Milestone Harmony
MILESTONE DEVELOPERS AND OTHERS · Rangareddy · RERA P02400011133
MILESTONE HARMONY is a plotted development at FEROZGUDA, Ibrahimpatnam, Ranga Reddy, with a registered site extent of 21724.41 sq.m. It is being developed by MILESTONE DEVELOPERS AND OTHERS and comprises 55 plots, with stated plot sizes of 129.8–401.81 sq.m (155.2–480.6 sq.yd). The project is registered under TG-RERA registration P02400011133, and its proposed completion is 18/10/2029.
More from Milestone Developers · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
| Project identity | Record |
|---|---|
| Registered project name | MILESTONE HARMONY RERA record |
| Project type | Plotted development / open-plot layout RERA record |
| Registered phase or portion | New project; the registered portion is not separately described as a phase in the supplied records. RERA record |
| TG-RERA registration | P02400011133; registered under section 5. The certificate records validity from 19/06/2026 to 18/06/2029. RERA record |
| RERA status | Registered; certificate issued 22/08/2026. |
| Registered promoter | MILESTONE DEVELOPERS AND OTHERS; entity type is recorded as “Others.” RERA record RERA filing |
| Land and geographic identity | Record |
|---|---|
| Locality | Ibrahimpatnam Mandal / Ferozguda. The layout records the revenue village as FEROZGUDA. RERA record |
| Revenue village | FEROZGUDA (also written Ferozguda in the filed layout-permission records). |
| Mandal / district / PIN | Ibrahimpatnam / Ranga Reddy / 501510. RERA record |
| Project survey number and subdivisions | Survey No. 84Part; the layout approval extraction renders it 84 PART. RERA record Land records |
| Registered site extent | 21724.41 sq.m. |
| Layout areas | Total Layout Area: 21262.40 sq.m; the drawing records Net Layout Area: 21262.4 sq.m and Road Widening Area: 81.86 sq.m. |
| Boundaries in RERA-filed land details | North: 15M WIDE MAIN ROAD; West: 30M WIDE MAIN ROAD; East and South: OTHERS LAND. RERA filing |
| Development identity | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the filed layout-permission record also identifies GHMC in its delegated/local-body context. Approvals record |
| Principal layout-permission identifiers | 2241/HMDA/SWDL/2026, dated 19/06/2026; application/file number 017660/HMDA/04467/SWDL/SHZ/2026. Approvals record |
| Final-layout drawing identifiers | The RERA-filed drawing is headed “MILESTONE DEVELOPERS HMDA APPROVED FINAL LAYOUT”; it also carries approval number 000150/LO/Plg/HMDA/2021, with approval date recorded as 10 Aug 2023. |
| Approved area / buildings | Approved built-up area is recorded as 12549.15 sq.m; the project is a plotted layout, not a building scheme in the supplied project record. No tower, block, building-floor or parking-level count is disclosed. RERA filing Layout record |
| RERA-declared plotted count | The drawing schedule records 55 plots. Layout record |
| Parking provision | Layout area statement records Common Parking Area: 0.00 sq.m. No sanctioned parking-space count or plot-specific parking allocation is supplied. |
| Offering and status | Record |
|---|---|
| Offered unit type | Plots. The layout drawing’s plot schedule records 55 plots; RERA unit-by-unit booked/available counts are not supplied here. Layout record |
| Plot-size information | Software-read layout schedule covers 55 plots; stated size range is 129.8–401.81 sq.m (155.2–480.6 sq.yd). Layout record |
| Construction stage | The project is identified as a “New Project.” No independently verified site-progress percentage or construction-stage report is provided. RERA record |
| Completion date | The promoter’s Form B undertaking states completion by 18/06/2029. The header separately records proposed completion as 18/10/2029. RERA record |
| Occupancy/completion certificate | No occupancy or completion certificate is identified in the supplied project evidence. For a plotted layout, the supplied record instead includes layout-permission and development-work requirements. Document index |
2. The project story
- MILESTONE HARMONY is registered as a plotted development on Survey No. 84Part at Ferozguda, Ibrahimpatnam Mandal, Ranga Reddy District. The filed layout drawing presents an open-plot scheme with 55 scheduled plots, internal roads, open space, social-infrastructure land and utility land. RERA record Land records Layout record
- The drawing allocates 12549.15 sq.m to plots, 5641.76 sq.m to roads, 1599.22 sq.m to open space, 533.34 sq.m to social infrastructure and 178.23 sq.m to utilities. The layout-permission material describes development works to be completed, including road formation, drainage, water and electricity infrastructure, park development and rainwater-harvesting pits. These are required or described works; the supplied evidence does not establish their current completion on site.
- The registration certificate is valid through 18/06/2029; that is the registration-validity period, not an occupancy certificate or proof of completion. The promoter’s Form B gives 18/06/2029 as its completion undertaking, while the project header records 18/10/2029 as proposed completion. No site inspection or independently verified construction-progress figure is supplied. RERA record
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The approved-layout drawing’s area statement identifies the following land uses; these are layout areas, not building floor areas.
| Layout component | Area | Drawing-stated share |
|---|---|---|
| Plotted area | 12549.15 sq.m | 59.02 % |
| Road area | 5641.76 sq.m | 26.53 % |
| Open space area | 1599.22 sq.m | 7.52 % |
| Buffer area | 760.70 sq.m | 3.58 % |
| Social infrastructure area | 533.34 sq.m | 2.51 % |
| Utility area | 178.23 sq.m | 0.84 % |
| Green strip area | 0.00 sq.m | 0 % |
| Common parking area | 0.00 sq.m | 0 % |
| Facilities area | 0.00 sq.m | 0 % |
| Amenities area | 0.00 sq.m | 0 % |
| Green belt area | 0.00 sq.m | 0 % |
| Total layout area | 21262.40 sq.m | 100 % |
- The RERA-filed drawing includes 55 plots and road labels with widths including 30m Wide Main Road, 15m Wide Main Road, and other internal-road labels. The complete road-width annotations are not reproduced here; the drawing-derived road network should be checked on the plan itself. Layout record
- The drawing-derived plot schedule and size bands are software-read from the layout plan and are not a substitute for checking individual plot dimensions against the stamped drawing. Layout record
| Software-read plot-size band | Plot count |
|---|---|
| 150–200 sq.yd (125–167 sq.m) | 7 |
| 200–250 sq.yd (167–209 sq.m) | 7 |
| 250–300 sq.yd (209–251 sq.m) | 27 |
| 300–400 sq.yd (251–334 sq.m) | 13 |
| 400–500 sq.yd (334–418 sq.m) | 1 |
The supplied records do not provide building footprints, building heights, apartment configurations, floor arrangements or a building-phase schedule. The RERA-fielded 12549.15 sq.m is labelled approved built-up area in the project information; it is distinct from the layout drawing’s 12549.15 sq.m plotted area. No FSI-counted, carpet or saleable building-area schedule is supplied. RERA filing Layout record
4. Homes, configurations & floor plans
This project is a plotted development, so apartment configurations and apartment floor plans are not applicable to the offering described in the supplied records. Individual plot inventory status—booked, available or sold—is not provided in this tab’s evidence. RERA record Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 55 | Not disclosed | Not disclosed | Not disclosed plot-by-plot | Not applicable | Not supplied |
The software-read drawing schedule gives plot sizes from 129.8 sq.m (155.2 sq.yd) to 401.81 sq.m (480.6 sq.yd); the median is 222.97 sq.m (266.7 sq.yd). These are software-measured from the drawing text and should be checked against the layout plan. Layout record
5. Parking & vehicle circulation
The layout area statement shows 0.00 sq.m under common parking area. The supplied materials do not give a sanctioned count of vehicle spaces, visitor or accessible parking, EV-charging locations, or plot-specific parking allocations. Internal roads are shown in the layout, and the drawing includes multiple road-width annotations; no parking-space-per-plot ratio is established.
The layout-permission conditions state that any cellar or stilt parking approved in a plan must be used exclusively for vehicle parking, but the supplied project record does not identify a cellar, stilt parking or parking provision for this plotted layout.
6. Amenities, recreation & open spaces
The RERA amenity data marks several layout-infrastructure categories “YES,” while recording 0% progress for the listed items. The layout-permission documents describe works or requirements; those descriptions do not by themselves verify that the facilities have been completed. RERA amenities
| Description / size | No clubhouse or indoor facility is identified in the supplied RERA layout records. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Not disclosed; no completion verification supplied. |
| Description / size | Open-space area: 1599.22 sq.m (7.52 %); drawing/permission refers to park development and a tot-lot. |
|---|---|
| Declared progress / verified status | Amenity data records Green Strip/TOT LOT/Park as available “YES” and progress 0%; physical completion is not independently verified. |
| Description / size | Open space: 1599.22 sq.m; buffer area: 760.70 sq.m. Drawing conditions refer to tree planting and maintaining greenery. |
|---|---|
| Declared progress / verified status | Required/described in the filed records; actual delivery not verified. |
| Description / size | Social-infrastructure land: 533.34 sq.m; utility land: 178.23 sq.m. No building or facility schedule for these areas is supplied. |
|---|---|
| Declared progress / verified status | Areas are shown in the layout; facility construction or completion is not established. |
Vendor-listed features such as power backup, CCTV, fire sprinklers and sewage treatment are third-party listing claims, not established as delivered or as sanctioned project amenities in the supplied RERA layout evidence. Promoter website
7. Utilities, building services & safety
The layout-permission material describes the infrastructure intended or required for layout development, including internal water-supply pipelines, an overhead tank and sumps, electricity lines, transformer, street lighting, underground utilities, drainage, a common septic tank/STP, rainwater-harvesting pits, garbage management and a bio-compost unit. These are document-described provisions and conditions; the records supplied do not verify their present installation, capacity or operation.
| Evidence in the filed records | Water-supply infrastructure, overhead tank and sumps are described; permission conditions refer to arranging connectivity for potable water. |
|---|---|
| Status limitation | Source, storage capacity and operational status are not supplied. |
| Evidence in the filed records | Common septic tank/STP, underground drainage and storm-water drainage are described; the RERA amenity record marks sewerage and storm-water drains “YES.” |
|---|---|
| Status limitation | No capacity, commissioning evidence or verified operating status is provided. RERA amenities |
| Evidence in the filed records | Electricity supply lines, street lighting and a transformer/transformer yard are described; the RERA amenity record marks the electrical meter room/sub-station/receiving station “YES.” |
|---|---|
| Status limitation | No electrical capacity or completion verification is supplied. RERA amenities |
| Evidence in the filed records | Permission conditions describe solid-waste space, source segregation and a bio-compost unit; a garbage house is also mentioned in the layout conditions. |
|---|---|
| Status limitation | No verified installation or operating details are provided. |
| Evidence in the filed records | Rainwater-harvesting pits, avenue planting and park development are described. |
|---|---|
| Status limitation | No completion or performance evidence is supplied. |
| Evidence in the filed records | The drawing conditions refer to fire-safety requirements and qualified technical supervision. |
|---|---|
| Status limitation | These are conditions and general requirements, not evidence of a project-specific clearance or completed system. |
| Evidence in the filed records | No project-specific lift, accessible-circulation, CCTV, backup-power or security-system specifications are supplied in the RERA-filed layout evidence. |
|---|---|
| Status limitation | Not disclosed or verified. RERA amenities Document index |
8. Location, access & connectivity
The registered project location is Ferozguda Village, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana, PIN 501510. The layout records a 30M WIDE MAIN ROAD along the west boundary and a 15M WIDE MAIN ROAD along the north boundary; the east and south boundaries are described as other land. RERA record RERA filing
The supplied location dataset gives the following mapped distances. These are location-data distances; the evidence does not identify them as measured road journeys or give travel times. Location record
| Nearby feature | Category | Supplied distance |
|---|---|---|
| Financial District (Nanakramguda) | Anchor | 1.2 km |
| IndusInd Bank | Bank | 0.4 km |
| Unnamed bus station | Bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | College | 1.6 km |
| Sankaraya Eye Hospital | Hospital | 1.6 km |
| ADP | IT office | 0.0 km |
| South India Shopping Mall | Mall | 2.6 km |
| Unnamed park | Park | 1.2 km |
| Nanakramguda Govt primary school | School | 0.5 km |
No public-transport service frequency, route details or project-specific travel times are provided. Location record
9. Developer & development status
The registered promoter is MILESTONE DEVELOPERS AND OTHERS. The RERA record lists organization type as “Others”; a more specific legal entity type is not supplied. The promoter’s GSTIN is 36ABCFM7496H1ZT. RERA record RERA filing Corporate record
- The registered office is recorded on the TG-RERA certificate as Village: Telicom Nagar, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500032. The project registration record separately lists the promoter address as PLOT NO 21, 1ST FLOOR, JAYABHERI PINE VALLEY, TELECOM NAGAR, FEROZGUDA VILLAGE, IBRAHIMPATNAM MANDAL, Ranga Reddy, PIN 501510. RERA filing
- The promoter’s Form B, dated 24 JUN 2026, declares a completion date of 18/06/2029 and states that 70% of amounts realised will be deposited in a separate scheduled-bank account. The registration certificate likewise records the 70% separate-account condition and requires quarterly updates. These are filed declarations and certificate conditions, not evidence of current construction progress or fund movement.
- No phase-wise construction-progress report or independently verified site-progress figure is supplied. The project header records proposed completion as 18/10/2029; this is reported separately from the Form B completion undertaking and the registration-validity end date. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for MILESTONE HARMONY, registration P02400011133, issued 22/08/2026, valid 19/06/2026–18/06/2029. |
| Layout drawing | RERA-filed drawing titled “MILESTONE DEVELOPERS HMDA APPROVED FINAL LAYOUT,” showing Survey No. 84 PART, 55 plots and the layout area statement. |
| Layout permission | Permission record 2241/HMDA/SWDL/2026, dated 19/06/2026, associated with application/file 017660/HMDA/04467/SWDL/SHZ/2026; the supplied extraction describes it as a draft layout letter with development and final-release conditions. |
| Additional approval identifier on drawing | 000150/LO/Plg/HMDA/2021, with recorded approval date 10 Aug 2023. |
| Mortgage and public-purpose transfer records referenced in layout permission | Mortgage deeds 8880/2026 and 8881/2026, and gift deed 8887/2026, all dated 06/06/2026, are referenced in the permission extraction. |
| Commencement / occupancy / completion certificates | No separate project commencement certificate or occupancy/completion certificate is identified in the supplied evidence. Document index |
| Promoter declaration | Form B declaration for the project, dated 24 JUN 2026, signed by the authorized signatory. |
The supplied records include conditions concerning development works, handing over specified layout areas, and submission of completion/occupancy documentation where applicable. This overview identifies the available records; it does not independently verify fulfilment of those conditions.
1. Project at a glance
Registered project name: MILESTONE HARMONY
Project type: Plotted development / open-plot layout
Registered phase or portion: New project; the registered portion is not separately described as a phase in the supplied records.
TG-RERA registration: P02400011133; registered under section 5. The certificate records validity from 19/06/2026 to 18/06/2029.
RERA status: Registered; certificate issued 22/08/2026.
Registered promoter: MILESTONE DEVELOPERS AND OTHERS; entity type is recorded as “Others.”
Locality: Ibrahimpatnam Mandal / Ferozguda. The layout records the revenue village as FEROZGUDA.
Revenue village: FEROZGUDA (also written Ferozguda in the filed layout-permission records).
Mandal / district / PIN: Ibrahimpatnam / Ranga Reddy / 501510.
Project survey number and subdivisions: Survey No. 84Part; the layout approval extraction renders it 84 PART.
Registered site extent: 21724.41 sq.m.
Layout areas: Total Layout Area: 21262.40 sq.m; the drawing records Net Layout Area: 21262.4 sq.m and Road Widening Area: 81.86 sq.m.
Boundaries in RERA-filed land details: North: 15M WIDE MAIN ROAD; West: 30M WIDE MAIN ROAD; East and South: OTHERS LAND.
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the filed layout-permission record also identifies GHMC in its delegated/local-body context.
Principal layout-permission identifiers: 2241/HMDA/SWDL/2026, dated 19/06/2026; application/file number 017660/HMDA/04467/SWDL/SHZ/2026.
Final-layout drawing identifiers: The RERA-filed drawing is headed “MILESTONE DEVELOPERS HMDA APPROVED FINAL LAYOUT”; it also carries approval number 000150/LO/Plg/HMDA/2021, with approval date recorded as 10 Aug 2023.
Approved area / buildings: Approved built-up area is recorded as 12549.15 sq.m; the project is a plotted layout, not a building scheme in the supplied project record. No tower, block, building-floor or parking-level count is disclosed.
RERA-declared plotted count: The drawing schedule records 55 plots.
Parking provision: Layout area statement records Common Parking Area: 0.00 sq.m. No sanctioned parking-space count or plot-specific parking allocation is supplied.
Offered unit type: Plots. The layout drawing’s plot schedule records 55 plots; RERA unit-by-unit booked/available counts are not supplied here.
Plot-size information: Software-read layout schedule covers 55 plots; stated size range is 129.8–401.81 sq.m (155.2–480.6 sq.yd).
Construction stage: The project is identified as a “New Project.” No independently verified site-progress percentage or construction-stage report is provided.
Completion date: The promoter’s Form B undertaking states completion by 18/06/2029. The header separately records proposed completion as 18/10/2029.
Occupancy/completion certificate: No occupancy or completion certificate is identified in the supplied project evidence. For a plotted layout, the supplied record instead includes layout-permission and development-work requirements.
2. The project story
- MILESTONE HARMONY is registered as a plotted development on Survey No. 84Part at Ferozguda, Ibrahimpatnam Mandal, Ranga Reddy District. The filed layout drawing presents an open-plot scheme with 55 scheduled plots, internal roads, open space, social-infrastructure land and utility land.
- The drawing allocates 12549.15 sq.m to plots, 5641.76 sq.m to roads, 1599.22 sq.m to open space, 533.34 sq.m to social infrastructure and 178.23 sq.m to utilities. The layout-permission material describes development works to be completed, including road formation, drainage, water and electricity infrastructure, park development and rainwater-harvesting pits. These are required or described works; the supplied evidence does not establish their current completion on site.
- The registration certificate is valid through 18/06/2029; that is the registration-validity period, not an occupancy certificate or proof of completion. The promoter’s Form B gives 18/06/2029 as its completion undertaking, while the project header records 18/10/2029 as proposed completion. No site inspection or independently verified construction-progress figure is supplied.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The approved-layout drawing’s area statement identifies the following land uses; these are layout areas, not building floor areas.
| Layout component | Area | Drawing-stated share |
|---|---|---|
| Plotted area | 12549.15 sq.m | 59.02 % |
| Road area | 5641.76 sq.m | 26.53 % |
| Open space area | 1599.22 sq.m | 7.52 % |
| Buffer area | 760.70 sq.m | 3.58 % |
| Social infrastructure area | 533.34 sq.m | 2.51 % |
| Utility area | 178.23 sq.m | 0.84 % |
| Green strip area | 0.00 sq.m | 0 % |
| Common parking area | 0.00 sq.m | 0 % |
| Facilities area | 0.00 sq.m | 0 % |
| Amenities area | 0.00 sq.m | 0 % |
| Green belt area | 0.00 sq.m | 0 % |
| Total layout area | 21262.40 sq.m | 100 % |
- The RERA-filed drawing includes 55 plots and road labels with widths including 30m Wide Main Road, 15m Wide Main Road, and other internal-road labels. The complete road-width annotations are not reproduced here; the drawing-derived road network should be checked on the plan itself.
- The drawing-derived plot schedule and size bands are software-read from the layout plan and are not a substitute for checking individual plot dimensions against the stamped drawing.
150–200 sq.yd (125–167 sq.m): 7
200–250 sq.yd (167–209 sq.m): 7
250–300 sq.yd (209–251 sq.m): 27
300–400 sq.yd (251–334 sq.m): 13
400–500 sq.yd (334–418 sq.m): 1
The supplied records do not provide building footprints, building heights, apartment configurations, floor arrangements or a building-phase schedule. The RERA-fielded 12549.15 sq.m is labelled approved built-up area in the project information; it is distinct from the layout drawing’s 12549.15 sq.m plotted area. No FSI-counted, carpet or saleable building-area schedule is supplied.
4. Homes, configurations & floor plans
This project is a plotted development, so apartment configurations and apartment floor plans are not applicable to the offering described in the supplied records. Individual plot inventory status—booked, available or sold—is not provided in this tab’s evidence.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 55 | Not disclosed | Not disclosed | Not disclosed plot-by-plot | Not applicable | Not supplied |
The software-read drawing schedule gives plot sizes from 129.8 sq.m (155.2 sq.yd) to 401.81 sq.m (480.6 sq.yd); the median is 222.97 sq.m (266.7 sq.yd). These are software-measured from the drawing text and should be checked against the layout plan.
5. Parking & vehicle circulation
The layout area statement shows 0.00 sq.m under common parking area. The supplied materials do not give a sanctioned count of vehicle spaces, visitor or accessible parking, EV-charging locations, or plot-specific parking allocations. Internal roads are shown in the layout, and the drawing includes multiple road-width annotations; no parking-space-per-plot ratio is established.
The layout-permission conditions state that any cellar or stilt parking approved in a plan must be used exclusively for vehicle parking, but the supplied project record does not identify a cellar, stilt parking or parking provision for this plotted layout.
6. Amenities, recreation & open spaces
The RERA amenity data marks several layout-infrastructure categories “YES,” while recording 0% progress for the listed items. The layout-permission documents describe works or requirements; those descriptions do not by themselves verify that the facilities have been completed.
| Description / size | No clubhouse or indoor facility is identified in the supplied RERA layout records. |
|---|---|
| Declared progress / verified status | Not disclosed; no completion verification supplied. |
| Description / size | Open-space area: 1599.22 sq.m (7.52 %); drawing/permission refers to park development and a tot-lot. |
|---|---|
| Declared progress / verified status | Amenity data records Green Strip/TOT LOT/Park as available “YES” and progress 0%; physical completion is not independently verified. |
| Description / size | Open space: 1599.22 sq.m; buffer area: 760.70 sq.m. Drawing conditions refer to tree planting and maintaining greenery. |
|---|---|
| Declared progress / verified status | Required/described in the filed records; actual delivery not verified. |
| Description / size | Social-infrastructure land: 533.34 sq.m; utility land: 178.23 sq.m. No building or facility schedule for these areas is supplied. |
|---|---|
| Declared progress / verified status | Areas are shown in the layout; facility construction or completion is not established. |
Vendor-listed features such as power backup, CCTV, fire sprinklers and sewage treatment are third-party listing claims, not established as delivered or as sanctioned project amenities in the supplied RERA layout evidence.
7. Utilities, building services & safety
The layout-permission material describes the infrastructure intended or required for layout development, including internal water-supply pipelines, an overhead tank and sumps, electricity lines, transformer, street lighting, underground utilities, drainage, a common septic tank/STP, rainwater-harvesting pits, garbage management and a bio-compost unit. These are document-described provisions and conditions; the records supplied do not verify their present installation, capacity or operation.
| Evidence in the filed records | Water-supply infrastructure, overhead tank and sumps are described; permission conditions refer to arranging connectivity for potable water. |
|---|---|
| Status limitation | Source, storage capacity and operational status are not supplied. |
| Evidence in the filed records | Common septic tank/STP, underground drainage and storm-water drainage are described; the RERA amenity record marks sewerage and storm-water drains “YES.” |
|---|---|
| Status limitation | No capacity, commissioning evidence or verified operating status is provided. |
| Evidence in the filed records | Electricity supply lines, street lighting and a transformer/transformer yard are described; the RERA amenity record marks the electrical meter room/sub-station/receiving station “YES.” |
|---|---|
| Status limitation | No electrical capacity or completion verification is supplied. |
| Evidence in the filed records | Permission conditions describe solid-waste space, source segregation and a bio-compost unit; a garbage house is also mentioned in the layout conditions. |
|---|---|
| Status limitation | No verified installation or operating details are provided. |
| Evidence in the filed records | Rainwater-harvesting pits, avenue planting and park development are described. |
|---|---|
| Status limitation | No completion or performance evidence is supplied. |
| Evidence in the filed records | The drawing conditions refer to fire-safety requirements and qualified technical supervision. |
|---|---|
| Status limitation | These are conditions and general requirements, not evidence of a project-specific clearance or completed system. |
| Evidence in the filed records | No project-specific lift, accessible-circulation, CCTV, backup-power or security-system specifications are supplied in the RERA-filed layout evidence. |
|---|---|
| Status limitation | Not disclosed or verified. |
8. Location, access & connectivity
The registered project location is Ferozguda Village, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana, PIN 501510. The layout records a 30M WIDE MAIN ROAD along the west boundary and a 15M WIDE MAIN ROAD along the north boundary; the east and south boundaries are described as other land.
The supplied location dataset gives the following mapped distances. These are location-data distances; the evidence does not identify them as measured road journeys or give travel times.
| Nearby feature | Category | Supplied distance |
|---|---|---|
| Financial District (Nanakramguda) | Anchor | 1.2 km |
| IndusInd Bank | Bank | 0.4 km |
| Unnamed bus station | Bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | College | 1.6 km |
| Sankaraya Eye Hospital | Hospital | 1.6 km |
| ADP | IT office | 0.0 km |
| South India Shopping Mall | Mall | 2.6 km |
| Unnamed park | Park | 1.2 km |
| Nanakramguda Govt primary school | School | 0.5 km |
No public-transport service frequency, route details or project-specific travel times are provided.
9. Developer & development status
The registered promoter is MILESTONE DEVELOPERS AND OTHERS. The RERA record lists organization type as “Others”; a more specific legal entity type is not supplied. The promoter’s GSTIN is 36ABCFM7496H1ZT.
- The registered office is recorded on the TG-RERA certificate as Village: Telicom Nagar, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500032. The project registration record separately lists the promoter address as PLOT NO 21, 1ST FLOOR, JAYABHERI PINE VALLEY, TELECOM NAGAR, FEROZGUDA VILLAGE, IBRAHIMPATNAM MANDAL, Ranga Reddy, PIN 501510.
- The promoter’s Form B, dated 24 JUN 2026, declares a completion date of 18/06/2029 and states that 70% of amounts realised will be deposited in a separate scheduled-bank account. The registration certificate likewise records the 70% separate-account condition and requires quarterly updates. These are filed declarations and certificate conditions, not evidence of current construction progress or fund movement.
- No phase-wise construction-progress report or independently verified site-progress figure is supplied. The project header records proposed completion as 18/10/2029; this is reported separately from the Form B completion undertaking and the registration-validity end date.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for MILESTONE HARMONY, registration P02400011133, issued 22/08/2026, valid 19/06/2026–18/06/2029.
Layout drawing: RERA-filed drawing titled “MILESTONE DEVELOPERS HMDA APPROVED FINAL LAYOUT,” showing Survey No. 84 PART, 55 plots and the layout area statement.
Layout permission: Permission record 2241/HMDA/SWDL/2026, dated 19/06/2026, associated with application/file 017660/HMDA/04467/SWDL/SHZ/2026; the supplied extraction describes it as a draft layout letter with development and final-release conditions.
Additional approval identifier on drawing: 000150/LO/Plg/HMDA/2021, with recorded approval date 10 Aug 2023.
Mortgage and public-purpose transfer records referenced in layout permission: Mortgage deeds 8880/2026 and 8881/2026, and gift deed 8887/2026, all dated 06/06/2026, are referenced in the permission extraction.
Commencement / occupancy / completion certificates: No separate project commencement certificate or occupancy/completion certificate is identified in the supplied evidence.
Promoter declaration: Form B declaration for the project, dated 24 JUN 2026, signed by the authorized signatory.
The supplied records include conditions concerning development works, handing over specified layout areas, and submission of completion/occupancy documentation where applicable. This overview identifies the available records; it does not independently verify fulfilment of those conditions.
Frequently asked questions
Is MILESTONE HARMONY registered with Telangana RERA?
Yes. MILESTONE HARMONY is registered with the Telangana Real Estate Regulatory Authority as P02400011133; the registration status is New Project.
Who is the developer of MILESTONE HARMONY?
The promoter named in the RERA registration is MILESTONE DEVELOPERS AND OTHERS.
Where is MILESTONE HARMONY located?
MILESTONE HARMONY is in IBRAHIMPATNAM MANDAL, Ibrahimpatnam, Rangareddy, Telangana (501510).
When will MILESTONE HARMONY be completed?
The promoter's proposed date of completion filed with RERA is 18/10/2029. This is the promoter's declaration, not a guarantee.
More projects in Ibrahimpatnam