Sri Lakshmi Nagar
SRI TIRUMALA ESTATES · Yadadri Bhuvanagiri · RERA P02000002597
SRI LAKSHMI NAGAR is a plotted development at Raigiri, Bhongir mandal, Yadadri Bhuvanagiri district. It is being developed by SRI TIRUMALA ESTATES on land recorded as 103346 sqmts, with no tower or block count, floor configuration, plot count, or plot-size range disclosed in the supplied records. The project is registered under TG-RERA number P02000002597, and its proposed completion date is 01/04/2024.
More from Sri Tirumala Estates · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SRI LAKSHMI NAGAR RERA record |
| Project type | Plotted development / plotted layout RERA record |
| Phase or registered portion | Not separately identified; registration covers the project land listed below |
| TG-RERA registration | P02000002597, granted 23/02/2021; recorded validity 23/02/2021–01/04/2024. The certificate says extension is possible if granted by the Authority; the supplied record says no extension is recorded. Registration validity is distinct from the completion date and from any completion/occupancy certificate. |
| Registered promoter | SRI TIRUMALA ESTATES, identified in the registration certificate as Sri Tirumala Estates |
| RERA status | Certificate records registration under section 5. Current registration status after 01/04/2024 is not established by the supplied certificate. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Raigiri (also written Raigiri/Raigir in supplied records); the revenue-village spelling should be confirmed against current land records. RERA record |
| Mandal | Bhongir RERA record |
| District | Yadadri Bhuvanagiri (the layout proceedings also state “Yadadri Bhongir District”) RERA record |
| PIN | 508116 RERA record |
| Project survey numbers / subdivisions as registered | 592/P, 593/P, 595/P, 596/P and 610/P |
| Site extent in registration fields | Total area 103346 sqmts; area affected in road widening/FTL of tanks/nala widening 4815 sqmts; net area 98531.00 sqmts. RERA filing |
| Extent in layout proceedings | Ac.25.8375 cents (1,04,590.2 Sq.mts) |
| Boundaries in RERA filing | East: OTHERS LAND; West: OTHERS LAND; North: ROAD; South: ROAD. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority / principal approval | Bhongir Municipality proceedings for draft layout, D.T.L.P.No.01/2020/YTDA, approved 05.03.2020. The proceedings identify the file as Lr.No. G1/1101/2019 and proceedings as Lr.Roc.No.4235/2018/YTDA. Approvals record |
| Approved built-up area | RERA fields list 59007 sqmts as approved built-up area; the supplied records do not clarify how this figure applies to a plotted layout. RERA filing |
| Building count / floor configuration | Not disclosed in the supplied project records; this is a plotted layout, not a documented apartment-building scheme. RERA record |
| Mortgage area | 8926 sqmts in the RERA fields. The layout proceedings separately identify mortgaged plots Nos. 65 to 91 and 139 to 142, recorded as 10676.00 sq.yards i.e., 15.13%. RERA filing |
| Plot count and approved plot-size range | Not established from the supplied RERA extracts. Document index |
Offering and status
| Item | Record |
|---|---|
| Unit type | Plot RERA record Promoter website |
| RERA-filed plot count / booked / available counts | Not available in the supplied records. Document index |
| RERA-filed saleable plot-size range | Not available in the supplied records. Document index |
| Proposed completion date in RERA fields | 01/04/2024 RERA filing |
| Construction / development stage | A RERA field reports 80% completeness; the basis, date, and independent verification of this percentage are not supplied. RERA record |
| Completion / occupancy certificate | No completion or occupancy certificate is included in the supplied documents; certificate status is therefore unverified. Document index |
The project story
SRI LAKSHMI NAGAR is registered as a plotted development at Raigiri, Bhongir mandal, on land recorded under survey numbers 592/P, 593/P, 595/P, 596/P and 610/P. The registration certificate identifies the project and promoter, while the municipal proceedings describe a draft layout permission for the same survey numbers and specify development works and land reserved for roads, open space, social infrastructure and utilities.
The RERA record gives a proposed completion date of 01/04/2024 and a completeness figure of 80%, but the supplied material does not state the measurement date or provide independent site verification. The available certificate records registration validity through 01/04/2024; it does not establish completion, current registration validity, or issuance of a completion/occupancy certificate. RERA filing RERA record
Master plan, architecture & building design
The supplied layout proceedings describe a draft plotted layout on Ac.25.8375 cents (1,04,590.2 Sq.mts). Their recorded land-use components include 15.13% mortgaged plots (10676.00 sq.yards), 7.50% open space (Ac.1.826 cents), 2.50% social infrastructure (Ac.0.61 cents), 29.12% roads (Ac.7.09 cents) and 0.98 % utilities (Ac.0.24 cents). The proceedings also mention a Ac.0.30 cents cart-track area to be gifted to the local body. These are figures stated in the proceedings, not a measured reconstruction of the site plan.
The proceedings specify layout infrastructure including road formation and black topping, storm-water drains, underground drainage, a common septic tank/STP, internal water lines, an overhead tank, an assured water source, electrical supply lines, street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. They require development works to be completed within THREE (3) YEARS and identify roads, open spaces, social infrastructure and utilities for handover to the Municipality through registered gift deed.
No building count, plot arrangement drawing, approved plot schedule, road-width schedule, or drawing-based open-space plan is available in the supplied extracts. The approved built-up area field states 59007 sqmts, but its relationship to the plotted-layout approval is not explained in the provided record. RERA filing Document index
Homes, configurations & floor plans
This is a plotted project; the supplied records do not provide a RERA plot inventory table with plot counts, plot-size bands, or booked and available plot totals. RERA record Document index
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plot | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawings are listed, but both are pending scan; none has been software-measured. Accordingly, no drawing-based plot dimensions or measured area are available. Floor plans
Parking & vehicle circulation
The layout proceedings describe roads and road-development works, but the supplied project records do not establish parking-space counts, visitor parking, accessible parking, parking allocation to individual plots, or EV provision. The proceedings identify plots reserved as mortgage security; that is not evidence of parking allocation. Document index
Amenities, recreation & open spaces
The RERA amenity record marks the following as available with a reported progress value of 0; the meaning or measurement date of that progress value is not provided. Separately, the layout proceedings specify several infrastructure works, but do not establish that they have been completed or independently verified. RERA amenities
| Description / size | Layout infrastructure; roads area stated as Ac.7.09 cents (29.12%) in the proceedings |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity record: YES, 0; completion not independently verified |
| Description / size | Open-space area stated as Ac.1.826 cents (7.50%); park development and avenue planting specified |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity record: YES, 0; completion not independently verified |
| Description / size | No size or count supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0; completion not verified |
| Description / size | No separate size supplied beyond the open-space figure above |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity record: YES, 0; completion not verified |
Utilities, building services & safety
The layout proceedings specify planned infrastructure works: internal water-supply lines, an assured water-supply source, overhead tank, underground drainage and common septic tank/STP, storm-water drains and nala channelization, rainwater-harvesting pits, electrical supply lines, transformer and street lighting. The proceedings also refer to underground ducting for utility and service lines. These are approval-condition descriptions; the supplied evidence does not verify installation, operating capacity, or completion.
| Evidence in the supplied record | Internal water-supply lines, assured source, overhead tank and protected water supply specified |
|---|---|
| Status / limitation | Proposed/required in proceedings; source, storage capacity and completion not verified |
| Evidence in the supplied record | Underground drainage, common septic tank/STP, storm-water drains and nala channelization specified |
|---|---|
| Status / limitation | Proposed/required in proceedings; capacity and completion not verified |
| Evidence in the supplied record | Rainwater-harvesting pits specified |
|---|---|
| Status / limitation | Proposed/required; quantity and completion not verified |
| Evidence in the supplied record | Electrical supply lines, transformer and street lighting specified |
|---|---|
| Status / limitation | Proposed/required; capacity and completion not verified |
| Evidence in the supplied record | No project-specific design or completion evidence supplied |
|---|---|
| Status / limitation | Not established RERA amenities |
Location, access & connectivity
The registered project location is Raigiri village/locality, Bhongir mandal, Yadadri Bhuvanagiri district, PIN 508116. A cadastral parcel-centroid coordinate is reported as 17.53653, 78.94639. RERA record Location record
The layout proceedings record roads on the north and south boundaries and require a main approach road to be black-topped or developed to the nearest existing public road. The supplied location data reports the nearest sampled Outer Ring Road interchange at 29.8 km (approx); this is a measured/sample-based distance, not a travel-time estimate. RERA filing Location record
Developer & development status
The TG-RERA registration certificate names Sri Tirumala Estates as promoter, and the Form B declaration identifies SRI TIRUMALA ESTATES and names Nomula Krishna Goud as declarant/promoter. The promoter is recorded in the project data as a partnership; the listed partners are Nomula Krishna Goud and Nomula Indrani. Corporate record
A RERA filing field records a proposed completion date of 01/04/2024 and 80% completeness, but the supplied evidence does not identify the date or verification method for that progress figure. The Form B completion undertaking is unfilled. The supplied registration certificate records validity through 01/04/2024, with no extension shown in the provided record. These facts do not establish that the layout is complete or that a completion/occupancy certificate has issued. RERA filing RERA record
The registration certificate lists a promoter-office address as “Village: Mandal: Amberpet, District: Hyderabad, Pin: 500036.” The supplied record does not provide a complete registered-office address or official contact details.
Approvals, official records & documents
| What the supplied document establishes | Form C registration for SRI LAKSHMI NAGAR, P02000002597, granted under section 5; validity stated as 23/02/2021–01/04/2024 |
|---|
| What the supplied document establishes | Bhongir Municipality proceedings for a draft layout on survey numbers 592/P, 593/P, 595/P, 596/P and 610/P; approval D.T.L.P.No.01/2020/YTDA, dated 05.03.2020; permission states it is not proof of title |
|---|
| What the supplied document establishes | Promoter declaration on title, encumbrances, separate-account and audit undertakings; completion period and declaration date are not filled in |
|---|
| What the supplied document establishes | The RERA document register lists a layout-plan requirement, but the supplied record does not include an extracted approved layout drawing |
|---|
| What the supplied document establishes | Not included in the supplied project documents |
|---|---|
| Reference | Document index |
Project at a glance
Project identity
Registered project name: SRI LAKSHMI NAGAR
Project type: Plotted development / plotted layout
Phase or registered portion: Not separately identified; registration covers the project land listed below
TG-RERA registration: P02000002597, granted 23/02/2021; recorded validity 23/02/2021–01/04/2024. The certificate says extension is possible if granted by the Authority; the supplied record says no extension is recorded. Registration validity is distinct from the completion date and from any completion/occupancy certificate.
Registered promoter: SRI TIRUMALA ESTATES, identified in the registration certificate as Sri Tirumala Estates
RERA status: Certificate records registration under section 5. Current registration status after 01/04/2024 is not established by the supplied certificate.
Land and geographic identity
Locality / revenue village: Raigiri (also written Raigiri/Raigir in supplied records); the revenue-village spelling should be confirmed against current land records.
Mandal: Bhongir
District: Yadadri Bhuvanagiri (the layout proceedings also state “Yadadri Bhongir District”)
PIN: 508116
Project survey numbers / subdivisions as registered: 592/P, 593/P, 595/P, 596/P and 610/P
Site extent in registration fields: Total area 103346 sqmts; area affected in road widening/FTL of tanks/nala widening 4815 sqmts; net area 98531.00 sqmts.
Extent in layout proceedings: Ac.25.8375 cents (1,04,590.2 Sq.mts)
Boundaries in RERA filing: East: OTHERS LAND; West: OTHERS LAND; North: ROAD; South: ROAD.
Development identity
Sanctioning authority / principal approval: Bhongir Municipality proceedings for draft layout, D.T.L.P.No.01/2020/YTDA, approved 05.03.2020. The proceedings identify the file as Lr.No. G1/1101/2019 and proceedings as Lr.Roc.No.4235/2018/YTDA.
Approved built-up area: RERA fields list 59007 sqmts as approved built-up area; the supplied records do not clarify how this figure applies to a plotted layout.
Building count / floor configuration: Not disclosed in the supplied project records; this is a plotted layout, not a documented apartment-building scheme.
Mortgage area: 8926 sqmts in the RERA fields. The layout proceedings separately identify mortgaged plots Nos. 65 to 91 and 139 to 142, recorded as 10676.00 sq.yards i.e., 15.13%.
Plot count and approved plot-size range: Not established from the supplied RERA extracts.
Offering and status
Unit type: Plot
RERA-filed plot count / booked / available counts: Not available in the supplied records.
RERA-filed saleable plot-size range: Not available in the supplied records.
Proposed completion date in RERA fields: 01/04/2024
Construction / development stage: A RERA field reports 80% completeness; the basis, date, and independent verification of this percentage are not supplied.
Completion / occupancy certificate: No completion or occupancy certificate is included in the supplied documents; certificate status is therefore unverified.
The project story
SRI LAKSHMI NAGAR is registered as a plotted development at Raigiri, Bhongir mandal, on land recorded under survey numbers 592/P, 593/P, 595/P, 596/P and 610/P. The registration certificate identifies the project and promoter, while the municipal proceedings describe a draft layout permission for the same survey numbers and specify development works and land reserved for roads, open space, social infrastructure and utilities.
The RERA record gives a proposed completion date of 01/04/2024 and a completeness figure of 80%, but the supplied material does not state the measurement date or provide independent site verification. The available certificate records registration validity through 01/04/2024; it does not establish completion, current registration validity, or issuance of a completion/occupancy certificate.
Master plan, architecture & building design
The supplied layout proceedings describe a draft plotted layout on Ac.25.8375 cents (1,04,590.2 Sq.mts). Their recorded land-use components include 15.13% mortgaged plots (10676.00 sq.yards), 7.50% open space (Ac.1.826 cents), 2.50% social infrastructure (Ac.0.61 cents), 29.12% roads (Ac.7.09 cents) and 0.98 % utilities (Ac.0.24 cents). The proceedings also mention a Ac.0.30 cents cart-track area to be gifted to the local body. These are figures stated in the proceedings, not a measured reconstruction of the site plan.
The proceedings specify layout infrastructure including road formation and black topping, storm-water drains, underground drainage, a common septic tank/STP, internal water lines, an overhead tank, an assured water source, electrical supply lines, street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. They require development works to be completed within THREE (3) YEARS and identify roads, open spaces, social infrastructure and utilities for handover to the Municipality through registered gift deed.
No building count, plot arrangement drawing, approved plot schedule, road-width schedule, or drawing-based open-space plan is available in the supplied extracts. The approved built-up area field states 59007 sqmts, but its relationship to the plotted-layout approval is not explained in the provided record.
Homes, configurations & floor plans
This is a plotted project; the supplied records do not provide a RERA plot inventory table with plot counts, plot-size bands, or booked and available plot totals.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plot | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawings are listed, but both are pending scan; none has been software-measured. Accordingly, no drawing-based plot dimensions or measured area are available.
Parking & vehicle circulation
The layout proceedings describe roads and road-development works, but the supplied project records do not establish parking-space counts, visitor parking, accessible parking, parking allocation to individual plots, or EV provision. The proceedings identify plots reserved as mortgage security; that is not evidence of parking allocation.
Amenities, recreation & open spaces
The RERA amenity record marks the following as available with a reported progress value of 0; the meaning or measurement date of that progress value is not provided. Separately, the layout proceedings specify several infrastructure works, but do not establish that they have been completed or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Layout infrastructure; roads area stated as Ac.7.09 cents (29.12%) in the proceedings | RERA amenity record: YES, 0; completion not independently verified | |
| Green strip / tot lot / park | Open-space area stated as Ac.1.826 cents (7.50%); park development and avenue planting specified | RERA amenity record: YES, 0; completion not independently verified | |
| Community buildings | No size or count supplied | Progress recorded as 0; completion not verified | |
| Aggregate area of recreational open space | No separate size supplied beyond the open-space figure above | RERA amenity record: YES, 0; completion not verified |
Utilities, building services & safety
The layout proceedings specify planned infrastructure works: internal water-supply lines, an assured water-supply source, overhead tank, underground drainage and common septic tank/STP, storm-water drains and nala channelization, rainwater-harvesting pits, electrical supply lines, transformer and street lighting. The proceedings also refer to underground ducting for utility and service lines. These are approval-condition descriptions; the supplied evidence does not verify installation, operating capacity, or completion.
| Evidence in the supplied record | Internal water-supply lines, assured source, overhead tank and protected water supply specified |
|---|---|
| Status / limitation | Proposed/required in proceedings; source, storage capacity and completion not verified |
| Evidence in the supplied record | Underground drainage, common septic tank/STP, storm-water drains and nala channelization specified |
|---|---|
| Status / limitation | Proposed/required in proceedings; capacity and completion not verified |
| Evidence in the supplied record | Rainwater-harvesting pits specified |
|---|---|
| Status / limitation | Proposed/required; quantity and completion not verified |
| Evidence in the supplied record | Electrical supply lines, transformer and street lighting specified |
|---|---|
| Status / limitation | Proposed/required; capacity and completion not verified |
| Evidence in the supplied record | No project-specific design or completion evidence supplied |
|---|---|
| Status / limitation | Not established |
Location, access & connectivity
The registered project location is Raigiri village/locality, Bhongir mandal, Yadadri Bhuvanagiri district, PIN 508116. A cadastral parcel-centroid coordinate is reported as 17.53653, 78.94639.
The layout proceedings record roads on the north and south boundaries and require a main approach road to be black-topped or developed to the nearest existing public road. The supplied location data reports the nearest sampled Outer Ring Road interchange at 29.8 km (approx); this is a measured/sample-based distance, not a travel-time estimate.
Developer & development status
The TG-RERA registration certificate names Sri Tirumala Estates as promoter, and the Form B declaration identifies SRI TIRUMALA ESTATES and names Nomula Krishna Goud as declarant/promoter. The promoter is recorded in the project data as a partnership; the listed partners are Nomula Krishna Goud and Nomula Indrani.
A RERA filing field records a proposed completion date of 01/04/2024 and 80% completeness, but the supplied evidence does not identify the date or verification method for that progress figure. The Form B completion undertaking is unfilled. The supplied registration certificate records validity through 01/04/2024, with no extension shown in the provided record. These facts do not establish that the layout is complete or that a completion/occupancy certificate has issued.
The registration certificate lists a promoter-office address as “Village: Mandal: Amberpet, District: Hyderabad, Pin: 500036.” The supplied record does not provide a complete registered-office address or official contact details.
Approvals, official records & documents
| What the supplied document establishes | Form C registration for SRI LAKSHMI NAGAR, P02000002597, granted under section 5; validity stated as 23/02/2021–01/04/2024 |
|---|
| What the supplied document establishes | Bhongir Municipality proceedings for a draft layout on survey numbers 592/P, 593/P, 595/P, 596/P and 610/P; approval D.T.L.P.No.01/2020/YTDA, dated 05.03.2020; permission states it is not proof of title |
|---|
| What the supplied document establishes | Promoter declaration on title, encumbrances, separate-account and audit undertakings; completion period and declaration date are not filled in |
|---|
| What the supplied document establishes | The RERA document register lists a layout-plan requirement, but the supplied record does not include an extracted approved layout drawing |
|---|
| What the supplied document establishes | Not included in the supplied project documents |
|---|
Frequently asked questions
Is SRI LAKSHMI NAGAR registered with Telangana RERA?
Yes. SRI LAKSHMI NAGAR is registered with the Telangana Real Estate Regulatory Authority as P02000002597; the registration status is New Project.
Who is the developer of SRI LAKSHMI NAGAR?
The promoter named in the RERA registration is SRI TIRUMALA ESTATES.
Where is SRI LAKSHMI NAGAR located?
SRI LAKSHMI NAGAR is in RAIGIRI, Bhongir, Yadadri Bhuvanagiri, Telangana (508116).
When will SRI LAKSHMI NAGAR be completed?
The promoter's proposed date of completion filed with RERA is 01/04/2024. This is the promoter's declaration, not a guarantee.