Golden Valley
BHUMIREDDY CONSTRUCTIONS & INFRA DEVELOPERS LLP · Rangareddy · RERA P02400010282
GOLDEN VALLEY is a new plotted development in the Chatanpally / Farooqnagar area, Farooqnagar Mandal, Ranga Reddy District, developed by BHUMIREDDY CONSTRUCTIONS & INFRA DEVELOPERS LLP. The project covers **20,260.84 sq.m** and the HMDA layout record identifies **61 plots**; plot configurations are not stated in the TG-RERA unit inventory. Its TG-RERA registration number is **P02400010282**, and the proposed completion date recorded in the project header is **22/02/2029**.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | GOLDEN VALLEY RERA record |
| Project type | New plotted development / open plotted layout RERA record |
| Phase / registered portion | Phase not separately identified; TG-RERA registration covers land described as portions of Survey Nos. 175 and 745 |
| TG-RERA registration | P02400010282 |
| Registration validity | 23/10/2025 to 22/10/2028, unless extended by the Authority; this is the registration period, not the project completion deadline |
| Registered promoter | BHUMIREDDY CONSTRUCTIONS & INFRA DEVELOPERS LLP RERA record Corporate record |
| RERA status | Registered; certificate requires quarterly updates and sets project-specific conditions |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Chatanpally / Farooqnagar area RERA record |
| Revenue villages | Farooqnagar Village and Chatanpally Village |
| Mandal | Farooqnagar Mandal RERA record |
| District | Ranga Reddy District RERA record |
| PIN | 509216 RERA record |
| Project survey references | 175/PART OF FAROOQNAGAR VILLAGE ANDMANDAL; 745/PART OF CHATANPALLY VILLAGE. The approval and certificate also abbreviate these as 175/PART and 745/PART. Land records |
| Site extent | 20,260.84 sq.m total site area; the HMDA draft layout letter states a 20,213.20 sq.m net site area. The RERA land record gives 20,260.84 sq.m as both total and net area. Land records |
| Boundaries in RERA land details | East: EXISTING 30 ROAD; West: SURVEY NO 175 PART; North: OTHERS LAND; South: OTHERS LAND. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | 011368/LO/HMDA/3004/SMD/2024, approved 23 October 2025; filed as draft layout permission / technical approval Approvals record |
| Related file number | TS/054405/2024 |
| Approved built-up area | 0.00 proposed built-up area, both excluding and including parking, in the layout approval parameters; this is a plotted layout, not an apartment-building approval. |
| Layout scale | 61 plots shown in the HMDA layout record and layout drawing Layout record |
| Towers / building floors | Not applicable to the approved open plotted layout; no tower count or floor configuration is disclosed in the RERA project record. |
| Parking | No common parking area is shown in the layout area schedule (0.00); no project-wide parking-space count or individual plot parking allocation is supplied. |
Offering and status
| Item | Project record |
|---|---|
| Offered product | Residential plots; the HMDA layout record identifies 61 plots Layout record |
| RERA-filed plot sizes / inventory counts | Plot-wise RERA unit inventory and saleable-area schedule are not supplied in the available record. The layout drawing contains plot areas; see §4. RERA unit table Layout record |
| Booked / available | Not disclosed in the supplied project evidence. RERA unit table |
| Construction stage | No independently verified site-progress measurement is supplied. HMDA’s approval requires layout infrastructure works; completion of those works is not established by the supplied evidence. |
| Promoter-declared completion | Form B states 22/10/2028; the registration certificate remains valid through 22/10/2028 unless extended. The header separately records a proposed completion date of 22/02/2029. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The evidence describes a draft layout approval, not an issued OC. Document index |
2. The project story
GOLDEN VALLEY is registered with TG-RERA as a plotted development by BHUMIREDDY CONSTRUCTIONS & INFRA DEVELOPERS LLP. The registered land description covers portions of Survey No. 175 in Farooqnagar Village and Survey No. 745 in Chatanpally Village, within Farooqnagar Mandal, Ranga Reddy District. RERA record
The HMDA-filed layout material describes an open layout of 61 plots, with land set aside for plots, roads, park/open space, social infrastructure and utilities. The project is therefore a layout-and-infrastructure offering rather than a tower or apartment scheme.
The records establish layout permission subject to development and handover conditions, but do not establish that the roads, utilities, park or other works have been completed. No site inspection or independently verified construction-progress report is included. The promoter’s Form B states a completion undertaking of 22/10/2028; the RERA certificate records registration validity through 22/10/2028, while the project header records a proposed completion date of 22/02/2029. These dates describe different recorded fields; the available evidence does not provide an issued completion or occupancy certificate. RERA record
3. Master plan, architecture & building design
The project is a plotted layout, not a multi-storey building scheme. The layout drawing’s schedule covers all 61 plots. The software-measured plot sizes range from 127.29 sq.m to 367.84 sq.m, with a median of 184.57 sq.m; these are drawing-derived measurements, not a RERA-filed plot-size schedule. Layout record
The layout drawing’s land-use table allocates the 20,260.84 sq.m base area as follows: Layout record
| Layout use | Area | Share shown in drawing |
|---|---|---|
| Plotted area | 11,993.10 sq.m | 59.19% |
| Roads | 6,005.59 sq.m | 29.64% |
| Parks / organized open space | 1,526.54 sq.m | 7.53% |
| Social infrastructure | 508.42 sq.m | 2.51% |
| Utilities | 227.19 sq.m | 1.12% |
| Amenity area | 0.00 sq.m | 0.00% |
The layout documents identify road widths including 9.14M, 12.0M, 30.00 MT WIDE EXISTING, 30.00 MT WIDE PROPOSED ROAD, and EXISTING 100'0" WIDE ROAD. HMDA’s conditions require roads to remain accessible to neighbouring sites and describe road formation, drainage, footpaths, lighting and utility works.
No building footprint, apartment configuration, building height or floor arrangement is provided. The layout drawing is the relevant physical-plan evidence; no promotional building plan is used here.
4. Homes, configurations & floor plans
This is a plotted project, so the relevant product is plots rather than apartments. TG-RERA’s supplied project evidence does not include a plot-by-plot RERA saleable-area or booking/availability schedule. RERA unit table
The layout drawing schedule identifies 61 plots. Software measurement of that drawing gives the following plot-size bands; verify any individual plot’s dimensions against the approved drawing and its plot schedule. These are not a RERA-filed saleable-area schedule. Layout record
| Drawing-derived plot size band | Plot count |
|---|---|
| 150–200 sq.yd (125–167 sq.m) | 22 |
| 200–250 sq.yd (167–209 sq.m) | 24 |
| 250–300 sq.yd (209–251 sq.m) | 6 |
| 300–400 sq.yd (251–334 sq.m) | 4 |
| 400–500 sq.yd (334–418 sq.m) | 5 |
The two supplied layout sheets contain no flats, and no apartment floor-plan or measured carpet-area data applies. The RERA-filed unit saleable areas, booked plots and available plots are not disclosed in the supplied evidence. Floor plans RERA unit table
5. Parking & vehicle circulation
The layout area schedule records 0.00 for common parking area. No sanctioned project-wide parking-space count, visitor or accessible parking provision, or plot-specific parking allocation is supplied. A vendor listing mentions “covered car parking,” but that is a third-party marketed claim rather than a confirmed HMDA layout provision. Promoter website
The HMDA layout record includes internal roads and road widths, and the draft approval conditions require roads to be opened for access to neighbouring sites. The evidence does not specify separate pedestrian/vehicle circulation, ramps, EV charging or parking allotments.
6. Amenities, recreation & open spaces
The layout record identifies park/open space, social infrastructure, utility land and infrastructure works. The following facilities are recorded in the HMDA draft layout material; the supplied records do not establish that they have been completed.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 1,526.54 sq.m; drawing schedule shows 7.53% | Layout record | Planned in the layout; completion not verified |
| Social infrastructure area | 508.42 sq.m | Layout record | Earmarked; handover/development not verified |
| Tot-lot | Identified in layout approval record; no separate area supplied | Listed as a layout feature; completion not verified | |
| Cycle track | Listed in layout approval conditions | Required/planned; completion not verified |
A vendor listing advertises a clubhouse, swimming pool, gym, children’s play area and “large green area.” These are third-party marketing claims; the available HMDA layout record does not establish those facilities as approved or delivered project amenities. Promoter website
7. Utilities, building services & safety
HMDA’s draft layout conditions describe infrastructure to be provided as part of layout development. The record calls for internal water-supply pipelines, an overhead tank and sumps, a protected water supply source, a common septic tank/STP or independent sewerage-disposal system, underground drainage, storm-water drainage, rainwater-harvesting pits, electrical supply lines, a transformer, street lighting, utility ducting, solid-waste disposal space and a bio-compost unit. These are approval conditions or proposed works, not evidence of completed services.
| Evidence in the project record | Internal water-supply pipelines, overhead tank and sumps; potable-water connectivity to Mission Bhagiratha or another authority-approved source is required by the draft approval conditions. |
|---|---|
| Status evidenced | Required/planned; source, capacity and completion not verified |
| Evidence in the project record | Common septic tank/STP or independent disposal system; underground sewerage and storm-water drainage are specified. |
|---|---|
| Status evidenced | Required/planned; capacity and completion not supplied |
| Evidence in the project record | Rainwater-harvesting pits are listed. |
|---|---|
| Status evidenced | Listed/required; completion not verified |
| Evidence in the project record | Supply lines, transformer yard and street lighting, including LED lighting, are specified in the draft conditions. |
|---|---|
| Status evidenced | Required/planned; capacity and completion not supplied |
| Evidence in the project record | Solid-waste disposal space, source segregation and bio-compost unit are specified. |
|---|---|
| Status evidenced | Required/planned; completion not verified |
| Evidence in the project record | No project-specific fire system or fire-clearance evidence is supplied. RERA amenities |
|---|---|
| Status evidenced | Not established |
| Evidence in the project record | Footpaths and cycling tracks are specified; no accessible-route details are supplied. |
|---|---|
| Status evidenced | Required/planned; completion not verified |
| Evidence in the project record | No project-specific CCTV or access-control evidence is supplied in the HMDA approval record. |
|---|---|
| Status evidenced | Not established |
The vendor listing advertises treated water, 24×7 security, CCTV and underground utilities; these are marketing claims and are not independently verified by the supplied approval material. Promoter website
8. Location, access & connectivity
The official project location is in Chatanpally Village and Farooqnagar Village, Farooqnagar Mandal, Ranga Reddy District, Telangana, PIN 509216. The RERA record also describes the site as within the Farooqnagar/Chatanpally area. RERA record
The HMDA layout material identifies existing and proposed roads, including an existing 30-metre road, a proposed 30-metre road, 9.14M and 12.0M roads, and an existing 100'0" wide road. Its conditions require layout roads to be made accessible to neighbouring sites.
The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 29.3 km. No public-transport stops, travel times or further measured landmark distances are provided in the project evidence. Location record
9. Developer & development status
The registered promoter is BHUMIREDDY CONSTRUCTIONS & INFRA DEVELOPERS LLP, an LLP, with GSTIN 36AAZFB7779A1ZV. The RERA record identifies BHUMIREDDY HAREESHA as Partner and BHUMIREDDY NAVEEN REDDY as Authorized Signatory. Corporate record Parties record
The RERA certificate lists the promoter’s address as Village: Mandal: Saroornagar, District: Ranga Reddy, Pin: 500060. The project evidence does not provide an official promoter website or contact details.
The promoter’s Form B declares the project completion date as 22/10/2028 and contains undertakings on project funds, audits, approvals and allottee obligations. This is a promoter declaration; the supplied evidence does not include independently verified progress or an issued completion certificate.
10. Approvals, official records & documents
| Identifier / date | P02400010282; valid 23/10/2025–22/10/2028 unless extended |
|---|---|
| What the supplied record establishes | Registration of GOLDEN VALLEY and its stated project land and promoter; certificate conditions include quarterly updates, a separate account and later sale agreements and conveyance deeds. |
| Identifier / date | 011368/LO/HMDA/3004/SMD/2024; approved 23 October 2025 |
|---|---|
| What the supplied record establishes | Draft open plotted layout permission for 61 plots on portions of Survey Nos. 175 and 745, subject to development, mortgage and handover conditions. The letter states permission is not proof of title. |
| Identifier / date | File TS/054405/2024 |
|---|---|
| What the supplied record establishes | Layout drawing and area schedule, including plot count, land uses, roads and utility/social-infrastructure areas. |
| Identifier / date | Document 5123/2025, dated 08 July 2025 |
|---|---|
| What the supplied record establishes | The layout approval identifies plots 55, 56, 57, 58, 59, 60, 61 and 46, stated extent 1891.9 sq.m, as mortgaged to HMDA. |
| Identifier / date | Filed for GOLDEN VALLEY |
|---|---|
| What the supplied record establishes | Promoter-declared completion undertaking of 22/10/2028, title and encumbrance declarations, and project-account/audit undertakings. |
| Identifier / date | Two layout sheets; 61 plots |
|---|---|
| What the supplied record establishes | Software-measured plot sizes and area breakdown; not a RERA-filed unit schedule. Layout record |
No occupancy or completion certificate is included in the supplied project documents. The HMDA layout approval and its conditions should not be read as proof that the specified infrastructure works have been completed. Document index
1. Project at a glance
Project identity
Registered project name: GOLDEN VALLEY
Project type: New plotted development / open plotted layout
Phase / registered portion: Phase not separately identified; TG-RERA registration covers land described as portions of Survey Nos. 175 and 745
TG-RERA registration: P02400010282
Registration validity: 23/10/2025 to 22/10/2028, unless extended by the Authority; this is the registration period, not the project completion deadline
Registered promoter: BHUMIREDDY CONSTRUCTIONS & INFRA DEVELOPERS LLP
RERA status: Registered; certificate requires quarterly updates and sets project-specific conditions
Land and geographic identity
Locality: Chatanpally / Farooqnagar area
Revenue villages: Farooqnagar Village and Chatanpally Village
Mandal: Farooqnagar Mandal
District: Ranga Reddy District
PIN: 509216
Project survey references: 175/PART OF FAROOQNAGAR VILLAGE ANDMANDAL; 745/PART OF CHATANPALLY VILLAGE. The approval and certificate also abbreviate these as 175/PART and 745/PART.
Site extent: 20,260.84 sq.m total site area; the HMDA draft layout letter states a 20,213.20 sq.m net site area. The RERA land record gives 20,260.84 sq.m as both total and net area.
Boundaries in RERA land details: East: EXISTING 30 ROAD; West: SURVEY NO 175 PART; North: OTHERS LAND; South: OTHERS LAND.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: 011368/LO/HMDA/3004/SMD/2024, approved 23 October 2025; filed as draft layout permission / technical approval
Related file number: TS/054405/2024
Approved built-up area: 0.00 proposed built-up area, both excluding and including parking, in the layout approval parameters; this is a plotted layout, not an apartment-building approval.
Layout scale: 61 plots shown in the HMDA layout record and layout drawing
Towers / building floors: Not applicable to the approved open plotted layout; no tower count or floor configuration is disclosed in the RERA project record.
Parking: No common parking area is shown in the layout area schedule (0.00); no project-wide parking-space count or individual plot parking allocation is supplied.
Offering and status
Offered product: Residential plots; the HMDA layout record identifies 61 plots
RERA-filed plot sizes / inventory counts: Plot-wise RERA unit inventory and saleable-area schedule are not supplied in the available record. The layout drawing contains plot areas; see §4.
Booked / available: Not disclosed in the supplied project evidence.
Construction stage: No independently verified site-progress measurement is supplied. HMDA’s approval requires layout infrastructure works; completion of those works is not established by the supplied evidence.
Promoter-declared completion: Form B states 22/10/2028; the registration certificate remains valid through 22/10/2028 unless extended. The header separately records a proposed completion date of 22/02/2029.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The evidence describes a draft layout approval, not an issued OC.
2. The project story
GOLDEN VALLEY is registered with TG-RERA as a plotted development by BHUMIREDDY CONSTRUCTIONS & INFRA DEVELOPERS LLP. The registered land description covers portions of Survey No. 175 in Farooqnagar Village and Survey No. 745 in Chatanpally Village, within Farooqnagar Mandal, Ranga Reddy District.
The HMDA-filed layout material describes an open layout of 61 plots, with land set aside for plots, roads, park/open space, social infrastructure and utilities. The project is therefore a layout-and-infrastructure offering rather than a tower or apartment scheme.
The records establish layout permission subject to development and handover conditions, but do not establish that the roads, utilities, park or other works have been completed. No site inspection or independently verified construction-progress report is included. The promoter’s Form B states a completion undertaking of 22/10/2028; the RERA certificate records registration validity through 22/10/2028, while the project header records a proposed completion date of 22/02/2029. These dates describe different recorded fields; the available evidence does not provide an issued completion or occupancy certificate.
3. Master plan, architecture & building design
The project is a plotted layout, not a multi-storey building scheme. The layout drawing’s schedule covers all 61 plots. The software-measured plot sizes range from 127.29 sq.m to 367.84 sq.m, with a median of 184.57 sq.m; these are drawing-derived measurements, not a RERA-filed plot-size schedule.
The layout drawing’s land-use table allocates the 20,260.84 sq.m base area as follows:
| Layout use | Area | Share shown in drawing |
|---|---|---|
| Plotted area | 11,993.10 sq.m | 59.19% |
| Roads | 6,005.59 sq.m | 29.64% |
| Parks / organized open space | 1,526.54 sq.m | 7.53% |
| Social infrastructure | 508.42 sq.m | 2.51% |
| Utilities | 227.19 sq.m | 1.12% |
| Amenity area | 0.00 sq.m | 0.00% |
The layout documents identify road widths including 9.14M, 12.0M, 30.00 MT WIDE EXISTING, 30.00 MT WIDE PROPOSED ROAD, and EXISTING 100'0" WIDE ROAD. HMDA’s conditions require roads to remain accessible to neighbouring sites and describe road formation, drainage, footpaths, lighting and utility works.
No building footprint, apartment configuration, building height or floor arrangement is provided. The layout drawing is the relevant physical-plan evidence; no promotional building plan is used here.
4. Homes, configurations & floor plans
This is a plotted project, so the relevant product is plots rather than apartments. TG-RERA’s supplied project evidence does not include a plot-by-plot RERA saleable-area or booking/availability schedule.
The layout drawing schedule identifies 61 plots. Software measurement of that drawing gives the following plot-size bands; verify any individual plot’s dimensions against the approved drawing and its plot schedule. These are not a RERA-filed saleable-area schedule.
150–200 sq.yd (125–167 sq.m): 22
200–250 sq.yd (167–209 sq.m): 24
250–300 sq.yd (209–251 sq.m): 6
300–400 sq.yd (251–334 sq.m): 4
400–500 sq.yd (334–418 sq.m): 5
The two supplied layout sheets contain no flats, and no apartment floor-plan or measured carpet-area data applies. The RERA-filed unit saleable areas, booked plots and available plots are not disclosed in the supplied evidence.
5. Parking & vehicle circulation
The layout area schedule records 0.00 for common parking area. No sanctioned project-wide parking-space count, visitor or accessible parking provision, or plot-specific parking allocation is supplied. A vendor listing mentions “covered car parking,” but that is a third-party marketed claim rather than a confirmed HMDA layout provision.
The HMDA layout record includes internal roads and road widths, and the draft approval conditions require roads to be opened for access to neighbouring sites. The evidence does not specify separate pedestrian/vehicle circulation, ramps, EV charging or parking allotments.
6. Amenities, recreation & open spaces
The layout record identifies park/open space, social infrastructure, utility land and infrastructure works. The following facilities are recorded in the HMDA draft layout material; the supplied records do not establish that they have been completed.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 1,526.54 sq.m; drawing schedule shows 7.53% | Planned in the layout; completion not verified | |
| Social infrastructure area | 508.42 sq.m | Earmarked; handover/development not verified | |
| Tot-lot | Identified in layout approval record; no separate area supplied | Listed as a layout feature; completion not verified | |
| Cycle track | Listed in layout approval conditions | Required/planned; completion not verified |
A vendor listing advertises a clubhouse, swimming pool, gym, children’s play area and “large green area.” These are third-party marketing claims; the available HMDA layout record does not establish those facilities as approved or delivered project amenities.
7. Utilities, building services & safety
HMDA’s draft layout conditions describe infrastructure to be provided as part of layout development. The record calls for internal water-supply pipelines, an overhead tank and sumps, a protected water supply source, a common septic tank/STP or independent sewerage-disposal system, underground drainage, storm-water drainage, rainwater-harvesting pits, electrical supply lines, a transformer, street lighting, utility ducting, solid-waste disposal space and a bio-compost unit. These are approval conditions or proposed works, not evidence of completed services.
| Evidence in the project record | Internal water-supply pipelines, overhead tank and sumps; potable-water connectivity to Mission Bhagiratha or another authority-approved source is required by the draft approval conditions. |
|---|---|
| Status evidenced | Required/planned; source, capacity and completion not verified |
| Evidence in the project record | Common septic tank/STP or independent disposal system; underground sewerage and storm-water drainage are specified. |
|---|---|
| Status evidenced | Required/planned; capacity and completion not supplied |
| Evidence in the project record | Rainwater-harvesting pits are listed. |
|---|---|
| Status evidenced | Listed/required; completion not verified |
| Evidence in the project record | Supply lines, transformer yard and street lighting, including LED lighting, are specified in the draft conditions. |
|---|---|
| Status evidenced | Required/planned; capacity and completion not supplied |
| Evidence in the project record | Solid-waste disposal space, source segregation and bio-compost unit are specified. |
|---|---|
| Status evidenced | Required/planned; completion not verified |
| Evidence in the project record | No project-specific fire system or fire-clearance evidence is supplied. |
|---|---|
| Status evidenced | Not established |
| Evidence in the project record | Footpaths and cycling tracks are specified; no accessible-route details are supplied. |
|---|---|
| Status evidenced | Required/planned; completion not verified |
| Evidence in the project record | No project-specific CCTV or access-control evidence is supplied in the HMDA approval record. |
|---|---|
| Status evidenced | Not established |
The vendor listing advertises treated water, 24×7 security, CCTV and underground utilities; these are marketing claims and are not independently verified by the supplied approval material.
8. Location, access & connectivity
The official project location is in Chatanpally Village and Farooqnagar Village, Farooqnagar Mandal, Ranga Reddy District, Telangana, PIN 509216. The RERA record also describes the site as within the Farooqnagar/Chatanpally area.
The HMDA layout material identifies existing and proposed roads, including an existing 30-metre road, a proposed 30-metre road, 9.14M and 12.0M roads, and an existing 100'0" wide road. Its conditions require layout roads to be made accessible to neighbouring sites.
The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 29.3 km. No public-transport stops, travel times or further measured landmark distances are provided in the project evidence.
9. Developer & development status
The registered promoter is BHUMIREDDY CONSTRUCTIONS & INFRA DEVELOPERS LLP, an LLP, with GSTIN 36AAZFB7779A1ZV. The RERA record identifies BHUMIREDDY HAREESHA as Partner and BHUMIREDDY NAVEEN REDDY as Authorized Signatory.
The RERA certificate lists the promoter’s address as Village: Mandal: Saroornagar, District: Ranga Reddy, Pin: 500060. The project evidence does not provide an official promoter website or contact details.
The promoter’s Form B declares the project completion date as 22/10/2028 and contains undertakings on project funds, audits, approvals and allottee obligations. This is a promoter declaration; the supplied evidence does not include independently verified progress or an issued completion certificate.
10. Approvals, official records & documents
| Identifier / date | P02400010282; valid 23/10/2025–22/10/2028 unless extended |
|---|---|
| What the supplied record establishes | Registration of GOLDEN VALLEY and its stated project land and promoter; certificate conditions include quarterly updates, a separate account and later sale agreements and conveyance deeds. |
| Identifier / date | 011368/LO/HMDA/3004/SMD/2024; approved 23 October 2025 |
|---|---|
| What the supplied record establishes | Draft open plotted layout permission for 61 plots on portions of Survey Nos. 175 and 745, subject to development, mortgage and handover conditions. The letter states permission is not proof of title. |
| Identifier / date | File TS/054405/2024 |
|---|---|
| What the supplied record establishes | Layout drawing and area schedule, including plot count, land uses, roads and utility/social-infrastructure areas. |
| Identifier / date | Document 5123/2025, dated 08 July 2025 |
|---|---|
| What the supplied record establishes | The layout approval identifies plots 55, 56, 57, 58, 59, 60, 61 and 46, stated extent 1891.9 sq.m, as mortgaged to HMDA. |
| Identifier / date | Filed for GOLDEN VALLEY |
|---|---|
| What the supplied record establishes | Promoter-declared completion undertaking of 22/10/2028, title and encumbrance declarations, and project-account/audit undertakings. |
| Identifier / date | Two layout sheets; 61 plots |
|---|---|
| What the supplied record establishes | Software-measured plot sizes and area breakdown; not a RERA-filed unit schedule. |
No occupancy or completion certificate is included in the supplied project documents. The HMDA layout approval and its conditions should not be read as proof that the specified infrastructure works have been completed.
Frequently asked questions
Is GOLDEN VALLEY registered with Telangana RERA?
Yes. GOLDEN VALLEY is registered with the Telangana Real Estate Regulatory Authority as P02400010282; the registration status is New Project.
Who is the developer of GOLDEN VALLEY?
The promoter named in the RERA registration is BHUMIREDDY CONSTRUCTIONS & INFRA DEVELOPERS LLP.
Where is GOLDEN VALLEY located?
GOLDEN VALLEY is in FARROQNAGAR MANDAL, Chatanpally, Farooqnagar, Rangareddy, Telangana (509216).
When will GOLDEN VALLEY be completed?
The promoter's proposed date of completion filed with RERA is 22/02/2029. This is the promoter's declaration, not a guarantee.