681.05 Sq. Mt. and comprises one building with 1Cellar + 1Ground + 5 Upper floors, with 71 2BHK units, each with a RERA-filed saleable area of 115.12 sq m. It is registered under TG-RERA number P02400005728, and the project information records a proposed completion date of 06/09/2027.

01What we found

RegisteredTG-RERA - valid till 6 May 2027
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameDLSK AVATAR RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for the project on the survey numbers listed below.
TG-RERA registrationP02400005728; Form C registration issued 09/03/2023, valid through 06/05/2027. This is the registration validity period, not the project completion deadline.
Registered promoterAvatar Infra Tech (also recorded as AVATAR INFRA TECH); entity type recorded as partnership. RERA filing
RERA statusThe supplied registration certificate records the project as registered. No extension is recorded in that certificate.

Land and geographic identity

ItemProject record
LocalityShankarpally / SHANKARPALLY RERA record
Revenue villageShankarpalle Village (also recorded as Shankarpally)
MandalShankarpalle
DistrictRanga Reddy
PIN501203
Project survey numbers and subdivisions242/A1/4, 242/A1/2 and 242/A1
Registered site extent2,681.05 Sq. Mt.
RERA-filed land areaTotal area 2681.05 sqmts; net area 2681.05 sqmts; area stated as affected by road widening/FTL of tanks/nala widening 0. RERA filing
Boundaries recorded in filingEast: 40 FEET WIDE INTERNAL ROAD; West, North and South: LAND IN SURVEY NO 242. RERA filing

Development identity

ItemProject record
Sanctioning / technical approval authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval letter refers to sanction and release of plans by the delegated local Executive Authority, Shankarpally Municipality.
Principal approval number031792/SKP/R1/U6/HMDA/14122019, HMDA technical approval dated 22/11/2022.
Approved built-up areaThe project filing records 6789.97 sqmts as approved built-up area. RERA filing
Building count and floor configurationOne building; the HMDA technical approval describes 1Cellar + 1Ground + 5 Upper floors. RERA filing
Parking levelsThe technical approval identifies the cellar and stilts approved for parking, but the supplied record does not state a parking-space count.
Unit countHMDA approval condition: sanctioned unit count is not to be increased without prior GHMC approval; the supplied extract does not state the approved count. TG-RERA filing records 72 building units, comprising 71 2BHK units and one Club House entry. RERA filing RERA unit table

Offering and status

ItemProject record
Unit type and RERA-filed saleable area2BHK; 115.12 sq m per unit. RERA unit table
Filed bookings and availabilityPortal-derived filing snapshot records 0 booked and 71 available 2BHK units; the source record gives no as-of date, so these counts are indicative. RERA unit table
Declared completion dateForm B states 06"" MAY, 2027 as the promoter’s completion undertaking.
Other completion date recorded in project dataProject information records proposed completion as 06/09/2027. RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project evidence. The HMDA technical approval states that an Occupancy Certificate is compulsory before occupation.

2. The project story

DLSK AVATAR is registered as a residential apartment project in Shankarpalle Village, Ranga Reddy District, on land identified as Survey Nos. 242/A1/4, 242/A1/2 and 242/A1. The registered site extent is 2,681.05 Sq. Mt.

The project is organized as one residential building. HMDA’s technical approval describes a cellar, ground floor and five upper floors, with the cellar and stilts designated for parking. The RERA filing lists 71 2BHK homes and a separate Club House entry; that Club House row is not a home offered for sale. RERA unit table

The registration record includes the promoter’s completion undertaking, while the supplied evidence does not establish construction progress through an independently verified site inspection or provide an occupancy/completion certificate. Accordingly, the dates in the record should be read as stated project commitments, not as proof of completion. RERA filing

3. Master plan, architecture & building design

The HMDA technical approval identifies a single residential building with 1Cellar + 1Ground + 5 Upper floors on a site stated as 2,681.05 Sq. Mt. The project filing records 6789.97 sqmts as approved built-up area; this is the filing’s approved built-up-area figure, not a carpet-area or saleable-area figure. RERA filing

The technical approval records a building height of 17.94 (the supplied extract does not state a unit), proposed built-up area of 6998.52, required mortgage area of 678.997 Sq.mts, and provided mortgage area of 700.77 Sq.mts. It also records a 15% mortgage of built-up area, stated as 1089.04 Sq mtrs, in favour of the Metropolitan Commissioner, HMDA. The supplied approval materials also reference registered mortgage documents 3866/2021 and 3861/2021, dated 25/06/2021, in connection with the HMDA mortgage provision. The approval requires the cellar and stilts designated for parking to remain used exclusively for vehicle parking and prohibits construction in setback areas.

The supplied approval extract does not provide a floor-by-floor unit schedule, building footprint, tower arrangement beyond one building, lift or stair details, internal circulation drawings, or a quantified open-space and landscaping plan. It does identify a tot-lot, rainwater-harvesting structure/percolation pit, transformer space and garbage house as approval-related provisions. The project’s filed land area is 2681.05 sqmts total and net. RERA filing

4. Homes, configurations & floor plans

TG-RERA’s unit record lists 71 2BHK units, all recorded as available in the supplied snapshot. The 2BHK RERA-filed saleable area is 115.12 sq m. The separate Club House entry is a common-area record, not a dwelling unit. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK71071115.12 sq mSoftware-measured: median 71.9 sq m; range 64.6–77.3 sq m38%

Carpet-area measurements are software-measured from the floor-plan drawing geometry, not RERA-filed measurements; the supplied measurement record says the drawings need review. It reports 46 measured 2BHK flat designs, with 44 requiring review. RERA saleable area and drawing-measured carpet area are different measures: the supplied drawing note says saleable area includes the home’s share of common areas. Floor plans RERA unit details

A typical drawing panel identifies two bedrooms, dining, kitchen, two toilets, a puja space and a balcony. One measured panel records the balcony as 1.0m Balcony, with dimensions 4.66 × 3.77 m; it is excluded from the measured carpet-area total. These room and balcony details are drawing-derived, not RERA-filed unit specifications. RERA unit details

5. Parking & vehicle circulation

HMDA’s technical approval states that the cellar and stilts shown for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and are not to be converted to another use. It also prohibits parking or construction in setback areas.

The supplied approval and RERA unit records do not establish the number of parking spaces, visitor or accessible-space provision, two-wheeler allocation, ramp arrangement, or unit-specific parking allotments. The filing records 71 homes, but no verified spaces-per-home figure is available. A parking area shown or reserved in the approval does not, on this evidence, establish an exclusive parking right attached to an individual unit. RERA unit table

6. Amenities, recreation & open spaces

The RERA amenity record contains infrastructure and site-facility entries, with progress percentages shown below. These percentages are recorded declarations, not independently verified completion. The HMDA approval separately identifies several site provisions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green strip / parkSize not statedHMDA technical approval; RERA amenity record RERA amenitiesHMDA approval identifies a tot-lot; RERA record lists Green Strip/TOT LOT/Park: YES, 0%. Not independently verified complete.
Recreational open spaceAggregate area not statedRERA amenity record RERA amenitiesListed as available YES, 0%; not independently verified complete.
Community buildingsNo facility or size detailedRERA amenity record RERA amenitiesProgress recorded as 0%.
Club HouseOne filing row; size and facilities not statedRERA unit record RERA unit tableListed as a common-area entry; no completion status supplied.
Internal roads and footpathsDimensions not statedRERA amenity record RERA amenitiesYES, 50% declared progress; not independently verified complete.
Street lightingQuantity and layout not statedRERA amenity record RERA amenitiesYES, 0% declared progress; not independently verified complete.

The supplied third-party vendor record lists additional facilities such as a swimming pool, gym and clubhouse, but these are not established by the supplied TG-RERA amenity or HMDA approval records and are therefore not presented as approved or delivered project facilities. Promoter website RERA amenities

7. Utilities, building services & safety

ServiceEvidence in the project record
Water supplyRERA amenity record lists Water Supply as YES, 0%. The source, storage capacity and treatment arrangement are not stated. RERA amenities
Sewerage and wastewaterRERA amenity record lists “Sewerage (Chamber, Lines, Septic Tank, STP)” as YES, 0%. HMDA’s 2021 intimation requires an STP and septic tank as per standard specification; the supplied records do not establish completion. RERA amenities
Storm-water drainageListed in the RERA amenity record at 0%; no design or capacity is supplied. RERA amenities
Rainwater harvestingHMDA technical approval requires rainwater-harvesting structures and identifies a percolation pit. The RERA amenity record lists water conservation/rainwater harvesting at 0%. RERA amenities
ElectricityHMDA technical approval requires space for a transformer; the RERA amenity record lists electrical meter room, sub-station and receiving station as YES, 0%. Supply capacity and backup provision are not established in the supplied project records. RERA amenities
Garbage and wasteHMDA technical approval requires a garbage house within the premises. The RERA amenity record lists solid-waste management and disposal at 0%. RERA amenities
Fire and life safetyThe RERA amenity record lists fire protection and fire-safety requirements at 0%. HMDA’s 2021 intimation refers to fire-service department norms; the supplied evidence does not establish completed systems or a fire clearance. RERA amenities
Lifts, accessibility and securityNo project-specific lift details, accessible-circulation provisions, CCTV, access-control or security-system completion evidence is supplied in the TG-RERA and HMDA records provided for this overview. RERA amenities

8. Location, access & connectivity

The registered location is Shankarpalle locality, Shankarpalle Mandal, Ranga Reddy District, PIN 501203, in Shankarpalle Village. The project boundary record identifies a 40 FEET WIDE INTERNAL ROAD on the eastern side. The HMDA technical approval separately refers to an 18 mt. road width. RERA filing

The supplied location record places a bus stand at 0.1 km, Shankarpalli railway station at 0.6 km, an unnamed school at 0.6 km, and a Primary Health Centre at 0.0 km. It records the nearest sampled Outer Ring Road interchange at approximately 16.0 km. These are location-record distances; no travel times are supplied. Location record

The project evidence does not provide a documented public-transport service schedule, surveyed route distances, or a detailed approach-road plan.

9. Developer & development status

The registered promoter is AVATAR INFRA TECH, recorded as a partnership. The RERA filing names SRINATH REDDY AMBATI as authorized signatory and RAJESH YADAV GORLA and SURESH VAKAMULLA as partners. The promoter GSTIN is 36ABQFA0991D1ZD. RERA filing Corporate record Parties record

The RERA certificate records the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500075.” The supplied data does not provide a verified official project website or contact details.

The promoter’s Form B affidavit, dated 29TH DAY OF APRIL, 2022, undertakes completion by 06"" MAY, 2027. The project information fields separately record a proposed completion date of 06/09/2027. The supplied evidence does not include a later extension order, verified construction-progress report, or occupancy/completion certificate; the stated dates are commitments recorded in project materials, not confirmation of delivery. RERA filing

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C registration certificate for DLSK AVATAR, registration P02400005728, issued 09/03/2023, valid through 06/05/2027.
HMDA building technical approvalApproval 031792/SKP/R1/U6/HMDA/14122019, dated 22/11/2022, for a residential building on Survey Nos. 242/A1/4, 242/A1/2 and 242/A1 in Shankarpalle Village.
HMDA application/intimationApplication 031792/SKP/R1/U6/HMDA/14122019; the 2021 intimation states that it is not approval of the proposal or permission for development.
Form B promoter declarationForm B affidavit dated 29TH DAY OF APRIL, 2022, including the promoter’s completion undertaking.
Encumbrance statementProject-filed encumbrance statement 119043923, covering 01-10-2007 to 23-11-2022.
Layout / floor-plan materialA layout-plan document is listed in the RERA document register; the supplied drawing-derived measurements identify document 233163 as the floor-plan source. Document index
Occupancy / completion evidenceNo occupancy or completion certificate is present in the supplied evidence. HMDA’s technical approval states that an Occupancy Certificate is compulsory before occupation.

Frequently asked questions

Is DLSK AVATAR registered with Telangana RERA?

Yes. DLSK AVATAR is registered with the Telangana Real Estate Regulatory Authority as P02400005728; the registration status is New Project.

Who is the developer of DLSK AVATAR?

The promoter named in the RERA registration is AVATAR INFRA TECH.

Where is DLSK AVATAR located?

DLSK AVATAR is in SHANKARPALLY, Shankarpalle, Rangareddy, Telangana (501203).

When will DLSK AVATAR be completed?

The promoter's proposed date of completion filed with RERA is 06/09/2027. This is the promoter's declaration, not a guarantee.