Maruthi Nagar II
KADAVERGU · Siddipet · RERA P01300011044
MARUTHI NAGAR II is a plotted development / residential layout in SIDDIPET URBAN, SIDDIPET (URBAN) Mandal, Siddipet District, developed by registered promoter KADAVERGU NARSIMLU. The site area is 7,737.72 sq.m, and the filed layout shows 24 residential plots ranging from 99.82 sq.m to 492.43 sq.m; building or floor configurations are not disclosed. The project is registered with TG-RERA under P01300011044, and its proposed completion date is 02/01/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | MARUTHI NAGAR II RERA record |
| Project type | Plotted development / residential layout RERA record |
| Phase or registered portion | No separate phase designation is disclosed; the registration is for this plotted project. RERA record |
| TG-RERA registration | P01300011044 RERA record |
| Registration validity | 03/09/2025–02/09/2027, unless extended by the Authority. This is the registration period, not the project completion deadline. RERA record |
| Registered promoter | KADAVERGU NARSIMLU (also shown in the filing as KADAVERGU). RERA record |
| RERA status | New project; registration certificate issued. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | SIDDIPET URBAN RERA record RERA filing |
| Revenue village | MITTAPALLY (also rendered “Mittapalle Village” in approval-document text). RERA record |
| Mandal / district / PIN | SIDDIPET (URBAN) / Siddipet / 502375 RERA record RERA filing |
| Project survey number and subdivision | 1040/G/2 RERA record Land records |
| Registered site extent | 7,737.72 sq.m total site area; 7,485.68 sq.m net layout area. Road widening area is recorded as 252.04 sq.m. RERA filing |
| Boundaries recorded in RERA filing | North: “MAIN RD 9 14M EXISTING RD WIDTH 18M PROPOSED RD WD”; south: “9 14 M WIDE SUB ROAD”; east: “OTHERS PLOTS”; west: “LAND OF ETTABOINA BABU.” RERA filing |
Development identity
| Item | Project record |
|---|---|
| Principal plan approval | Layout plan/file no. 005327/GP/00009/SWDL/2025, dated 18/11/2025; the filed drawing identifies DTCP as authority. Approvals record |
| Gram Panchayat record | Tentative layout plan approval by Mittapalle Gram Panchayat, dated 18/11/2025, for Sy.No. 1040/G/2. |
| Approved layout scale | 24 plots; 4,480.69 sq.m plotted area, 2,031.26 sq.m roads, 700.26 sq.m open space, 195.57 sq.m social infrastructure area and 77.90 sq.m utility area in the filed layout drawing. |
| Built-up area / buildings / floors | Not applicable as a disclosed building scheme for this plotted layout. No building count, floor configuration or approved residential building built-up area is supplied. RERA record |
| Parking | The filed layout drawing records 0.00 sq.m common parking area; no parking-space count or plot-specific parking allocation is disclosed. |
Offering and status
| Item | Project record |
|---|---|
| Offering | Residential plots in a layout; the filed drawing lists 24 plots. |
| Plot-size range | 99.82 sq.m to 492.43 sq.m, as stated in the filed drawing extraction. |
| Booked / available counts | Not disclosed in the supplied project data. |
| Construction stage | The registration is for a new project. Amenity progress entries supplied here show 0%; these entries do not independently verify on-site progress. RERA record RERA amenities |
| Completion dates | The Form B declaration states completion by 02/09/2027; the project header separately records a proposed completion date of 02/01/2028. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout, and the supplied records do not establish completion or certification of the layout works. Document index RERA record |
2. The project story
MARUTHI NAGAR II is registered as a residential plotted development in revenue village MITTAPALLY, SIDDIPET (URBAN) Mandal, Siddipet District, on survey number 1040/G/2. The RERA-filed site extent is 7,737.72 sq.m in total, with 7,485.68 sq.m net layout area after the recorded 252.04 sq.m road-widening area. RERA record Land records RERA filing
The filed layout plan shows 24 plots, with internal roads and areas marked for open space, social infrastructure and utilities. The document’s conditions describe planned infrastructure works including road formation, storm-water drains, underground drainage, water supply infrastructure, electrical lines and street lighting, park development and rainwater-harvesting pits. These are approval-document requirements or proposed works, not evidence that the works have been completed.
The available records describe a proposed layout rather than a completed or occupancy-certified residential building. No independent site inspection or verified construction-progress evidence is supplied; the RERA amenity progress fields show 0%. RERA amenities Document index
3. Master plan, architecture & building design
The filed layout drawing records 7,737.72 sq.m total site area, 7,485.68 sq.m net layout area and 252.04 sq.m road-widening area. Its land-use statement allocates the net layout area as follows:
| Layout use | Area | Share shown in drawing |
|---|---|---|
| Plotted area | 4,480.69 sq.m | 59.86% |
| Road area | 2,031.26 sq.m | 27.14% |
| Open space area | 700.26 sq.m | 9.35% |
| Social infrastructure area | 195.57 sq.m | 2.61% |
| Utility area | 77.90 sq.m | 1.04% |
| Buffer area | 0.00 sq.m | 0% |
| Common parking area | 0.00 sq.m | 0% |
| Facilities area | 0.00 sq.m | 0% |
| Green belt area | 0.00 sq.m | 0% |
| Total net layout area | 7,485.68 sq.m | 100% |
The drawing identifies 24 plots, with plot areas ranging from 99.82 sq.m to 492.43 sq.m. The layout material also records road widths including an existing road width of 9.14 m, a proposed road width of 18.0 m, a 9.14 m Main Internal Approach Road, and a 9.14 m Wide Sub Road. These are drawing-based layout details.
No building arrangement, building footprint, floor configuration, tower height, apartment mix or building-level phase plan is disclosed for this plotted project. The supplied floor-plan records contain two layout sheets and no measured floor plans or flats. Floor plans
4. Homes, configurations & floor plans
This is a plotted layout rather than an apartment configuration. The supplied records do not provide plot-wise booked or available status.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Residential plots | 24 plots shown in the filed layout | Not disclosed | Not disclosed | Not supplied plot-by-plot | Not applicable | Not supplied |
The extracted plot schedule records 24 plots, but no individual plot schedule is reproduced in the supplied data. These are layout-drawing figures, not apartment carpet or saleable-area measurements. The filed drawing extraction gives a plot-area range of 99.82 sq.m to 492.43 sq.m. Layout record
5. Parking & vehicle circulation
The filed layout plan records 0.00 sq.m as common parking area. No parking-space count, visitor or accessible parking provision, EV charging provision, plot-specific parking allocation or legally documented parking entitlement is supplied.
Internal roads are shown in the layout. The Gram Panchayat approval conditions state that roads are to remain open for access to neighbouring sites and that a compound wall or fencing is not to be constructed around the site.
6. Amenities, recreation & open spaces
The filed layout and approval materials identify the following areas and works. Amenity progress is recorded as 0% in the supplied RERA data; no independent verification of completion is provided. RERA amenities
| Description / size | 700.26 sq.m in the filed layout drawing |
|---|---|
| Declared progress / verified status | Progress recorded as 0%; completion not independently verified. RERA amenities |
| Description / size | 195.57 sq.m in the filed layout drawing |
|---|---|
| Declared progress / verified status | Progress recorded as 0%; facility details and completion not independently verified. RERA amenities |
| Description / size | 77.90 sq.m in the filed layout drawing |
|---|---|
| Declared progress / verified status | Progress recorded as 0%; specific utility installations and completion not independently verified. RERA amenities |
| Description / size | Listed as available in the RERA amenity data; the layout drawing separately identifies open space |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified. |
| Description / size | Listed in RERA amenity data; no size or description supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; no completion evidence supplied. |
| Description / size | Layout roads are shown; road area is 2,031.26 sq.m in the filed drawing |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified. |
The Gram Panchayat approval describes infrastructure and amenity works including park development and avenue plantation, subject to the approval conditions. These are described as required development works, not as delivered facilities.
7. Utilities, building services & safety
The Gram Panchayat approval conditions describe layout development works including internal water-supply pipelines, an overhead tank, an assured water-supply source, underground drainage lines and a common septic tank/STP, storm-water drains, electrical supply lines, streetlights, a transformer, solid-waste-management facilities and rainwater-harvesting pits. The approval also says that roads, open space and utility areas are to be handed over to the relevant municipality or municipal corporation under applicable requirements. These are approval conditions and planned provisions; the supplied evidence does not establish their installation, capacity or operational status.
The RERA amenity data lists water supply, sewerage, storm-water drains, street lighting, water conservation/rainwater harvesting, solid-waste management and an electrical meter room/sub-station/receiving station, each with progress recorded as 0%. No utility capacity, water source details, electrical load, backup system, waste-treatment capacity or completed-service evidence is supplied. RERA amenities
No building-specific lifts, fire-safety systems, accessible circulation or building safety clearances are disclosed for this plotted layout. The supplied material does not establish completed statutory utility connections or service operation. Document index RERA amenities
8. Location, access & connectivity
The registered project location is MITTAPALLY, SIDDIPET (URBAN) Mandal, Siddipet District, PIN 502375, on survey number 1040/G/2. The cadastral parcel centroid supplied for the location is 18.08580, 78.86247. RERA record RERA filing Location record
The nearest sampled Outer Ring Road interchange is recorded at approximately 64.9 km; no travel time is supplied. Location record
9. Developer & development status
The registered promoter is KADAVERGU NARSIMLU, named on the TG-RERA certificate and the Form B declaration. A project filing describes the promoter as proprietor of a sole-proprietorship firm, but the supplied project identity data lists the entity type as unknown; a verified corporate identifier and a complete registered-office/contact profile are not supplied here. Corporate record
The Form B declaration states that the project will be completed by 02/09/2027. The project header records a proposed completion date of 02/01/2028. The TG-RERA registration remains separately valid from 03/09/2025 to 02/09/2027, unless extended. No construction-stage inspection, completed layout works or occupancy/completion certificate is supplied. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for MARUTHI NAGAR II, registration P01300011044, promoter KADAVERGU NARSIMLU; validity 03/09/2025–02/09/2027. |
| Principal layout plan | Filed layout drawing under file no. 005327/GP/00009/SWDL/2025, dated 18/11/2025, identifying DTCP as authority and showing survey number 1040/G/2. |
| Gram Panchayat layout record | Tentative layout-plan approval by Mittapalle Gram Panchayat, dated 18/11/2025, for 24 plots on survey number 1040/G/2. |
| Promoter declaration | Form B declaration for MARUTHI NAGAR II, including the promoter’s stated completion undertaking and RERA-account obligations. |
| Building commencement / occupancy certificates | No building-specific commencement certificate, completion certificate or occupancy certificate is supplied. The document labelled “Commencement Certificates for each building in each phase” is extracted as a tentative layout-plan approval. Document index |
The supplied evidence supports a project profile based on the RERA registration and filed layout materials. It does not include independent site-verification records or a certificate establishing completion of the layout works. Document index RERA amenities
1. Project at a glance
Project identity
Registered project name: MARUTHI NAGAR II
Project type: Plotted development / residential layout
Phase or registered portion: No separate phase designation is disclosed; the registration is for this plotted project.
TG-RERA registration: P01300011044
Registration validity: 03/09/2025–02/09/2027, unless extended by the Authority. This is the registration period, not the project completion deadline.
Registered promoter: KADAVERGU NARSIMLU (also shown in the filing as KADAVERGU).
RERA status: New project; registration certificate issued.
Land and geographic identity
Locality: SIDDIPET URBAN
Revenue village: MITTAPALLY (also rendered “Mittapalle Village” in approval-document text).
Mandal / district / PIN: SIDDIPET (URBAN) / Siddipet / 502375
Project survey number and subdivision: 1040/G/2
Registered site extent: 7,737.72 sq.m total site area; 7,485.68 sq.m net layout area. Road widening area is recorded as 252.04 sq.m.
Boundaries recorded in RERA filing: North: “MAIN RD 9 14M EXISTING RD WIDTH 18M PROPOSED RD WD”; south: “9 14 M WIDE SUB ROAD”; east: “OTHERS PLOTS”; west: “LAND OF ETTABOINA BABU.”
Development identity
Principal plan approval: Layout plan/file no. 005327/GP/00009/SWDL/2025, dated 18/11/2025; the filed drawing identifies DTCP as authority.
Gram Panchayat record: Tentative layout plan approval by Mittapalle Gram Panchayat, dated 18/11/2025, for Sy.No. 1040/G/2.
Approved layout scale: 24 plots; 4,480.69 sq.m plotted area, 2,031.26 sq.m roads, 700.26 sq.m open space, 195.57 sq.m social infrastructure area and 77.90 sq.m utility area in the filed layout drawing.
Built-up area / buildings / floors: Not applicable as a disclosed building scheme for this plotted layout. No building count, floor configuration or approved residential building built-up area is supplied.
Parking: The filed layout drawing records 0.00 sq.m common parking area; no parking-space count or plot-specific parking allocation is disclosed.
Offering and status
Offering: Residential plots in a layout; the filed drawing lists 24 plots.
Plot-size range: 99.82 sq.m to 492.43 sq.m, as stated in the filed drawing extraction.
Booked / available counts: Not disclosed in the supplied project data.
Construction stage: The registration is for a new project. Amenity progress entries supplied here show 0%; these entries do not independently verify on-site progress.
Completion dates: The Form B declaration states completion by 02/09/2027; the project header separately records a proposed completion date of 02/01/2028.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout, and the supplied records do not establish completion or certification of the layout works.
2. The project story
MARUTHI NAGAR II is registered as a residential plotted development in revenue village MITTAPALLY, SIDDIPET (URBAN) Mandal, Siddipet District, on survey number 1040/G/2. The RERA-filed site extent is 7,737.72 sq.m in total, with 7,485.68 sq.m net layout area after the recorded 252.04 sq.m road-widening area.
The filed layout plan shows 24 plots, with internal roads and areas marked for open space, social infrastructure and utilities. The document’s conditions describe planned infrastructure works including road formation, storm-water drains, underground drainage, water supply infrastructure, electrical lines and street lighting, park development and rainwater-harvesting pits. These are approval-document requirements or proposed works, not evidence that the works have been completed.
The available records describe a proposed layout rather than a completed or occupancy-certified residential building. No independent site inspection or verified construction-progress evidence is supplied; the RERA amenity progress fields show 0%.
3. Master plan, architecture & building design
The filed layout drawing records 7,737.72 sq.m total site area, 7,485.68 sq.m net layout area and 252.04 sq.m road-widening area. Its land-use statement allocates the net layout area as follows:
| Layout use | Area | Share shown in drawing |
|---|---|---|
| Plotted area | 4,480.69 sq.m | 59.86% |
| Road area | 2,031.26 sq.m | 27.14% |
| Open space area | 700.26 sq.m | 9.35% |
| Social infrastructure area | 195.57 sq.m | 2.61% |
| Utility area | 77.90 sq.m | 1.04% |
| Buffer area | 0.00 sq.m | 0% |
| Common parking area | 0.00 sq.m | 0% |
| Facilities area | 0.00 sq.m | 0% |
| Green belt area | 0.00 sq.m | 0% |
| Total net layout area | 7,485.68 sq.m | 100% |
The drawing identifies 24 plots, with plot areas ranging from 99.82 sq.m to 492.43 sq.m. The layout material also records road widths including an existing road width of 9.14 m, a proposed road width of 18.0 m, a 9.14 m Main Internal Approach Road, and a 9.14 m Wide Sub Road. These are drawing-based layout details.
No building arrangement, building footprint, floor configuration, tower height, apartment mix or building-level phase plan is disclosed for this plotted project. The supplied floor-plan records contain two layout sheets and no measured floor plans or flats.
4. Homes, configurations & floor plans
This is a plotted layout rather than an apartment configuration. The supplied records do not provide plot-wise booked or available status.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Residential plots | 24 plots shown in the filed layout | Not disclosed | Not disclosed | Not supplied plot-by-plot | Not applicable | Not supplied |
The extracted plot schedule records 24 plots, but no individual plot schedule is reproduced in the supplied data. These are layout-drawing figures, not apartment carpet or saleable-area measurements. The filed drawing extraction gives a plot-area range of 99.82 sq.m to 492.43 sq.m.
5. Parking & vehicle circulation
The filed layout plan records 0.00 sq.m as common parking area. No parking-space count, visitor or accessible parking provision, EV charging provision, plot-specific parking allocation or legally documented parking entitlement is supplied.
Internal roads are shown in the layout. The Gram Panchayat approval conditions state that roads are to remain open for access to neighbouring sites and that a compound wall or fencing is not to be constructed around the site.
6. Amenities, recreation & open spaces
The filed layout and approval materials identify the following areas and works. Amenity progress is recorded as 0% in the supplied RERA data; no independent verification of completion is provided.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 700.26 sq.m in the filed layout drawing | Progress recorded as 0%; completion not independently verified. | |
| Social infrastructure area | 195.57 sq.m in the filed layout drawing | Progress recorded as 0%; facility details and completion not independently verified. | |
| Utility area | 77.90 sq.m in the filed layout drawing | Progress recorded as 0%; specific utility installations and completion not independently verified. | |
| Green strip / tot lot / park | Listed as available in the RERA amenity data; the layout drawing separately identifies open space | Progress recorded as 0%; not independently verified. | |
| Community buildings | Listed in RERA amenity data; no size or description supplied | Progress recorded as 0%; no completion evidence supplied. | |
| Internal roads and footpaths | Layout roads are shown; road area is 2,031.26 sq.m in the filed drawing | Progress recorded as 0%; not independently verified. |
The Gram Panchayat approval describes infrastructure and amenity works including park development and avenue plantation, subject to the approval conditions. These are described as required development works, not as delivered facilities.
7. Utilities, building services & safety
The Gram Panchayat approval conditions describe layout development works including internal water-supply pipelines, an overhead tank, an assured water-supply source, underground drainage lines and a common septic tank/STP, storm-water drains, electrical supply lines, streetlights, a transformer, solid-waste-management facilities and rainwater-harvesting pits. The approval also says that roads, open space and utility areas are to be handed over to the relevant municipality or municipal corporation under applicable requirements. These are approval conditions and planned provisions; the supplied evidence does not establish their installation, capacity or operational status.
The RERA amenity data lists water supply, sewerage, storm-water drains, street lighting, water conservation/rainwater harvesting, solid-waste management and an electrical meter room/sub-station/receiving station, each with progress recorded as 0%. No utility capacity, water source details, electrical load, backup system, waste-treatment capacity or completed-service evidence is supplied.
No building-specific lifts, fire-safety systems, accessible circulation or building safety clearances are disclosed for this plotted layout. The supplied material does not establish completed statutory utility connections or service operation.
8. Location, access & connectivity
The registered project location is MITTAPALLY, SIDDIPET (URBAN) Mandal, Siddipet District, PIN 502375, on survey number 1040/G/2. The cadastral parcel centroid supplied for the location is 18.08580, 78.86247.
The nearest sampled Outer Ring Road interchange is recorded at approximately 64.9 km; no travel time is supplied.
9. Developer & development status
The registered promoter is KADAVERGU NARSIMLU, named on the TG-RERA certificate and the Form B declaration. A project filing describes the promoter as proprietor of a sole-proprietorship firm, but the supplied project identity data lists the entity type as unknown; a verified corporate identifier and a complete registered-office/contact profile are not supplied here.
The Form B declaration states that the project will be completed by 02/09/2027. The project header records a proposed completion date of 02/01/2028. The TG-RERA registration remains separately valid from 03/09/2025 to 02/09/2027, unless extended. No construction-stage inspection, completed layout works or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for MARUTHI NAGAR II, registration P01300011044, promoter KADAVERGU NARSIMLU; validity 03/09/2025–02/09/2027.
Principal layout plan: Filed layout drawing under file no. 005327/GP/00009/SWDL/2025, dated 18/11/2025, identifying DTCP as authority and showing survey number 1040/G/2.
Gram Panchayat layout record: Tentative layout-plan approval by Mittapalle Gram Panchayat, dated 18/11/2025, for 24 plots on survey number 1040/G/2.
Promoter declaration: Form B declaration for MARUTHI NAGAR II, including the promoter’s stated completion undertaking and RERA-account obligations.
Building commencement / occupancy certificates: No building-specific commencement certificate, completion certificate or occupancy certificate is supplied. The document labelled “Commencement Certificates for each building in each phase” is extracted as a tentative layout-plan approval.
The supplied evidence supports a project profile based on the RERA registration and filed layout materials. It does not include independent site-verification records or a certificate establishing completion of the layout works.
Frequently asked questions
Is MARUTHI NAGAR II registered with Telangana RERA?
Yes. MARUTHI NAGAR II is registered with the Telangana Real Estate Regulatory Authority as P01300011044; the registration status is New Project.
Who is the developer of MARUTHI NAGAR II?
The promoter named in the RERA registration is KADAVERGU.
Where is MARUTHI NAGAR II located?
MARUTHI NAGAR II is in SIDDIPET URBAN, MITTAPALLY, SIDDIPET (URBAN), Siddipet, Telangana (502375).
When will MARUTHI NAGAR II be completed?
The promoter's proposed date of completion filed with RERA is 02/01/2028. This is the promoter's declaration, not a guarantee.
More projects in Mittapally