Lakshmi Aranya

G R K INFRA · Rangareddy · RERA P02400010846

LAKSHMI ARANYA is a residential apartment project in Miyapur, Serilingampally Mandal, Ranga Reddy District, developed by registered promoter G R K INFRA. The project covers 445.92 sq. m and comprises one building with a stilt and 5 upper floors, with 10 3BHK apartments. It is registered under TG-RERA number P02400010846, and the proposed completion date is 22-03-2029.

More from G R K Infra · 3 projects →

01What we found

RegisteredTG-RERA - valid till 22 Mar 2029
13documents on file - each fact links to its page
157court cases on this project's land (survey 44, Miyapur)
7items to check - 1 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 1 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameLAKSHMI ARANYA RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNew Project; the supplied record identifies one building on the registered site. A separate phase designation is not disclosed. RERA record
TG-RERA registrationP02400010846 RERA record
Registration validity22/03/2026 to 22/03/2029 (three years, unless extended by the Authority). This is the registration period, not the building-permit completion deadline. RERA record
Registered promoterG R K INFRA RERA record
RERA statusRegistered. The portal registration was captured on 10/09/2026. RERA record Approvals record

Land and geographic identity

ItemProject record
LocalityMiyapur; the filed building plan identifies Madhava Nagar Colony. RERA record
Revenue villageMiyapur Village RERA record
MandalSerilingampally RERA record
DistrictRanga Reddy RERA record
PIN500049 RERA record
Project survey number(s)Survey No. 44/2. No project subdivision is specified in the supplied project records. Land records
Registered site extent445.92 sq. m
Sanctioned gross and net plot area445.92 sq. m gross; 445.92 sq. m net. The plan records 0 sq. m road-affected area and 0 sq. m nala-widening area.
Boundaries as filedNorth: 30 feet wide road; South: 30 feet wide road; East: 40 feet wide road; West: Plot Nos. 164 and 167. RERA filing

Development identity

ItemProject record
Sanctioning authorityCyberabad Municipal Corporation (the RERA filing names GHMC as the authority). RERA filing
Building permit3247/GHMC/SWBP/SLP2/2026, approved 22/03/2026.
Filed plan / file number010643/GHMC/04872/SWBP/SLP2/2025
Approved area1239.6 sq. m residential upper-floor area; the plan separately records Gross BUA 1501.56 sq. m, Net BUA 1239.60 sq. m, and Net Parking Area 247.92 sq. m.
Building count and configurationOne building, named “BUILDING”; Stilt + 5 Upper Floors. The plan records a proposed height of 14.9 m from GL and 17.85 m including concession floors.
Parking provisionThe plan records 4.00 car parking spaces and 247.92 sq. m net parking area; the permit identifies the stilt and cellar areas approved for parking.
Unit count10 dwelling units in the building permit; 10 units in the RERA configuration record. RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK; 10 units RERA unit table
RERA-filed saleable area146.31 sq. m per unit RERA unit table
Booked / available0 booked / 10 available, as last read from the TG-RERA portal; the portal record has no as-of date, so counts are indicative. RERA unit table
Construction stageThe permit and RERA records describe a proposed project; no independently verified site-progress status is supplied. RERA unit table
Completion datesPromoter’s Form B undertakes completion by 22-03-2029; the building permit states construction is to be completed before 22/03/2029. These are completion deadlines, separate from registration validity.
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The building permit requires an occupancy certificate before occupation and before delivery of any part of the building.

2. The project story

LAKSHMI ARANYA is a registered residential apartment project on Plot Nos. 165 and 166, Survey No. 44/2, in Miyapur Village, Serilingampally Mandal, Ranga Reddy District. The supplied RERA and building-permit records describe one standalone building with a stilt level and five upper floors, approved for 10 dwelling units. RERA record

The RERA-filed offering is 10 3BHK apartments. The portal snapshot records all 10 as available and none booked, but provides no date for that inventory count. No independently verified construction-progress evidence or occupancy certificate is included in the supplied material; therefore the project is presented here as proposed, not as completed or occupied. RERA unit table

3. Master plan, architecture & building design

The approved building plan covers a 445.92 sq. m gross and net plot. It records a proposed coverage area of 247.92 sq. m, vacant plot area of 188.59 sq. m, and residential BUA of 1239.6 sq. m excluding parking. The plan separately records 1487.52 sq. m total proposed BUA including parking and 1501.56 sq. m Gross BUA; these are distinct plan-labelled area figures and are not saleable or carpet areas.

The sanctioned arrangement is one residential building with a stilt and five upper floors. The plan lists 247.92 sq. m for each of the stilt and first through fifth floors, with the fifth floor marked TDR, and a 14.04 sq. m terrace. The building height is recorded as 14.9 m from GL and 17.85 m including concession floors.

The plan shows four car-parking spaces and 247.92 sq. m net parking area. The permit also requires the approved cellar and stilt parking areas to remain exclusively for vehicle parking. The supplied records do not establish the number of apartments per floor, lift or stair configuration, or the detailed circulation arrangement.

4. Homes, configurations & floor plans

The TG-RERA configuration record lists 10 3BHK units, each with a filed saleable area of 146.31 sq. m. The portal shows 0 booked and 10 available, without an inventory as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010146.31 sq. mMedian 76.4 sq. m; range 69.5–83.5 sq. m48%

Carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures; six flat designs were measured and the measurements are marked as needing review. The supplied drawing record identifies two balconies in the measured fifth-floor example, with measured areas of 6.07 sq. m and 2.79 sq. m; these balcony areas are excluded from the software-measured carpet area. Saleable area is the RERA-filed figure and includes the home’s share of common areas, so it is not interchangeable with the drawing-measured carpet area. Floor plans RERA unit details

5. Parking & vehicle circulation

The sanctioned plan records 4.00 car parking spaces and 247.92 sq. m of net parking area. The building permit identifies the cellar and stilt areas as parking and requires them to be used exclusively for parking, without partition walls or rolling shutters.

The supplied records do not specify visitor or accessible parking counts, two-wheeler spaces, EV charging locations, ramp dimensions, internal driveway arrangements, or parking allocation to individual apartments. The plan’s parking provision does not by itself establish exclusive ownership or allotment of a particular bay to a buyer.

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 project infrastructure and facility categories. All entries with a supplied progress percentage show 0%; the available-status fields are marked “YES” for water supply, sewerage, energy management, fire protection and fire safety, and electrical meter room/sub-station/receiving station. These are filed status fields, not independent verification of completion. RERA amenities

Community open space / tot lot
Description / sizePermit lists Tot Lot: 0 Sq. Mtrs and requires a fenced tot-lot to be maintained as greenery before occupancy certification.
Evidence sourceBuilding permit
Declared progress / verified statusRERA amenity record: Green Strip/TOT LOT/Park 0%; completion not independently verified. RERA amenities
Tree planting / greenery
Description / sizePermit specifies 15 trees and a peripheral greenery strip.
Evidence sourceBuilding permit
Declared progress / verified statusRequired/provided for in permit; planting and maintenance not independently verified.
Internal roads and footpaths
Description / sizeListed as a project infrastructure category; no dimensions or detailed plan are supplied. RERA amenities
Evidence sourceRERA amenity record
Declared progress / verified status0% recorded; completion not independently verified.
Community buildings
Description / sizeListed; no size or facility details supplied. RERA amenities
Evidence sourceRERA amenity record
Declared progress / verified status0% recorded; completion not independently verified.
Street lighting
Description / sizeListed; no quantity or specification supplied. RERA amenities
Evidence sourceRERA amenity record
Declared progress / verified status0% recorded; completion not independently verified.

No RERA-filed evidence in the supplied material establishes a clubhouse, swimming pool, gym, or other indoor recreation facility. Those features are not treated here as project-provided amenities.

7. Utilities, building services & safety

The RERA amenity record marks water supply and sewerage as “YES,” but does not provide a water source, storage capacity, treatment capacity, or sewage-treatment details. It also lists storm-water drains, treatment and disposal of sewage and sullage, solid-waste management, and rainwater harvesting; each has 0% progress recorded. RERA amenities

The building permit requires a rainwater-harvesting percolation pit, space for a transformer, and a garbage house. It also requires an occupancy fire NOC before issuance of an occupancy certificate and states that occupancy certification is required before occupation. The supplied evidence does not establish completion of these facilities or systems.

The permit requires parking places to be provided with electric-vehicle charging infrastructure. The supplied records do not give the number of charging points or their locations. The RERA amenity record marks energy management, fire protection/fire safety, and electrical meter room/sub-station/receiving station as “YES”; no capacity, system description, or completed status is supplied. RERA amenities

8. Location, access & connectivity

The registered location is Miyapur, Miyapur Village, Serilingampally Mandal, Ranga Reddy District, PIN 500049. The building-permit record identifies Plot Nos. 165 and 166 in Survey No. 44/2, with roads recorded on the north, south and east boundaries. RERA record RERA filing

The supplied location record gives HITEC City — 7.8 km. A cadastral-parcel centroid is recorded at 17.51343, 78.36713. No verified public-transport details or other measured access distances are supplied in the project-location record. Location record

9. Developer & development status

The TG-RERA registration certificate names G R K INFRA as the registered promoter. The promoter is identified in the project filing as a partnership; the supplied corporate details include GSTIN 36AAWFG5420AIZJ. The available material does not identify a separately verified registered-office address or official project contact details. RERA record RERA filing Corporate record

Rithvik Kumar Godas is identified as the promoter’s authorized signatory, and the project’s Form B declaration is made by him on behalf of GRK INFRA. That declaration undertakes completion by 22-03-2029. The building permit also states a completion deadline before 22/03/2029. Neither the declaration nor deadline establishes actual construction progress; no independently verified progress update is supplied. Parties record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for LAKSHMI ARANYA, P02400010846, covering Survey No. 44/2, Miyapur, Serilingampally, Ranga Reddy; valid 22/03/2026–22/03/2029.
Building permitBuilding Permit Order 3247/GHMC/SWBP/SLP2/2026, approved 22/03/2026; applicant Sri G. Mallesham; one residential building, Stilt + 5 Upper Floors, 10 dwelling units.
Filed plan / applicationFile No. 010643/GHMC/04872/SWBP/SLP2/2025; application date 26/11/2025.
Approved building planPlan for the proposed residential apartment on Plot Nos. 165 and 166, Survey No. 44/2, Miyapur Village; records site areas, BUA, building configuration, height and parking.
Promoter declarationForm B by Rithvik Kumar Godas representing GRK INFRA, including the promoter’s completion undertaking and other project declarations.
Occupancy / completion documentsNo occupancy or completion certificate is included in the supplied material. The building permit requires an occupancy certificate before occupation.
Environmental clearance searchA promoter-name search returned “no EC found”; the supplied record says the match is at promoter level, not project-specific. It does not establish whether an approval requirement applies to this project. Regulatory record

Frequently asked questions

Is LAKSHMI ARANYA registered with Telangana RERA?

Yes. LAKSHMI ARANYA is registered with the Telangana Real Estate Regulatory Authority as P02400010846; the registration status is New Project.

Who is the developer of LAKSHMI ARANYA?

The promoter named in the RERA registration is G R K INFRA.

Where is LAKSHMI ARANYA located?

LAKSHMI ARANYA is in MIYAPUR, Serilingampally, Rangareddy, Telangana (500049).

When will LAKSHMI ARANYA be completed?

The promoter's proposed date of completion filed with RERA is 22/07/2029. This is the promoter's declaration, not a guarantee.

More projects in Miyapur