Svs Constructions

SURENDER RAO · Khammam · RERA P00800005537

SVS CONSTRUCTIONS is a residential apartment project in Velugumatla, Khammam (Urban) Mandal, Khammam district, developed by registered promoter Surender Rao Vure. The project covers 520.15 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 10 apartments: 5 × 2BHK and 5 × 3BHK. It is registered under TG-RERA registration number P00800005537, with a proposed completion date of 14th July, 2025.

01What we found

Period endedTG-RERA registration ran to 14 Jul 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
1court case on this project's land (survey 408, Velugumatla)
6items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSVS CONSTRUCTIONS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified; registration record covers the project on Survey No. 408
TG-RERA registrationP00800005537; Form C registration issued under section 5
Registration validity20/12/2022 to 14/07/2025; certificate records a two-year validity period. No extension is recorded in the supplied evidence.
Registered promoterSurender Rao Vure in the registration certificate; other project filing records use SURENDER RAO / VURE SURENDER RAO. RERA record
RERA status in supplied recordRegistration dates are documented; current active/extended status is not established. Approvals record

Land and geographic identity

ItemProject record
LocalityVelugumatla; the registration certificate also gives “Khammam” as locality. RERA record
Revenue villageVelugumatla (also rendered “VELUGUMATLA” in the building approval). RERA record
Mandal / district / PINKhammam (Urban) Mandal / Khammam / 507318 RERA record
Project survey numberSurvey No. 408; no subdivision is specified in the project identity or registration certificate. Land records
Site identifiersPlot Nos. 29 and 30 RERA filing
Registered site extent520.15 sq. m Land records
Net / total areaBuilding-approval extraction: site area 520.15 sq. m, net area 518.18 sq. m. RERA land filing: total and net area 520.15 sq. m. Land records
Boundaries recorded in RERA filingEast: OTHERS PLOT; West: 30 FEET WIDE ROAD; North: OTHERS PLOT; South: OTHERS PLOT RERA filing

Development identity

ItemProject record
Sanctioning authorityKhammam Municipal Corporation; the RERA filing identifies DTCP in its authority field. Approvals record
Principal building approval0242/BP/3018/2022, approved 14 July 2022 Approvals record
Related file number005626/BP/DTCP/3018/0273/2022
Approved building configurationOne residential building, 1 Stilt + 5 upper floors; stated height 14.25 m
Approved area figuresApproved upper-floor area: 1,181.80 sq. m; stilt area: 229.90 sq. m
Building / tower countOne building is recorded in the project filing; the approval identifies “Building - A (APP).” RERA filing
Approved versus RERA-declared homesApproval filing lists 1 total building unit; the RERA unit schedule lists 10 apartments across two configurations. The meaning of the approval’s “building units” field is not further specified in the supplied material. RERA filing RERA unit table
Parking levelsStilt is approved; the building approval says stilt parking shown in the plan is to be used exclusively for vehicle parking. A parking count is not supplied.

Offering and status

ItemProject record
RERA-filed configurations5 × 2BHK and 5 × 3BHK RERA unit table
RERA-filed saleable area2BHK: 109.16 sq. m; 3BHK: 136.28 sq. m RERA unit table
Booked / available2BHK: 0 booked / 5 available; 3BHK: 0 booked / 5 available. These portal counts have no supplied as-of date and are indicative only. RERA unit table
Construction stageNo independently verified or dated construction-progress report is supplied. The RERA filing labels the project “New Project.” RERA filing RERA amenities
Completion deadlinePromoter’s Form B undertaking: 14th July, 2025.
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed records. The building approval states that an occupancy certificate is required before occupation.

2. The project story

SVS CONSTRUCTIONS is recorded with TG-RERA as a residential apartment development on Survey No. 408, Plot Nos. 29 and 30, in Velugumatla, Khammam (Urban) Mandal. The registration certificate identifies the registered portion by Survey No. 408; the supplied material does not identify a separate phase. Land records

The building-construction approval describes one residential building, “Building - A (APP),” with one stilt and five upper floors. The RERA unit schedule lists ten apartments: five 2BHK and five 3BHK. The promoter’s filed Form B sets 14 July 2025 as the completion undertaking. The supplied evidence does not establish construction progress through an independently verified site inspection, nor does it include an occupancy certificate. RERA unit table Document index

3. Master plan, architecture & building design

The building approval records a site area of 520.15 sq. m, a net area of 518.18 sq. m, approved upper-floor area of 1,181.80 sq. m, and stilt area of 229.90 sq. m. It identifies one residential building with 1 Stilt + 5 upper floors and a stated height of 14.25 m. These are approval-record figures, not carpet or saleable-area figures.

The approval extraction requires the sanctioned plan to be followed and displayed at the site, prior approval for modifications, and one entry and one exit with minimum width 4.5 m and height clearance 5 m. It also specifies tree planting along the site periphery and in front, a fenced tot-lot to be maintained as greenery, a rainwater-harvesting structure, transformer space and a garbage house. The listed tot-lot area is “NA”; no building footprint, floor-by-floor apartment count, lift or stair count, or detailed internal-circulation drawing information is available in the supplied material.

4. Homes, configurations & floor plans

The RERA filing records the unit counts and saleable areas below. The carpet-area figures are software measurements from the supplied floor-plan drawing extraction, not RERA-filed disclosures; the drawing measurement record notes that review is needed for one 2BHK design. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505109.16 sq. m71.8–71.9 sq. m (median 71.9 sq. m)34%
3BHK505136.28 sq. m98.3–98.5 sq. m (median 98.5 sq. m)28%

The drawing-derived sample shows a 2BHK plan with living/dining, kitchen, two bedrooms, two toilets and a balcony; the measured balcony is 2.07 sq. m and excluded from measured carpet area. The sample 3BHK plan shows living, dining/kitchen, three bedrooms, three toilets and a balcony; the measured balcony is 11.37 sq. m, also excluded from measured carpet area. These room areas and dimensions are drawing-based software measurements, not RERA disclosures.

Carpet area is the measured usable internal area in the drawings; the filed saleable area is a separate RERA figure and may include the unit’s share of common areas. The supplied records do not provide a separate RERA-filed carpet-area figure or an area breakdown for common-area loading. RERA unit table Floor plans

5. Parking & vehicle circulation

The building approval says that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The evidence supplied identifies a stilt but does not establish a sanctioned parking-space count, visitor or accessible spaces, parking allocation by apartment, a basement/cellar configuration, parking ramp details, or EV charging. A drawn or stated parking area does not, by itself, establish an exclusive allocation to a purchaser.

6. Amenities, recreation & open spaces

The building approval includes requirements for greenery, a fenced tot-lot, rainwater harvesting and a garbage house. TG-RERA amenity fields list the facilities below, but report 0% progress for each listed item; this is a filed progress field, not independent confirmation of site conditions. RERA amenities

Green strip / tot-lot / park
Description / sizeTot-lot area recorded as “NA” in the approval extraction; approval requires a fenced tot-lot maintained as greenery and a greenery strip around the site.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity field: 0%; completion not independently verified.
Internal roads & footpaths
Description / sizeNo dimensions or detailed layout supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity field: 0%; completion not independently verified.
Community buildings
Description / sizeNo description or area supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity field: 0%; completion not independently verified.
Water conservation / rainwater harvesting
Description / sizeApproval specifies a rainwater-harvesting structure and records 4 RWHPs.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity field: 0%; completion not independently verified.

No project-filed clubhouse, sports, recreation or other indoor amenity details are available in the supplied RERA material.

7. Utilities, building services & safety

The building approval specifies separate underground static water storage of 25,000 L and a separate residential terrace tank of 25,000 L. TG-RERA fields list water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station; the listed fields show 0% progress where a percentage is supplied. The records do not provide a water source, STP capacity, reuse arrangement, electrical capacity, backup capacity, lift count or capacity, or a detailed fire-system design. RERA amenities

The approval requires a garbage house within the premises; provision of transformer space; construction of services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations under qualified technical personnel; and minimum separation from high- and low-tension electrical lines. It states that an automatic sprinkler system is required if basement area exceeds 200 sq. m. These are approval conditions; the supplied evidence does not independently confirm installation or statutory compliance.

8. Location, access & connectivity

The registered project location is Velugumatla, Khammam (Urban) Mandal, Khammam district, Telangana, PIN 507318. The building approval identifies Survey / Premises No. 408 and records a road-width reference of 18M; the RERA land schedule lists the west boundary as a 30 FEET WIDE ROAD. RERA record RERA filing

A supplied cadastral-parcel centroid is 17.41528, 78.35459, and the location record lists Financial District (Nanakramguda) at 1.2 km. The supplied data does not give a verified route, travel time or public-transport connection. Location record

9. Developer & development status

The TG-RERA registration certificate names Surender Rao Vure as promoter; the project filing and Form B use SURENDER RAO / VURE SURENDER RAO. The legal entity type, corporate registration identifiers, registered office beyond the supplied project/promoter address, and official contact or website details are not established in the supplied evidence. RERA record Corporate record

Form B is the promoter’s filed declaration and completion undertaking, including a completion date of 14th July, 2025. The supplied evidence does not include dated, independently verified construction progress or an occupancy certificate. The registration certificate records validity through 14/07/2025 and no extension is shown in the reviewed materials. Document index

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificate, P00800005537Form C registration for SVS CONSTRUCTIONS; issued 20/12/2022, valid through 14/07/2025 according to the certificate.
Building-construction approval, 0242/BP/3018/2022Khammam Municipal Corporation approval dated 14 July, 2022, for the residential building at Survey No. 408; extracted as one stilt plus five upper floors.
Related approval file, 005626/BP/DTCP/3018/0273/2022File number stated in the building-approval extraction.
Form B promoter declarationFiled declaration by VURE SURENDER RAO, including title and encumbrance assertions, project-fund obligations and the 14th July, 2025 completion undertaking. These are promoter declarations.
Layout / floor-plan record, 265212Identified in the supplied material as a layout-plan document; drawing-based software measurements were extracted for 2BHK and 3BHK plans. Floor plans
Occupancy / completion certificateNot supplied in the reviewed records. Document index

The building approval also lists LRS Proceeding Nos. GI/LRS/881/2013 and G1/LRS/878/2013, dated 27/07/2013, transaction reference TS/13970/2022, notarised affidavit number 9168 dated 07 July, 2022, and S.R.O. 2208KHAMMAM RO dated 07 July, 2022.

Frequently asked questions

Is SVS CONSTRUCTIONS registered with Telangana RERA?

Yes. SVS CONSTRUCTIONS is registered with the Telangana Real Estate Regulatory Authority as P00800005537; the registration status is New Project.

Who is the developer of SVS CONSTRUCTIONS?

The promoter named in the RERA registration is SURENDER RAO.

Where is SVS CONSTRUCTIONS located?

SVS CONSTRUCTIONS is in Velugumatla, Khammam (Urban) Mandal, Khammam, Telangana (507318).

When will SVS CONSTRUCTIONS be completed?

The promoter's proposed date of completion filed with RERA is 14/07/2025. This is the promoter's declaration, not a guarantee.