Sign in

Raghavendra Brundhavanam

M/S RK INFRASTRUCTURES · Medchal-Malkajgiri · RERA P02200000897

RAGHAVENDRA BRUNDHAVANAM is a residential apartment project in Bachupally, Bachupally(M) Mandal, Medchal-Malkajgiri district, developed by registered promoter M/S RK INFRASTRUCTURES. The project covers 3,138.76 sq. m. and comprises 2 blocks: Block A has 1 Cellar + 1 Stilt + 5 Upper floors, and Block B has 1 Stilt + 5. It has 70 homes: 40 2BHK units of 53.2 sq. m. each and 30 3BHK units of 84.54 sq. m. each. It is registered with TG-RERA under P02200000897, with a proposed completion date of 15.05.2025.

01What we found

Period endedTG-RERA registration ran to 15 May 2025 - check its extension on TG-RERA
10documents on file - each fact links to its page
52court cases on this project's land (survey 146, Bachupally)
12items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from gharpe.comPhoto from squareyards.com
▦ View all 2 photos
Bachupally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameRAGHAVENDRA BRUNDHAVANAM RERA record
Project type / statusResidential apartment project; filed as New Project RERA record RERA filing
Phase / registered portionRegistration is for the project on Survey No. 146/B; a separately named phase is not disclosed Land records
TG-RERA registrationP02200000897
Registration validity17/06/2019–15/05/2025; the certificate states five years and says validity is unless extended by the Authority in accordance with the Act and rules. The supplied certificate records no extension
Registered promoterM/S RK INFRASTRUCTURES; partnership RERA filing Parties record
RERA statusRegistration certificate issued in Form C under section 5

Land and geographic identity

FieldProject record
LocalityBachupally RERA record RERA filing
Revenue villageBachupally (also rendered “Bachpalle” in the HMDA approval extraction) RERA record
MandalNot disclosed in the project identity fields; HMDA approval extraction states Bachupally(M) Mandal, while the RERA certificate gives Kukatpally RERA filing
District / PINMedchal-Malkajgiri; 500090 RERA record
Project survey number / subdivisionSurvey No. 146/B RERA record Land records
Site extent3,138.76 sq. m. total and net area; affected area recorded as 0 sq. m. RERA filing
Boundaries as filedEast: Sy. No. 146 part; West: 12-wide road; North: Sy. No. 148; South: Sy. No. 146 part and 10 m road RERA filing

Development identity

FieldProject record
Technical approval authorityHyderabad Metropolitan Development Authority (HMDA)
Principal approval number / date012251/MED/R1/U6/HMDA/31052018; approved date 15/05/2019 Approvals record
Approved built-up area6,618.06 sq. m. in the RERA project fields RERA filing
Buildings2 blocks: Block A and Block B RERA filing
Sanctioned configuration stated in approvalBlock A: 1 Cellar + 1 Stilt + 5 Upper floors; Block B: 1 Stilt + 5
Parking levelsBlock A’s cellar and stilt, and Block B’s stilt, are identified in the approval; the approval requires cellar/stilt areas to be used exclusively for vehicle parking
Unit count70 units filed: 40 2BHK and 30 3BHK. The project fields record two proposed building units; the approval extraction does not state a flat count RERA unit table RERA unit table RERA filing

Offering and status

FieldProject record
RERA-filed configurations and saleable area2BHK: 40 units, 53.2 sq. m. each as filed; 3BHK: 30 units, 84.54 sq. m. each as filed RERA unit table
Booked / availableThe portal snapshot records 0 booked and 40 available 2BHK units, and 0 booked and 30 available 3BHK units. The record has no booking-count as-of date; treat these figures as indicative, not current inventory confirmation RERA unit table RERA unit details
Construction stageThe project filing records 90% completeness; this is a filed status, not an independently verified site assessment RERA record
Completion deadlinePromoter’s Form B undertaking states 15.05.2025
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed project evidence. Certificate status should be confirmed for the project and each block Document index

2. The project story

RAGHAVENDRA BRUNDHAVANAM is filed as a residential apartment development on 3,138.76 sq. m. in Survey No. 146/B, Bachupally village, Medchal-Malkajgiri district. The approved proposal is arranged as two residential blocks: Block A, with one cellar and one stilt level below five upper floors, and Block B, with one stilt level below five floors. The RERA filing lists 70 homes across 2BHK and 3BHK configurations. RERA record RERA filing RERA unit table

The RERA record reports 90% completeness, while the promoter’s Form B gives a completion undertaking of 15.05.2025. These are filing and promoter-declaration figures; the supplied materials do not include an independent site-progress report or an occupancy/completion certificate. RERA record Document index

3. Master plan, architecture & building design

The filed site area is 3,138.76 sq. m., and the RERA project fields list approved built-up area as 6,618.06 sq. m. RERA filing RERA filing

The HMDA technical approval identifies two residential blocks and gives their floor configurations as Block A: 1 Cellar + 1 Stilt + 5 Upper floors; Block B: 1 Stilt + 5. The approval also identifies an 18 m road width and requires that no parking or construction be placed in setback areas.

The technical approval lists a tot-lot and identifies provisions for a transformer, garbage house, rainwater-harvesting structure (percolation pit) and ETP. It does not establish from the supplied information the flats-per-floor arrangement, building footprints, tower heights as built, lifts, stairs, entrances, internal circulation, landscaping area or detailed open-space distribution.

The approval’s extracted block-level built-up figures are 3,051.2 for Block B and 3,566.85 for Block A, and it separately states a total built-up area of 8,126.59. These are approval-document figures; the RERA project field separately records approved built-up area as 6,618.06 sq. m. The supplied record does not provide a reconciled area schedule. RERA filing

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK4004053.2 sq. m.Not availableNot supplied
3BHK3003084.54 sq. m.Not availableNot supplied

RERA unit table RERA unit details

Saleable areas and unit counts above are RERA-filed figures. The floor-plan record says the supplied drawings were not measured for unit carpet areas; therefore no software-measured carpet area or room dimensions can be reported. Saleable area and carpet area are different measurement categories: the supplied floor-plan note describes RERA saleable area as also counting the home’s share of common areas, whereas a carpet-area measurement would need to be taken from the drawing geometry and reviewed. RERA unit details Floor plans

The portal’s booked/available counts have no as-of date in the supplied record. Confirm current inventory and unit-specific area particulars directly against the project’s current RERA disclosures and the relevant unit documents before purchase. RERA unit table

5. Parking & vehicle circulation

HMDA’s approval identifies a cellar in Block A and stilt levels in both blocks, and states that cellar/stilt areas must be used exclusively for vehicle parking, without partition walls or rolling shutters. It also prohibits parking or construction in setback areas.

The supplied records do not establish the sanctioned number of parking spaces, resident or visitor allocation, accessible spaces, two-wheeler provision, ramp arrangement, EV charging, or parking entitlement for any particular unit. A buyer should check the sanctioned parking plan and the written unit-allocation terms; the approval’s parking requirement alone does not establish exclusive ownership of a particular bay. Document index

6. Amenities, recreation & open spaces

The RERA amenity schedule records 14 common-development and service categories. The table below distinguishes those schedule entries from the specific provisions identified in the HMDA technical approval.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsNo dimensions suppliedRERA amenitiesSchedule shows 0%; completion not independently verified
Water supplyNo source or capacity suppliedRERA amenitiesSchedule shows 0%; completion not independently verified
Sewerage / sewage treatmentSchedule refers to chamber, lines, septic tank and STP; no capacity suppliedRERA amenitiesSchedule shows 0%; completion not independently verified
Storm-water drainsNo dimensions suppliedRERA amenitiesSchedule shows 0%; completion not independently verified
Green strip / tot-lot / parkHMDA approval lists a tot-lot; no size suppliedRERA amenitiesSchedule shows 0%; delivery not independently verified
Street lightingNo details suppliedRERA amenitiesSchedule shows 0%; completion not independently verified
Community buildingsNo description or size suppliedRERA amenitiesSchedule shows 0%; completion not independently verified
Sewage and sullage treatment/disposalNo system details or capacity suppliedRERA amenitiesSchedule shows 0%; completion not independently verified
Solid-waste management and disposalHMDA approval provides for a garbage house; no capacity or operating details suppliedRERA amenitiesSchedule shows 0%; completion not independently verified
Water conservation / rainwater harvestingHMDA approval requires a rainwater-harvesting structure, identified as a percolation pitRERA amenitiesSchedule shows 0%; completion not independently verified
Energy managementNo system details suppliedRERA amenitiesSchedule shows 0%; completion not independently verified
Fire protection and safety requirementsSchedule lists the category; no specific system or clearance details suppliedRERA amenitiesSchedule shows 0%; completion not independently verified
Electrical meter room / sub-station / receiving stationRERA schedule marks the category “YES”; HMDA approval requires provision for a transformerRERA amenitiesSchedule shows 0%; completion not independently verified
Recreational open spaceAggregate area not suppliedRERA amenitiesSchedule shows 0%; completion not independently verified
ETPRequired provision in the HMDA approval; no capacity suppliedCompletion not independently verified

The supplied vendor material lists additional facilities—including a clubhouse, gymnasium, swimming pool, courts, jogging/cycle track, indoor games, security, CCTV, intercom and power backup—but does not establish them as sanctioned or delivered project facilities. They are therefore not treated here as confirmed amenities. Promoter website

7. Utilities, building services & safety

The HMDA approval requires provision for a transformer, garbage house, rainwater-harvesting structure and ETP. The RERA amenity schedule lists water supply, sewerage, storm-water drains, solid-waste management, energy management and fire-safety categories, but reports 0% progress for the listed categories. The electrical meter room/sub-station/receiving-station category is marked “YES,” also with 0% progress. These schedule entries do not independently establish completed or operational services. RERA amenities

The supplied evidence does not specify water source or storage and treatment capacity; STP/ETP capacity or reuse arrangements; drainage design; electrical supply or backup capacity; lifts; fire-system details or clearances; CCTV/access-control arrangements; or accessible circulation. Confirm the as-built services, relevant certificates and operating arrangements for the blocks before purchase. RERA amenities Document index

8. Location, access & connectivity

The registered project location is Bachupally, in the revenue village of Bachupally, Medchal-Malkajgiri district, Telangana, PIN 500090. The parcel’s recorded boundaries include a 12-wide road on the west and a 10 m road on the south; the HMDA approval extraction also refers to 18 mt road widths. These are record descriptions, not a route or access assessment. RERA record RERA filing

The location dataset supplies a cadastral parcel-centroid coordinate of 17.41528, 78.35459. Its nearby-place entries include an unnamed bus station at 2.2 km, IndusInd Bank at 0.4 km, Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, South India Shopping Mall at 2.6 km, and Nanakramguda Government Primary School at 0.5 km. These are supplied location-data measurements; no travel times or route conditions are provided. Location record

9. Developer & development status

The registered promoter is M/S RK INFRASTRUCTURES, identified in the RERA fields as a partnership. The supplied partner records name T Chinna Konda Reddy and T Deepa; T Chinna Konda Reddy is also listed as authorized signatory. RERA filing Parties record

The RERA certificate gives the promoter office as Pragathi Nagar, Kukatpally, Medchal-Malkajgiri, PIN 500072. The project contact/address fields separately list Venkata Parameswara Residency, Flat No. 303, Bachupally, Medchal-Malkajgiri, PIN 500090. No official project website or contact number is supplied. RERA filing

The promoter’s Form B, dated 06 June 2019, declares a completion date of 15.05.2025 and states that the land is free from encumbrances. The RERA project record separately reports 90% completeness. Neither is independent evidence of current construction progress or completion; no occupancy/completion certificate is included in the supplied documents. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Supplied evidenceForm C; P02200000897; dated 17/06/2019; stated validity to 15/05/2025
Scope / noteProject registration and certificate conditions
HMDA technical approval
Supplied evidence012251/MED/R1/U6/HMDA/31052018; approval date 15/05/2019
Scope / noteTechnical approval covering residential Blocks A and B; the approval states that building plans are to be sanctioned by the Executive Authority in conformity with the technically approved plans
Promoter Form B
Supplied evidenceDeclaration dated 06 June 2019
Scope / notePromoter’s title, encumbrance, completion and project-account declarations
Layout / plan record
Supplied evidenceRERA document list includes a layout-plan item, but the supplied document record is not extracted Document index
Scope / noteThe approved layout drawing is not available here for review
Occupancy / completion certificate
Supplied evidenceNot supplied Document index
Scope / noteCertificate status should be confirmed for each applicable block/phase
HMDA technical approval conditions
Supplied evidenceApproval extraction records requirements including setbacks, parking use, rainwater harvesting, transformer, garbage house, ETP, commencement/completion notices and occupancy certification before occupation
Scope / noteFull conditions and implementation require review of the underlying approval and current authority records

Frequently asked questions

Is RAGHAVENDRA BRUNDHAVANAM registered with Telangana RERA?

Yes. RAGHAVENDRA BRUNDHAVANAM is registered with the Telangana Real Estate Regulatory Authority as P02200000897; the registration status is New Project.

Who is the developer of RAGHAVENDRA BRUNDHAVANAM?

The promoter named in the RERA registration is M/S RK INFRASTRUCTURES.

Where is RAGHAVENDRA BRUNDHAVANAM located?

RAGHAVENDRA BRUNDHAVANAM is in BACHUPALLY, Medchal-Malkajgiri, Telangana (500090).

When will RAGHAVENDRA BRUNDHAVANAM be completed?

The promoter's proposed date of completion filed with RERA is 15/05/2025. This is the promoter's declaration, not a guarantee.

More projects in Medchal-Malkajgiri