Haritha Nivas
SUDHEER KUMAR NALLAMOTHU · Nalgonda · RERA P01800010576
HARITHA NIVAS is a residential apartment project at H No 7-161, Chaitnya Nagar, Miryalguda, in Miryalguda mandal, Nalgonda district. The registered promoter is SUDHEER KUMAR NALLAMOTHU. The project is on 725.52 sq. m and comprises one residential building with 1 Stilt + 5 Floors and 20 2BHK units. It is registered with TG-RERA under P01800010576, and the promoter’s Form B declaration gives a proposed completion date of 12/11/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | HARITHA NIVAS RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; TG-RERA registration is for HARITHA NIVAS |
| TG-RERA registration number | P01800010576 |
| Registration validity | 13/11/2025 to 12/11/2028 |
| Registered promoter | SUDHEER KUMAR NALLAMOTHU RERA record |
| RERA status | Registered; the certificate records a validity period and conditions. Registration validity is distinct from the building completion deadline and from an occupancy certificate. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / site address | H No 7-161, Chaitnya Nagar, Miryalguda |
| Revenue village | Chaitnya Nagar is the registered project location; the supplied records also describe the permit site as Chaitanya Nagar, Miryalguda. The revenue-village identification should be confirmed against the land records. RERA record |
| Mandal | Miryalguda RERA filing |
| District | Nalgonda RERA record |
| PIN | 508207 RERA record |
| Survey number(s) / subdivision(s) | Survey No. 51; no subdivision is specified in the supplied project identity or permit records. Land records |
| Registered site extent | 725.52 sq. m RERA filing |
| Plan-record area | Gross plot area 725.52 sq.m; net plot area 725.52 sq.m; road-affected area 0 sq.m and NALA-affected area 0 sq.m in the building-permit extraction. |
| Boundaries as filed | East: 10M WIDE MAIN ROAD; West: VENDORS PLOT; North: 10M WIDE MAIN ROAD; South: 10M WIDE MAIN ROAD. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Miryalguda Municipality; the project filing identifies DTCP as the authority for the plan approval number. RERA filing |
| Principal filed plan / permit identifier | 007423/MIRY/00014/SWBP/2025; the building permit order also records approval no. 0012/MIRY/SWBP/2025. RERA record |
| Approval date | 13/11/2025 |
| Approved built-up area | 1900.35 sq.m excluding parking; 2296.87 sq.m including parking, as stated in the plan extraction. |
| Building count and configuration | One residential building; 1 Stilt + 5 Floors. |
| Building height | Permit extraction states 14.75 m height from ground level and 17.95 m total height. |
| Parking provision in plan record | Total parking area 362.36 sq.m, with visitor parking area 34.17 sq.m in the plan extraction; the extracted plan also lists Car Parking Spaces: 5.00. |
| Approved / RERA-declared units | 20 units in the building-permit and plan records; the TG-RERA configuration record also lists 20 units. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Unit type | 2BHK apartments RERA unit table |
| RERA-filed saleable area | 95.01 sqm RERA unit table |
| Booked / available | 0 booked / 20 available, as last read from the TG-RERA portal; the record provides no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | No independently verified site-progress evidence is supplied. The available registration and permit records establish registration and permission, not construction progress. |
| Completion timeline | The building permit states construction is to be completed before 13/11/2028. The promoter’s Form B declaration gives 12/11/2028; the permit deadline and promoter declaration are reported separately. |
| Occupancy / completion certificate | No completion certificate or occupancy certificate is supplied; the permit extraction records completion as not certified. |
2. The project story
HARITHA NIVAS is registered as a residential apartment development on Survey No. 51 at H No 7-161, Chaitnya Nagar, Miryalguda, Nalgonda. The registered site is stated to measure 725.52 sq. m. The building permit describes one building with a stilt level and five floors, for 20 residential units. RERA filing
The RERA filing lists 20 2BHK units and shows all 20 as available and none booked in the portal data supplied; those counts have no stated as-of date. The provided records do not establish the current physical construction stage. The permit sets a completion deadline, but no completion or occupancy certificate is included. RERA unit table
3. Master plan, architecture & building design
The filed plan identifies one residential building on a gross and net plot area of 725.52 sq.m, with 1 Stilt + 5 Floors. The plan extraction states proposed coverage of 396.52 sq.m (55.00%), vacant plot area of 320.85 sq.m, total proposed built-up area of 1900.35 sq.m excluding parking and 2296.87 sq.m including parking. These are plan-record figures; the supplied data does not provide a separate FSI calculation or carpet-area schedule for the building as a whole.
The building-permit extraction records residential area of 1900.35 sq.m, commercial area 0.0 sq.m, and others 0.0 sq.m. It lists front, rear and side setbacks of 3.0 m, 3.5 m, 3.5 m and 3.5 m respectively. The plan extraction also records a 5m Wide Drive Way and 2m Wide Corridor. Detailed floor-by-floor apartment layouts, lifts/stairs counts, apartment distribution by floor, and entry/exit arrangements are not established in the supplied extracts.
The plan records 190.07 sq.m as the proposed 10% mortgage area. The building-permit extraction identifies the mortgaged area as the 5th Floor.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 95.01 sqm | 61.5–69.0 sqm; median 63.5 sqm | 33% |
Unit counts, booking counts and saleable area are from the TG-RERA filing; booking counts have no supplied as-of date. Carpet-area figures are software-measured from the approved floor-plan drawing, not RERA-filed figures, and are marked as needing review. The drawing measurement covers 15 flat designs. RERA unit table RERA unit details Floor plans
Saleable area and carpet area are different measurements: the software-measured carpet figure is smaller than the RERA-filed saleable area, which also reflects the home’s share of common areas. The supplied drawing extract identifies two bedrooms, a hall, kitchen, toilet and two open-to-air balconies for one measured flat; no reliable room dimensions are provided for the project’s full unit set. Verify drawing measurements against the plans. Floor plans RERA unit details
5. Parking & vehicle circulation
The plan extraction records 362.36 sq.m of parking area and 34.17 sq.m of visitor parking area, and lists 5.00 Car Parking Spaces. It also states that the stilt parking area is to be used exclusively for vehicle parking. The sanctioned record lists 0.00 onsite parking and 0.00 two-wheeler spaces in separate fields; the supplied extracts do not explain those fields further.
The project filing does not establish individual parking allocations to units. A plan provision does not by itself establish exclusive ownership or allocation. The vendor record mentions open and covered parking, but the supplied project-plan evidence does not establish a covered-parking count or unit-wise allocation. Promoter website
6. Amenities, recreation & open spaces
| Description / size | Tot-lot shown in the plan’s amenity list; permit condition requires it to be fenced and maintained as greenery before occupancy certification. No area or completed status supplied. |
|---|---|
| Declared progress / verified status | Required/recorded in plan conditions; completion not verified. |
| Description / size | 34.17 sq.m in the plan extraction. |
|---|---|
| Declared progress / verified status | Plan-record provision; completion not verified. |
| Description / size | Listed in the plan’s amenity/utility extraction; quantity, capacity and construction status are not supplied. |
|---|---|
| Declared progress / verified status | Listed; completion not verified. |
| Description / size | Listed in the plan’s amenity/utility extraction; no further description or progress evidence supplied. |
|---|---|
| Declared progress / verified status | Listed; completion not verified. |
The TG-RERA amenity data marks progress at 0% for the listed facilities, including green strip/tot lot/park and community buildings; it does not supply separate measurements or evidence of completion. RERA amenities
7. Utilities, building services & safety
The building permit lists one rainwater-harvesting pit, a transformer space, a garbage house, and 30 trees. It also requires rainwater harvesting and peripheral greenery. These are permit provisions or conditions; the supplied evidence does not verify installation or completion.
The TG-RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, while reporting 0% progress for the listed amenities. No water source, storage or treatment capacity, sewage-treatment capacity, reuse arrangement, electrical capacity, backup-power provision, lift capacity, fire-system specifications, CCTV/security system or accessibility design is established by the supplied records. RERA amenities
The permit states that fire-safety requirements and services—including sanitation, plumbing, fire safety, lifts and electrical installations—are to be addressed during construction, and that safety responsibilities rest with the relevant project professionals and owner/builder. The supplied evidence does not establish completed fire-safety works or an occupancy-stage fire clearance.
8. Location, access & connectivity
The registered location is H No 7-161, Chaitnya Nagar, Miryalguda, Nalgonda, Telangana 508207, in Survey No. 51. The filed parcel boundaries identify a 10M WIDE MAIN ROAD on the east, north and south, and a vendor’s plot on the west. RERA filing
A location dataset gives a sampled distance of 111.4 km to the nearest sampled Outer Ring Road interchange. The supplied record does not identify a project-specific public-transport route, measured distances to other landmarks, or travel times. Location record
9. Developer & development status
The registered promoter is SUDHEER KUMAR NALLAMOTHU, identified in the project filing as a proprietorship. The filing lists NALLAMOTHU SUDHEER KUMAR as authorized signatory. The supplied project record does not provide a company registration number or verified official website or contact details. RERA record RERA filing Parties record
The promoter’s Form B declaration states a project completion deadline of 12/11/2028 and includes declarations concerning title basis, encumbrances, project funds, audits and approvals. These are promoter declarations, not independent verification of construction progress or delivery.
The building permit states a completion deadline before 13/11/2028 and requires a completion notice and occupancy certificate before occupation. No occupancy or completion certificate is included in the supplied documents.
10. Approvals, official records & documents
| Identifier / date | P01800010576; valid 13/11/2025–12/11/2028 |
|---|---|
| What the supplied record establishes | Registration certificate for HARITHA NIVAS, naming SUDHEER KUMAR NALLAMOTHU as promoter and locating the project at Chaitnya Nagar, Miryalguda, Nalgonda. |
| Identifier / date | Approval no. 0012/MIRY/SWBP/2025; 13/11/2025 |
|---|---|
| What the supplied record establishes | Miryalguda Municipality permit record for one residential building, 1 Stilt + 5 Floors, on 725.52 sq.m in Survey No. 51. |
| Identifier / date | 007423/MIRY/00014/SWBP/2025; plan record dated 13/11/2025 |
|---|---|
| What the supplied record establishes | Plan extraction for the proposed residential apartment with 1 Stilt + 5 Floors on Survey No. 51. |
| Identifier / date | M/MIRY/016229/2020; 02/08/2025 |
|---|---|
| What the supplied record establishes | LRS proceedings concern Plot No. 10 in Survey No. 51, Miryalaguda, measuring 523.42 sq.m; the document describes regularisation of an individual plot and says it does not confer ownership or serve as proof of title. |
| Identifier / date | 7638/2025; 06/11/2025 |
|---|---|
| What the supplied record establishes | Permit extraction records mortgage of 190.07 sq.m associated with the 5th Floor. |
| Identifier / date | Filed document |
|---|---|
| What the supplied record establishes | Promoter declaration concerning the proposed project and stated completion deadline. |
No occupancy certificate or completion certificate is included in the supplied project documents. The index above describes the records available for this overview; it is not a statement that every approval or later-stage certificate has been reviewed.
1. Project at a glance
Project identity
Registered project name: HARITHA NIVAS
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; TG-RERA registration is for HARITHA NIVAS
TG-RERA registration number: P01800010576
Registration validity: 13/11/2025 to 12/11/2028
Registered promoter: SUDHEER KUMAR NALLAMOTHU
RERA status: Registered; the certificate records a validity period and conditions. Registration validity is distinct from the building completion deadline and from an occupancy certificate.
Land and geographic identity
Locality / site address: H No 7-161, Chaitnya Nagar, Miryalguda
Revenue village: Chaitnya Nagar is the registered project location; the supplied records also describe the permit site as Chaitanya Nagar, Miryalguda. The revenue-village identification should be confirmed against the land records.
Mandal: Miryalguda
District: Nalgonda
PIN: 508207
Survey number(s) / subdivision(s): Survey No. 51; no subdivision is specified in the supplied project identity or permit records.
Registered site extent: 725.52 sq. m
Plan-record area: Gross plot area 725.52 sq.m; net plot area 725.52 sq.m; road-affected area 0 sq.m and NALA-affected area 0 sq.m in the building-permit extraction.
Boundaries as filed: East: 10M WIDE MAIN ROAD; West: VENDORS PLOT; North: 10M WIDE MAIN ROAD; South: 10M WIDE MAIN ROAD.
Development identity
Sanctioning authority: Miryalguda Municipality; the project filing identifies DTCP as the authority for the plan approval number.
Principal filed plan / permit identifier: 007423/MIRY/00014/SWBP/2025; the building permit order also records approval no. 0012/MIRY/SWBP/2025.
Approval date: 13/11/2025
Approved built-up area: 1900.35 sq.m excluding parking; 2296.87 sq.m including parking, as stated in the plan extraction.
Building count and configuration: One residential building; 1 Stilt + 5 Floors.
Building height: Permit extraction states 14.75 m height from ground level and 17.95 m total height.
Parking provision in plan record: Total parking area 362.36 sq.m, with visitor parking area 34.17 sq.m in the plan extraction; the extracted plan also lists Car Parking Spaces: 5.00.
Approved / RERA-declared units: 20 units in the building-permit and plan records; the TG-RERA configuration record also lists 20 units.
Offering and status
Unit type: 2BHK apartments
RERA-filed saleable area: 95.01 sqm
Booked / available: 0 booked / 20 available, as last read from the TG-RERA portal; the record provides no as-of date, so these counts are indicative.
Construction stage: No independently verified site-progress evidence is supplied. The available registration and permit records establish registration and permission, not construction progress.
Completion timeline: The building permit states construction is to be completed before 13/11/2028. The promoter’s Form B declaration gives 12/11/2028; the permit deadline and promoter declaration are reported separately.
Occupancy / completion certificate: No completion certificate or occupancy certificate is supplied; the permit extraction records completion as not certified.
2. The project story
HARITHA NIVAS is registered as a residential apartment development on Survey No. 51 at H No 7-161, Chaitnya Nagar, Miryalguda, Nalgonda. The registered site is stated to measure 725.52 sq. m. The building permit describes one building with a stilt level and five floors, for 20 residential units.
The RERA filing lists 20 2BHK units and shows all 20 as available and none booked in the portal data supplied; those counts have no stated as-of date. The provided records do not establish the current physical construction stage. The permit sets a completion deadline, but no completion or occupancy certificate is included.
3. Master plan, architecture & building design
The filed plan identifies one residential building on a gross and net plot area of 725.52 sq.m, with 1 Stilt + 5 Floors. The plan extraction states proposed coverage of 396.52 sq.m (55.00%), vacant plot area of 320.85 sq.m, total proposed built-up area of 1900.35 sq.m excluding parking and 2296.87 sq.m including parking. These are plan-record figures; the supplied data does not provide a separate FSI calculation or carpet-area schedule for the building as a whole.
The building-permit extraction records residential area of 1900.35 sq.m, commercial area 0.0 sq.m, and others 0.0 sq.m. It lists front, rear and side setbacks of 3.0 m, 3.5 m, 3.5 m and 3.5 m respectively. The plan extraction also records a 5m Wide Drive Way and 2m Wide Corridor. Detailed floor-by-floor apartment layouts, lifts/stairs counts, apartment distribution by floor, and entry/exit arrangements are not established in the supplied extracts.
The plan records 190.07 sq.m as the proposed 10% mortgage area. The building-permit extraction identifies the mortgaged area as the 5th Floor.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 95.01 sqm | 61.5–69.0 sqm; median 63.5 sqm | 33% |
Unit counts, booking counts and saleable area are from the TG-RERA filing; booking counts have no supplied as-of date. Carpet-area figures are software-measured from the approved floor-plan drawing, not RERA-filed figures, and are marked as needing review. The drawing measurement covers 15 flat designs.
Saleable area and carpet area are different measurements: the software-measured carpet figure is smaller than the RERA-filed saleable area, which also reflects the home’s share of common areas. The supplied drawing extract identifies two bedrooms, a hall, kitchen, toilet and two open-to-air balconies for one measured flat; no reliable room dimensions are provided for the project’s full unit set. Verify drawing measurements against the plans.
5. Parking & vehicle circulation
The plan extraction records 362.36 sq.m of parking area and 34.17 sq.m of visitor parking area, and lists 5.00 Car Parking Spaces. It also states that the stilt parking area is to be used exclusively for vehicle parking. The sanctioned record lists 0.00 onsite parking and 0.00 two-wheeler spaces in separate fields; the supplied extracts do not explain those fields further.
The project filing does not establish individual parking allocations to units. A plan provision does not by itself establish exclusive ownership or allocation. The vendor record mentions open and covered parking, but the supplied project-plan evidence does not establish a covered-parking count or unit-wise allocation.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot shown in the plan’s amenity list; permit condition requires it to be fenced and maintained as greenery before occupancy certification. No area or completed status supplied. |
|---|---|
| Declared progress / verified status | Required/recorded in plan conditions; completion not verified. |
| Description / size | 34.17 sq.m in the plan extraction. |
|---|---|
| Declared progress / verified status | Plan-record provision; completion not verified. |
| Description / size | Listed in the plan’s amenity/utility extraction; quantity, capacity and construction status are not supplied. |
|---|---|
| Declared progress / verified status | Listed; completion not verified. |
| Description / size | Listed in the plan’s amenity/utility extraction; no further description or progress evidence supplied. |
|---|---|
| Declared progress / verified status | Listed; completion not verified. |
The TG-RERA amenity data marks progress at 0% for the listed facilities, including green strip/tot lot/park and community buildings; it does not supply separate measurements or evidence of completion.
7. Utilities, building services & safety
The building permit lists one rainwater-harvesting pit, a transformer space, a garbage house, and 30 trees. It also requires rainwater harvesting and peripheral greenery. These are permit provisions or conditions; the supplied evidence does not verify installation or completion.
The TG-RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, while reporting 0% progress for the listed amenities. No water source, storage or treatment capacity, sewage-treatment capacity, reuse arrangement, electrical capacity, backup-power provision, lift capacity, fire-system specifications, CCTV/security system or accessibility design is established by the supplied records.
The permit states that fire-safety requirements and services—including sanitation, plumbing, fire safety, lifts and electrical installations—are to be addressed during construction, and that safety responsibilities rest with the relevant project professionals and owner/builder. The supplied evidence does not establish completed fire-safety works or an occupancy-stage fire clearance.
8. Location, access & connectivity
The registered location is H No 7-161, Chaitnya Nagar, Miryalguda, Nalgonda, Telangana 508207, in Survey No. 51. The filed parcel boundaries identify a 10M WIDE MAIN ROAD on the east, north and south, and a vendor’s plot on the west.
A location dataset gives a sampled distance of 111.4 km to the nearest sampled Outer Ring Road interchange. The supplied record does not identify a project-specific public-transport route, measured distances to other landmarks, or travel times.
9. Developer & development status
The registered promoter is SUDHEER KUMAR NALLAMOTHU, identified in the project filing as a proprietorship. The filing lists NALLAMOTHU SUDHEER KUMAR as authorized signatory. The supplied project record does not provide a company registration number or verified official website or contact details.
The promoter’s Form B declaration states a project completion deadline of 12/11/2028 and includes declarations concerning title basis, encumbrances, project funds, audits and approvals. These are promoter declarations, not independent verification of construction progress or delivery.
The building permit states a completion deadline before 13/11/2028 and requires a completion notice and occupancy certificate before occupation. No occupancy or completion certificate is included in the supplied documents.
10. Approvals, official records & documents
| Identifier / date | P01800010576; valid 13/11/2025–12/11/2028 |
|---|---|
| What the supplied record establishes | Registration certificate for HARITHA NIVAS, naming SUDHEER KUMAR NALLAMOTHU as promoter and locating the project at Chaitnya Nagar, Miryalguda, Nalgonda. |
| Identifier / date | Approval no. 0012/MIRY/SWBP/2025; 13/11/2025 |
|---|---|
| What the supplied record establishes | Miryalguda Municipality permit record for one residential building, 1 Stilt + 5 Floors, on 725.52 sq.m in Survey No. 51. |
| Identifier / date | 007423/MIRY/00014/SWBP/2025; plan record dated 13/11/2025 |
|---|---|
| What the supplied record establishes | Plan extraction for the proposed residential apartment with 1 Stilt + 5 Floors on Survey No. 51. |
| Identifier / date | M/MIRY/016229/2020; 02/08/2025 |
|---|---|
| What the supplied record establishes | LRS proceedings concern Plot No. 10 in Survey No. 51, Miryalaguda, measuring 523.42 sq.m; the document describes regularisation of an individual plot and says it does not confer ownership or serve as proof of title. |
| Identifier / date | 7638/2025; 06/11/2025 |
|---|---|
| What the supplied record establishes | Permit extraction records mortgage of 190.07 sq.m associated with the 5th Floor. |
| Identifier / date | Filed document |
|---|---|
| What the supplied record establishes | Promoter declaration concerning the proposed project and stated completion deadline. |
No occupancy certificate or completion certificate is included in the supplied project documents. The index above describes the records available for this overview; it is not a statement that every approval or later-stage certificate has been reviewed.
Frequently asked questions
Is HARITHA NIVAS registered with Telangana RERA?
Yes. HARITHA NIVAS is registered with the Telangana Real Estate Regulatory Authority as P01800010576; the registration status is New Project.
Who is the developer of HARITHA NIVAS?
The promoter named in the RERA registration is SUDHEER KUMAR NALLAMOTHU.
Where is HARITHA NIVAS located?
HARITHA NIVAS is in MIRYALAGUDA MANDAL, Chaitnya Nagar, Miryalguda, Nalgonda, Telangana (508207).
When will HARITHA NIVAS be completed?
The promoter's proposed date of completion filed with RERA is 12/03/2029. This is the promoter's declaration, not a guarantee.