Aditya Township
SRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI · Rangareddy · RERA P02400009765
ADITYA TOWNSHIP is a plotted development in Adibatla, Ibrahimpatnam mandal, Ranga Reddy district. The registered promoter is SRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI. The project covers 33284.99 sq.mt total site area and its filed layout material shows 62 individual plots, with plot areas from 167.23 sq.m to 794.4 sq.m; no tower or building count or floor configuration is disclosed. Its TG-RERA registration is P02400009765, valid 30/04/2025–30/04/2028, and the Form-B declaration undertakes completion by 30th April 2028.
📘 Project brochure from the promoter’s website ↗01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | ADITYA TOWNSHIP RERA record |
| Project type | Plotted development / proposed residential open-plot layout RERA record |
| Phase or registered portion | New Project; the registration identifies the stated Adibatla survey numbers. No separate phase designation is disclosed. RERA record |
| TG-RERA registration | P02400009765 RERA record |
| Registration validity | 30/04/2025–30/04/2028. This is the registration period, not a construction-completion or occupancy-certificate status. Approvals record |
| Registered promoter | SRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI RERA record RERA filing |
| RERA status | Registered; the certificate records a three-year validity period and conditions for the promoters. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Adibatla / Adibatla RERA record |
| Mandal | Ibrahimpatnam RERA record |
| District | Ranga Reddy RERA record |
| PIN | 501510 RERA record |
| All project survey numbers and subdivisions | 121/P, 125/P, 126, 127/P, 129, 130/P and 132/P |
| Registered site extent | 33284.99 sq.mt total site area; 6631.90 sq.mt road-affected area; 26653.09 sq.mt net area, as recorded in the project filing. RERA filing Layout record |
| Boundaries | North: ROAD; South: OTHERS LAND; East: NEIGHBOURS LAND OF SURVEY NOS 123 124 AND 125P; West: NEIGHBOURS LAND OF SURVEY NOS 127P 128 AND 132P. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the filing also records Adibatla Municipality / Municipal Corporation proceedings. Approvals record |
| Principal layout approval | 006202/LO/HMDA/1431/SMD/2024, dated 30 April, 2025. The filed documents describe layout/draft layout permission for an open plotted layout. Approvals record |
| Approved built-up area | 18120.85 sq.mts is recorded in the RERA project information as approved built-up area. The filed layout plan separately states proposed built-up area, excluding and including parking, as 0.00 for this plotted-layout proposal. RERA filing |
| Buildings / floors | No tower or building count or floor configuration is disclosed for this plotted development. |
| Parking | No project-wide car- or two-wheeler-parking count or parking level is disclosed. The filed layout plan records common parking area as 0.00. |
| Plot count | 62 individual plots are shown in the filed layout material. |
Offering and status
| Field | Project record |
|---|---|
| Offering | Individual plots in a plotted layout; the filed layout drawing identifies 62 sub-plots. |
| Filed plot-size range | The layout schedule was software-read as 167.23–794.4 sq.m (smallest to largest); verify individual plot dimensions against the drawing. Layout record |
| Booked / available plots | Not disclosed in the supplied project records. |
| Construction / development stage | RERA filing labels this a “New Project.” The supplied evidence includes declared progress percentages for some layout works, but no independent site inspection or verified completion status. RERA record RERA amenities |
| Completion date | The Form-B declaration undertakes completion by 30th April 2028. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is recorded in the supplied evidence. For this plotted layout, final layout release is discussed in the filed approval documents; its current status is not established here. |
2. The project story
ADITYA TOWNSHIP is registered as a plotted development in Adibatla village, Ibrahimpatnam mandal, Ranga Reddy district, on land identified as Survey Nos. 121/P, 125/P, 126, 127/P, 129, 130/P and 132/P. The proposal is an open residential layout rather than an apartment or multi-storey building project. Its filed layout material shows 62 individual plots, internal roads, park/open-space land, social-infrastructure land and utility land.
The RERA filing records the project as new and the registration certificate is valid through 30/04/2028. Separately, the promoter’s Form-B declaration undertakes project completion by 30th April 2028. Those dates describe registration validity and the promoter’s stated completion undertaking, respectively; they do not establish that the layout works are complete. No occupancy or completion certificate is included in the supplied evidence. RERA record
The filed layout material sets out proposed infrastructure and records progress percentages for selected works. These are filing-reported figures, not independently verified observations of work on site. RERA amenities
3. Master plan, architecture & building design
This is a plotted-layout proposal, so the relevant design evidence is the layout arrangement and allocation of land rather than tower plans, apartment floor plans or building-floor configurations. The filed drawing identifies 33284.99 sq.mt total layout area and 26653.09 sq.mt net layout area, with 6631.90 sq.mt identified as road-affected area. The layout schedule lists 62 individual sub-plots.
The layout plan’s land-use schedule records 18120.85 sq.mt for plots, 5568.91 sq.mt for roads, 2103.25 sq.mt for organized open space/park, 700.94 sq.mt for social infrastructure and 158.82 sq.mt for utilities. It records amenity area and common parking area as 0.00. Road widths shown on the filed plan include 12.19M, 9.14 M, 14.1, 14.00 MT and 36.00 MT.
The layout schedule was software-read as 62 plots, with plot areas from 167.23 sq.m to 794.4 sq.m; the drawing-derived plot measurements should be checked against the plan itself. No residential building footprint, tower arrangement, floor configuration, apartment circulation or phase-wise building arrangement is disclosed. Layout record
The filed approval material identifies plots reserved or mortgaged to HMDA and states that specified roads, open space, social-infrastructure and utility areas are to be handed over to the local body before final layout release. The approved-document index and detailed conditions are addressed in Approvals.
4. Homes, configurations & floor plans
There are no apartment configurations or apartment floor plans in the supplied evidence. The offering is plotted: the filed drawing records 62 plots. The software-read size bands below describe plot areas from that drawing, not RERA-filed saleable areas or independently surveyed plot measurements. Layout record
| Plot-size band (sq. yd; software-read) | Plot count |
|---|---|
| 200–250 | 12 |
| 250–300 | 14 |
| 300–400 | 26 |
| 400–500 | 3 |
| 500–1000 | 7 |
The software-read smallest, median and largest plot areas are 167.23 sq.m, 264.6 sq.m and 794.4 sq.m, respectively. The available floor-plan data reports no measured drawings and two sheets with no flats; accordingly, no carpet-area, room-dimension or apartment-loading figures are available. Layout record Floor plans
5. Parking & vehicle circulation
The filed layout plan records 0.00 common parking area, and the supplied documents do not establish a project-wide parking-space count, visitor or accessible parking provision, plot-specific parking allocation, or parking ownership arrangements.
The layout documents show internal roads and require roads to be opened for access to neighbouring sites. Road widths printed on the filed layout plan include 12.19M, 9.14 M, 14.1, 14.00 MT and 36.00 MT. No separate pedestrian-only circulation, EV-charging provision, ramps or parking levels are disclosed.
6. Amenities, recreation & open spaces
The table below distinguishes facilities or works appearing in the filed layout/approval records from progress percentages reported in the RERA filing. Progress figures are filing-reported and are not independent completion verification. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 2103.25 sq.mt; layout schedule states 7.89%. | Green Strip/TOT LOT/Park: 30% reported; not independently verified. RERA amenities | |
| Social infrastructure | 700.94 sq.mt. | No completion percentage supplied. RERA amenities | |
| Internal roads and footpaths | Layout road area 5568.91 sq.mt. | Internal Roads & Footpaths: 10% reported; not independently verified. RERA amenities | |
| Community buildings | No size or facility detail supplied. | RERA amenities | Community Buildings: 0% reported. |
| Utility land | 158.82 sq.mt. | No completion percentage supplied. RERA amenities |
The filed approval records also identify water-harvesting pits and a common septic tank in the layout material; those are site-service elements and are described under Utilities.
7. Utilities, building services & safety
The filed draft layout letter lists proposed road formation with blacktop, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical lines, street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-document requirements or proposed works, not evidence that the facilities have been completed or are operating.
| Evidence in the project record | Water supply, internal pipelines, overhead tank and an assured source are listed in the draft layout letter. |
|---|---|
| Declared progress / status | Water Supply: 50% reported; not independently verified. RERA amenities |
| Evidence in the project record | Underground drainage lines and common septic tank / STP are listed; storm-water drains are also specified. |
|---|---|
| Declared progress / status | Sewerage: 20%; Storm Water Drains: 30% reported; not independently verified. RERA amenities |
| Evidence in the project record | Rainwater-harvesting pits are listed in the draft layout letter. |
|---|---|
| Declared progress / status | Water Conservation, Rain water Harvesting: 10% reported; not independently verified. RERA amenities |
| Evidence in the project record | Electrical supply lines, transformer and street lighting are listed in the draft layout letter. |
|---|---|
| Declared progress / status | Street Lighting: 40%; Electrical Meter Room, Sub-Station, Receiving Station: 20% reported; not independently verified. RERA amenities |
| Evidence in the project record | No detailed operating arrangement or capacity is supplied. |
|---|---|
| Declared progress / status | Solid Waste Management and Disposal: 0% reported. RERA amenities |
| Evidence in the project record | No project-specific fire-safety system, clearance or equipment detail is supplied. |
|---|---|
| Declared progress / status | Fire Protection and Fire Safety Requirements: 0% reported. RERA amenities |
| Evidence in the project record | No lift, accessible-circulation or project-specific security-system details are supplied. |
|---|---|
| Declared progress / status | Not disclosed in the supplied RERA project records. |
8. Location, access & connectivity
The registered location is Adibatla village, Ibrahimpatnam mandal, Ranga Reddy district, Telangana, PIN 501510. The cadastral parcel centroid supplied for the project is 17.23588, 78.54311. RERA record Location record
The nearest sampled Outer Ring Road interchange is recorded at approximately 0.9 km. This is the supplied mapped distance; the evidence does not provide a verified travel time. Location record
9. Developer & development status
The registered promoter is SRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI. The RERA filing classifies the organization type as “Others” and describes the arrangement as “Joint Development”; a more specific legal-entity type is not established in the supplied record. The filing gives the promoter address as H.No.2-45, Raviryala, Adibatla, Adibatla, Ibrahimpatnam, Ranga Reddy, 501510. RERA record RERA filing Parties record
The RERA certificate names SRI ADITYA BUILDERS & DEVELOPERS and SMT. MADHAVARAM SARASWATHI DEVI as promoters. The Form-B declaration, made by authorized signatory Maheshwaram Chandraprakash, states a completion undertaking of 30th April 2028. This is the promoter’s declaration; the supplied evidence does not independently verify site progress or completion.
The promoter website supplied in the evidence is sriadityabuilders.com. The brochure lists 8008668285 as a contact number; this is a promoter-marketing contact, not a separately verified official contact record. Parties record
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate — P02400009765 | Form C registration for ADITYA TOWNSHIP, valid 30/04/2025–30/04/2028, and identifying the project’s Adibatla survey numbers. |
| HMDA layout approval — 006202/LO/HMDA/1431/SMD/2024, dated 30 April, 2025 | The filed approval material describes layout permission / draft layout permission for a 62-plot layout and specifies development and handover conditions. |
| Filed layout plan — file no. TS/061718/2024 | Three-sheet proposed residential open-plot layout plan showing the plot schedule, land-use allocations and layout information. |
| Mortgage deed — 6388/2025, dated 28 April, 2025 | Referenced in the HMDA layout-approval material for plots mortgaged to HMDA. |
| Gift deed — 6389/2025, dated 28/04/2025 | Referenced in the approval material for the master-plan road-affected area. |
| NALA conversion proceeding — 2500238700, dated 28/04/2025 | Identified in the HMDA approval material. |
| Form-B promoter declaration | Records the promoter’s declared completion date of 30th April 2028 and other promoter declarations. |
| Occupancy / completion certificate | None is identified in the supplied evidence. The current status of final layout release is not established by the materials reviewed here. |
The supplied evidence does not include apartment-building plans, commencement certificates for buildings, or an occupancy certificate; the project is recorded as a plotted layout.
1. Project at a glance
Project identity
Registered project name: ADITYA TOWNSHIP
Project type: Plotted development / proposed residential open-plot layout
Phase or registered portion: New Project; the registration identifies the stated Adibatla survey numbers. No separate phase designation is disclosed.
TG-RERA registration: P02400009765
Registration validity: 30/04/2025–30/04/2028. This is the registration period, not a construction-completion or occupancy-certificate status.
Registered promoter: SRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI
RERA status: Registered; the certificate records a three-year validity period and conditions for the promoters.
Land and geographic identity
Locality / revenue village: Adibatla / Adibatla
Mandal: Ibrahimpatnam
District: Ranga Reddy
PIN: 501510
All project survey numbers and subdivisions: 121/P, 125/P, 126, 127/P, 129, 130/P and 132/P
Registered site extent: 33284.99 sq.mt total site area; 6631.90 sq.mt road-affected area; 26653.09 sq.mt net area, as recorded in the project filing.
Boundaries: North: ROAD; South: OTHERS LAND; East: NEIGHBOURS LAND OF SURVEY NOS 123 124 AND 125P; West: NEIGHBOURS LAND OF SURVEY NOS 127P 128 AND 132P.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the filing also records Adibatla Municipality / Municipal Corporation proceedings.
Principal layout approval: 006202/LO/HMDA/1431/SMD/2024, dated 30 April, 2025. The filed documents describe layout/draft layout permission for an open plotted layout.
Approved built-up area: 18120.85 sq.mts is recorded in the RERA project information as approved built-up area. The filed layout plan separately states proposed built-up area, excluding and including parking, as 0.00 for this plotted-layout proposal.
Buildings / floors: No tower or building count or floor configuration is disclosed for this plotted development.
Parking: No project-wide car- or two-wheeler-parking count or parking level is disclosed. The filed layout plan records common parking area as 0.00.
Plot count: 62 individual plots are shown in the filed layout material.
Offering and status
Offering: Individual plots in a plotted layout; the filed layout drawing identifies 62 sub-plots.
Filed plot-size range: The layout schedule was software-read as 167.23–794.4 sq.m (smallest to largest); verify individual plot dimensions against the drawing.
Booked / available plots: Not disclosed in the supplied project records.
Construction / development stage: RERA filing labels this a “New Project.” The supplied evidence includes declared progress percentages for some layout works, but no independent site inspection or verified completion status.
Completion date: The Form-B declaration undertakes completion by 30th April 2028.
Occupancy / completion certificate: No occupancy certificate or completion certificate is recorded in the supplied evidence. For this plotted layout, final layout release is discussed in the filed approval documents; its current status is not established here.
2. The project story
ADITYA TOWNSHIP is registered as a plotted development in Adibatla village, Ibrahimpatnam mandal, Ranga Reddy district, on land identified as Survey Nos. 121/P, 125/P, 126, 127/P, 129, 130/P and 132/P. The proposal is an open residential layout rather than an apartment or multi-storey building project. Its filed layout material shows 62 individual plots, internal roads, park/open-space land, social-infrastructure land and utility land.
The RERA filing records the project as new and the registration certificate is valid through 30/04/2028. Separately, the promoter’s Form-B declaration undertakes project completion by 30th April 2028. Those dates describe registration validity and the promoter’s stated completion undertaking, respectively; they do not establish that the layout works are complete. No occupancy or completion certificate is included in the supplied evidence.
The filed layout material sets out proposed infrastructure and records progress percentages for selected works. These are filing-reported figures, not independently verified observations of work on site.
3. Master plan, architecture & building design
This is a plotted-layout proposal, so the relevant design evidence is the layout arrangement and allocation of land rather than tower plans, apartment floor plans or building-floor configurations. The filed drawing identifies 33284.99 sq.mt total layout area and 26653.09 sq.mt net layout area, with 6631.90 sq.mt identified as road-affected area. The layout schedule lists 62 individual sub-plots.
The layout plan’s land-use schedule records 18120.85 sq.mt for plots, 5568.91 sq.mt for roads, 2103.25 sq.mt for organized open space/park, 700.94 sq.mt for social infrastructure and 158.82 sq.mt for utilities. It records amenity area and common parking area as 0.00. Road widths shown on the filed plan include 12.19M, 9.14 M, 14.1, 14.00 MT and 36.00 MT.
The layout schedule was software-read as 62 plots, with plot areas from 167.23 sq.m to 794.4 sq.m; the drawing-derived plot measurements should be checked against the plan itself. No residential building footprint, tower arrangement, floor configuration, apartment circulation or phase-wise building arrangement is disclosed.
The filed approval material identifies plots reserved or mortgaged to HMDA and states that specified roads, open space, social-infrastructure and utility areas are to be handed over to the local body before final layout release. The approved-document index and detailed conditions are addressed in Approvals.
4. Homes, configurations & floor plans
There are no apartment configurations or apartment floor plans in the supplied evidence. The offering is plotted: the filed drawing records 62 plots. The software-read size bands below describe plot areas from that drawing, not RERA-filed saleable areas or independently surveyed plot measurements.
200–250: 12
250–300: 14
300–400: 26
400–500: 3
500–1000: 7
The software-read smallest, median and largest plot areas are 167.23 sq.m, 264.6 sq.m and 794.4 sq.m, respectively. The available floor-plan data reports no measured drawings and two sheets with no flats; accordingly, no carpet-area, room-dimension or apartment-loading figures are available.
5. Parking & vehicle circulation
The filed layout plan records 0.00 common parking area, and the supplied documents do not establish a project-wide parking-space count, visitor or accessible parking provision, plot-specific parking allocation, or parking ownership arrangements.
The layout documents show internal roads and require roads to be opened for access to neighbouring sites. Road widths printed on the filed layout plan include 12.19M, 9.14 M, 14.1, 14.00 MT and 36.00 MT. No separate pedestrian-only circulation, EV-charging provision, ramps or parking levels are disclosed.
6. Amenities, recreation & open spaces
The table below distinguishes facilities or works appearing in the filed layout/approval records from progress percentages reported in the RERA filing. Progress figures are filing-reported and are not independent completion verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 2103.25 sq.mt; layout schedule states 7.89%. | Green Strip/TOT LOT/Park: 30% reported; not independently verified. | |
| Social infrastructure | 700.94 sq.mt. | No completion percentage supplied. | |
| Internal roads and footpaths | Layout road area 5568.91 sq.mt. | Internal Roads & Footpaths: 10% reported; not independently verified. | |
| Community buildings | No size or facility detail supplied. | Community Buildings: 0% reported. | |
| Utility land | 158.82 sq.mt. | No completion percentage supplied. |
The filed approval records also identify water-harvesting pits and a common septic tank in the layout material; those are site-service elements and are described under Utilities.
7. Utilities, building services & safety
The filed draft layout letter lists proposed road formation with blacktop, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical lines, street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-document requirements or proposed works, not evidence that the facilities have been completed or are operating.
| Evidence in the project record | Water supply, internal pipelines, overhead tank and an assured source are listed in the draft layout letter. |
|---|---|
| Declared progress / status | Water Supply: 50% reported; not independently verified. |
| Evidence in the project record | Underground drainage lines and common septic tank / STP are listed; storm-water drains are also specified. |
|---|---|
| Declared progress / status | Sewerage: 20%; Storm Water Drains: 30% reported; not independently verified. |
| Evidence in the project record | Rainwater-harvesting pits are listed in the draft layout letter. |
|---|---|
| Declared progress / status | Water Conservation, Rain water Harvesting: 10% reported; not independently verified. |
| Evidence in the project record | Electrical supply lines, transformer and street lighting are listed in the draft layout letter. |
|---|---|
| Declared progress / status | Street Lighting: 40%; Electrical Meter Room, Sub-Station, Receiving Station: 20% reported; not independently verified. |
| Evidence in the project record | No detailed operating arrangement or capacity is supplied. |
|---|---|
| Declared progress / status | Solid Waste Management and Disposal: 0% reported. |
| Evidence in the project record | No project-specific fire-safety system, clearance or equipment detail is supplied. |
|---|---|
| Declared progress / status | Fire Protection and Fire Safety Requirements: 0% reported. |
| Evidence in the project record | No lift, accessible-circulation or project-specific security-system details are supplied. |
|---|---|
| Declared progress / status | Not disclosed in the supplied RERA project records. |
8. Location, access & connectivity
The registered location is Adibatla village, Ibrahimpatnam mandal, Ranga Reddy district, Telangana, PIN 501510. The cadastral parcel centroid supplied for the project is 17.23588, 78.54311.
The nearest sampled Outer Ring Road interchange is recorded at approximately 0.9 km. This is the supplied mapped distance; the evidence does not provide a verified travel time.
9. Developer & development status
The registered promoter is SRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI. The RERA filing classifies the organization type as “Others” and describes the arrangement as “Joint Development”; a more specific legal-entity type is not established in the supplied record. The filing gives the promoter address as H.No.2-45, Raviryala, Adibatla, Adibatla, Ibrahimpatnam, Ranga Reddy, 501510.
The RERA certificate names SRI ADITYA BUILDERS & DEVELOPERS and SMT. MADHAVARAM SARASWATHI DEVI as promoters. The Form-B declaration, made by authorized signatory Maheshwaram Chandraprakash, states a completion undertaking of 30th April 2028. This is the promoter’s declaration; the supplied evidence does not independently verify site progress or completion.
The promoter website supplied in the evidence is sriadityabuilders.com. The brochure lists 8008668285 as a contact number; this is a promoter-marketing contact, not a separately verified official contact record.
10. Approvals, official records & documents
TG-RERA registration certificate — P02400009765: Form C registration for ADITYA TOWNSHIP, valid 30/04/2025–30/04/2028, and identifying the project’s Adibatla survey numbers.
HMDA layout approval — 006202/LO/HMDA/1431/SMD/2024, dated 30 April, 2025: The filed approval material describes layout permission / draft layout permission for a 62-plot layout and specifies development and handover conditions.
Filed layout plan — file no. TS/061718/2024: Three-sheet proposed residential open-plot layout plan showing the plot schedule, land-use allocations and layout information.
Mortgage deed — 6388/2025, dated 28 April, 2025: Referenced in the HMDA layout-approval material for plots mortgaged to HMDA.
Gift deed — 6389/2025, dated 28/04/2025: Referenced in the approval material for the master-plan road-affected area.
NALA conversion proceeding — 2500238700, dated 28/04/2025: Identified in the HMDA approval material.
Form-B promoter declaration: Records the promoter’s declared completion date of 30th April 2028 and other promoter declarations.
Occupancy / completion certificate: None is identified in the supplied evidence. The current status of final layout release is not established by the materials reviewed here.
The supplied evidence does not include apartment-building plans, commencement certificates for buildings, or an occupancy certificate; the project is recorded as a plotted layout.
Frequently asked questions
Is ADITYA TOWNSHIP registered with Telangana RERA?
Yes. ADITYA TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P02400009765; the registration status is New Project.
Who is the developer of ADITYA TOWNSHIP?
The promoter named in the RERA registration is SRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI.
Where is ADITYA TOWNSHIP located?
ADITYA TOWNSHIP is in Adibatla, Ibrahimpatnam, Rangareddy, Telangana (501510).
When will ADITYA TOWNSHIP be completed?
The promoter's proposed date of completion filed with RERA is 30/08/2028. This is the promoter's declaration, not a guarantee.
More projects in Adibatla