Laxmi Narayana Nilayam
MARUPAKULA · Hyderabad · RERA P02500004558
LAXMI NARAYANA NILAYAM is a residential apartment project in Padma Nagar-2, Qutubullapur mandal, Hyderabad district. The registered promoter is Marupakula Pushpalatha. The project is on 418 sq. m. of land and comprises one building, A (BUILDING), with 1 Stilt + 5 upper floors and 10 3BHK apartments. It is registered under TG-RERA number P02500004558, with proposed completion on 11/02/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | LAXMI NARAYANA NILAYAM RERA record |
| Project type / phase | Residential apartment project; registration is for the project as recorded. A separate phase name or phase-wise scope is not disclosed. RERA record RERA filing |
| TG-RERA registration | P02500004558 |
| Registration validity | 30 May 2022 to 11 February 2025; the certificate states a period of 2 years and says validity is subject to extension by the Authority. The supplied record does not show an extension. |
| Registered promoter | Marupakula Pushpalatha (also named in the filing as MARUPAKULA); legal entity type is not disclosed. Corporate record RERA record |
| RERA status in supplied record | New Project; registration certificate issued. Registration validity has ended on the dates stated above; this is separate from the completion deadline and from occupancy-certificate status. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / street | Padma Nagar-2; Padmanagar Phase-II. RERA record RERA filing |
| Revenue village | RERA identity records Padma Nagar; the building permit records QUTHBULLAPUR. The supplied records do not reconcile these village labels. RERA record Land records |
| Mandal | Qutubullapur in the building permit; not disclosed in the project identity fields. Land records |
| District / PIN | Project identity and RERA certificate: Hyderabad, PIN 500054. The building permit extract records district MEDCHAL. RERA record |
| Survey numbers | 100, 101 AND 105; the RERA certificate and building permit separately list 100, 101 and 105. No subdivision is disclosed. RERA record |
| Plot / site extent | Plot No. 665; total and net area 418 sq. m.; road-affected and nala-affected areas are each recorded as 0.0 sq. m. in the building permit. RERA filing |
| Boundaries | East: “OTHERS LAND -”; West: “OTHERS LAND -”; North: “OTHERS LAD -”; South: “OTHERS LAND -”. RERA filing |
| Registered site area | 418 sq. m. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC); the permit was delegated to Kukatpally Zone. |
| Principal building approval | 0151/GHMC/KPL/2022-BP, approved 11 February 2022. The permit also records file No. 000117/GHMC/0067/KPL2/2022-BP. Approvals record |
| Approved area figures | Permit records residential upper-floors area 1,122.70 Sq.Mt., stilt area 212.84 Sq.Mt., total parking area 224.5, and building height 14.95 (unit not stated in the extracted field). These are permit figures, not saleable or carpet-area figures. |
| Building / floors | One building, identified as A (BUILDING); sanctioned configuration 1 Stilt + 5 upper floors. RERA filing |
| Parking provision | Stilt and cellar are described in the permit conditions as approved for parking; the extracted permit records total parking area 224.5 but does not state the number of vehicle spaces. |
| Units | Approved-plan field records 1 total building unit; the RERA filing records 10 apartments. The supplied material does not explain this differing unit-count scope. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configuration | 3BHK apartments. RERA unit table RERA unit details |
| RERA-filed saleable area | 140.74 sq. m. per unit. RERA unit table RERA unit details |
| Booked / available | 8 booked; 2 available, as last read from the TG-RERA portal. The portal record has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | No project construction-progress percentage or independently verified site-stage evidence is supplied. Document index RERA amenities |
| Completion deadline | 11/02/2025, stated in the promoter’s Form B declaration and consistent with the registration certificate’s end date. |
| OC / completion certificate | No occupancy certificate or completion certificate is included in the supplied project documents. The building permit requires an occupancy certificate before occupation. Document index |
2. The project story
LAXMI NARAYANA NILAYAM is registered as a residential apartment project on a 418 sq. m. site at Padma Nagar-2, with the project records identifying survey numbers 100, 101 and 105 and plot No. 665. The GHMC building permit describes one residential building, A (BUILDING), with 1 Stilt + 5 upper floors. RERA record RERA filing
The TG-RERA unit record lists ten 3BHK apartments, with eight booked and two available in the portal snapshot; the snapshot has no as-of date. The approved-plan field separately records one total building unit, and the supplied evidence does not explain the scope behind that entry. RERA unit table RERA unit details RERA filing
The supplied pack does not establish construction progress or provide an occupancy/completion certificate, so the project’s current physical completion and occupation status cannot be stated from this evidence. Document index
3. Master plan, architecture & building design
The available floor-plan materials comprise two drawings, but neither was measured and both are recorded as having no flats. Accordingly, the supplied evidence does not support a drawing-based account of apartment arrangement, room dimensions, lifts, stairs, entrances, circulation, or building footprint. Floor plans
The permit lists setbacks as Front 3, Rear 2.5, Side I 2.5, and Side II 2.5; units are not stated in the extracted fields. It also requires a peripheral greenery strip and a rainwater-harvesting structure, and records a transformer space and garbage house.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 8 | 2 | 140.74 sq. m. | Not measured from the supplied drawings | Not supplied |
The unit count, booking status and saleable area are TG-RERA filing figures; booked/available counts are from a portal snapshot with no as-of date. No software-measured carpet or room dimensions are available: the supplied floor-plan set records two drawings, zero measured, and no flats. Carpet area and saleable area are different measures; the evidence provides no measured carpet area with which to describe that distinction numerically for these apartments. RERA unit details RERA unit table Floor plans
5. Parking & vehicle circulation
The building permit’s condition says the cellar and stilt areas are to be used exclusively for vehicle parking without partition walls or rolling shutters. The supplied extract does not state the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, or the number and arrangement of vehicle entries, ramps or driveways.
The RERA filing marks the 3BHK configuration as mortgaged; it does not establish an individual buyer’s parking allocation. A parking allocation or exclusive right should therefore not be inferred from the permit’s general parking provision. RERA unit table
6. Amenities, recreation & open spaces
The following are RERA-recorded infrastructure/amenity fields. The listed progress values are 0 where supplied; they are not evidence that a facility is complete. The GHMC permit separately requires or identifies certain site provisions, as noted below. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size or detail supplied | RERA amenities | Progress recorded as 0; completion not independently verified |
| Green strip / tot lot / park | No size or detail supplied; permit requires a strip of greenery on the site periphery | RERA amenities | Progress recorded as 0; no independent completion evidence |
| Community buildings | No description or size supplied | RERA amenities | Progress recorded as 0; no independent completion evidence |
| Aggregate recreational open space | No area supplied | RERA amenities | Progress recorded as 0; no independent completion evidence |
7. Utilities, building services & safety
The TG-RERA amenities record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Storm Water Drains, Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as available; each has a recorded progress value of 0. The record does not specify water source, storage or treatment capacity, STP capacity, reuse arrangements, electrical load, backup, or service capacities. RERA amenities
The building permit requires one rainwater-harvesting pit, space for a transformer, and a garbage house within the premises. It also requires a minimum 3.0mts. vertical and horizontal distance from high-tension electrical lines and 1.5mts. for low-tension lines, and says an occupancy fire NOC is to be obtained before issue of an occupancy certificate. These are recorded permit conditions; the supplied evidence does not establish their completion or satisfaction.
The amenities record includes fire protection and fire-safety requirements, energy management, and solid-waste management and disposal, but supplies no equipment, capacities, or completion status for them. No lift, service-lift, accessibility, CCTV, security-access, or backup-power specifications are documented in the supplied RERA project records. RERA amenities
8. Location, access & connectivity
The supplied location record gives a cadastral parcel centroid at 17.41528, 78.35459. It lists Financial District (Nanakramguda) at 1.2 km as an anchor, but no source methodology or route is provided. Location record
No RERA-recorded approach-road, public-transport, or landmark distances are supplied. The building permit refers to an 18 mt. road width and specifies a condition concerning a front compound wall on sites abutting 18 mt. road widths; this does not establish a particular road name or a verified route to the project.
9. Developer & development status
In Form B, the promoter declared legal title to the land, that the land was free from encumbrances, and a completion deadline of 11/02/2025. These are promoter declarations, not independent verification.
The supplied project records do not state a construction-progress percentage, revised completion date, or completion/occupancy certificate. Document index
10. Approvals, official records & documents
| Identifier / date | P02500004558; issued 30/05/2022; valid to 11/02/2025 |
|---|---|
| What the supplied record establishes | Form C registration for LAXMI NARAYANA NILAYAM; certificate includes the separate-account condition. |
| Identifier / date | Approval No. 0151/GHMC/KPL/2022-BP; 11 February, 2022 |
|---|---|
| What the supplied record establishes | Conditional building permit for the residential building on a 418 Sq. Mtrs plot; records 1 Stilt + 5 upper floors and permit conditions. |
| Identifier / date | 000117/GHMC/0067/KPL2/2022-BP |
|---|---|
| What the supplied record establishes | File number recorded in the building permit. |
| Identifier / date | Filed as document 234619 |
|---|---|
| What the supplied record establishes | Promoter’s statements on title, encumbrances, completion date and other undertakings. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate establishing occupancy or completion status is included in the supplied evidence. Document index |
The building permit also records LRS05052017062930, TDR DRC No. 01239/TDR/2021, and the handed-over registration number 3931/2022.
1. Project at a glance
Project identity
Registered name: LAXMI NARAYANA NILAYAM
Project type / phase: Residential apartment project; registration is for the project as recorded. A separate phase name or phase-wise scope is not disclosed.
TG-RERA registration: P02500004558
Registration validity: 30 May 2022 to 11 February 2025; the certificate states a period of 2 years and says validity is subject to extension by the Authority. The supplied record does not show an extension.
Registered promoter: Marupakula Pushpalatha (also named in the filing as MARUPAKULA); legal entity type is not disclosed.
RERA status in supplied record: New Project; registration certificate issued. Registration validity has ended on the dates stated above; this is separate from the completion deadline and from occupancy-certificate status.
Land and geographic identity
Locality / street: Padma Nagar-2; Padmanagar Phase-II.
Revenue village: RERA identity records Padma Nagar; the building permit records QUTHBULLAPUR. The supplied records do not reconcile these village labels.
Mandal: Qutubullapur in the building permit; not disclosed in the project identity fields.
District / PIN: Project identity and RERA certificate: Hyderabad, PIN 500054. The building permit extract records district MEDCHAL.
Survey numbers: 100, 101 AND 105; the RERA certificate and building permit separately list 100, 101 and 105. No subdivision is disclosed.
Plot / site extent: Plot No. 665; total and net area 418 sq. m.; road-affected and nala-affected areas are each recorded as 0.0 sq. m. in the building permit.
Boundaries: East: “OTHERS LAND -”; West: “OTHERS LAND -”; North: “OTHERS LAD -”; South: “OTHERS LAND -”.
Registered site area: 418 sq. m.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC); the permit was delegated to Kukatpally Zone.
Principal building approval: 0151/GHMC/KPL/2022-BP, approved 11 February 2022. The permit also records file No. 000117/GHMC/0067/KPL2/2022-BP.
Approved area figures: Permit records residential upper-floors area 1,122.70 Sq.Mt., stilt area 212.84 Sq.Mt., total parking area 224.5, and building height 14.95 (unit not stated in the extracted field). These are permit figures, not saleable or carpet-area figures.
Building / floors: One building, identified as A (BUILDING); sanctioned configuration 1 Stilt + 5 upper floors.
Parking provision: Stilt and cellar are described in the permit conditions as approved for parking; the extracted permit records total parking area 224.5 but does not state the number of vehicle spaces.
Units: Approved-plan field records 1 total building unit; the RERA filing records 10 apartments. The supplied material does not explain this differing unit-count scope.
Offering and status
Configuration: 3BHK apartments.
RERA-filed saleable area: 140.74 sq. m. per unit.
Booked / available: 8 booked; 2 available, as last read from the TG-RERA portal. The portal record has no as-of date, so these counts are indicative.
Construction stage: No project construction-progress percentage or independently verified site-stage evidence is supplied.
Completion deadline: 11/02/2025, stated in the promoter’s Form B declaration and consistent with the registration certificate’s end date.
OC / completion certificate: No occupancy certificate or completion certificate is included in the supplied project documents. The building permit requires an occupancy certificate before occupation.
2. The project story
LAXMI NARAYANA NILAYAM is registered as a residential apartment project on a 418 sq. m. site at Padma Nagar-2, with the project records identifying survey numbers 100, 101 and 105 and plot No. 665. The GHMC building permit describes one residential building, A (BUILDING), with 1 Stilt + 5 upper floors.
The TG-RERA unit record lists ten 3BHK apartments, with eight booked and two available in the portal snapshot; the snapshot has no as-of date. The approved-plan field separately records one total building unit, and the supplied evidence does not explain the scope behind that entry.
The supplied pack does not establish construction progress or provide an occupancy/completion certificate, so the project’s current physical completion and occupation status cannot be stated from this evidence.
3. Master plan, architecture & building design
The available floor-plan materials comprise two drawings, but neither was measured and both are recorded as having no flats. Accordingly, the supplied evidence does not support a drawing-based account of apartment arrangement, room dimensions, lifts, stairs, entrances, circulation, or building footprint.
The permit lists setbacks as Front 3, Rear 2.5, Side I 2.5, and Side II 2.5; units are not stated in the extracted fields. It also requires a peripheral greenery strip and a rainwater-harvesting structure, and records a transformer space and garbage house.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 8 | 2 | 140.74 sq. m. | Not measured from the supplied drawings | Not supplied |
The unit count, booking status and saleable area are TG-RERA filing figures; booked/available counts are from a portal snapshot with no as-of date. No software-measured carpet or room dimensions are available: the supplied floor-plan set records two drawings, zero measured, and no flats. Carpet area and saleable area are different measures; the evidence provides no measured carpet area with which to describe that distinction numerically for these apartments.
5. Parking & vehicle circulation
The building permit’s condition says the cellar and stilt areas are to be used exclusively for vehicle parking without partition walls or rolling shutters. The supplied extract does not state the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, or the number and arrangement of vehicle entries, ramps or driveways.
The RERA filing marks the 3BHK configuration as mortgaged; it does not establish an individual buyer’s parking allocation. A parking allocation or exclusive right should therefore not be inferred from the permit’s general parking provision.
6. Amenities, recreation & open spaces
The following are RERA-recorded infrastructure/amenity fields. The listed progress values are 0 where supplied; they are not evidence that a facility is complete. The GHMC permit separately requires or identifies certain site provisions, as noted below.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size or detail supplied | Progress recorded as 0; completion not independently verified | |
| Green strip / tot lot / park | No size or detail supplied; permit requires a strip of greenery on the site periphery | Progress recorded as 0; no independent completion evidence | |
| Community buildings | No description or size supplied | Progress recorded as 0; no independent completion evidence | |
| Aggregate recreational open space | No area supplied | Progress recorded as 0; no independent completion evidence |
7. Utilities, building services & safety
The TG-RERA amenities record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Storm Water Drains, Water Conservation, Rain water Harvesting, and Electrical Meter Room, Sub-Station, Receiving Station as available; each has a recorded progress value of 0. The record does not specify water source, storage or treatment capacity, STP capacity, reuse arrangements, electrical load, backup, or service capacities.
The building permit requires one rainwater-harvesting pit, space for a transformer, and a garbage house within the premises. It also requires a minimum 3.0mts. vertical and horizontal distance from high-tension electrical lines and 1.5mts. for low-tension lines, and says an occupancy fire NOC is to be obtained before issue of an occupancy certificate. These are recorded permit conditions; the supplied evidence does not establish their completion or satisfaction.
The amenities record includes fire protection and fire-safety requirements, energy management, and solid-waste management and disposal, but supplies no equipment, capacities, or completion status for them. No lift, service-lift, accessibility, CCTV, security-access, or backup-power specifications are documented in the supplied RERA project records.
8. Location, access & connectivity
The supplied location record gives a cadastral parcel centroid at 17.41528, 78.35459. It lists Financial District (Nanakramguda) at 1.2 km as an anchor, but no source methodology or route is provided.
No RERA-recorded approach-road, public-transport, or landmark distances are supplied. The building permit refers to an 18 mt. road width and specifies a condition concerning a front compound wall on sites abutting 18 mt. road widths; this does not establish a particular road name or a verified route to the project.
9. Developer & development status
In Form B, the promoter declared legal title to the land, that the land was free from encumbrances, and a completion deadline of 11/02/2025. These are promoter declarations, not independent verification.
The supplied project records do not state a construction-progress percentage, revised completion date, or completion/occupancy certificate.
10. Approvals, official records & documents
| Identifier / date | P02500004558; issued 30/05/2022; valid to 11/02/2025 |
|---|---|
| What the supplied record establishes | Form C registration for LAXMI NARAYANA NILAYAM; certificate includes the separate-account condition. |
| Identifier / date | Approval No. 0151/GHMC/KPL/2022-BP; 11 February, 2022 |
|---|---|
| What the supplied record establishes | Conditional building permit for the residential building on a 418 Sq. Mtrs plot; records 1 Stilt + 5 upper floors and permit conditions. |
| Identifier / date | 000117/GHMC/0067/KPL2/2022-BP |
|---|---|
| What the supplied record establishes | File number recorded in the building permit. |
| Identifier / date | Filed as document 234619 |
|---|---|
| What the supplied record establishes | Promoter’s statements on title, encumbrances, completion date and other undertakings. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No certificate establishing occupancy or completion status is included in the supplied evidence. |
The building permit also records LRS05052017062930, TDR DRC No. 01239/TDR/2021, and the handed-over registration number 3931/2022.
Frequently asked questions
Is LAXMI NARAYANA NILAYAM registered with Telangana RERA?
Yes. LAXMI NARAYANA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02500004558; the registration status is New Project.
Who is the developer of LAXMI NARAYANA NILAYAM?
The promoter named in the RERA registration is MARUPAKULA.
Where is LAXMI NARAYANA NILAYAM located?
LAXMI NARAYANA NILAYAM is in PADMA NAGAR-2, Hyderabad, Telangana (500054).
When will LAXMI NARAYANA NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 11/02/2025. This is the promoter's declaration, not a guarantee.