Nivanta
RVS CAPITAL · Karimnagar · RERA P02700011201
NIVANTA is a residential apartment project in Bhagathnagar area, Rampur locality, Karimnagar -I mandal, Karimnagar district. The registered promoter developing it is RVS CAPITAL. The project is on a 596.53 sq. m site and comprises one building with Stilt + 5 Upper Floors and 10 dwelling units, configured as 3BHK apartments. It is registered under TG-RERA number P02700011201, and the promoter’s Form B undertaking states completion on or before 22/06/2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | NIVANTA RERA record |
| Project type / phase | Residential apartment project; phase or registered-portion description is not separately stated. RERA record |
| TG-RERA registration | P02700011201; granted under section 5. |
| Registration validity | 22/06/2026–22/06/2029 (3 years, unless extended by the Authority). This is registration validity, not a completion certificate. |
| Registered promoter | RVS CAPITAL; partnership. Corporate record RERA filing |
| RERA status | Registered; the certificate records an issue date of 07/09/2026. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Within the limits of Karimnagar Municipal Corporation; Bhagathnagar area, Rampur locality. RERA record RERA filing |
| Revenue village | KARIMNAGAR (the filed location and title materials also refer to Karimnagar Town / Bhagathnagar locality). RERA record RERA filing |
| Mandal / district / PIN | Karimnagar -I / Karimnagar / 505001. RERA record |
| Survey number and subdivision | SY NO 1104/2; no further subdivision is stated in the project identity record. RERA record Land records |
| Plot identifiers | Plot Nos. 20 and 21; H No. 9-1-104. RERA filing |
| Registered site extent | 596.53 sq. m; the promoter’s Form B declares 713.45 Sq.Yards or its equivalent to 596.53 Sq.Metres. |
| Total / net area | Total area 596.53 sq. m; net area 596.53 sq. m. RERA filing |
| Boundaries as filed | East: Plot No. 22; West: Plot No. 19; North: open land of others and H No. 9-1-109BY2 of others; South: 30 feet wide road. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Principal sanction | Building permission 0116/KARI/SWBP/2026, dated 22/06/2026; the filed building-permit order carries file no. 020274/KARI/00224/SWBP/2026. The RERA filing identifies the authority as DTCP; the filed permit documents identify Karimnagar Municipal Corporation/GHMC. RERA record Approvals record |
| Building configuration | One residential apartment building, Stilt + 5 Upper Floors. |
| Approved built-up area | 1542.40 sq. m excluding parking; 1850.94 sq. m including parking in the plan extract. The permit separately records residential upper-floor area as 1542.4 sq. m. |
| Building height | The plan extract records Height from GL 17.99 m and Total Height 20.99 m; the building-permit extract separately records Height of the Building (m) 14.99. |
| Parking provision in approval | 2.00 Car Parking Spaces; proposed parking area 308.54 sq. m. The permit records a Stilt parking floor and total parking area 308.54 sq. m. |
| Units | 10 dwelling units sanctioned; TG-RERA filing also records 10 units. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Configuration | 3BHK, 10 units. RERA unit table |
| RERA-filed saleable area | 179.76 sq. m per unit. RERA unit table |
| Booked / available | 0 booked / 10 available in the portal-derived unit record; its booking count has no stated as-of date, so treat it as indicative. RERA unit table |
| Construction stage | No independently verified construction progress is supplied. The permit sets construction commencement before 19/12/2026 and completion before 22/06/2029. |
| Completion date | Promoter’s Form B undertaking: on or before 22/06/2029. |
| Occupancy certificate (OC) | No OC is recorded in the supplied project documents; the building permit requires an OC before occupation. |
2. The project story
NIVANTA is registered as a residential apartment project on Plot Nos. 20 and 21 in Survey No. 1104/2, at Bhagathnagar area, Rampur locality, within Karimnagar Municipal Corporation limits. The project record identifies a 596.53 sq. m site and a single apartment building comprising a stilt level and five upper floors, with 10 dwelling units. RERA record RERA filing
The RERA unit record lists ten 3BHK apartments, all shown as available and none booked in the portal-derived count; that count has no as-of date. No construction-progress evidence or independently verified site-status report is supplied, so the approved configuration and promoter’s completion undertaking should not be read as proof that construction is underway or complete. The promoter has undertaken completion by 22/06/2029; the permit requires an occupancy certificate before occupation. RERA unit table
3. Master plan, architecture & building design
The filed building-permit plan describes one apartment building on Plot Nos. 20 and 21, with Stilt + 5 Upper Floors. The plan extract records gross/net plot area as 596.53 sq. m, proposed coverage area 308.53 sq. m (52%), proposed built-up area 1542.4 sq. m excluding parking and 1850.94 sq. m including parking, with 308.54 sq. m proposed parking area. These are plan-recorded figures; they are not carpet-area measurements.
The permit records front, rear, and side setbacks of 3.0 m, 4.19 m, 3.5 m, and 2.81 m respectively. It also records one rainwater-harvesting pit, 20 trees, a transformer space and a garbage house. The plan lists a tot-lot, while the permit extract records tot-lot area as 0 sq. m; no separate recreational open-space area is established in the supplied materials.
The building-permit extract records five residential upper floors and a height of 14.99 m; the plan extract also gives 17.99 m from GL and 20.99 m total height. No floor-by-floor apartment schedule, lifts, stair details, circulation drawings, or detailed common-area breakdown is supplied in the extracted records.
4. Homes, configurations & floor plans
The RERA filing records ten 3BHK units, with a saleable area of 179.76 sq. m each. Software measurement of the approved floor-plan drawing gives a median carpet area of 111.0 sq. m across four measured flat designs, ranging from 109.8–112.0 sq. m; the drawing-based measurements need review and are not RERA-filed areas. The measured loading is 38%. Saleable area and carpet area are different measures: the supplied drawing note says saleable area includes a share of common areas, while carpet area is measured from drawing geometry. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 179.76 sq. m | 109.8–112.0 sq. m; median 111.0 sq. m (software-measured) | 38% |
The drawing record identifies three bedrooms, living/dining, kitchen, toilets/WCs, a lobby and an open-to-air balcony. One measured drawing example records a kitchen of 2.41 × 3.16 m and an open-to-air balcony of 3.18 × 1.57 m. These are drawing-derived measurements, not RERA disclosures; verify them against the approved drawing. RERA unit details
5. Parking & vehicle circulation
The filed plan records 2.00 Car Parking Spaces, 308.54 sq. m of proposed parking area, and a stilt parking floor. The permit states that approved stilt and cellar parking spaces, where shown, are to be used exclusively for vehicle parking; the supplied extracted record does not establish a cellar parking level. No visitor or accessible-space count, two-wheeler count, EV charger count, ramp arrangement, or unit-wise parking allocation is provided. A plan provision does not establish exclusive allocation to a particular apartment.
6. Amenities, recreation & open spaces
The RERA amenity schedule records 14 listed infrastructure and amenity items. The portal fields show water supply, sewerage, green strip/tot-lot/park, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available; each listed item has recorded progress of 0%. Separately, the building permit requires or records a tot-lot, periphery greenery, a rainwater-harvesting pit, transformer space and a garbage house. The supplied evidence does not establish independent completion of any facility. RERA amenities
| Facility | Green strip / tot-lot / park |
|---|---|
| Description / size | No area established in the amenity schedule; permit extract records tot-lot area 0 sq. m and requires greenery/tot-lot maintenance. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress 0%; completion not independently verified. |
| Facility | Water supply |
|---|---|
| Description / size | No source or capacity stated. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed as available; progress 0%; completion not independently verified. |
| Facility | Sewerage (chamber, lines, septic tank, STP) |
|---|---|
| Description / size | No system type or capacity established. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed as available; progress 0%; completion not independently verified. |
| Facility | Water conservation / rainwater harvesting |
|---|---|
| Description / size | Permit records 1 rainwater-harvesting pit. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed as available; progress 0%; completion not independently verified. |
| Facility | Electrical meter room / sub-station / receiving station |
|---|---|
| Description / size | No capacity stated; permit requires transformer space. |
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed as available; progress 0%; completion not independently verified. |
The amenity schedule also lists internal roads and footpaths, storm-water drains, street lighting, community buildings, treatment and disposal of sewage/sullage, solid-waste management, energy management, fire protection/fire safety, and aggregate recreational open space; the supplied schedule provides no established sizes or completion evidence for these entries. RERA amenities
7. Utilities, building services & safety
The RERA amenity schedule lists water supply and sewerage, but does not specify water source, storage, treatment capacity, sewerage system design, or STP capacity. It also lists storm-water drains, sewage/sullage treatment and disposal, solid-waste management, and water conservation/rainwater harvesting; the permit extract specifies 1 rainwater-harvesting pit and a garbage house, without capacities or independent completion evidence. RERA amenities
The schedule lists an electrical meter room/sub-station/receiving station, and the permit requires transformer space, but no electrical capacity, backup arrangement, lift provision or lift capacity is stated in the supplied records. The permit requires fire-safety requirements and records that an occupancy Fire NOC is to be obtained before issue of an occupancy certificate; this is a stated approval condition, not evidence that the NOC has been obtained. The permit also requires a Cool Roof Policy undertaking/implementation condition for OC and EV charging infrastructure in building parking places, but the project record does not establish installation or completion. RERA amenities
8. Location, access & connectivity
The registered location is in KARIMNAGAR, Karimnagar -I mandal, Karimnagar district, PIN 505001, within Karimnagar Municipal Corporation limits; the filed site description identifies Bhagathnagar area, Rampur locality. The site boundary schedule identifies a 30 feet wide road to the south. RERA record RERA filing RERA filing
The supplied location record gives these measured distances from the project’s cadastral parcel centroid:
| Nearby place / transport | Distance |
|---|---|
| Gandi school | 0.3 km |
| Tata Childrens Hospital | 0.6 km |
| Unnamed bank | 0.6 km |
| SAI Wedding Mall | 0.8 km |
| TGSRTC Bus Station, Karimnagar | 1.4 km |
| Unnamed park | 1.4 km |
| VITS Engineering College | 1.8 km |
| Karimnagar railway station | 2.7 km |
| Outer Ring Road (nearest sampled interchange, approximate) | 113.6 km |
These are supplied distance measurements; no travel times or independent on-ground access assessment is provided. Location record
9. Developer & development status
The registered promoter is RVS CAPITAL, recorded as a partnership, with GSTIN 36ABJFR7450F1ZZ. The filing names Gaharwar Raghuveer Singh as authorized signatory and Gaharwar Ranveer Singh as partner. The promoter address supplied in the filing is RVS CAPITAL, Chaitanyapuri, Bhagathnagar Area Rampur locality, within Karimnagar Municipal Corporation, Karimnagar -I, Karimnagar, 505001. No official promoter website or contact details are established in the supplied project data. Corporate record Parties record RERA filing
The promoter’s Form B affidavit, dated 17/07/2026, declares title to the stated 596.53 sq. m net land, declares it free from encumbrances, and undertakes completion on or before 22/06/2029. These are promoter declarations. The supplied record does not establish construction progress or an issued occupancy certificate.
10. Approvals, official records & documents
| Record | What the supplied project file records |
|---|---|
| TG-RERA registration certificate | FORM ‘C’, registration P02700011201 for NIVANTA; validity 22/06/2026–22/06/2029. |
| Building permit order | Karimnagar Municipal Corporation; approval 0116/KARI/SWBP/2026, file 020274/KARI/00224/SWBP/2026, dated 22/06/2026; Survey No. 1104/2, Plot Nos. 20 and 21; Stilt + 5 Upper Floors and 10 dwelling units recorded. |
| Building-permission plan | Filed plan for the proposed residential apartment building; records plan areas, parking, setbacks and permit conditions. |
| Form B declaration | Promoter affidavit dated 17/07/2026, including the promoter’s completion undertaking and other declarations. |
| Occupancy / completion certificate | No issued certificate is included in the supplied project records. The building permit requires an occupancy certificate before occupation. |
| Filed amenity schedule | Portal-listed project infrastructure and amenities with progress fields; no item is shown as independently verified complete. RERA amenities |
The supplied documents are a project-file evidence index, not confirmation that every permit condition has been discharged or that construction has been inspected.
1. Project at a glance
Project identity
Registered name: NIVANTA
Project type / phase: Residential apartment project; phase or registered-portion description is not separately stated.
TG-RERA registration: P02700011201; granted under section 5.
Registration validity: 22/06/2026–22/06/2029 (3 years, unless extended by the Authority). This is registration validity, not a completion certificate.
Registered promoter: RVS CAPITAL; partnership.
RERA status: Registered; the certificate records an issue date of 07/09/2026.
Land and geographic identity
Locality: Within the limits of Karimnagar Municipal Corporation; Bhagathnagar area, Rampur locality.
Revenue village: KARIMNAGAR (the filed location and title materials also refer to Karimnagar Town / Bhagathnagar locality).
Mandal / district / PIN: Karimnagar -I / Karimnagar / 505001.
Survey number and subdivision: SY NO 1104/2; no further subdivision is stated in the project identity record.
Plot identifiers: Plot Nos. 20 and 21; H No. 9-1-104.
Registered site extent: 596.53 sq. m; the promoter’s Form B declares 713.45 Sq.Yards or its equivalent to 596.53 Sq.Metres.
Total / net area: Total area 596.53 sq. m; net area 596.53 sq. m.
Boundaries as filed: East: Plot No. 22; West: Plot No. 19; North: open land of others and H No. 9-1-109BY2 of others; South: 30 feet wide road.
Development identity
Principal sanction: Building permission 0116/KARI/SWBP/2026, dated 22/06/2026; the filed building-permit order carries file no. 020274/KARI/00224/SWBP/2026. The RERA filing identifies the authority as DTCP; the filed permit documents identify Karimnagar Municipal Corporation/GHMC.
Building configuration: One residential apartment building, Stilt + 5 Upper Floors.
Approved built-up area: 1542.40 sq. m excluding parking; 1850.94 sq. m including parking in the plan extract. The permit separately records residential upper-floor area as 1542.4 sq. m.
Building height: The plan extract records Height from GL 17.99 m and Total Height 20.99 m; the building-permit extract separately records Height of the Building (m) 14.99.
Parking provision in approval: 2.00 Car Parking Spaces; proposed parking area 308.54 sq. m. The permit records a Stilt parking floor and total parking area 308.54 sq. m.
Units: 10 dwelling units sanctioned; TG-RERA filing also records 10 units.
Offering and status
Configuration: 3BHK, 10 units.
RERA-filed saleable area: 179.76 sq. m per unit.
Booked / available: 0 booked / 10 available in the portal-derived unit record; its booking count has no stated as-of date, so treat it as indicative.
Construction stage: No independently verified construction progress is supplied. The permit sets construction commencement before 19/12/2026 and completion before 22/06/2029.
Completion date: Promoter’s Form B undertaking: on or before 22/06/2029.
Occupancy certificate (OC): No OC is recorded in the supplied project documents; the building permit requires an OC before occupation.
2. The project story
NIVANTA is registered as a residential apartment project on Plot Nos. 20 and 21 in Survey No. 1104/2, at Bhagathnagar area, Rampur locality, within Karimnagar Municipal Corporation limits. The project record identifies a 596.53 sq. m site and a single apartment building comprising a stilt level and five upper floors, with 10 dwelling units.
The RERA unit record lists ten 3BHK apartments, all shown as available and none booked in the portal-derived count; that count has no as-of date. No construction-progress evidence or independently verified site-status report is supplied, so the approved configuration and promoter’s completion undertaking should not be read as proof that construction is underway or complete. The promoter has undertaken completion by 22/06/2029; the permit requires an occupancy certificate before occupation.
3. Master plan, architecture & building design
The filed building-permit plan describes one apartment building on Plot Nos. 20 and 21, with Stilt + 5 Upper Floors. The plan extract records gross/net plot area as 596.53 sq. m, proposed coverage area 308.53 sq. m (52%), proposed built-up area 1542.4 sq. m excluding parking and 1850.94 sq. m including parking, with 308.54 sq. m proposed parking area. These are plan-recorded figures; they are not carpet-area measurements.
The permit records front, rear, and side setbacks of 3.0 m, 4.19 m, 3.5 m, and 2.81 m respectively. It also records one rainwater-harvesting pit, 20 trees, a transformer space and a garbage house. The plan lists a tot-lot, while the permit extract records tot-lot area as 0 sq. m; no separate recreational open-space area is established in the supplied materials.
The building-permit extract records five residential upper floors and a height of 14.99 m; the plan extract also gives 17.99 m from GL and 20.99 m total height. No floor-by-floor apartment schedule, lifts, stair details, circulation drawings, or detailed common-area breakdown is supplied in the extracted records.
4. Homes, configurations & floor plans
The RERA filing records ten 3BHK units, with a saleable area of 179.76 sq. m each. Software measurement of the approved floor-plan drawing gives a median carpet area of 111.0 sq. m across four measured flat designs, ranging from 109.8–112.0 sq. m; the drawing-based measurements need review and are not RERA-filed areas. The measured loading is 38%. Saleable area and carpet area are different measures: the supplied drawing note says saleable area includes a share of common areas, while carpet area is measured from drawing geometry.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 179.76 sq. m | 109.8–112.0 sq. m; median 111.0 sq. m (software-measured) | 38% |
The drawing record identifies three bedrooms, living/dining, kitchen, toilets/WCs, a lobby and an open-to-air balcony. One measured drawing example records a kitchen of 2.41 × 3.16 m and an open-to-air balcony of 3.18 × 1.57 m. These are drawing-derived measurements, not RERA disclosures; verify them against the approved drawing.
5. Parking & vehicle circulation
The filed plan records 2.00 Car Parking Spaces, 308.54 sq. m of proposed parking area, and a stilt parking floor. The permit states that approved stilt and cellar parking spaces, where shown, are to be used exclusively for vehicle parking; the supplied extracted record does not establish a cellar parking level. No visitor or accessible-space count, two-wheeler count, EV charger count, ramp arrangement, or unit-wise parking allocation is provided. A plan provision does not establish exclusive allocation to a particular apartment.
6. Amenities, recreation & open spaces
The RERA amenity schedule records 14 listed infrastructure and amenity items. The portal fields show water supply, sewerage, green strip/tot-lot/park, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available; each listed item has recorded progress of 0%. Separately, the building permit requires or records a tot-lot, periphery greenery, a rainwater-harvesting pit, transformer space and a garbage house. The supplied evidence does not establish independent completion of any facility.
| Facility | Green strip / tot-lot / park |
|---|---|
| Description / size | No area established in the amenity schedule; permit extract records tot-lot area 0 sq. m and requires greenery/tot-lot maintenance. |
| Declared progress / verified status | Portal progress 0%; completion not independently verified. |
| Facility | Water supply |
|---|---|
| Description / size | No source or capacity stated. |
| Declared progress / verified status | Listed as available; progress 0%; completion not independently verified. |
| Facility | Sewerage (chamber, lines, septic tank, STP) |
|---|---|
| Description / size | No system type or capacity established. |
| Declared progress / verified status | Listed as available; progress 0%; completion not independently verified. |
| Facility | Water conservation / rainwater harvesting |
|---|---|
| Description / size | Permit records 1 rainwater-harvesting pit. |
| Declared progress / verified status | Listed as available; progress 0%; completion not independently verified. |
| Facility | Electrical meter room / sub-station / receiving station |
|---|---|
| Description / size | No capacity stated; permit requires transformer space. |
| Declared progress / verified status | Listed as available; progress 0%; completion not independently verified. |
The amenity schedule also lists internal roads and footpaths, storm-water drains, street lighting, community buildings, treatment and disposal of sewage/sullage, solid-waste management, energy management, fire protection/fire safety, and aggregate recreational open space; the supplied schedule provides no established sizes or completion evidence for these entries.
7. Utilities, building services & safety
The RERA amenity schedule lists water supply and sewerage, but does not specify water source, storage, treatment capacity, sewerage system design, or STP capacity. It also lists storm-water drains, sewage/sullage treatment and disposal, solid-waste management, and water conservation/rainwater harvesting; the permit extract specifies 1 rainwater-harvesting pit and a garbage house, without capacities or independent completion evidence.
The schedule lists an electrical meter room/sub-station/receiving station, and the permit requires transformer space, but no electrical capacity, backup arrangement, lift provision or lift capacity is stated in the supplied records. The permit requires fire-safety requirements and records that an occupancy Fire NOC is to be obtained before issue of an occupancy certificate; this is a stated approval condition, not evidence that the NOC has been obtained. The permit also requires a Cool Roof Policy undertaking/implementation condition for OC and EV charging infrastructure in building parking places, but the project record does not establish installation or completion.
8. Location, access & connectivity
The registered location is in KARIMNAGAR, Karimnagar -I mandal, Karimnagar district, PIN 505001, within Karimnagar Municipal Corporation limits; the filed site description identifies Bhagathnagar area, Rampur locality. The site boundary schedule identifies a 30 feet wide road to the south.
The supplied location record gives these measured distances from the project’s cadastral parcel centroid:
Gandi school: 0.3 km
Tata Childrens Hospital: 0.6 km
Unnamed bank: 0.6 km
SAI Wedding Mall: 0.8 km
TGSRTC Bus Station, Karimnagar: 1.4 km
Unnamed park: 1.4 km
VITS Engineering College: 1.8 km
Karimnagar railway station: 2.7 km
Outer Ring Road (nearest sampled interchange, approximate): 113.6 km
These are supplied distance measurements; no travel times or independent on-ground access assessment is provided.
9. Developer & development status
The registered promoter is RVS CAPITAL, recorded as a partnership, with GSTIN 36ABJFR7450F1ZZ. The filing names Gaharwar Raghuveer Singh as authorized signatory and Gaharwar Ranveer Singh as partner. The promoter address supplied in the filing is RVS CAPITAL, Chaitanyapuri, Bhagathnagar Area Rampur locality, within Karimnagar Municipal Corporation, Karimnagar -I, Karimnagar, 505001. No official promoter website or contact details are established in the supplied project data.
The promoter’s Form B affidavit, dated 17/07/2026, declares title to the stated 596.53 sq. m net land, declares it free from encumbrances, and undertakes completion on or before 22/06/2029. These are promoter declarations. The supplied record does not establish construction progress or an issued occupancy certificate.
10. Approvals, official records & documents
TG-RERA registration certificate: FORM ‘C’, registration P02700011201 for NIVANTA; validity 22/06/2026–22/06/2029.
Building permit order: Karimnagar Municipal Corporation; approval 0116/KARI/SWBP/2026, file 020274/KARI/00224/SWBP/2026, dated 22/06/2026; Survey No. 1104/2, Plot Nos. 20 and 21; Stilt + 5 Upper Floors and 10 dwelling units recorded.
Building-permission plan: Filed plan for the proposed residential apartment building; records plan areas, parking, setbacks and permit conditions.
Form B declaration: Promoter affidavit dated 17/07/2026, including the promoter’s completion undertaking and other declarations.
Occupancy / completion certificate: No issued certificate is included in the supplied project records. The building permit requires an occupancy certificate before occupation.
Filed amenity schedule: Portal-listed project infrastructure and amenities with progress fields; no item is shown as independently verified complete.
The supplied documents are a project-file evidence index, not confirmation that every permit condition has been discharged or that construction has been inspected.
Frequently asked questions
Is NIVANTA registered with Telangana RERA?
Yes. NIVANTA is registered with the Telangana Real Estate Regulatory Authority as P02700011201; the registration status is New Project.
Who is the developer of NIVANTA?
The promoter named in the RERA registration is RVS CAPITAL.
Where is NIVANTA located?
NIVANTA is in WITHIN THE LIMITS OF KARIMNAGAR MUNICIPAL CORPORATION, KARIMNAGAR, Karimnagar -I, Telangana (505001).
When will NIVANTA be completed?
The promoter's proposed date of completion filed with RERA is 22/06/2029. This is the promoter's declaration, not a guarantee.