SRI LAKSHMI NAGAR is a plotted development at Raigiri, Bhongir mandal, Yadadri Bhuvanagiri district. It is being developed by SRI TIRUMALA ESTATES on land recorded as 103346 sqmts, with no tower or block count, floor configuration, plot count, or plot-size range disclosed in the supplied records. The project is registered under TG-RERA number P02000002597, and its proposed completion date is 01/04/2024.

More from Sri Tirumala Estates · 3 projects →

01What we found

Period endedTG-RERA registration ran to 1 Apr 2024 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Raigiri, Bhongir, Yadadri Bhuvanagiri · geocoded — approximate.

Project at a glance

Project identity

ItemRecord
Registered project nameSRI LAKSHMI NAGAR RERA record
Project typePlotted development / plotted layout RERA record
Phase or registered portionNot separately identified; registration covers the project land listed below
TG-RERA registrationP02000002597, granted 23/02/2021; recorded validity 23/02/2021–01/04/2024. The certificate says extension is possible if granted by the Authority; the supplied record says no extension is recorded. Registration validity is distinct from the completion date and from any completion/occupancy certificate.
Registered promoterSRI TIRUMALA ESTATES, identified in the registration certificate as Sri Tirumala Estates
RERA statusCertificate records registration under section 5. Current registration status after 01/04/2024 is not established by the supplied certificate.

Land and geographic identity

ItemRecord
Locality / revenue villageRaigiri (also written Raigiri/Raigir in supplied records); the revenue-village spelling should be confirmed against current land records. RERA record
MandalBhongir RERA record
DistrictYadadri Bhuvanagiri (the layout proceedings also state “Yadadri Bhongir District”) RERA record
PIN508116 RERA record
Project survey numbers / subdivisions as registered592/P, 593/P, 595/P, 596/P and 610/P
Site extent in registration fieldsTotal area 103346 sqmts; area affected in road widening/FTL of tanks/nala widening 4815 sqmts; net area 98531.00 sqmts. RERA filing
Extent in layout proceedingsAc.25.8375 cents (1,04,590.2 Sq.mts)
Boundaries in RERA filingEast: OTHERS LAND; West: OTHERS LAND; North: ROAD; South: ROAD. RERA filing

Development identity

ItemRecord
Sanctioning authority / principal approvalBhongir Municipality proceedings for draft layout, D.T.L.P.No.01/2020/YTDA, approved 05.03.2020. The proceedings identify the file as Lr.No. G1/1101/2019 and proceedings as Lr.Roc.No.4235/2018/YTDA. Approvals record
Approved built-up areaRERA fields list 59007 sqmts as approved built-up area; the supplied records do not clarify how this figure applies to a plotted layout. RERA filing
Building count / floor configurationNot disclosed in the supplied project records; this is a plotted layout, not a documented apartment-building scheme. RERA record
Mortgage area8926 sqmts in the RERA fields. The layout proceedings separately identify mortgaged plots Nos. 65 to 91 and 139 to 142, recorded as 10676.00 sq.yards i.e., 15.13%. RERA filing
Plot count and approved plot-size rangeNot established from the supplied RERA extracts. Document index

Offering and status

ItemRecord
Unit typePlot RERA record Promoter website
RERA-filed plot count / booked / available countsNot available in the supplied records. Document index
RERA-filed saleable plot-size rangeNot available in the supplied records. Document index
Proposed completion date in RERA fields01/04/2024 RERA filing
Construction / development stageA RERA field reports 80% completeness; the basis, date, and independent verification of this percentage are not supplied. RERA record
Completion / occupancy certificateNo completion or occupancy certificate is included in the supplied documents; certificate status is therefore unverified. Document index

The project story

SRI LAKSHMI NAGAR is registered as a plotted development at Raigiri, Bhongir mandal, on land recorded under survey numbers 592/P, 593/P, 595/P, 596/P and 610/P. The registration certificate identifies the project and promoter, while the municipal proceedings describe a draft layout permission for the same survey numbers and specify development works and land reserved for roads, open space, social infrastructure and utilities.

The RERA record gives a proposed completion date of 01/04/2024 and a completeness figure of 80%, but the supplied material does not state the measurement date or provide independent site verification. The available certificate records registration validity through 01/04/2024; it does not establish completion, current registration validity, or issuance of a completion/occupancy certificate. RERA filing RERA record

Master plan, architecture & building design

The supplied layout proceedings describe a draft plotted layout on Ac.25.8375 cents (1,04,590.2 Sq.mts). Their recorded land-use components include 15.13% mortgaged plots (10676.00 sq.yards), 7.50% open space (Ac.1.826 cents), 2.50% social infrastructure (Ac.0.61 cents), 29.12% roads (Ac.7.09 cents) and 0.98 % utilities (Ac.0.24 cents). The proceedings also mention a Ac.0.30 cents cart-track area to be gifted to the local body. These are figures stated in the proceedings, not a measured reconstruction of the site plan.

The proceedings specify layout infrastructure including road formation and black topping, storm-water drains, underground drainage, a common septic tank/STP, internal water lines, an overhead tank, an assured water source, electrical supply lines, street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. They require development works to be completed within THREE (3) YEARS and identify roads, open spaces, social infrastructure and utilities for handover to the Municipality through registered gift deed.

No building count, plot arrangement drawing, approved plot schedule, road-width schedule, or drawing-based open-space plan is available in the supplied extracts. The approved built-up area field states 59007 sqmts, but its relationship to the plotted-layout approval is not explained in the provided record. RERA filing Document index

Homes, configurations & floor plans

This is a plotted project; the supplied records do not provide a RERA plot inventory table with plot counts, plot-size bands, or booked and available plot totals. RERA record Document index

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
PlotNot disclosedNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

Two drawings are listed, but both are pending scan; none has been software-measured. Accordingly, no drawing-based plot dimensions or measured area are available. Floor plans

Parking & vehicle circulation

The layout proceedings describe roads and road-development works, but the supplied project records do not establish parking-space counts, visitor parking, accessible parking, parking allocation to individual plots, or EV provision. The proceedings identify plots reserved as mortgage security; that is not evidence of parking allocation. Document index

Amenities, recreation & open spaces

The RERA amenity record marks the following as available with a reported progress value of 0; the meaning or measurement date of that progress value is not provided. Separately, the layout proceedings specify several infrastructure works, but do not establish that they have been completed or independently verified. RERA amenities

Internal roads & footpaths
Description / sizeLayout infrastructure; roads area stated as Ac.7.09 cents (29.12%) in the proceedings
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: YES, 0; completion not independently verified
Green strip / tot lot / park
Description / sizeOpen-space area stated as Ac.1.826 cents (7.50%); park development and avenue planting specified
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: YES, 0; completion not independently verified
Community buildings
Description / sizeNo size or count supplied
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0; completion not verified
Aggregate area of recreational open space
Description / sizeNo separate size supplied beyond the open-space figure above
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: YES, 0; completion not verified

Utilities, building services & safety

The layout proceedings specify planned infrastructure works: internal water-supply lines, an assured water-supply source, overhead tank, underground drainage and common septic tank/STP, storm-water drains and nala channelization, rainwater-harvesting pits, electrical supply lines, transformer and street lighting. The proceedings also refer to underground ducting for utility and service lines. These are approval-condition descriptions; the supplied evidence does not verify installation, operating capacity, or completion.

Water
Evidence in the supplied recordInternal water-supply lines, assured source, overhead tank and protected water supply specified
Status / limitationProposed/required in proceedings; source, storage capacity and completion not verified
Sewerage and drainage
Evidence in the supplied recordUnderground drainage, common septic tank/STP, storm-water drains and nala channelization specified
Status / limitationProposed/required in proceedings; capacity and completion not verified
Rainwater management
Evidence in the supplied recordRainwater-harvesting pits specified
Status / limitationProposed/required; quantity and completion not verified
Electrical and lighting
Evidence in the supplied recordElectrical supply lines, transformer and street lighting specified
Status / limitationProposed/required; capacity and completion not verified
Fire, waste, security and accessibility
Evidence in the supplied recordNo project-specific design or completion evidence supplied
Status / limitationNot established RERA amenities

Location, access & connectivity

The registered project location is Raigiri village/locality, Bhongir mandal, Yadadri Bhuvanagiri district, PIN 508116. A cadastral parcel-centroid coordinate is reported as 17.53653, 78.94639. RERA record Location record

The layout proceedings record roads on the north and south boundaries and require a main approach road to be black-topped or developed to the nearest existing public road. The supplied location data reports the nearest sampled Outer Ring Road interchange at 29.8 km (approx); this is a measured/sample-based distance, not a travel-time estimate. RERA filing Location record

Developer & development status

The TG-RERA registration certificate names Sri Tirumala Estates as promoter, and the Form B declaration identifies SRI TIRUMALA ESTATES and names Nomula Krishna Goud as declarant/promoter. The promoter is recorded in the project data as a partnership; the listed partners are Nomula Krishna Goud and Nomula Indrani. Corporate record

A RERA filing field records a proposed completion date of 01/04/2024 and 80% completeness, but the supplied evidence does not identify the date or verification method for that progress figure. The Form B completion undertaking is unfilled. The supplied registration certificate records validity through 01/04/2024, with no extension shown in the provided record. These facts do not establish that the layout is complete or that a completion/occupancy certificate has issued. RERA filing RERA record

The registration certificate lists a promoter-office address as “Village: Mandal: Amberpet, District: Hyderabad, Pin: 500036.” The supplied record does not provide a complete registered-office address or official contact details.

Approvals, official records & documents

TG-RERA registration certificate
What the supplied document establishesForm C registration for SRI LAKSHMI NAGAR, P02000002597, granted under section 5; validity stated as 23/02/2021–01/04/2024
Draft layout proceedings
What the supplied document establishesBhongir Municipality proceedings for a draft layout on survey numbers 592/P, 593/P, 595/P, 596/P and 610/P; approval D.T.L.P.No.01/2020/YTDA, dated 05.03.2020; permission states it is not proof of title
Form B promoter declaration
What the supplied document establishesPromoter declaration on title, encumbrances, separate-account and audit undertakings; completion period and declaration date are not filled in
Layout drawing / stamped approval copy
What the supplied document establishesThe RERA document register lists a layout-plan requirement, but the supplied record does not include an extracted approved layout drawing
Completion / occupancy certificate
What the supplied document establishesNot included in the supplied project documents
ReferenceDocument index

Frequently asked questions

Is SRI LAKSHMI NAGAR registered with Telangana RERA?

Yes. SRI LAKSHMI NAGAR is registered with the Telangana Real Estate Regulatory Authority as P02000002597; the registration status is New Project.

Who is the developer of SRI LAKSHMI NAGAR?

The promoter named in the RERA registration is SRI TIRUMALA ESTATES.

Where is SRI LAKSHMI NAGAR located?

SRI LAKSHMI NAGAR is in RAIGIRI, Bhongir, Yadadri Bhuvanagiri, Telangana (508116).

When will SRI LAKSHMI NAGAR be completed?

The promoter's proposed date of completion filed with RERA is 01/04/2024. This is the promoter's declaration, not a guarantee.

More projects in Raigiri