Aditya Township

SRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI · Rangareddy · RERA P02400009765

ADITYA TOWNSHIP is a plotted development in Adibatla, Ibrahimpatnam mandal, Ranga Reddy district. The registered promoter is SRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI. The project covers 33284.99 sq.mt total site area and its filed layout material shows 62 individual plots, with plot areas from 167.23 sq.m to 794.4 sq.m; no tower or building count or floor configuration is disclosed. Its TG-RERA registration is P02400009765, valid 30/04/2025–30/04/2028, and the Form-B declaration undertakes completion by 30th April 2028.

📘 Project brochure from the promoter’s website ↗

01What we found

RegisteredTG-RERA - valid till 30 Apr 2028
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameADITYA TOWNSHIP RERA record
Project typePlotted development / proposed residential open-plot layout RERA record
Phase or registered portionNew Project; the registration identifies the stated Adibatla survey numbers. No separate phase designation is disclosed. RERA record
TG-RERA registrationP02400009765 RERA record
Registration validity30/04/2025–30/04/2028. This is the registration period, not a construction-completion or occupancy-certificate status. Approvals record
Registered promoterSRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI RERA record RERA filing
RERA statusRegistered; the certificate records a three-year validity period and conditions for the promoters.

Land and geographic identity

FieldProject record
Locality / revenue villageAdibatla / Adibatla RERA record
MandalIbrahimpatnam RERA record
DistrictRanga Reddy RERA record
PIN501510 RERA record
All project survey numbers and subdivisions121/P, 125/P, 126, 127/P, 129, 130/P and 132/P
Registered site extent33284.99 sq.mt total site area; 6631.90 sq.mt road-affected area; 26653.09 sq.mt net area, as recorded in the project filing. RERA filing Layout record
BoundariesNorth: ROAD; South: OTHERS LAND; East: NEIGHBOURS LAND OF SURVEY NOS 123 124 AND 125P; West: NEIGHBOURS LAND OF SURVEY NOS 127P 128 AND 132P. RERA filing

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the filing also records Adibatla Municipality / Municipal Corporation proceedings. Approvals record
Principal layout approval006202/LO/HMDA/1431/SMD/2024, dated 30 April, 2025. The filed documents describe layout/draft layout permission for an open plotted layout. Approvals record
Approved built-up area18120.85 sq.mts is recorded in the RERA project information as approved built-up area. The filed layout plan separately states proposed built-up area, excluding and including parking, as 0.00 for this plotted-layout proposal. RERA filing
Buildings / floorsNo tower or building count or floor configuration is disclosed for this plotted development.
ParkingNo project-wide car- or two-wheeler-parking count or parking level is disclosed. The filed layout plan records common parking area as 0.00.
Plot count62 individual plots are shown in the filed layout material.

Offering and status

FieldProject record
OfferingIndividual plots in a plotted layout; the filed layout drawing identifies 62 sub-plots.
Filed plot-size rangeThe layout schedule was software-read as 167.23–794.4 sq.m (smallest to largest); verify individual plot dimensions against the drawing. Layout record
Booked / available plotsNot disclosed in the supplied project records.
Construction / development stageRERA filing labels this a “New Project.” The supplied evidence includes declared progress percentages for some layout works, but no independent site inspection or verified completion status. RERA record RERA amenities
Completion dateThe Form-B declaration undertakes completion by 30th April 2028.
Occupancy / completion certificateNo occupancy certificate or completion certificate is recorded in the supplied evidence. For this plotted layout, final layout release is discussed in the filed approval documents; its current status is not established here.

2. The project story

ADITYA TOWNSHIP is registered as a plotted development in Adibatla village, Ibrahimpatnam mandal, Ranga Reddy district, on land identified as Survey Nos. 121/P, 125/P, 126, 127/P, 129, 130/P and 132/P. The proposal is an open residential layout rather than an apartment or multi-storey building project. Its filed layout material shows 62 individual plots, internal roads, park/open-space land, social-infrastructure land and utility land.

The RERA filing records the project as new and the registration certificate is valid through 30/04/2028. Separately, the promoter’s Form-B declaration undertakes project completion by 30th April 2028. Those dates describe registration validity and the promoter’s stated completion undertaking, respectively; they do not establish that the layout works are complete. No occupancy or completion certificate is included in the supplied evidence. RERA record

The filed layout material sets out proposed infrastructure and records progress percentages for selected works. These are filing-reported figures, not independently verified observations of work on site. RERA amenities

3. Master plan, architecture & building design

This is a plotted-layout proposal, so the relevant design evidence is the layout arrangement and allocation of land rather than tower plans, apartment floor plans or building-floor configurations. The filed drawing identifies 33284.99 sq.mt total layout area and 26653.09 sq.mt net layout area, with 6631.90 sq.mt identified as road-affected area. The layout schedule lists 62 individual sub-plots.

The layout plan’s land-use schedule records 18120.85 sq.mt for plots, 5568.91 sq.mt for roads, 2103.25 sq.mt for organized open space/park, 700.94 sq.mt for social infrastructure and 158.82 sq.mt for utilities. It records amenity area and common parking area as 0.00. Road widths shown on the filed plan include 12.19M, 9.14 M, 14.1, 14.00 MT and 36.00 MT.

The layout schedule was software-read as 62 plots, with plot areas from 167.23 sq.m to 794.4 sq.m; the drawing-derived plot measurements should be checked against the plan itself. No residential building footprint, tower arrangement, floor configuration, apartment circulation or phase-wise building arrangement is disclosed. Layout record

The filed approval material identifies plots reserved or mortgaged to HMDA and states that specified roads, open space, social-infrastructure and utility areas are to be handed over to the local body before final layout release. The approved-document index and detailed conditions are addressed in Approvals.

4. Homes, configurations & floor plans

There are no apartment configurations or apartment floor plans in the supplied evidence. The offering is plotted: the filed drawing records 62 plots. The software-read size bands below describe plot areas from that drawing, not RERA-filed saleable areas or independently surveyed plot measurements. Layout record

Plot-size band (sq. yd; software-read)Plot count
200–25012
250–30014
300–40026
400–5003
500–10007

The software-read smallest, median and largest plot areas are 167.23 sq.m, 264.6 sq.m and 794.4 sq.m, respectively. The available floor-plan data reports no measured drawings and two sheets with no flats; accordingly, no carpet-area, room-dimension or apartment-loading figures are available. Layout record Floor plans

5. Parking & vehicle circulation

The filed layout plan records 0.00 common parking area, and the supplied documents do not establish a project-wide parking-space count, visitor or accessible parking provision, plot-specific parking allocation, or parking ownership arrangements.

The layout documents show internal roads and require roads to be opened for access to neighbouring sites. Road widths printed on the filed layout plan include 12.19M, 9.14 M, 14.1, 14.00 MT and 36.00 MT. No separate pedestrian-only circulation, EV-charging provision, ramps or parking levels are disclosed.

6. Amenities, recreation & open spaces

The table below distinguishes facilities or works appearing in the filed layout/approval records from progress percentages reported in the RERA filing. Progress figures are filing-reported and are not independent completion verification. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space2103.25 sq.mt; layout schedule states 7.89%.Green Strip/TOT LOT/Park: 30% reported; not independently verified. RERA amenities
Social infrastructure700.94 sq.mt.No completion percentage supplied. RERA amenities
Internal roads and footpathsLayout road area 5568.91 sq.mt.Internal Roads & Footpaths: 10% reported; not independently verified. RERA amenities
Community buildingsNo size or facility detail supplied.RERA amenitiesCommunity Buildings: 0% reported.
Utility land158.82 sq.mt.No completion percentage supplied. RERA amenities

The filed approval records also identify water-harvesting pits and a common septic tank in the layout material; those are site-service elements and are described under Utilities.

7. Utilities, building services & safety

The filed draft layout letter lists proposed road formation with blacktop, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical lines, street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-document requirements or proposed works, not evidence that the facilities have been completed or are operating.

Water
Evidence in the project recordWater supply, internal pipelines, overhead tank and an assured source are listed in the draft layout letter.
Declared progress / statusWater Supply: 50% reported; not independently verified. RERA amenities
Sewerage and drainage
Evidence in the project recordUnderground drainage lines and common septic tank / STP are listed; storm-water drains are also specified.
Declared progress / statusSewerage: 20%; Storm Water Drains: 30% reported; not independently verified. RERA amenities
Rainwater harvesting
Evidence in the project recordRainwater-harvesting pits are listed in the draft layout letter.
Declared progress / statusWater Conservation, Rain water Harvesting: 10% reported; not independently verified. RERA amenities
Electrical and street lighting
Evidence in the project recordElectrical supply lines, transformer and street lighting are listed in the draft layout letter.
Declared progress / statusStreet Lighting: 40%; Electrical Meter Room, Sub-Station, Receiving Station: 20% reported; not independently verified. RERA amenities
Solid-waste management
Evidence in the project recordNo detailed operating arrangement or capacity is supplied.
Declared progress / statusSolid Waste Management and Disposal: 0% reported. RERA amenities
Fire and life safety
Evidence in the project recordNo project-specific fire-safety system, clearance or equipment detail is supplied.
Declared progress / statusFire Protection and Fire Safety Requirements: 0% reported. RERA amenities
Lifts, accessibility and security
Evidence in the project recordNo lift, accessible-circulation or project-specific security-system details are supplied.
Declared progress / statusNot disclosed in the supplied RERA project records.

8. Location, access & connectivity

The registered location is Adibatla village, Ibrahimpatnam mandal, Ranga Reddy district, Telangana, PIN 501510. The cadastral parcel centroid supplied for the project is 17.23588, 78.54311. RERA record Location record

The nearest sampled Outer Ring Road interchange is recorded at approximately 0.9 km. This is the supplied mapped distance; the evidence does not provide a verified travel time. Location record

9. Developer & development status

The registered promoter is SRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI. The RERA filing classifies the organization type as “Others” and describes the arrangement as “Joint Development”; a more specific legal-entity type is not established in the supplied record. The filing gives the promoter address as H.No.2-45, Raviryala, Adibatla, Adibatla, Ibrahimpatnam, Ranga Reddy, 501510. RERA record RERA filing Parties record

The RERA certificate names SRI ADITYA BUILDERS & DEVELOPERS and SMT. MADHAVARAM SARASWATHI DEVI as promoters. The Form-B declaration, made by authorized signatory Maheshwaram Chandraprakash, states a completion undertaking of 30th April 2028. This is the promoter’s declaration; the supplied evidence does not independently verify site progress or completion.

The promoter website supplied in the evidence is sriadityabuilders.com. The brochure lists 8008668285 as a contact number; this is a promoter-marketing contact, not a separately verified official contact record. Parties record

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA registration certificate — P02400009765Form C registration for ADITYA TOWNSHIP, valid 30/04/2025–30/04/2028, and identifying the project’s Adibatla survey numbers.
HMDA layout approval — 006202/LO/HMDA/1431/SMD/2024, dated 30 April, 2025The filed approval material describes layout permission / draft layout permission for a 62-plot layout and specifies development and handover conditions.
Filed layout plan — file no. TS/061718/2024Three-sheet proposed residential open-plot layout plan showing the plot schedule, land-use allocations and layout information.
Mortgage deed — 6388/2025, dated 28 April, 2025Referenced in the HMDA layout-approval material for plots mortgaged to HMDA.
Gift deed — 6389/2025, dated 28/04/2025Referenced in the approval material for the master-plan road-affected area.
NALA conversion proceeding — 2500238700, dated 28/04/2025Identified in the HMDA approval material.
Form-B promoter declarationRecords the promoter’s declared completion date of 30th April 2028 and other promoter declarations.
Occupancy / completion certificateNone is identified in the supplied evidence. The current status of final layout release is not established by the materials reviewed here.

The supplied evidence does not include apartment-building plans, commencement certificates for buildings, or an occupancy certificate; the project is recorded as a plotted layout.

Frequently asked questions

Is ADITYA TOWNSHIP registered with Telangana RERA?

Yes. ADITYA TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P02400009765; the registration status is New Project.

Who is the developer of ADITYA TOWNSHIP?

The promoter named in the RERA registration is SRI ADITYA BUILDERS & DEVELOPERS AND Smt. MADHAVARAM SARASWATHI DEVI.

Where is ADITYA TOWNSHIP located?

ADITYA TOWNSHIP is in Adibatla, Ibrahimpatnam, Rangareddy, Telangana (501510).

When will ADITYA TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 30/08/2028. This is the promoter's declaration, not a guarantee.

More projects in Adibatla