Elv Legacy
ELV DEVELOPERS · Rangareddy · RERA P02400010274
Elv Legacy is a residential apartment project in Adibatla, Ibrahimpatnam Mandal, Ranga Reddy District, developed by the registered promoter ELV DEVELOPERS. The project covers 2,006.58 sq. m and comprises one proposed residential building with 1 Stilt + 5 upper floors and 40 2BHK units. Its TG-RERA registration number is P02400010274, and the promoter undertakes completion before 03 July 2028.
More from Elv Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | Elv Legacy RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | One proposed residential building; no separate phase name is disclosed RERA filing |
| TG-RERA registration | P02400010274 RERA record |
| Registration validity | 3 July 2025 to 3 July 2028, unless extended by the Authority RERA record |
| Registered promoter | ELV DEVELOPERS RERA record |
| RERA status | Registered; the registration certificate records a three-year validity period RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Adibatla RERA record RERA filing |
| Mandal | Ibrahimpatnam RERA record |
| District | Ranga Reddy RERA record |
| PIN | 501510 RERA record |
| Project survey numbers and subdivisions | 708/A1/2, 708/A2/2 and 708/A4/2 RERA record |
| Registered site extent | 2,006.58 sq. m in the building-permit record |
| Total / net land area | Total area 2,006.58 sq. m; net area 2,006.58 sq. m RERA filing |
| Boundaries | East: Land in Sy. No. 708 Part; West: Land in Sy. No. 708 Part; North: Land in Sy. No. 656; South: Existing 33 Wide Road RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning / permitting record | Building Permit Order issued by Adibatla Municipality / Municipal Corporation, recording HMDA building permission |
| Principal approval | 010453/BP/HMDA/2734/SMD/2024, approved 3 July 2025 RERA record |
| Building arrangement | One proposed residential building RERA filing |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors |
| Approved height | 20.38 mt. total; 17.88 mt. from GL excluding Stilt Floor |
| Built-up area | The approval-plan record lists TOTAL BUA: 6300.84 and NET BUA: 5010.30; its parameters also list TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 6153.82 and PARKING AREA: 1143.52 |
| Parking provision | Stilt parking; 30 proposed cars |
| Unit counts | 40 units in the RERA configuration record; the layout-plan extraction also states 40 units RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 2BHK; 40 units RERA unit table |
| RERA-filed saleable area | 31.97 sq. m per recorded configuration RERA unit table |
| Booked / available | 0 booked and 40 available, as last read from the TG-RERA portal; the record does not provide an as-of date, so counts are indicative RERA unit table |
| Construction stage | No independently verified construction progress is supplied. The record identifies a proposed building; the permit extraction states that an occupancy certificate has not been issued |
| Promoter completion undertaking | Before 03 July 2028 |
| Registration validity end | 03 July 2028, unless extended |
| Occupancy certificate | Not recorded as issued in the supplied permit extraction; the permit requires an occupancy certificate before occupation |
2. The project story
Elv Legacy is registered as a residential apartment project on land at Adibatla, Ibrahimpatnam Mandal, Ranga Reddy District. The registered land comprises survey subdivisions 708/A1/2, 708/A2/2 and 708/A4/2, and the building-permit record describes a site extent of 2,006.58 sq. m. RERA record RERA filing
The approval record describes a single residential building with one stilt level and five upper floors. The RERA filing records 40 2BHK units. The project is registered through 3 July 2028, and the promoter’s Form B declaration undertakes completion before 3 July 2028. These are registration and declared completion dates, not evidence that construction is complete. The supplied record does not establish current on-site progress or an issued occupancy certificate. RERA unit table
3. Master plan, architecture & building design
The approval-plan records describe one residential building on a 2,006.58 sq. m site, configured as 1 Stilt + 5 upper floors. The plan extraction gives a total height of 20.38 mt., including a stated 17.88 mt. from ground level excluding the stilt floor.
The plan extraction separately lists TOTAL BUA: 6300.84, NET BUA: 5010.30, and PARKING AREA: 1143.52. It also gives TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 6153.82 and VACANT PLOT AREA: 863.06. These are figures as recorded in the approval-plan extraction; the supplied materials do not include enough drawing detail to describe a building footprint, flats per floor, internal circulation, landscaping layout, or common-area distribution.
The available material identifies a stilt parking level but does not provide detailed floor plans or a reliable breakdown of the apartment layouts by floor. The permit record also lists a simple mortgage in favour of MC, HMDA over 517.97 sq. m of built-up area.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 0 | 40 | 31.97 sq. m | Not available | Not supplied |
The 31.97 sq. m figure is the RERA-filed saleable area. No usable software-measured carpet-area figure is supplied: the drawing record reports no measured flat design for the 2BHK configuration. Saleable area is not interchangeable with carpet area; the supplied drawing notes explain that saleable area also counts a home’s share of common areas. RERA unit table RERA unit details Floor plans
The portal’s booked and available counts have no stated as-of date and should be treated as indicative rather than a live inventory confirmation. RERA unit table
5. Parking & vehicle circulation
The approval-plan extraction records 30 proposed car spaces and a stilt parking area of 1143.52. The building-permit conditions state that the stilt is to be used exclusively for vehicle parking and that parking or construction is not to be placed in setback areas. No separate visitor, accessible, or two-wheeler parking counts, parking-allocation schedule, ramp arrangement, or internal vehicle-circulation plan is supplied. The record of drawn or proposed parking does not establish exclusive allocation to a particular unit.
The approval material includes a provision for electric-vehicle charging infrastructure at parking places; it does not establish installation or completion.
6. Amenities, recreation & open spaces
The TG-RERA amenity record lists 14 project-facility categories. Each is recorded at 0% progress; the table below reports the filed status, not independently verified completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size supplied | RERA amenities | 0%; completion not independently verified |
| Water supply | Listed as available: YES; no source or capacity specified in this amenity record | RERA amenities | 0%; completion not independently verified |
| Sewerage | Chambers, lines, septic tank and STP listed; no capacity supplied | RERA amenities | 0%; completion not independently verified |
| Storm-water drains | No size supplied | RERA amenities | 0%; completion not independently verified |
| Green strip / TOT LOT / park | No area supplied | RERA amenities | 0%; completion not independently verified |
| Street lighting | No details supplied | RERA amenities | 0%; completion not independently verified |
| Community buildings | No description or size supplied | RERA amenities | 0%; completion not independently verified |
| Treatment and disposal of sewage and sullage water | No capacity supplied | RERA amenities | 0%; completion not independently verified |
| Solid-waste management and disposal | No system details supplied | RERA amenities | 0%; completion not independently verified |
| Water conservation / rainwater harvesting | Listed as available: YES; no capacity supplied | RERA amenities | 0%; completion not independently verified |
| Energy management | No details supplied | RERA amenities | 0%; completion not independently verified |
| Fire protection and fire-safety requirements | Listed as available: YES; no system details supplied in the amenity record | RERA amenities | 0%; completion not independently verified |
| Electrical meter room, sub-station, receiving station | No capacity supplied | RERA amenities | 0%; completion not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenities | 0%; completion not independently verified |
The building-permit material additionally lists rainwater-harvesting structures, a garbage house, STP, a transformer and electric-vehicle charging infrastructure as provisions or requirements. These records do not establish that the facilities have been installed or completed.
7. Utilities, building services & safety
Water and drainage: The approval record lists separate underground and terrace water-storage tanks, each with a capacity of 25,000 lts. It also lists STP and rainwater-harvesting structures. The available material does not specify a water source, treatment capacity, reuse volumes, or storm-water system details.
Electrical and building services: The plan conditions list a transformer and electric-vehicle charging infrastructure. The records do not specify electrical supply capacity, backup capacity, lift count or lift specifications. A vendor listing mentions power backup and borewell water, but those are third-party claims rather than established RERA-filed or completed provisions. Promoter website
Fire and life safety: The approval material lists fire-fighting installations, emergency lighting, hose reels, down corners and an automatic sprinkler system. These are approval-record provisions, not evidence of installation, inspection, or statutory compliance. The permit also requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be carried out under qualified technical supervision.
Waste, access and safety measures: The approval record lists a garbage house and requires CCTV cameras. It does not provide CCTV coverage details, access-control arrangements, waste-segregation specifications, accessibility features, or lift capacities.
8. Location, access & connectivity
The registered project location is Adibatla village, Ibrahimpatnam Mandal, Ranga Reddy District, PIN 501510. The project boundaries recorded in the RERA filing include an existing 33 Wide Road on the south. The permit material also refers to a 4.5mts. road width and requires the approach road indicated in the plan to be developed and maintained as a black-topped road before release of occupancy. RERA record RERA filing
A location record gives the nearest sampled Outer Ring Road interchange at approximately 0.9 km. This is a supplied location-data estimate, not a stated travel time. Location record
9. Developer & development status
The TG-RERA-registered promoter is ELV DEVELOPERS, identified in the filing as a partnership. The supplied corporate identifier is GSTIN 36AAFFE9707K1Z3. The filing names Erugadindla Srinivas and Erugadindla Vinod as partners and names Erugadindla Srinivas as authorized signatory. RERA record RERA filing Corporate record
The promoter’s Form B declaration states that it entered into a Development Agreement-cum-General Power of Attorney dated 8 June 2023 with Sri Kommuri Venkata Ramulu Goud and undertakes completion before 3 July 2028. The RERA registration certificate is valid through 3 July 2028 unless extended. Neither date establishes construction progress or occupancy certification; no independently verified progress update is supplied here.
The supplied RERA address details give H.No. 5-80, Teachers Colony, Gurrum Guda, Adibatla, Ibrahimpatnam, Ranga Reddy, PIN 501510. No official website or project-specific contact details are provided. RERA filing Parties record
10. Approvals, official records & documents
| Identifier / date | P02400010274; registration period 3 July 2025–3 July 2028 |
|---|---|
| What the supplied record establishes | Registration of Elv Legacy and stated promoter conditions, including sale agreements, conveyance registration, separate-account deposits and quarterly updates. |
| Identifier / date | 010453/BP/HMDA/2734/SMD/2024; 3 July 2025 |
|---|---|
| What the supplied record establishes | Records permission for a residential building of 1 Stilt + 5 upper floors on the project survey land; the order states an occupancy certificate is compulsory before occupation. |
| Identifier / date | File TS/061055/2024 |
|---|---|
| What the supplied record establishes | Contains the proposed building-plan parameters, including site, height, built-up-area and parking figures. |
| Identifier / date | 9805/2025; 30 June 2025 |
|---|---|
| What the supplied record establishes | The permit and supporting record describe a simple mortgage of built-up area in favour of MC, HMDA. |
| Identifier / date | 2300197219; 15 March 2023 |
|---|---|
| What the supplied record establishes | Identified in the approval material as NALA proceedings; the supplied extraction does not provide a separate full order for review. |
| Identifier / date | 24 July 2025 |
|---|---|
| What the supplied record establishes | Records the promoter’s development-agreement basis, completion undertaking, and stated project-fund commitments. |
The supplied materials do not establish an issued occupancy or completion certificate. A separate public HMDA DPMS layout lookup was not available in the supplied record; that unavailability is not evidence that an approval was refused. HMDA
1. Project at a glance
Project identity
Registered project name: Elv Legacy
Project type: Residential apartment project
Phase / registered portion: One proposed residential building; no separate phase name is disclosed
TG-RERA registration: P02400010274
Registration validity: 3 July 2025 to 3 July 2028, unless extended by the Authority
Registered promoter: ELV DEVELOPERS
RERA status: Registered; the registration certificate records a three-year validity period
Land and geographic identity
Locality / revenue village: Adibatla
Mandal: Ibrahimpatnam
District: Ranga Reddy
PIN: 501510
Project survey numbers and subdivisions: 708/A1/2, 708/A2/2 and 708/A4/2
Registered site extent: 2,006.58 sq. m in the building-permit record
Total / net land area: Total area 2,006.58 sq. m; net area 2,006.58 sq. m
Boundaries: East: Land in Sy. No. 708 Part; West: Land in Sy. No. 708 Part; North: Land in Sy. No. 656; South: Existing 33 Wide Road
Development identity
Sanctioning / permitting record: Building Permit Order issued by Adibatla Municipality / Municipal Corporation, recording HMDA building permission
Principal approval: 010453/BP/HMDA/2734/SMD/2024, approved 3 July 2025
Building arrangement: One proposed residential building
Sanctioned floor configuration: 1 Stilt + 5 upper floors
Approved height: 20.38 mt. total; 17.88 mt. from GL excluding Stilt Floor
Built-up area: The approval-plan record lists TOTAL BUA: 6300.84 and NET BUA: 5010.30; its parameters also list TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 6153.82 and PARKING AREA: 1143.52
Parking provision: Stilt parking; 30 proposed cars
Unit counts: 40 units in the RERA configuration record; the layout-plan extraction also states 40 units
Offering and status
RERA-filed configuration: 2BHK; 40 units
RERA-filed saleable area: 31.97 sq. m per recorded configuration
Booked / available: 0 booked and 40 available, as last read from the TG-RERA portal; the record does not provide an as-of date, so counts are indicative
Construction stage: No independently verified construction progress is supplied. The record identifies a proposed building; the permit extraction states that an occupancy certificate has not been issued
Promoter completion undertaking: Before 03 July 2028
Registration validity end: 03 July 2028, unless extended
Occupancy certificate: Not recorded as issued in the supplied permit extraction; the permit requires an occupancy certificate before occupation
2. The project story
Elv Legacy is registered as a residential apartment project on land at Adibatla, Ibrahimpatnam Mandal, Ranga Reddy District. The registered land comprises survey subdivisions 708/A1/2, 708/A2/2 and 708/A4/2, and the building-permit record describes a site extent of 2,006.58 sq. m.
The approval record describes a single residential building with one stilt level and five upper floors. The RERA filing records 40 2BHK units. The project is registered through 3 July 2028, and the promoter’s Form B declaration undertakes completion before 3 July 2028. These are registration and declared completion dates, not evidence that construction is complete. The supplied record does not establish current on-site progress or an issued occupancy certificate.
3. Master plan, architecture & building design
The approval-plan records describe one residential building on a 2,006.58 sq. m site, configured as 1 Stilt + 5 upper floors. The plan extraction gives a total height of 20.38 mt., including a stated 17.88 mt. from ground level excluding the stilt floor.
The plan extraction separately lists TOTAL BUA: 6300.84, NET BUA: 5010.30, and PARKING AREA: 1143.52. It also gives TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 6153.82 and VACANT PLOT AREA: 863.06. These are figures as recorded in the approval-plan extraction; the supplied materials do not include enough drawing detail to describe a building footprint, flats per floor, internal circulation, landscaping layout, or common-area distribution.
The available material identifies a stilt parking level but does not provide detailed floor plans or a reliable breakdown of the apartment layouts by floor. The permit record also lists a simple mortgage in favour of MC, HMDA over 517.97 sq. m of built-up area.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 0 | 40 | 31.97 sq. m | Not available | Not supplied |
The 31.97 sq. m figure is the RERA-filed saleable area. No usable software-measured carpet-area figure is supplied: the drawing record reports no measured flat design for the 2BHK configuration. Saleable area is not interchangeable with carpet area; the supplied drawing notes explain that saleable area also counts a home’s share of common areas.
The portal’s booked and available counts have no stated as-of date and should be treated as indicative rather than a live inventory confirmation.
5. Parking & vehicle circulation
The approval-plan extraction records 30 proposed car spaces and a stilt parking area of 1143.52. The building-permit conditions state that the stilt is to be used exclusively for vehicle parking and that parking or construction is not to be placed in setback areas. No separate visitor, accessible, or two-wheeler parking counts, parking-allocation schedule, ramp arrangement, or internal vehicle-circulation plan is supplied. The record of drawn or proposed parking does not establish exclusive allocation to a particular unit.
The approval material includes a provision for electric-vehicle charging infrastructure at parking places; it does not establish installation or completion.
6. Amenities, recreation & open spaces
The TG-RERA amenity record lists 14 project-facility categories. Each is recorded at 0% progress; the table below reports the filed status, not independently verified completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size supplied | 0%; completion not independently verified | |
| Water supply | Listed as available: YES; no source or capacity specified in this amenity record | 0%; completion not independently verified | |
| Sewerage | Chambers, lines, septic tank and STP listed; no capacity supplied | 0%; completion not independently verified | |
| Storm-water drains | No size supplied | 0%; completion not independently verified | |
| Green strip / TOT LOT / park | No area supplied | 0%; completion not independently verified | |
| Street lighting | No details supplied | 0%; completion not independently verified | |
| Community buildings | No description or size supplied | 0%; completion not independently verified | |
| Treatment and disposal of sewage and sullage water | No capacity supplied | 0%; completion not independently verified | |
| Solid-waste management and disposal | No system details supplied | 0%; completion not independently verified | |
| Water conservation / rainwater harvesting | Listed as available: YES; no capacity supplied | 0%; completion not independently verified | |
| Energy management | No details supplied | 0%; completion not independently verified | |
| Fire protection and fire-safety requirements | Listed as available: YES; no system details supplied in the amenity record | 0%; completion not independently verified | |
| Electrical meter room, sub-station, receiving station | No capacity supplied | 0%; completion not independently verified | |
| Aggregate recreational open space | No area supplied | 0%; completion not independently verified |
The building-permit material additionally lists rainwater-harvesting structures, a garbage house, STP, a transformer and electric-vehicle charging infrastructure as provisions or requirements. These records do not establish that the facilities have been installed or completed.
7. Utilities, building services & safety
Water and drainage: The approval record lists separate underground and terrace water-storage tanks, each with a capacity of 25,000 lts. It also lists STP and rainwater-harvesting structures. The available material does not specify a water source, treatment capacity, reuse volumes, or storm-water system details.
Electrical and building services: The plan conditions list a transformer and electric-vehicle charging infrastructure. The records do not specify electrical supply capacity, backup capacity, lift count or lift specifications. A vendor listing mentions power backup and borewell water, but those are third-party claims rather than established RERA-filed or completed provisions.
Fire and life safety: The approval material lists fire-fighting installations, emergency lighting, hose reels, down corners and an automatic sprinkler system. These are approval-record provisions, not evidence of installation, inspection, or statutory compliance. The permit also requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be carried out under qualified technical supervision.
Waste, access and safety measures: The approval record lists a garbage house and requires CCTV cameras. It does not provide CCTV coverage details, access-control arrangements, waste-segregation specifications, accessibility features, or lift capacities.
8. Location, access & connectivity
The registered project location is Adibatla village, Ibrahimpatnam Mandal, Ranga Reddy District, PIN 501510. The project boundaries recorded in the RERA filing include an existing 33 Wide Road on the south. The permit material also refers to a 4.5mts. road width and requires the approach road indicated in the plan to be developed and maintained as a black-topped road before release of occupancy.
A location record gives the nearest sampled Outer Ring Road interchange at approximately 0.9 km. This is a supplied location-data estimate, not a stated travel time.
9. Developer & development status
The TG-RERA-registered promoter is ELV DEVELOPERS, identified in the filing as a partnership. The supplied corporate identifier is GSTIN 36AAFFE9707K1Z3. The filing names Erugadindla Srinivas and Erugadindla Vinod as partners and names Erugadindla Srinivas as authorized signatory.
The promoter’s Form B declaration states that it entered into a Development Agreement-cum-General Power of Attorney dated 8 June 2023 with Sri Kommuri Venkata Ramulu Goud and undertakes completion before 3 July 2028. The RERA registration certificate is valid through 3 July 2028 unless extended. Neither date establishes construction progress or occupancy certification; no independently verified progress update is supplied here.
The supplied RERA address details give H.No. 5-80, Teachers Colony, Gurrum Guda, Adibatla, Ibrahimpatnam, Ranga Reddy, PIN 501510. No official website or project-specific contact details are provided.
10. Approvals, official records & documents
| Identifier / date | P02400010274; registration period 3 July 2025–3 July 2028 |
|---|---|
| What the supplied record establishes | Registration of Elv Legacy and stated promoter conditions, including sale agreements, conveyance registration, separate-account deposits and quarterly updates. |
| Identifier / date | 010453/BP/HMDA/2734/SMD/2024; 3 July 2025 |
|---|---|
| What the supplied record establishes | Records permission for a residential building of 1 Stilt + 5 upper floors on the project survey land; the order states an occupancy certificate is compulsory before occupation. |
| Identifier / date | File TS/061055/2024 |
|---|---|
| What the supplied record establishes | Contains the proposed building-plan parameters, including site, height, built-up-area and parking figures. |
| Identifier / date | 9805/2025; 30 June 2025 |
|---|---|
| What the supplied record establishes | The permit and supporting record describe a simple mortgage of built-up area in favour of MC, HMDA. |
| Identifier / date | 2300197219; 15 March 2023 |
|---|---|
| What the supplied record establishes | Identified in the approval material as NALA proceedings; the supplied extraction does not provide a separate full order for review. |
| Identifier / date | 24 July 2025 |
|---|---|
| What the supplied record establishes | Records the promoter’s development-agreement basis, completion undertaking, and stated project-fund commitments. |
The supplied materials do not establish an issued occupancy or completion certificate. A separate public HMDA DPMS layout lookup was not available in the supplied record; that unavailability is not evidence that an approval was refused.
Frequently asked questions
Is Elv Legacy registered with Telangana RERA?
Yes. Elv Legacy is registered with the Telangana Real Estate Regulatory Authority as P02400010274; the registration status is New Project.
Who is the developer of Elv Legacy?
The promoter named in the RERA registration is ELV DEVELOPERS.
Where is Elv Legacy located?
Elv Legacy is in Adibatla, Ibrahimpatnam, Rangareddy, Telangana (501510).
When will Elv Legacy be completed?
The promoter's proposed date of completion filed with RERA is 03/11/2028. This is the promoter's declaration, not a guarantee.
More projects in Adibatla







