Bridge Epsilon

BRIDGE SANDOHA MANSIONS · Rangareddy · RERA P02400009348

BRIDGE EPSILON is a residential villa project in Srinagar, Maheshwaram Mandal, Ranga Reddy District, developed by the registered promoter BRIDGE SANDOHA MANSIONS. The project covers 79,938.30 sq. m. and has 129 proposed building units, with a sanctioned configuration of 1 Ground + 3 upper floors; the supplied RERA unit descriptions are floor labels rather than stated villa configurations. It is registered under TG-RERA number P02400009348, with a proposed completion date of 30/04/2028.

01What we found

RegisteredTG-RERA
52documents on file - each fact links to its page
2court cases on this project's land (survey 239, 240, Srinagar)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameBRIDGE EPSILON RERA record
Project typeResidential villa project; the RERA-filed project type is recorded as residential, and the building permit describes a residential building/villa development. RERA record RERA filing
Phase / registered portionPhase not identified in the supplied record. RERA record
TG-RERA registrationP02400009348; registered from 31/12/2024. RERA record Approvals record
Registration validityCertificate states validity from 31/12/2024 to 30/12/2027, unless extended by the Authority. This is the registration period, not the completion deadline. The record does not state that registration has been extended. RERA record
Registered promoterBRIDGE SANDOHA MANSIONS, identified as a partnership in the RERA filing. RERA filing Corporate record
RERA statusNew Project; registration certificate on file. RERA record

Land and geographic identity

ItemProject record
Locality / address descriptionMaheshwaram Mandal; the filed plans also identify Lamoor Road. RERA record RERA filing
Revenue villageSrinagar; approval documents also render the name as “Sree Nagar” or “Sreenagar.” RERA record RERA filing
Mandal / district / PINMaheshwaram / Ranga Reddy / 501510. RERA record RERA filing
Project survey numbers239/P and 240/P. RERA record RERA filing
Site extentRERA filing and building-permit record state 79,938.30 sq. m. RERA filing
Land area fields in filed planPlan extraction records “AREA OF PLOT (Minimum) 82139.65” and “NET AREA OF PLOT 79938.30”; units for the first figure are not stated in the extraction.
Boundaries in RERA filingNorth: 7 M WIDE EXTERNAL DRIVEWAY; south: 18 MT WIDE EXISTING ROAD; east: OTHERS; west: NEIGHBOURS LAND. RERA filing

Development identity

ItemProject record
Sanctioning authorityHMDA technical approval, with the building-permit order delegated to Thukkuguda Municipality / Municipal Corporation for release of proceedings and plans.
Principal approval007060/BP/HMDA/1678/SMD/2024, dated 31 December, 2024. Approvals record
Approved built-up area107,170.50 sq. m. is stated as the approved/proposed built-up area excluding parking in the plan extraction; the permit also records 184,732.29 sq. m. total built up area. These are distinct figures as stated in the records.
Building count / arrangementRERA land details state 129 total building units as per approved plan and 129 proposed building units as per agreement. The permit identifies “A (VILLA)” and the supplied materials do not provide a clearly itemised building-by-building schedule. RERA filing
Sanctioned floor configuration1 Ground + 3 upper floors; building height stated as 14.99 in the approval-plan extraction (unit not specified there).
Parking levelsFiled plan conditions specify cellar/stilt for parking; the building-permit order also says stilt/cellar is to be used exclusively for vehicle parking. The supplied record does not state a parking-space count.
UnitsRERA land details state 129 proposed building units; the unit table separately records 500 entries under floor labels, not a count of homes by villa configuration. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed unit descriptionsUnit table entries are labelled GROUND FLOOR, FIRST FLOOR, FIRST FOOR, SECOND FLOOR and THIRD FLOOR. The filing does not provide a recognised villa configuration in the supplied unit data. RERA unit details RERA unit table
Filed saleable areaRecorded range: 88.53–186.84 sq. m. across the floor-label entries. RERA unit table
Booked / availableUnit table indicates 0 booked and 500 available across those entries. The portal capture has no as-of date in the supplied record; treat these counts as indicative, not a live inventory confirmation. RERA unit table RERA unit table
Construction stageRERA amenity/infrastructure entries report several items at 2% and others at 0%; no independently verified site-progress report is supplied. RERA amenities
Completion datesRERA header proposed completion: 30/04/2028. The Form-B declaration states completion by 30/12/2027. These are separately attributed records; the RERA header date is the project-profile completion date used here. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The permit requires an occupancy certificate before occupation; the HMDA approval extraction records completion as not certified.

2. The project story

BRIDGE EPSILON is registered as a residential project in Srinagar Revenue Village, Maheshwaram Mandal, Ranga Reddy District, on the filed site identified as Survey Nos. 239/P and 240/P. The RERA filing describes 129 proposed building units; the HMDA technical approval and building-permit documents describe a residential villa building/development with 1 Ground + 3 upper floors. RERA record RERA filing RERA filing

The approved project land extent is recorded as 79,938.30 sq. m. The HMDA documents state an approved/proposed built-up area of 107,170.50 sq. m., and also record 184,732.29 sq. m. total built up area. The supplied extracts do not provide enough detail to explain the area calculation or allocate building areas by villa, block or phase. RERA filing

The project is registered and has building-permit documentation, but the supplied evidence does not establish construction completion or occupancy certification for any portion. RERA infrastructure reporting shows only limited declared progress for some listed items, while no independent site inspection or verified construction-progress certificate is included here. RERA amenities

3. Master plan, architecture & building design

The filed plan identifies Survey Nos. 239/P and 240/P, a net plot area of 79938.30, and a proposed residential development shown as Ground + 3 floors. The building-permit order describes “A (VILLA)” and 1 Ground + 3 upper floors. The plan extraction also records 14.99 MT building height and a vacant plot area of 19151.39; units for the latter are not stated in the extracted text.

The filed plan depicts internal driveways of 6.0 M, 10.0 M and 12.0 M, a 7.0 M WIDE EXTERNAL DRIVEWAY, an 18.00 MT WIDE EXISTING road and a 45.72 MT WIDE PROPOSED ROAD. The RERA filing records north and south boundaries as a 7 M external driveway and an 18 MT existing road respectively. RERA filing

The approval material distinguishes 107,170.50 sq. m. as proposed built-up area excluding parking in the plan extraction and separately states 184,732.29 sq. m. total built up area. The supplied documents do not provide a verified schedule separating FSI-counted, gross, parking or other area components, so those categories should not be inferred from these figures.

The plan extraction lists a Tot-lot, Green Strip, Zen garden & Pet Park, and Swimming Pool. These are plan-listed features, not evidence that they are completed or available.

4. Homes, configurations & floor plans

The supplied TG-RERA unit table records floor labels rather than standard villa configurations. In keeping with the filing, these entries are shown as filed; they should not be treated as evidence of 500 distinct homes. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
FIRST FLOOR1280128186.84 sq. m.Not measured in supplied drawingsNot supplied
FIRST FOOR101176.45 sq. m.Not measured in supplied drawingsNot supplied
GROUND FLOOR1290129140.97 sq. m.Not measured in supplied drawingsNot supplied
SECOND FLOOR1290129142.73 sq. m.Not measured in supplied drawingsNot supplied
THIRD FLOOR113011388.53 sq. m.Not measured in supplied drawingsNot supplied

The unit table’s 500 total entries are explicitly classified in the supplied normalised record as floor-label rows, not homes for sale. The RERA land details separately state 129 total building units as per approved plan and 129 proposed building units as per agreement. RERA unit table RERA filing

The supplied floor-plan review reports five drawings, with 0 measured, 1 scan pending and 4 with no flats. Accordingly, there is no software-measured carpet-area figure or reliable room-measurement schedule to present. The developer-site brochure has villa plan types and areas, but those are marketing material, not RERA-filed measurements or approved-plan evidence for this table. Floor plans

5. Parking & vehicle circulation

The filed plan states that the cellar/stilt floor is to be used for parking; the building-permit order likewise specifies exclusive vehicle parking use for the stilt/cellar. No sanctioned parking-space count, visitor or accessible-space allocation, parking layout by unit, or legally documented parking allotment is supplied.

The filed plan shows internal driveways of 6.0 M, 10.0 M and 12.0 M, with a 7.0 M external driveway; it also depicts a 45.72 MT WIDE PROPOSED ROAD and an 18.00 MT WIDE EXISTING road. These are drawing/approval-plan entries and do not establish unit-specific parking rights.

6. Amenities, recreation & open spaces

The RERA filing lists project infrastructure and amenities with low declared completion percentages. The plan and approval documents also include proposed facilities. These entries establish what is recorded or shown, not that a facility has been delivered or independently verified. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkPlan extraction also lists Zen garden & Pet Park; no size supplied.RERA amenity filing; filed plan RERA amenitiesRERA reports 2% for “Green Strip/TOT LOT/Park”; not independently verified complete.
Swimming poolShown in the filed plan; no size or capacity supplied.Filed planNo completion status supplied.
Community buildingsNo further description or size supplied.RERA amenity filing RERA amenities0% reported; not independently verified complete.
Recreational open spaceAggregate area not supplied.RERA amenity filing RERA amenities0% reported.

The developer-site brochure lists further clubhouse, sports and recreation features, but these are promoter-marketed claims rather than RERA-declared or independently verified facilities; they are not presented as project-delivery facts here. Promoter website

7. Utilities, building services & safety

The HMDA approval and building-permit extracts list water supply, drainage and sewerage disposal, STP, transformer, garbage house, and rainwater-harvesting structures. The filed plan also lists a sump, septic tank and underground drainage; its conditions include a dual-piping provision for potable and other uses. These are approval/plan requirements or listed provisions, not proof of installation or operation.

For safety, the approval material lists fire extinguishers, emergency lighting, underground static water storage tank, terrace tank, hose reel and automatic sprinkler system. The plan includes fire-protection requirements and states that automatic sprinklers are to be provided if basement area exceeds 200 Sq. Mtrs. The supplied record does not confirm system capacities, commissioning, fire clearance or completed safety inspections.

The filed plan includes Electric Vehicle Charging Infrastructure requirements and broadband/digital connectivity infrastructure provisions. The RERA amenity report records the electrical meter room/sub-station/receiving station at 0%. The supplied project-specific material does not establish lift count, lift capacity, generator capacity, CCTV installation, water source or treatment capacity. RERA amenities

8. Location, access & connectivity

The registered location is Srinagar, Maheshwaram, Ranga Reddy, 501510, in Maheshwaram Mandal. The filed plan places the project at Lamoor Road, Sreenagar Village, and the RERA filing gives the site boundaries as a 7 M WIDE EXTERNAL DRIVEWAY to the north and an 18 MT WIDE EXISTING ROAD to the south. RERA record RERA filing

The filed plan also shows a 45.72 MT WIDE PROPOSED ROAD, plus 6.0 M, 10.0 M and 12.0 M driveways. These are drawing entries; the supplied material does not establish the present completion or public accessibility of the proposed road.

A location record gives the nearest sampled Outer Ring Road interchange at approximately 10.8 km. No other measured connectivity distance or verified travel time is supplied in the project-location record. Location record

9. Developer & development status

The registered promoter is BRIDGE SANDOHA MANSIONS, recorded as a partnership, with GSTIN 36AAYFB6004H1ZA. The RERA filing names SURABHI UJWAL KUMAR as authorised signatory and identifies PULLURI MANASA RAO and VELCHALA VIKRAM RAO as partners. Corporate record Parties record RERA filing

The RERA certificate lists the promoter address as Village: Gachi Bowli, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500032. The project filing’s promoter address fields separately give LUMBINI AVENUE, GACHIBOWLI, SREE NAGAR VILLAGE, MAHESWARAM MANDAL, Maheshwaram, Ranga Reddy, 501510. No official contact details are supplied in the RERA identity record. Parties record RERA filing

The RERA header records a proposed completion date of 30/04/2028. The registration certificate is valid through 30/12/2027 unless extended; these are different dates and the supplied evidence does not show an extension. The Form-B declaration separately states completion by 30/12/2027. No construction stage has been independently verified, and no occupancy certificate is supplied. RERA record

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C certificate, P02400009348
What it establishesProject registration and stated registration validity; not a conveyance or occupancy certificate.
Principal building approval
Supplied evidenceHMDA approval 007060/BP/HMDA/1678/SMD/2024, dated 31 December, 2024
What it establishesTechnical approval for the proposed residential building/development and recorded conditions.
Building-permit order
Supplied evidenceThukkuguda Municipality / Municipal Corporation order, 007060/BP/HMDA/1678/SMD/2024, dated 31 December, 2024
What it establishesBuilding-permit record for Survey Nos. 239/P and 240/P, with occupancy required before occupation.
Filed plans
Supplied evidencePlan documents 526052 and 526053
What it establishesProposed building and site-plan information; the supplied OCR extraction for these plan documents does not contain complete approval-number/date fields.
Promoter declaration
Supplied evidenceForm-B affidavit by BRIDGE SANDOHA MANSIONS through SURABHI UJWAL KUMAR
What it establishesPromoter declarations and undertakings, including the stated completion undertaking; not independent verification of those assertions.
Occupancy / completion certificate
Supplied evidenceNot supplied; approval extract says completion is not certified
What it establishesNo evidence here that an occupancy or completion certificate has been issued.

The permit extracts list mortgage document numbers 20658/2024, 20660/2024 and 20659/2024, dated 16 December, 2024, in favour of HMDA. Full mortgage scope and conditions are addressed in the approvals and land-and-title sections.

Frequently asked questions

Is BRIDGE EPSILON registered with Telangana RERA?

Yes. BRIDGE EPSILON is registered with the Telangana Real Estate Regulatory Authority as P02400009348; the registration status is New Project.

Who is the developer of BRIDGE EPSILON?

The promoter named in the RERA registration is BRIDGE SANDOHA MANSIONS.

Where is BRIDGE EPSILON located?

BRIDGE EPSILON is in MAHESWARAM MANDAL, Srinagar, Maheshwaram, Rangareddy, Telangana (501510).

When will BRIDGE EPSILON be completed?

The promoter's proposed date of completion filed with RERA is 30/04/2028. This is the promoter's declaration, not a guarantee.