DUBEYs LEGACY 2
ISHAA DEVELOPERS · Rangareddy · RERA P02400010079
DUBEYs LEGACY 2 is a residential apartment project in Manikonda Municipality / Neknampur, Gandipet, Ranga Reddy. The registered promoter is ISHAA DEVELOPERS. The project has a registered site area of 640.42 sq. m and one building, Building A, comprising 1 Stilt + 5 upper floors, with 15 2BHK units. Its TG-RERA registration number is P02400010079, and the project header records proposed completion as 16/04/2028.
More from Ishaa Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | DUBEYs LEGACY 2 RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | The registration identifies this project as a registered project; a separate phase name or phase number is not disclosed. RERA record |
| TG-RERA registration | P02400010079 RERA record |
| RERA registration validity | 16 December 2024 to 16 December 2027; the certificate states a three-year validity period. This is registration validity, not the stated construction completion deadline. RERA record |
| Registered promoter | ISHAA DEVELOPERS, recorded as a proprietorship; authorized signatory: POSA VENKATA SHIVARAM. RERA filing Corporate record |
| RERA status | Registered; the supplied certificate records the validity dates above. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Manikonda Municipality / Neknampur RERA record RERA filing |
| Revenue village | Neknapur; the approval and title-document extracts also use Neknampur. RERA record Land records |
| Mandal / district / PIN | Gandipet / Ranga Reddy / 500089 RERA record RERA filing |
| Survey number(s) and subdivision(s) | Not disclosed in the supplied project land identity; the building-permit description identifies H.No. 1-7/1 & 1-8/1, not survey numbers. Land records |
| Registered site extent | 640.42 sq. m site area; project land record also reports total and net area as 640.42 sq. m. Land records |
| Sanctioned plan area figures | AREA OF PLOT (Minimum) 640.42; ROAD AFFECTED AREA /ROAD WIDENING AREA 29.73; NET AREA OF PLOT 610.69. |
| Boundaries filed with RERA | East: neighbours’ house; West: land belonging to Ranveer Prasad Dubey and others; North: 30-feet road and land belonging to Sunil Prasad Dubey; South: neighbours’ land. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Manikonda Municipality/Municipal Corporation; the filed plan document also identifies TS-DTCP / ULB TS-DTCP in its approval details. Approvals record |
| Principal building approval | Approval No. 0131/BP/3128/2024, dated 16 December 2024; file No. 009671/BP/MANK/3128/0165/2024. Approvals record |
| Building | One residential building, Building A, comprising 1 Stilt + 5 upper floors. |
| Approved area | TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 1178.90; TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 1475.58; the same plan extract also records TOTAL BUA 1487.58 and NET BUA 1178.90. These are the plan’s separately labelled figures. |
| Building height | Building height excluding stilt: 14.90 MT.; total height: 19.85mt.; stair cabin: +17.90 mt. |
| Approved / RERA-filed units | The building-permit extracts state 15 dwelling units; the RERA unit record also lists 15 units. RERA unit table |
| Parking | Plan records PARKING AREA 296.68; the unit allocation and number of approved vehicle spaces are not established in the supplied approval extracts. |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 2BHK; 15 units. RERA unit table RERA unit details |
| RERA-filed saleable area | 111.74 sq. m per recorded unit configuration. RERA unit table RERA unit details |
| Booking status | TG-RERA portal-derived record lists 0 booked and 15 available; it carries no as-of date, so treat counts as indicative. RERA unit table |
| Construction stage | No independently verified site progress or construction-stage percentage is supplied. The registration certificate is valid through 16 December 2027. RERA record |
| Completion dates | Project header records proposed completion 16/04/2028; the promoter’s Form B declaration undertakes completion by 16th December, 2027. RERA record |
| Occupancy / completion certificate | The supplied building-permit record says no completion certificate is certified in the record; no occupancy certificate is supplied. |
2. The project story
DUBEYs LEGACY 2 is a residential apartment project registered with TG-RERA as P02400010079, located at Neknapur/Neknampur in Gandipet Mandal, Ranga Reddy District, PIN 500089. The filed building-permit material describes a single residential building, Building A, with one stilt level and five upper floors, on a site identified by house numbers 1-7/1 & 1-8/1. The available project land record does not disclose a survey number or subdivision. RERA record Land records
The RERA unit record lists 15 2BHK homes, with 0 booked and 15 available in the portal-derived snapshot; the snapshot has no stated as-of date. No site inspection, independently verified construction progress, or completion/occupancy certificate is included in the supplied material. The promoter’s Form B declaration gives a completion undertaking of 16 December 2027; the project header separately records proposed completion as 16/04/2028. RERA unit table RERA unit details RERA record
3. Master plan, architecture & building design
The filed plan describes one residential building, A, on a plot of 640.42 area units, with a 29.73 road-affected portion and 610.69 net plot area. The approval extract labels the units “Minimum” and does not state a unit for these figures; the RERA land and approval records state area in square metres. Land records
The sanctioned configuration is 1 Stilt + 5 upper floors. The plan records NO OF FLOORS: 6, building height excluding stilt of 14.90 MT., total height 19.85mt., and stair cabin +17.90 mt. The approval records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 1178.90, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 1475.58, TOTAL BUA 1487.58, and NET BUA 1178.90; the supplied extracts do not explain the difference between the two “including parking/total BUA” figures.
The plan shows a 6.100 MT WIDE EXISTING road and a 9.00 MT WIDE PROPOSED ROAD. It also records a VACANT PLOT AREA 314.01 and 14% open space in the approval extract. The supplied drawings do not establish a complete account of floor-by-floor flat arrangement, building footprint, lift provision, entrances, or internal circulation.
4. Homes, configurations & floor plans
The RERA filing lists 15 2BHK units, all shown as available and none booked in the portal-derived record, which has no as-of date. The filed saleable area is 111.74 sq. m. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 111.74 sq. m | 49.9–67.7 sq. m; median 60.0 sq. m | 46% |
Carpet-area figures are software measurements from the approved floor-plan drawing geometry, across four measured flat designs; they are not RERA-filed figures and are noted as needing review. The drawing labels a typical plan for floors 1, 2, 3 and 5. For one drawn flat, the measured room schedule includes two bedrooms, living/dining, kitchen and two toilets; the drawing also shows a balcony and utility. The listed balcony and utility areas are excluded from the software-measured carpet area. Floor plans RERA unit details
The RERA saleable area and software-measured carpet area are different measurement categories: saleable area may include the home’s share of common areas, while the measured carpet figure is derived from drawing geometry. No RERA-filed carpet-area figure or legally documented unit-specific area schedule is supplied here. RERA unit details Floor plans
5. Parking & vehicle circulation
The building-permit extract records a parking area of 296.68 and identifies a stilt level. It requires the approved stilt parking space to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied approval extract does not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible parking, or a unit-by-unit parking allocation.
The approval also includes a requirement for electric-vehicle charging infrastructure in building parking places, referring to the applicable CEA and Ministry of Power requirements. This is an approval condition, not evidence that charging equipment has been installed or is operational. The supplied documents do not establish the ramp arrangement, internal driveway design, pedestrian separation, or exclusive ownership of any parking bay.
6. Amenities, recreation & open spaces
The RERA amenity record marks several infrastructure categories as available but shows 0% progress for each listed item. This is a filed status record, not independent verification of completion. The building-permit document separately states specific site conditions and utilities. RERA amenities
| Description / size | RERA amenity record says “YES”; building-permit condition requires a fenced tot-lot maintained as greenery and a peripheral greenery strip. Tot-lot size is recorded as “NA.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% in RERA amenity record; not independently verified complete. |
| Description / size | No size supplied. Approval extract records open space as 14% and vacant plot area as 314.01. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% in RERA amenity record; no independent completion verification. |
| Description / size | RERA amenity record says “YES”; approval requires rainwater harvesting structures and lists 5 RWHPs and a percolation pit. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% in RERA amenity record; not independently verified complete. |
| Description / size | Listed in the RERA amenity record; no description or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; not independently verified. |
| Description / size | Listed in the RERA amenity record; no further project-specific detail supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; not independently verified. |
| Description / size | Listed in the RERA amenity record; no further detail supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; not independently verified. |
7. Utilities, building services & safety
The approval extract lists a sump, septic tank, percolation pit and distribution transformer, and requires a garbage house within the premises, rainwater harvesting, and space for a transformer. The commencement approval records 5 rainwater-harvesting structures. These are approval-record details and conditions; the supplied material does not verify installation or operation.
The RERA amenity record marks water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, water conservation/rainwater harvesting, energy management, and electrical meter room/sub-station/receiving station as “YES” where shown; each listed amenity category records 0% progress. No capacities, water sources, storage volumes, treatment specifications, electrical backup capacity, lift details, fire-system equipment schedule, security systems, or accessibility provisions are established by the supplied project records. RERA amenities
The building-permit conditions call for a tot-lot and peripheral greenery, and state that an occupancy certificate is compulsory before occupation. The supplied record does not establish that an occupancy certificate has been issued or that safety or service installations have been completed.
8. Location, access & connectivity
The official project location in the supplied RERA and approval material is Neknapur/Neknampur, Gandipet Mandal, Ranga Reddy District, Telangana, PIN 500089, within the locality identified as Manikonda Municipality. The building-permit description locates the site at H.No. 1-7/1 & 1-8/1 and records a 6.100 MT WIDE EXISTING road and a 9.00 MT WIDE PROPOSED ROAD. RERA record RERA filing
The supplied location data identifies Financial District (Nanakramguda) at 6.5 km as an anchor location; the basis and measurement date are not provided. No public-transport routes or other independently verified project-access measurements are supplied. Location record
9. Developer & development status
The registered promoter is ISHAA DEVELOPERS, recorded in the project information as a proprietorship. Its RERA-listed address is B Block, Road No 29, Neknampur, Manikonda Municipality, Gandipet, Ranga Reddy, 500089. The authorized signatory identified in the supplied certificate is POSA VENKATA SHIVARAM. No official website or contact details are supplied in the project evidence. RERA filing RERA filing Corporate record
The project is registered through 16 December 2027. The promoter’s Form B affidavit declares completion by 16th December, 2027; the project header records proposed completion as 16/04/2028. No independently verified construction-progress report or occupancy/completion certificate is supplied, so physical progress and completion status cannot be confirmed from this record. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for DUBEYs LEGACY 2, registration P02400010079, valid from 16/12/2024 to 16/12/2027. |
| Principal building approval | Approval No. 0131/BP/3128/2024, issued by Manikonda Municipality/Municipal Corporation on 16 December, 2024; file No. 009671/BP/MANK/3128/0165/2024. |
| Filed layout/building plan | Plan document identifies a residential building of stilt, first, second, third, fourth and fifth floors at H.No. 1-7/1 & 1-8/1, Neknampur Village. The supplied extraction includes the plan’s key area, floor and condition details. |
| Commencement / construction approval | Building-construction approval record for Building A, one stilt plus five upper floors; no commencement notice or independent evidence of construction start is supplied. |
| Occupancy/completion certificate | No occupancy or completion certificate is supplied; the commencement approval states that an occupancy certificate is required before occupation. |
| Promoter declaration | Form B affidavit by Posa Venkata Shivaram on behalf of ISHAA DEVELOPERS, verified at Hyderabad on 19th July, 2025, including a declared completion date of 16th December, 2027. |
| Other project documents | The supplied evidence also includes a filed agreement-for-sale template and legal-title report, listed here as document records only. |
The building-permit record requires a commencement notice before work begins and a completion notice and occupancy certificate after completion. The supplied record does not establish that these later-stage documents have been issued.
1. Project at a glance
Project identity
Registered project name: DUBEYs LEGACY 2
Project type: Residential apartment project
Phase / registered portion: The registration identifies this project as a registered project; a separate phase name or phase number is not disclosed.
TG-RERA registration: P02400010079
RERA registration validity: 16 December 2024 to 16 December 2027; the certificate states a three-year validity period. This is registration validity, not the stated construction completion deadline.
Registered promoter: ISHAA DEVELOPERS, recorded as a proprietorship; authorized signatory: POSA VENKATA SHIVARAM.
RERA status: Registered; the supplied certificate records the validity dates above.
Land and geographic identity
Locality: Manikonda Municipality / Neknampur
Revenue village: Neknapur; the approval and title-document extracts also use Neknampur.
Mandal / district / PIN: Gandipet / Ranga Reddy / 500089
Survey number(s) and subdivision(s): Not disclosed in the supplied project land identity; the building-permit description identifies H.No. 1-7/1 & 1-8/1, not survey numbers.
Registered site extent: 640.42 sq. m site area; project land record also reports total and net area as 640.42 sq. m.
Sanctioned plan area figures: AREA OF PLOT (Minimum) 640.42; ROAD AFFECTED AREA /ROAD WIDENING AREA 29.73; NET AREA OF PLOT 610.69.
Boundaries filed with RERA: East: neighbours’ house; West: land belonging to Ranveer Prasad Dubey and others; North: 30-feet road and land belonging to Sunil Prasad Dubey; South: neighbours’ land.
Development identity
Sanctioning authority: Manikonda Municipality/Municipal Corporation; the filed plan document also identifies TS-DTCP / ULB TS-DTCP in its approval details.
Principal building approval: Approval No. 0131/BP/3128/2024, dated 16 December 2024; file No. 009671/BP/MANK/3128/0165/2024.
Building: One residential building, Building A, comprising 1 Stilt + 5 upper floors.
Approved area: TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 1178.90; TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 1475.58; the same plan extract also records TOTAL BUA 1487.58 and NET BUA 1178.90. These are the plan’s separately labelled figures.
Building height: Building height excluding stilt: 14.90 MT.; total height: 19.85mt.; stair cabin: +17.90 mt.
Approved / RERA-filed units: The building-permit extracts state 15 dwelling units; the RERA unit record also lists 15 units.
Parking: Plan records PARKING AREA 296.68; the unit allocation and number of approved vehicle spaces are not established in the supplied approval extracts.
Offering and status
RERA-filed configuration: 2BHK; 15 units.
RERA-filed saleable area: 111.74 sq. m per recorded unit configuration.
Booking status: TG-RERA portal-derived record lists 0 booked and 15 available; it carries no as-of date, so treat counts as indicative.
Construction stage: No independently verified site progress or construction-stage percentage is supplied. The registration certificate is valid through 16 December 2027.
Completion dates: Project header records proposed completion 16/04/2028; the promoter’s Form B declaration undertakes completion by 16th December, 2027.
Occupancy / completion certificate: The supplied building-permit record says no completion certificate is certified in the record; no occupancy certificate is supplied.
2. The project story
DUBEYs LEGACY 2 is a residential apartment project registered with TG-RERA as P02400010079, located at Neknapur/Neknampur in Gandipet Mandal, Ranga Reddy District, PIN 500089. The filed building-permit material describes a single residential building, Building A, with one stilt level and five upper floors, on a site identified by house numbers 1-7/1 & 1-8/1. The available project land record does not disclose a survey number or subdivision.
The RERA unit record lists 15 2BHK homes, with 0 booked and 15 available in the portal-derived snapshot; the snapshot has no stated as-of date. No site inspection, independently verified construction progress, or completion/occupancy certificate is included in the supplied material. The promoter’s Form B declaration gives a completion undertaking of 16 December 2027; the project header separately records proposed completion as 16/04/2028.
3. Master plan, architecture & building design
The filed plan describes one residential building, A, on a plot of 640.42 area units, with a 29.73 road-affected portion and 610.69 net plot area. The approval extract labels the units “Minimum” and does not state a unit for these figures; the RERA land and approval records state area in square metres.
The sanctioned configuration is 1 Stilt + 5 upper floors. The plan records NO OF FLOORS: 6, building height excluding stilt of 14.90 MT., total height 19.85mt., and stair cabin +17.90 mt. The approval records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 1178.90, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 1475.58, TOTAL BUA 1487.58, and NET BUA 1178.90; the supplied extracts do not explain the difference between the two “including parking/total BUA” figures.
The plan shows a 6.100 MT WIDE EXISTING road and a 9.00 MT WIDE PROPOSED ROAD. It also records a VACANT PLOT AREA 314.01 and 14% open space in the approval extract. The supplied drawings do not establish a complete account of floor-by-floor flat arrangement, building footprint, lift provision, entrances, or internal circulation.
4. Homes, configurations & floor plans
The RERA filing lists 15 2BHK units, all shown as available and none booked in the portal-derived record, which has no as-of date. The filed saleable area is 111.74 sq. m.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 111.74 sq. m | 49.9–67.7 sq. m; median 60.0 sq. m | 46% |
Carpet-area figures are software measurements from the approved floor-plan drawing geometry, across four measured flat designs; they are not RERA-filed figures and are noted as needing review. The drawing labels a typical plan for floors 1, 2, 3 and 5. For one drawn flat, the measured room schedule includes two bedrooms, living/dining, kitchen and two toilets; the drawing also shows a balcony and utility. The listed balcony and utility areas are excluded from the software-measured carpet area.
The RERA saleable area and software-measured carpet area are different measurement categories: saleable area may include the home’s share of common areas, while the measured carpet figure is derived from drawing geometry. No RERA-filed carpet-area figure or legally documented unit-specific area schedule is supplied here.
5. Parking & vehicle circulation
The building-permit extract records a parking area of 296.68 and identifies a stilt level. It requires the approved stilt parking space to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied approval extract does not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible parking, or a unit-by-unit parking allocation.
The approval also includes a requirement for electric-vehicle charging infrastructure in building parking places, referring to the applicable CEA and Ministry of Power requirements. This is an approval condition, not evidence that charging equipment has been installed or is operational. The supplied documents do not establish the ramp arrangement, internal driveway design, pedestrian separation, or exclusive ownership of any parking bay.
6. Amenities, recreation & open spaces
The RERA amenity record marks several infrastructure categories as available but shows 0% progress for each listed item. This is a filed status record, not independent verification of completion. The building-permit document separately states specific site conditions and utilities.
| Description / size | RERA amenity record says “YES”; building-permit condition requires a fenced tot-lot maintained as greenery and a peripheral greenery strip. Tot-lot size is recorded as “NA.” |
|---|---|
| Declared progress / verified status | 0% in RERA amenity record; not independently verified complete. |
| Description / size | No size supplied. Approval extract records open space as 14% and vacant plot area as 314.01. |
|---|---|
| Declared progress / verified status | 0% in RERA amenity record; no independent completion verification. |
| Description / size | RERA amenity record says “YES”; approval requires rainwater harvesting structures and lists 5 RWHPs and a percolation pit. |
|---|---|
| Declared progress / verified status | 0% in RERA amenity record; not independently verified complete. |
| Description / size | Listed in the RERA amenity record; no description or size supplied. |
|---|---|
| Declared progress / verified status | 0%; not independently verified. |
| Description / size | Listed in the RERA amenity record; no further project-specific detail supplied. |
|---|---|
| Declared progress / verified status | 0%; not independently verified. |
| Description / size | Listed in the RERA amenity record; no further detail supplied. |
|---|---|
| Declared progress / verified status | 0%; not independently verified. |
7. Utilities, building services & safety
The approval extract lists a sump, septic tank, percolation pit and distribution transformer, and requires a garbage house within the premises, rainwater harvesting, and space for a transformer. The commencement approval records 5 rainwater-harvesting structures. These are approval-record details and conditions; the supplied material does not verify installation or operation.
The RERA amenity record marks water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, water conservation/rainwater harvesting, energy management, and electrical meter room/sub-station/receiving station as “YES” where shown; each listed amenity category records 0% progress. No capacities, water sources, storage volumes, treatment specifications, electrical backup capacity, lift details, fire-system equipment schedule, security systems, or accessibility provisions are established by the supplied project records.
The building-permit conditions call for a tot-lot and peripheral greenery, and state that an occupancy certificate is compulsory before occupation. The supplied record does not establish that an occupancy certificate has been issued or that safety or service installations have been completed.
8. Location, access & connectivity
The official project location in the supplied RERA and approval material is Neknapur/Neknampur, Gandipet Mandal, Ranga Reddy District, Telangana, PIN 500089, within the locality identified as Manikonda Municipality. The building-permit description locates the site at H.No. 1-7/1 & 1-8/1 and records a 6.100 MT WIDE EXISTING road and a 9.00 MT WIDE PROPOSED ROAD.
The supplied location data identifies Financial District (Nanakramguda) at 6.5 km as an anchor location; the basis and measurement date are not provided. No public-transport routes or other independently verified project-access measurements are supplied.
9. Developer & development status
The registered promoter is ISHAA DEVELOPERS, recorded in the project information as a proprietorship. Its RERA-listed address is B Block, Road No 29, Neknampur, Manikonda Municipality, Gandipet, Ranga Reddy, 500089. The authorized signatory identified in the supplied certificate is POSA VENKATA SHIVARAM. No official website or contact details are supplied in the project evidence.
The project is registered through 16 December 2027. The promoter’s Form B affidavit declares completion by 16th December, 2027; the project header records proposed completion as 16/04/2028. No independently verified construction-progress report or occupancy/completion certificate is supplied, so physical progress and completion status cannot be confirmed from this record.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for DUBEYs LEGACY 2, registration P02400010079, valid from 16/12/2024 to 16/12/2027.
Principal building approval: Approval No. 0131/BP/3128/2024, issued by Manikonda Municipality/Municipal Corporation on 16 December, 2024; file No. 009671/BP/MANK/3128/0165/2024.
Filed layout/building plan: Plan document identifies a residential building of stilt, first, second, third, fourth and fifth floors at H.No. 1-7/1 & 1-8/1, Neknampur Village. The supplied extraction includes the plan’s key area, floor and condition details.
Commencement / construction approval: Building-construction approval record for Building A, one stilt plus five upper floors; no commencement notice or independent evidence of construction start is supplied.
Occupancy/completion certificate: No occupancy or completion certificate is supplied; the commencement approval states that an occupancy certificate is required before occupation.
Promoter declaration: Form B affidavit by Posa Venkata Shivaram on behalf of ISHAA DEVELOPERS, verified at Hyderabad on 19th July, 2025, including a declared completion date of 16th December, 2027.
Other project documents: The supplied evidence also includes a filed agreement-for-sale template and legal-title report, listed here as document records only.
The building-permit record requires a commencement notice before work begins and a completion notice and occupancy certificate after completion. The supplied record does not establish that these later-stage documents have been issued.
Frequently asked questions
Is DUBEYs LEGACY 2 registered with Telangana RERA?
Yes. DUBEYs LEGACY 2 is registered with the Telangana Real Estate Regulatory Authority as P02400010079; the registration status is New Project.
Who is the developer of DUBEYs LEGACY 2?
The promoter named in the RERA registration is ISHAA DEVELOPERS.
Where is DUBEYs LEGACY 2 located?
DUBEYs LEGACY 2 is in Manikonda Municipality, Neknapur, Gandipet, Rangareddy, Telangana (500089).
When will DUBEYs LEGACY 2 be completed?
The promoter's proposed date of completion filed with RERA is 16/04/2028. This is the promoter's declaration, not a guarantee.
More projects in Neknapur