KRISHNA BAI RESIDENCY is a residential apartment project in PEERZADIGUDA, Medipally Mandal, Medchal-Malkajgiri District, developed by registered promoter SHIVA KRISHNA CONSTRUCTIONS. The project covers 3,992.13 sq. m. and comprises one building with 1 Cellar + 1 Stilt + 5 upper floors, containing 80 apartments: 50 2BHK and 30 3BHK. It is registered under TG-RERA registration P02200005385, with a proposed completion date of 16/07/2025.

01What we found

Period endedTG-RERA registration ran to 16 Jul 2025 - check its extension on TG-RERA
19documents on file - each fact links to its page
2court cases on this project's land (survey 79, Peerjadiguda)
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.inPhoto from housing.com
▦ View all 2 photos
Peerjadiguda, Medipally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameKRISHNA BAI RESIDENCY
Project typeResidential apartment project RERA record
Phase / registered portionNot identified as a separate phase; the registration describes this project. RERA record
TG-RERA registrationP02200005385
Registration validity25/11/2022 to 16/07/2025, unless extended by the Authority. A later extension is not evidenced in the supplied record.
Registered promoterSHIVA KRISHNA CONSTRUCTIONS; partnership RERA record Corporate record
Current RERA statusThe supplied certificate records the above validity dates; the project record labels it “New Project.” Current registration status beyond the recorded end date is not established by the supplied evidence. RERA record

Land and geographic identity

ItemProject record
Locality / revenue villagePEERZADIGUDA / Peerjadiguda RERA record Land records
MandalMedipally RERA record Land records
DistrictMedchal-Malkajgiri RERA record Land records
PIN500039 RERA record
Project survey numbers78/PART and 79/PART. The filing does not identify a more specific subdivision for either project survey. RERA record Land records
Site extent3,992.13 sq. m. recorded as total and net area; affected area is recorded as 0 sq. m. RERA filing
Boundaries in RERA filingNorth: 30FT ROAD AND SY NO 78; South: SY NO 79; East and West: NEIGHBOURS LAND. RERA filing

Development identity

ItemProject record
Sanctioning authority / principal approvalHyderabad Metropolitan Development Authority (HMDA), technical building approval 005287/BP/HMDA/0766/GHT/2021, dated 16 July, 2022. Approvals record
Municipal building-permission recordA filed technical approval/release record names Peerzadiguda Municipal Corporation; its extracted approval number and date are OCR-unclear.
Approved built-up area13,263.8 sq. m. stated in the approval extraction. The same extracted approval also lists “Proposed Built-up Area 8,894.95”; the approval record does not clarify the relationship between these two figures in the supplied extract.
Building count / floorsOne building is recorded in the RERA filing. The sanctioned configuration is 1 Cellar + 1 Stilt + 5 upper floors. RERA filing
Parking levelsCellar and stilt are designated for vehicle parking in the approval conditions; no number of parking spaces is established in the supplied record.
Unit counts80 total units in the filing: 50 2BHK and 30 3BHK. RERA unit table RERA unit details

Offering and status

ItemProject record
Configurations2BHK and 3BHK apartments. RERA unit table RERA unit details
RERA-filed saleable area2BHK: 33.4 sq. m.; 3BHK: 57.1 sq. m. RERA unit details
Booked / availablePortal-read counts show 0 booked and 50 available 2BHK units; 0 booked and 30 available 3BHK units. The supplied booking record has no as-of date, so these counts are indicative. RERA unit table RERA unit details
Construction stageNo independently verified site-progress or completion-stage evidence is supplied. The RERA record carries the promoter’s proposed completion date; that is not proof of construction completion. RERA record
Completion datePromoter’s Form B states completion by 16/07l2025; the project header records proposed completion as 16/07/2025. No revised completion date is evidenced. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is evidenced in the supplied project documents. The building approval requires a completion notice and occupancy certificate before occupation.

2. The project story

KRISHNA BAI RESIDENCY is registered as a residential apartment project on land identified in the RERA filing as Survey Nos. 78/PART and 79/PART, at Peerjadiguda, Medipally Mandal, Medchal-Malkajgiri District. The recorded site extent is 3,992.13 sq. m. RERA record Land records RERA filing

The approval record describes one residential building with a cellar, stilt and five upper floors. The RERA unit schedule lists 80 apartments—50 2BHK and 30 3BHK. The filed booking figures show no units booked, but are undated and should be treated as indicative rather than a live sales position. RERA unit table RERA unit details

The promoter declared a completion date of 16/07/2025. The supplied evidence does not establish current construction progress, completion, or an occupancy certificate; the approval’s requirement to obtain an occupancy certificate is a condition, not evidence that one has been issued.

3. Master plan, architecture & building design

The filed site area is 3,992.13 sq. m. The HMDA approval extraction records an approved built-up area of 13,263.8 sq. m. and also lists a proposed built-up area of 8,894.95; the supplied extract does not explain how those figures relate. The approved building form is one residential building comprising 1 Cellar + 1 Stilt + 5 upper floors, with a stated height of 14.75. RERA filing

The approval calls for no parking or construction in setback areas and specifies that the cellar and stilt be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied material does not establish the building footprint, number of apartments per floor, lift or stair arrangements, entrances, internal circulation, landscaped area, or residential/common-area breakdown.

Four floor-plan drawings are listed, but all four remain unmeasured/scans pending in the supplied measurement record. No software-measured room or carpet-area figures are therefore available. RERA unit details

4. Homes, configurations & floor plans

The following are the TG-RERA-filed unit counts and saleable areas. The portal booking counts have no supplied as-of date. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK5005033.4 sq. m.Not measuredNot supplied
3BHK3003057.1 sq. m.Not measuredNot supplied

The four listed floor-plan drawings have not been measured. Accordingly, no drawing-based room dimensions, balcony or utility measurements, or software-measured carpet areas can be reported. Carpet area, saleable area and any share of common areas are distinct measures; no loading figure is supplied for this project. RERA unit details

5. Parking & vehicle circulation

The HMDA approval specifies the cellar and stilt for vehicle parking and states that these areas are to be used exclusively for parking. It also prohibits parking or construction in setback areas. The approval extraction lists a mortgage area of 930.03 sq. m.; this is not a count of parking spaces.

No sanctioned parking-space count, resident or visitor allocation, accessible-space provision, two-wheeler count, mechanical-parking provision, ramp arrangement, EV charging provision, or unit-specific parking allocation is established in the supplied evidence. A project-wide or unit-level parking entitlement cannot be determined from the available record. Document index

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 project amenities. Each has a recorded progress percentage of 0; this is a portal declaration and does not independently verify construction or delivery. The approval separately lists certain required provisions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not suppliedRERA amenities0%; not independently verified
Water SupplyDetails not suppliedRERA amenities0%; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Details not suppliedRERA amenities0%; not independently verified
Storm Water DrainsDetails not suppliedRERA amenities0%; not independently verified
Green Strip/TOT LOT/ParkSize not suppliedRERA amenities0%; not independently verified
Street LightingDetails not suppliedRERA amenities0%; not independently verified
Community BuildingsDetails not suppliedRERA amenities0%; not independently verified
Treatment And Disposal Of Sewage And Sullage WaterDetails not suppliedRERA amenities0%; not independently verified
Solid Waste Management And DisposalDetails not suppliedRERA amenities0%; not independently verified
Water Conservation, Rain water HarvestingApproval records call for rainwater-harvesting provision; no size or capacity suppliedRERA amenitiesRERA entry: 0%; approval condition is not proof of installation
Energy managementDetails not suppliedRERA amenities0%; not independently verified
Fire Protection And Fire Safety RequirementsDetails not suppliedRERA amenities0%; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationDetails not suppliedRERA amenities0%; not independently verified
Aggregate area of recreational Open SpaceArea not suppliedRERA amenities0%; not independently verified

7. Utilities, building services & safety

The RERA amenity list includes water supply, sewerage and sewage treatment, storm-water drains, solid-waste management, energy management, fire-safety requirements, electrical-meter/substation/receiving-station provision, and rainwater harvesting. The approval records call for an STP, transformer, garbage house and rainwater-harvesting structures; the municipal approval extraction also refers to a percolation pit. These are listed provisions or approval requirements, not verified completed facilities. RERA amenities

The supplied evidence does not specify water source or storage capacity, STP capacity or reuse arrangements, storm-water or drainage design, electrical supply or backup capacity, lift provision, fire-system details, escape-stair arrangements, CCTV installation status, waste-segregation arrangements, security systems, or accessibility features. The HMDA approval requires following Fire Service department norms and installing CCTV, but the record does not establish their installation or statutory clearance.

8. Location, access & connectivity

The registered location is Peerjadiguda, Medipally Mandal, Medchal-Malkajgiri District, PIN 500039; the RERA filing records the locality as PEERZADIGUDA. The site boundary schedule identifies a 30FT ROAD AND SY NO 78 to the north. The building-approval extraction refers to a 4.5mts road width and a minimum approach-road width indicated in the plan; the supplied extract does not identify the route or establish its current condition. RERA record RERA filing

The supplied location record lists these distances: nearest metro, Uppal, 3.7 km; State Bank of India, 0.3 km; Uppal bus station, 2.8 km; Gyan Jyothi College of Pharmacy, 0.4 km; Anitha Nursing Home, 0.4 km; Sareenikethan Shopping Mall, 0.3 km; an unnamed park, 0.6 km; and Sri Chaitanya High School, 0.9 km. These are recorded location data; no travel times are supplied. Location record

9. Developer & development status

The registered promoter is SHIVA KRISHNA CONSTRUCTIONS, identified in the RERA record as a partnership firm. The corporate identifier supplied is GSTIN 36AEQFS6443F1ZM. The partnership deed identifies Dubbaka Rajesh as managing partner and authorised signatory. Corporate record

The promoter’s Form B is an affidavit-cum-declaration by Dubbaka Ramesh for the project. It declares a completion date of 16/07l2025 and states that the land is free from encumbrances; these are promoter declarations, not independent verification.

The RERA certificate gives the registration period as 25/11/2022 to 16/07/2025. The supplied record does not establish a subsequent extension, current construction progress, or an issued occupancy/completion certificate. The certificate lists a promoter-office PIN of 500088, while the project location is recorded as PIN 500039. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Supplied evidenceRegistration No. P02200005385, Form C, issued 25/11/2022; validity stated to 16/07/2025.
What it establishesRegistration details and stated validity period.
HMDA technical building approval
Supplied evidenceApproval No. 005287/BP/HMDA/0766/GHT/2021, dated 16 July, 2022.
What it establishesApproval record for a residential building on Survey Nos. 78/PART and 79/PART, subject to listed conditions.
Municipal technical approval/release
Supplied evidenceFiled document names Peerzadiguda Municipal Corporation; extracted approval number/date are OCR-unclear.
What it establishesA municipal building-permission record is present; exact identifier and date cannot be reliably read from the supplied extraction.
Promoter Form B declaration
Supplied evidenceDeclaration in Form B by Dubbaka Ramesh for SHIVA KRISHNA CONSTRUCTIONS.
What it establishesPromoter declarations and completion undertaking.
Title-search report and title documents
Supplied evidenceAdvocate title report and related title documents are listed, including and.
What it establishesThese are project-filed title materials; their detailed title assessment is addressed in the Land & Title section.
Occupancy / completion certificate
Supplied evidenceNo such certificate supplied. Document index
What it establishesThe available record does not establish that an occupancy or completion certificate has been issued.

The supplied approval conditions include an occupancy-certificate requirement before occupation and directions concerning parking, rainwater harvesting, STP, transformer, garbage-house provision and fire-service norms. This index does not establish that those conditions have been completed or independently certified.

Frequently asked questions

Is KRISHNA BAI RESIDENCY registered with Telangana RERA?

Yes. KRISHNA BAI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200005385; the registration status is New Project.

Who is the developer of KRISHNA BAI RESIDENCY?

The promoter named in the RERA registration is SHIVA KRISHNA CONSTRUCTIONS.

Where is KRISHNA BAI RESIDENCY located?

KRISHNA BAI RESIDENCY is in PEERZADIGUDA, Peerjadiguda, Medipally, Medchal-Malkajgiri, Telangana (500039).

When will KRISHNA BAI RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 16/07/2025. This is the promoter's declaration, not a guarantee.