URBAN HEIGHTS is a residential apartment project in MITTAPALLY, SIDDIPET (URBAN), Siddipet district, developed by registered promoter M/s. FUTURE INFRATECH, represented by KOLAN NARSIMHA GOUD. The project covers 2430.38 sq.m. and comprises two residential blocks, BLOCK-A and BLOCK-B, each with 1 Stilt + 5 Floors, and 45 apartments: 25 2BHK and 20 3BHK. Its TG-RERA registration number is P01300010679, and the project information records a proposed completion date of 27/01/2029.

01What we found

RegisteredTG-RERA - valid till 27 Sep 2028
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Mittapally, Siddipet, Siddipet · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameURBAN HEIGHTS RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the supplied record; registration covers the project at the stated site RERA record
TG-RERA registrationP01300010679 RERA record
Registration validity27/09/2025–27/09/2028 RERA record
Registered promoterM/s. FUTURE INFRATECH, represented by KOLAN NARSIMHA GOUD RERA record
TG-RERA statusRegistered; the certificate states a three-year validity period, subject to the Act and Rules
Proposed completion date recorded in project information27/01/2029 RERA record
Promoter’s Form B completion undertaking27/09/2028

Land and geographic identity

FieldProject record
LocalityMITTAPALLY; the building-permit record also describes the site as Mittapally (Part), Old G.P. Rangdhampally, now merged in Siddipet Municipality RERA record
Revenue villageMittapally (also recorded as MITTAPALLY) RERA record
Mandal / district / PINSIDDIPET (URBAN), Siddipet, 502375 RERA record
Project survey number and subdivision1037/C2; the permit extraction also renders it as 1037/c2 RERA record
Other survey references in the filed plan instrument1037/^C2, 1037/2, 1038, 1037, 1036/1
Registered site extent2430.38 sq.m. RERA record
Net / total area in permit recordPlot area 2430.38 sq.m.; net plot area 2430.38 sq.m.; road-affected area 0 and NALA-affected area 0
Boundary detailsEast: LAND LORS LAND; west: 30FT WIDE ROAD; north and south: NEIGHBOURS LAND RERA record

Development identity

FieldProject record
Sanctioning authoritySiddipet Municipality; the permit is a building permit order
Principal building approval0012/SIDD/SWBP/2025, dated 27/09/2025
Related file number003358/SIDD/00010/SWBP/2025-REV
Approved built-up area5693.8 sq.m., excluding and including parking as stated in the plan extraction
BuildingsTwo residential blocks: BLOCK-A and BLOCK-B
Sanctioned floor configurationEach block: 1 Stilt + 5 Floors
Parking provision recorded in plan extractionTotal parking area 1147.73 sq.m.; car parking spaces 4.00; two-wheeler spaces 0.00; visitor parking area proposed 127.27 sq.m.
Unit countBuilding permit: 45 dwelling units; TG-RERA unit record: 45 units (25 2BHK and 20 3BHK) RERA unit table

Offering and status

FieldProject record
Configurations2BHK and 3BHK apartments RERA unit table
TG-RERA saleable areas2BHK: 141.01 sq.m.; 3BHK: 181.65 sq.m. RERA unit table
Booked / available2BHK: 0 booked / 25 available; 3BHK: 0 booked / 20 available. Portal counts are indicative because the record has no as-of date. RERA unit table
Construction stageNo project-specific construction progress or independently verified site status is supplied. RERA record RERA amenities
Completion dateProject information records 27/01/2029; Form B and the building permit record state 27/09/2028. RERA record
Occupancy certificate (OC)No OC is identified in the supplied project documents; the building permit requires an OC before occupation. Scope: the two permitted blocks.

Registration validity, the stated completion dates and OC status are separate matters: the registration certificate runs through 27/09/2028, the project information field gives 27/01/2029, and the supplied record does not identify an OC. RERA record

2. The project story

URBAN HEIGHTS is registered as a residential apartment development in Mittapally, Siddipet (Urban), Siddipet district. The registered site is 2430.38 sq.m. in Survey No. 1037/C2, and the building permit describes two blocks, each with a stilt level and five floors. The permit records 45 dwelling units in total; the TG-RERA unit schedule identifies 25 two-bedroom and 20 three-bedroom apartments. RERA record RERA unit table

The project record establishes permission and registration, but does not establish how much construction has been completed. The supplied RERA amenity progress entries are all at 0%, and no independently verified site inspection or OC is included. The permit requires a completion notice and occupancy certificate before occupation. RERA amenities

3. Master plan, architecture & building design

The filed permit describes residential use only. It records two blocks—BLOCK-A and BLOCK-B—each configured as 1 Stilt + 5 Floors. The approved built-up area is recorded as 5693.8 sq.m.; the permit extraction separately gives residential upper-floor areas of 3063.75 sq.m. for BLOCK-A and 2630.05 sq.m. for BLOCK-B.

The plan extraction records a proposed coverage area of 1250.84 sq.m. (51%) and vacant plot area of 1146.9 sq.m.; it also records a total parking area of 1147.73 sq.m. The permit lists a Tot Lot area of 0 sq.m. No floor-by-floor architectural drawings or reliable measurements of flat distribution by floor, lifts, stairs, entrances, internal circulation or landscaping layout are supplied for description here.

The plan extraction records heights for BLOCK-B as 17.7 m proposed and 19.7 m total, and for the overall building information gives 17.7 m from ground level and 14.9 m excluding stilt. These are plan-extraction figures, not independently measured site heights.

4. Homes, configurations & floor plans

TG-RERA records 45 apartments: 25 2BHK and 20 3BHK. The saleable areas below are the RERA-filed figures. Separately, software measurement of supplied floor-plan drawings estimates carpet-area ranges; those measurements are not RERA disclosures and are flagged for review. Saleable area and carpet area are different measures: saleable area includes a share of common areas, while the drawing-based carpet measurement is smaller. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK25025141.01 sq.m.63.2–95.0 sq.m.; median 84.5 sq.m.40%
3BHK20020181.65 sq.m.111.6–126.3 sq.m.; median 122.0 sq.m.33%

Drawing-based measurements cover 30 measured 2BHK designs and 15 measured 3BHK designs; all are marked as needing review. The supplied room extraction for one 2BHK drawing identifies bedrooms, hall, dining/kitchen, toilets and balconies. For one 3BHK drawing it identifies bedrooms, hall, kitchen, toilets, foyer, dress and puja areas. These examples describe measured drawing content, not a guarantee that every unit has the same arrangement. Floor plans RERA unit details

5. Parking & vehicle circulation

The plan extraction records 1147.73 sq.m. of total parking area, 4.00 car parking spaces, 0.00 two-wheeler spaces, and proposed visitor parking area of 127.27 sq.m. It also records required parking area of 1138.76 sq.m. and required visitor parking area of 113.88 sq.m.

The permit states that approved stilt parking must be used exclusively for vehicle parking and not partitioned or converted to another use. It also includes a requirement for EV-charging infrastructure in parking places. No unit-by-unit parking allocation, accessible-parking count, ramp or driveway details, or completed EV-charging provision is established by the supplied evidence.

6. Amenities, recreation & open spaces

The RERA amenity schedule records listed facilities but shows 0% progress for every entry. This is a filed progress status, not independent confirmation of construction or delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsListed; no size suppliedRERA amenities0%; not independently verified
Green Strip / Tot Lot / ParkListed; no size supplied; permit records Tot Lot area as 0 sq.m.RERA amenities0%; not independently verified
Community BuildingsListed; no size suppliedRERA amenities0%; not independently verified
Water Conservation / Rainwater HarvestingListed; permit specifies 4 rainwater-harvesting pitsRERA amenities0%; not independently verified
Street LightingListed; no size suppliedRERA amenities0%; not independently verified

No project-specific clubhouse or indoor/sports facility is established in the RERA amenity schedule supplied for this report.

7. Utilities, building services & safety

The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and electrical meter room/sub-station/receiving station. Each entry has 0% recorded progress; the schedule does not provide capacities, system designs or evidence of completed operation. RERA amenities

The building permit requires a transformer space, garbage house, rainwater-harvesting structure and fire-fighting installation, and includes EV-charging infrastructure and digital-connectivity provisions. It states that an occupancy fire NOC is required before an OC and that sanitation, plumbing, fire safety, lifts and electrical installations are to be supervised by qualified technical personnel. These are approval conditions, not evidence that the systems have been installed or certified.

No water source or storage capacity, STP capacity or reuse scheme, electrical backup capacity, lift count/capacity, CCTV/access-control specification, or accessibility design is established by the supplied project records.

8. Location, access & connectivity

The registered location is MITTAPALLY, SIDDIPET (URBAN), Siddipet district, PIN 502375. The filed permit describes Mittapally (Part), Old G.P. Rangdhampally, now merged in Siddipet Municipality. The site boundary information records a 30FT WIDE ROAD on the west. RERA record

The project parcel centroid is supplied as 18.085798130728403 latitude, 78.86246958240397 longitude. A sampled nearest Outer Ring Road interchange is listed at approximately 64.9 km; no other verified project-specific access or public-transport distances are supplied. Location record Cadastral map

9. Developer & development status

The registered promoter is M/s. FUTURE INFRATECH, an entity identified as a partnership, with GSTIN 36AAKFF5255C1ZJ. The RERA record names KOLAN NARSIMHA GOUD as authorised signatory. The supplied promoter address is VLR HEIGHTS, PRIYADARSHANI NAGAR, MITTAPALLY, SIDDIPET (URBAN), Siddipet, 502375. RERA record Corporate record Parties record

The project filing identifies three landowners—Y SATISH, Y YADAGIRI and Y SRINIVAS—and records an area-share development arrangement. The available material does not establish a construction-progress percentage or a verified site-completion status. The promoter’s Form B declares a completion date of 27/09/2028; the project information field records 27/01/2029. Parties record RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationCertificate for URBAN HEIGHTS, registration P01300010679, valid 27/09/2025–27/09/2028
Building permitSiddipet Municipality permit 0012/SIDD/SWBP/2025, dated 27/09/2025; file 003358/SIDD/00010/SWBP/2025-REV
Building configuration and land areaPermit records 2430.38 sq.m., BLOCK-A and BLOCK-B, each 1 Stilt + 5 Floors, and 45 dwelling units
Mortgage deed reference in permitMortgage Deed 3336/2025, dated 16/05/2025; permit records 609.76 sq.m. of fifth-floor mortgage area in favour of the Commissioner, Siddipet Municipality
Promoter declarationForm B affidavit by KOLAN NARSIMHA GOUD for M/s. FUTURE INFRATECH, dated 06/02/2026
Approved-plan filingBuilding-plan approval record with file number 003358/SIDD/00010/SWBP/2025-REV; the supplied extraction includes plan parameters and conditions
Occupancy/completion evidenceNo occupancy or completion certificate is identified in the supplied documents; the permit requires an OC before occupation

Frequently asked questions

Is URBAN HEIGHTS registered with Telangana RERA?

Yes. URBAN HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P01300010679; the registration status is New Project.

Who is the developer of URBAN HEIGHTS?

The promoter named in the RERA registration is M/s. FUTURE INFRATECH.

Where is URBAN HEIGHTS located?

URBAN HEIGHTS is in MITTAPALLY, SIDDIPET (URBAN), Siddipet, Telangana (502375).

When will URBAN HEIGHTS be completed?

The promoter's proposed date of completion filed with RERA is 27/01/2029. This is the promoter's declaration, not a guarantee.