Nivanta

RVS CAPITAL · Karimnagar · RERA P02700011201

NIVANTA is a residential apartment project in Bhagathnagar area, Rampur locality, Karimnagar -I mandal, Karimnagar district. The registered promoter developing it is RVS CAPITAL. The project is on a 596.53 sq. m site and comprises one building with Stilt + 5 Upper Floors and 10 dwelling units, configured as 3BHK apartments. It is registered under TG-RERA number P02700011201, and the promoter’s Form B undertaking states completion on or before 22/06/2029.

01What we found

RegisteredTG-RERA - valid till 22 Jun 2029
19documents on file - each fact links to its page
1court case on this project's land (survey 1104, Karimnagar)
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameNIVANTA RERA record
Project type / phaseResidential apartment project; phase or registered-portion description is not separately stated. RERA record
TG-RERA registrationP02700011201; granted under section 5.
Registration validity22/06/2026–22/06/2029 (3 years, unless extended by the Authority). This is registration validity, not a completion certificate.
Registered promoterRVS CAPITAL; partnership. Corporate record RERA filing
RERA statusRegistered; the certificate records an issue date of 07/09/2026.

Land and geographic identity

FieldProject record
LocalityWithin the limits of Karimnagar Municipal Corporation; Bhagathnagar area, Rampur locality. RERA record RERA filing
Revenue villageKARIMNAGAR (the filed location and title materials also refer to Karimnagar Town / Bhagathnagar locality). RERA record RERA filing
Mandal / district / PINKarimnagar -I / Karimnagar / 505001. RERA record
Survey number and subdivisionSY NO 1104/2; no further subdivision is stated in the project identity record. RERA record Land records
Plot identifiersPlot Nos. 20 and 21; H No. 9-1-104. RERA filing
Registered site extent596.53 sq. m; the promoter’s Form B declares 713.45 Sq.Yards or its equivalent to 596.53 Sq.Metres.
Total / net areaTotal area 596.53 sq. m; net area 596.53 sq. m. RERA filing
Boundaries as filedEast: Plot No. 22; West: Plot No. 19; North: open land of others and H No. 9-1-109BY2 of others; South: 30 feet wide road. RERA filing

Development identity

FieldProject record
Principal sanctionBuilding permission 0116/KARI/SWBP/2026, dated 22/06/2026; the filed building-permit order carries file no. 020274/KARI/00224/SWBP/2026. The RERA filing identifies the authority as DTCP; the filed permit documents identify Karimnagar Municipal Corporation/GHMC. RERA record Approvals record
Building configurationOne residential apartment building, Stilt + 5 Upper Floors.
Approved built-up area1542.40 sq. m excluding parking; 1850.94 sq. m including parking in the plan extract. The permit separately records residential upper-floor area as 1542.4 sq. m.
Building heightThe plan extract records Height from GL 17.99 m and Total Height 20.99 m; the building-permit extract separately records Height of the Building (m) 14.99.
Parking provision in approval2.00 Car Parking Spaces; proposed parking area 308.54 sq. m. The permit records a Stilt parking floor and total parking area 308.54 sq. m.
Units10 dwelling units sanctioned; TG-RERA filing also records 10 units. RERA unit table

Offering and status

FieldProject record
Configuration3BHK, 10 units. RERA unit table
RERA-filed saleable area179.76 sq. m per unit. RERA unit table
Booked / available0 booked / 10 available in the portal-derived unit record; its booking count has no stated as-of date, so treat it as indicative. RERA unit table
Construction stageNo independently verified construction progress is supplied. The permit sets construction commencement before 19/12/2026 and completion before 22/06/2029.
Completion datePromoter’s Form B undertaking: on or before 22/06/2029.
Occupancy certificate (OC)No OC is recorded in the supplied project documents; the building permit requires an OC before occupation.

2. The project story

NIVANTA is registered as a residential apartment project on Plot Nos. 20 and 21 in Survey No. 1104/2, at Bhagathnagar area, Rampur locality, within Karimnagar Municipal Corporation limits. The project record identifies a 596.53 sq. m site and a single apartment building comprising a stilt level and five upper floors, with 10 dwelling units. RERA record RERA filing

The RERA unit record lists ten 3BHK apartments, all shown as available and none booked in the portal-derived count; that count has no as-of date. No construction-progress evidence or independently verified site-status report is supplied, so the approved configuration and promoter’s completion undertaking should not be read as proof that construction is underway or complete. The promoter has undertaken completion by 22/06/2029; the permit requires an occupancy certificate before occupation. RERA unit table

3. Master plan, architecture & building design

The filed building-permit plan describes one apartment building on Plot Nos. 20 and 21, with Stilt + 5 Upper Floors. The plan extract records gross/net plot area as 596.53 sq. m, proposed coverage area 308.53 sq. m (52%), proposed built-up area 1542.4 sq. m excluding parking and 1850.94 sq. m including parking, with 308.54 sq. m proposed parking area. These are plan-recorded figures; they are not carpet-area measurements.

The permit records front, rear, and side setbacks of 3.0 m, 4.19 m, 3.5 m, and 2.81 m respectively. It also records one rainwater-harvesting pit, 20 trees, a transformer space and a garbage house. The plan lists a tot-lot, while the permit extract records tot-lot area as 0 sq. m; no separate recreational open-space area is established in the supplied materials.

The building-permit extract records five residential upper floors and a height of 14.99 m; the plan extract also gives 17.99 m from GL and 20.99 m total height. No floor-by-floor apartment schedule, lifts, stair details, circulation drawings, or detailed common-area breakdown is supplied in the extracted records.

4. Homes, configurations & floor plans

The RERA filing records ten 3BHK units, with a saleable area of 179.76 sq. m each. Software measurement of the approved floor-plan drawing gives a median carpet area of 111.0 sq. m across four measured flat designs, ranging from 109.8–112.0 sq. m; the drawing-based measurements need review and are not RERA-filed areas. The measured loading is 38%. Saleable area and carpet area are different measures: the supplied drawing note says saleable area includes a share of common areas, while carpet area is measured from drawing geometry. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010179.76 sq. m109.8–112.0 sq. m; median 111.0 sq. m (software-measured)38%

The drawing record identifies three bedrooms, living/dining, kitchen, toilets/WCs, a lobby and an open-to-air balcony. One measured drawing example records a kitchen of 2.41 × 3.16 m and an open-to-air balcony of 3.18 × 1.57 m. These are drawing-derived measurements, not RERA disclosures; verify them against the approved drawing. RERA unit details

5. Parking & vehicle circulation

The filed plan records 2.00 Car Parking Spaces, 308.54 sq. m of proposed parking area, and a stilt parking floor. The permit states that approved stilt and cellar parking spaces, where shown, are to be used exclusively for vehicle parking; the supplied extracted record does not establish a cellar parking level. No visitor or accessible-space count, two-wheeler count, EV charger count, ramp arrangement, or unit-wise parking allocation is provided. A plan provision does not establish exclusive allocation to a particular apartment.

6. Amenities, recreation & open spaces

The RERA amenity schedule records 14 listed infrastructure and amenity items. The portal fields show water supply, sewerage, green strip/tot-lot/park, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available; each listed item has recorded progress of 0%. Separately, the building permit requires or records a tot-lot, periphery greenery, a rainwater-harvesting pit, transformer space and a garbage house. The supplied evidence does not establish independent completion of any facility. RERA amenities

Landscape/open space
FacilityGreen strip / tot-lot / park
Description / sizeNo area established in the amenity schedule; permit extract records tot-lot area 0 sq. m and requires greenery/tot-lot maintenance.
Evidence sourceRERA amenities
Declared progress / verified statusPortal progress 0%; completion not independently verified.
Convenience/community
FacilityWater supply
Description / sizeNo source or capacity stated.
Evidence sourceRERA amenities
Declared progress / verified statusListed as available; progress 0%; completion not independently verified.
Utilities-related
FacilitySewerage (chamber, lines, septic tank, STP)
Description / sizeNo system type or capacity established.
Evidence sourceRERA amenities
Declared progress / verified statusListed as available; progress 0%; completion not independently verified.
Utilities-related
FacilityWater conservation / rainwater harvesting
Description / sizePermit records 1 rainwater-harvesting pit.
Evidence sourceRERA amenities
Declared progress / verified statusListed as available; progress 0%; completion not independently verified.
Convenience/community
FacilityElectrical meter room / sub-station / receiving station
Description / sizeNo capacity stated; permit requires transformer space.
Evidence sourceRERA amenities
Declared progress / verified statusListed as available; progress 0%; completion not independently verified.

The amenity schedule also lists internal roads and footpaths, storm-water drains, street lighting, community buildings, treatment and disposal of sewage/sullage, solid-waste management, energy management, fire protection/fire safety, and aggregate recreational open space; the supplied schedule provides no established sizes or completion evidence for these entries. RERA amenities

7. Utilities, building services & safety

The RERA amenity schedule lists water supply and sewerage, but does not specify water source, storage, treatment capacity, sewerage system design, or STP capacity. It also lists storm-water drains, sewage/sullage treatment and disposal, solid-waste management, and water conservation/rainwater harvesting; the permit extract specifies 1 rainwater-harvesting pit and a garbage house, without capacities or independent completion evidence. RERA amenities

The schedule lists an electrical meter room/sub-station/receiving station, and the permit requires transformer space, but no electrical capacity, backup arrangement, lift provision or lift capacity is stated in the supplied records. The permit requires fire-safety requirements and records that an occupancy Fire NOC is to be obtained before issue of an occupancy certificate; this is a stated approval condition, not evidence that the NOC has been obtained. The permit also requires a Cool Roof Policy undertaking/implementation condition for OC and EV charging infrastructure in building parking places, but the project record does not establish installation or completion. RERA amenities

8. Location, access & connectivity

The registered location is in KARIMNAGAR, Karimnagar -I mandal, Karimnagar district, PIN 505001, within Karimnagar Municipal Corporation limits; the filed site description identifies Bhagathnagar area, Rampur locality. The site boundary schedule identifies a 30 feet wide road to the south. RERA record RERA filing RERA filing

The supplied location record gives these measured distances from the project’s cadastral parcel centroid:

Nearby place / transportDistance
Gandi school0.3 km
Tata Childrens Hospital0.6 km
Unnamed bank0.6 km
SAI Wedding Mall0.8 km
TGSRTC Bus Station, Karimnagar1.4 km
Unnamed park1.4 km
VITS Engineering College1.8 km
Karimnagar railway station2.7 km
Outer Ring Road (nearest sampled interchange, approximate)113.6 km

These are supplied distance measurements; no travel times or independent on-ground access assessment is provided. Location record

9. Developer & development status

The registered promoter is RVS CAPITAL, recorded as a partnership, with GSTIN 36ABJFR7450F1ZZ. The filing names Gaharwar Raghuveer Singh as authorized signatory and Gaharwar Ranveer Singh as partner. The promoter address supplied in the filing is RVS CAPITAL, Chaitanyapuri, Bhagathnagar Area Rampur locality, within Karimnagar Municipal Corporation, Karimnagar -I, Karimnagar, 505001. No official promoter website or contact details are established in the supplied project data. Corporate record Parties record RERA filing

The promoter’s Form B affidavit, dated 17/07/2026, declares title to the stated 596.53 sq. m net land, declares it free from encumbrances, and undertakes completion on or before 22/06/2029. These are promoter declarations. The supplied record does not establish construction progress or an issued occupancy certificate.

10. Approvals, official records & documents

RecordWhat the supplied project file records
TG-RERA registration certificateFORM ‘C’, registration P02700011201 for NIVANTA; validity 22/06/2026–22/06/2029.
Building permit orderKarimnagar Municipal Corporation; approval 0116/KARI/SWBP/2026, file 020274/KARI/00224/SWBP/2026, dated 22/06/2026; Survey No. 1104/2, Plot Nos. 20 and 21; Stilt + 5 Upper Floors and 10 dwelling units recorded.
Building-permission planFiled plan for the proposed residential apartment building; records plan areas, parking, setbacks and permit conditions.
Form B declarationPromoter affidavit dated 17/07/2026, including the promoter’s completion undertaking and other declarations.
Occupancy / completion certificateNo issued certificate is included in the supplied project records. The building permit requires an occupancy certificate before occupation.
Filed amenity schedulePortal-listed project infrastructure and amenities with progress fields; no item is shown as independently verified complete. RERA amenities

The supplied documents are a project-file evidence index, not confirmation that every permit condition has been discharged or that construction has been inspected.

Frequently asked questions

Is NIVANTA registered with Telangana RERA?

Yes. NIVANTA is registered with the Telangana Real Estate Regulatory Authority as P02700011201; the registration status is New Project.

Who is the developer of NIVANTA?

The promoter named in the RERA registration is RVS CAPITAL.

Where is NIVANTA located?

NIVANTA is in WITHIN THE LIMITS OF KARIMNAGAR MUNICIPAL CORPORATION, KARIMNAGAR, Karimnagar -I, Telangana (505001).

When will NIVANTA be completed?

The promoter's proposed date of completion filed with RERA is 22/06/2029. This is the promoter's declaration, not a guarantee.

More projects in Karimnagar I