Skyline Orchid
VUPPALA · Rangareddy · RERA P02400010713
SKYLINE ORCHID is a residential apartment project in Adibatla, Ibrahimpatnam Mandal, Ranga Reddy District, developed by registered promoter VUPPALA VENKATESH. The registered site extent is 6,085.4 sq.m, and the project comprises one residential building with 2 Cellars + 1 Stilt + 14 upper floors. It offers 2BHK and 3BHK apartments; the RERA filing records 191 units. The project is registered under TG-RERA P02400010713, with completion proposed by 27 February 2031.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SKYLINE ORCHID RERA record |
| Project type / registered portion | Residential apartment project; the registration record identifies one building. No separate phase name or phase-wise registration scope is disclosed. RERA record RERA filing Land records |
| TG-RERA registration | P02400010713; Form C records registration under section 5. RERA record |
| Registration validity | 27 February 2026 to 27 February 2031; no extension is recorded in the supplied certificate. This is the registration period, not an occupancy certificate. RERA record |
| Registered promoter | VUPPALA VENKATESH (the certificate names VUPPALA VENKATESH; the filing identifies promoter VUPPALA). Legal entity type is not supplied. Corporate record |
| RERA status | Registered; the supplied Form C certificate was issued 7 April 2026. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Adibatla; the sanctioned plan describes the site as Adibatla Village. RERA record |
| Mandal / district / PIN | Ibrahimpatnam / Ranga Reddy / 501510. RERA record RERA filing |
| Project survey numbers and subdivisions | 120/1/1/1/1/1/1/1/1; 121 AA; 121 AA/1. RERA record Land records |
| Registered site extent | 6,085.4 sq.m total/gross plot area; 107.01 sq.m is identified as road-affected area; net plot area is 5,978.39 sq.m. RERA filing |
| Boundaries in the RERA filing | East: existing road; West: existing road; North: other land; South: existing road. RERA filing |
| Plan identifier | 004126/HMDA/01206/SWBP/SHZ/2025. RERA record Approvals record |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority / principal sanction | HMDA; building permit file 004126/HMDA/01206/SWBP/SHZ/2025, dated 27 February 2026. Approvals record |
| Subsequent permit record | GHMC permit/proceedings 1787/HMDA/SWBP/2026, dated 17 March 2026; the supplied record says it records HMDA technical approval and releases plans and proceedings. Approvals record |
| Building count / configuration | One residential building: 2 Cellars + 1 Stilt + 14 upper floors; the plan identifies the 13th and 14th floors as TDR floors. RERA filing |
| Building height | The supplied plan states 46.74 m total height and 40.74 m excluding stilt. |
| Approved built-up area | The filing records approved built-up area of 35,748.37 sq.m. The plan separately labels 25,391.02 sq.m as proposed BUA excluding parking and gives other BUA labels; those categories are not interchangeable. RERA filing |
| Parking provision | The plan lists 237.00 car parking spaces and 9,814.91 sq.m proposed parking area. It does not list two-wheeler spaces. |
| Unit count | The RERA filing records 191 units; the sanctioned plan records 192 dwelling units. The scope of that difference is not analysed here. RERA unit table |
Offering and status
| Field | Record |
|---|---|
| Configurations | 2BHK and 3BHK apartments. RERA unit table |
| RERA-filed saleable area | 2BHK: 125.42–126.24 sq.m; 3BHK: 156.08 sq.m. RERA unit table |
| Booked / available | Portal figures read as 0 booked and 191 available: 124 2BHK and 67 3BHK. The portal record supplies no as-of date, so these figures are indicative rather than a live availability confirmation. RERA unit table |
| Construction stage | The project is described as new; no independently verified on-site construction progress is supplied. RERA record |
| Completion deadline | Promoter’s Form B undertaking states completion by 27 February 2031. The permit record also states construction to be completed before 27 February 2031. |
| Original / revised dates | No separate original-versus-revised completion history is supplied. RERA record |
| Occupancy / completion certificate | No OC or completion certificate is supplied; the permit is for proposed construction and makes OC a later requirement. |
2. The project story
SKYLINE ORCHID is a registered residential apartment development at Adibatla Village, Ibrahimpatnam Mandal, Ranga Reddy District, on the three survey descriptions listed above. The sanctioned plans show one residential building with two cellar levels, a stilt and 14 upper floors. The plan characterises the 13th and 14th floors as TDR floors. RERA record
The RERA record offers 2BHK and 3BHK configurations. It records 191 units in total, while the sanctioned plan states 192 dwelling units; the figures are presented as recorded, without resolving the difference. RERA unit table
The record is for a new project, and the building permit is for proposed construction. No independent site inspection or verified construction-progress evidence is supplied. The promoter’s Form B and the permit state a completion deadline of 27 February 2031. The supplied documents do not establish that the building, any floor, or any unit is complete or occupancy-certified. RERA record
3. Master plan, architecture & building design
The sanctioned plan gives a gross plot area of 6,085.4 sq.m, identifies 107.01 sq.m as road-affected, and records a net plot area of 5,978.39 sq.m. It lists proposed coverage of 2,113.99 sq.m (35%) and vacant plot area of 3,833.82 sq.m. These are plan figures, not measurements of completed works.
The approved scheme is one residential building, with 2 Cellars + 1 Stilt + 14 upper floors. The sanctioned drawing identifies a RESIDENTIAL BUILDING and lists 2,113.99 sq.m at the building anchor. The plan’s area schedule distinguishes 25,391.02 sq.m proposed BUA excluding parking from 35,748.37 sq.m proposed BUA including parking. The permit extraction also contains a separate gross BUA figure of 36,602.76 sq.m; these labels are retained as stated and should not be treated as the same measurement.
The plan records 36.0 m as the building road width and shows road-width labels including 18 m and 36 m. It provides for periphery green strips and three tot-lots, and identifies service features including STP, a transformer space, garbage facilities, rainwater harvesting, creche, indoor games, yoga, gym and multipurpose hall. The supplied material does not establish the completed layout of circulation, lift or stair cores, or the delivered condition of these facilities.
The approved plan’s conditions include maintaining the tot-lot as greenery, providing rainwater-harvesting structures and transformer space, and keeping the cellars and stilt for parking. They also require an occupancy certificate before occupation. These are approval conditions, not evidence that the works are complete.
4. Homes, configurations & floor plans
RERA-filed saleable areas and unit counts are shown below. The separate carpet-area figures come from software measurement of the approved floor-plan drawing, not from a RERA carpet-area disclosure; the drawing-based measurements are flagged as needing review. Saleable area and carpet area are different measures: the supplied floor-plan analysis says saleable area also includes the home’s share of common areas. Balconies and utility areas shown on the drawing are excluded from the measured carpet area. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 124 | 0 | 124 | 125.42–126.24 sq.m | 63.8–71.7 sq.m; median 65.1 sq.m (software-measured) | 48% |
| 3BHK | 67 | 0 | 67 | 156.08 sq.m | 76.3–86.3 sq.m; median 82.5 sq.m (software-measured) | 47% |
The drawing analysis measured 43 2BHK and 23 3BHK flat designs from the approved plan. One illustrated 2BHK includes living, dining, kitchen, two bedrooms, two toilets and three balcony/open-to-air balcony spaces. One illustrated 3BHK includes living/dining, kitchen, bedrooms, three toilets, utility area and balcony/open-to-air balcony spaces. Room dimensions are not complete across all rooms in the supplied measurements; these examples should therefore be checked against the drawing before relying on them for a particular unit. RERA unit details Floor plans
5. Parking & vehicle circulation
The sanctioned plan records 237.00 car parking spaces and a proposed parking area of 9,814.91 sq.m. It also gives a visitor-parking area of 542.44 sq.m (10.53%). The permit record states that the cellars and stilt approved for parking are to be used exclusively for vehicle parking. No sanctioned two-wheeler-space count or RERA-filed unit-by-unit parking allocation is supplied.
The brochure describes “3 Level Parking,” but that is a promoter-marketed claim and does not establish a specific unit’s parking entitlement. A parking bay shown or counted in a plan does not, by itself, establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
The RERA portal lists 14 project infrastructure items, each with 0% progress in the supplied record. That is the reported portal status, not an independent site verification. The sanctioned plan also lists the facilities below. RERA amenities
| Description / size | Three listed areas: 249.01 sq.m, 322.8 sq.m and 50.77 sq.m; the permit also gives aggregate tot-lot area of 622.57 sq.m. |
|---|---|
| Evidence source | Sanctioned plan / permit |
| Declared progress / verified status | Proposed in plan; no independent completion verification. RERA portal’s Green Strip/TOT LOT/Park entry: 0%. |
| Description / size | Four listed areas: 130.75 sq.m, 156.51 sq.m, 152.99 sq.m and 96.83 sq.m. |
|---|---|
| Evidence source | Sanctioned plan |
| Declared progress / verified status | Proposed in plan; no independent completion verification. |
| Description / size | Facility named in the plan; no size supplied. |
|---|---|
| Evidence source | Sanctioned plan |
| Declared progress / verified status | Proposed; no progress or completion evidence supplied. |
| Description / size | Named in the plan; no sizes or capacities supplied. |
|---|---|
| Evidence source | Sanctioned plan |
| Declared progress / verified status | Proposed; no progress or completion evidence supplied. |
| Description / size | RERA portal lists community buildings; no size or description supplied. |
|---|---|
| Evidence source | RERA portal |
| Declared progress / verified status | Portal progress 0%; no independent completion verification. |
| Description / size | Promoter-marketed features; brochure says the swimming pool is to be constructed after OC. |
|---|---|
| Evidence source | Brochure |
| Declared progress / verified status | Marketing claims only; no sanctioned or delivered status established here. |
7. Utilities, building services & safety
The RERA portal marks water supply, sewerage/treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection and safety, electrical meter room/substation/receiving station, and street lighting as available; each listed item has 0% progress in the supplied record. “Available” is a portal entry, not independent evidence of operational or completed services. RERA amenities
The permit and plan identify an STP/sewerage network plan, 11 rainwater-harvesting pits, space for a transformer, garbage facilities and 290 trees. These are approval/document disclosures; the materials do not give water sources or storage capacities, STP capacity, generator capacity, lift count or capacity, fire-system equipment specifications, or accessible-route details.
Permit conditions require fire-fighting installations and safety/means-of-escape provision, and specify that an occupancy fire NOC is to be obtained before issue of an OC. The plan also states that parking places are to have EV-charging infrastructure and that specified digital-connectivity infrastructure is required for OC. These conditions do not establish installation or compliance at the site.
The brochure markets lifts, generator backup, CCTV and round-the-clock security; these are not treated as sanctioned or delivered facilities in this Overview.
8. Location, access & connectivity
The registered location is Adibatla, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana, PIN 501510. The sanctioned plan identifies the site on the project survey numbers and shows existing roads on the east, west and south boundaries in the RERA land details. RERA record RERA filing RERA filing
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 0.9 km. This is a database distance from the location record; no travel time or public-transport information is supplied. Location record
9. Developer & development status
The TG-RERA certificate identifies VUPPALA VENKATESH as promoter; the project header records the promoter as VUPPALA. The supplied data does not identify the legal entity type, corporate registration number, registered office, official promoter contact details or official website. Corporate record
The permit names the landowners as applicants represented by their DAGPA holder, Vuppala Venkatesh, and identifies VENKATESHWARA ENTERPRISES, represented by Venkatesh Vuppala, as developer/builder. The RERA-filed supplementary clarification says the residential portion is allocated to the developer and the commercial building portion to the landowners; it states there is no sharing of residential flats.
The project is recorded as new, with no independently verified construction-progress report supplied. The promoter’s Form B undertakes completion by 27 February 2031. No OC or completion certificate is present in the supplied project documents. RERA record
10. Approvals, official records & documents
| Identifier / date | P02400010713; issued 7 April 2026; valid 27 February 2026–27 February 2031 |
|---|---|
| What the supplied record establishes | Registration of SKYLINE ORCHID under section 5 and the stated validity period. |
| Identifier / date | File 004126/HMDA/01206/SWBP/SHZ/2025; dated 27 February 2026 |
|---|---|
| What the supplied record establishes | Sanctioned building plan for the proposed residential apartment building on the stated survey numbers. |
| Identifier / date | 1787/HMDA/SWBP/2026; dated 17 March 2026 |
|---|---|
| What the supplied record establishes | Permit record stating HMDA technical approval, with building-plan and project conditions. |
| Identifier / date | 1778/2026; 4 February 2026 |
|---|---|
| What the supplied record establishes | The supplied permit record describes a mortgage of built-up area on the first, second and third floors. |
| Identifier / date | 1777/2026; 4 February 2026 |
|---|---|
| What the supplied record establishes | Permit record says 107.01 sq.m of road-affected land was handed over to the Deputy Commissioner, Adibatla Circle. |
| Identifier / date | JNTU/CEH/CIVIL/PC/11292/2026; 23 February 2026 |
|---|---|
| What the supplied record establishes | Cited in the building permit record. |
| Identifier / date | SEIAA file SIA/TG/INFRA2/551076/2025 |
|---|---|
| What the supplied record establishes | Cited in the building permit record; this Overview does not independently verify the clearance or its scope. |
| Identifier / date | Form B; completion undertaking 27 February 2031 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, separate-account obligations and completion timeline. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The permit describes OC and completion notice as requirements after construction; no project OC is established by the supplied documents. |
The HMDA DPMS approved-layout lookup is recorded as unavailable through the public channel described in the supplied data; that limitation is not evidence of approval refusal. HMDA
1. Project at a glance
Project identity
Registered project name: SKYLINE ORCHID
Project type / registered portion: Residential apartment project; the registration record identifies one building. No separate phase name or phase-wise registration scope is disclosed.
TG-RERA registration: P02400010713; Form C records registration under section 5.
Registration validity: 27 February 2026 to 27 February 2031; no extension is recorded in the supplied certificate. This is the registration period, not an occupancy certificate.
Registered promoter: VUPPALA VENKATESH (the certificate names VUPPALA VENKATESH; the filing identifies promoter VUPPALA). Legal entity type is not supplied.
RERA status: Registered; the supplied Form C certificate was issued 7 April 2026.
Land and geographic identity
Locality / revenue village: Adibatla; the sanctioned plan describes the site as Adibatla Village.
Mandal / district / PIN: Ibrahimpatnam / Ranga Reddy / 501510.
Project survey numbers and subdivisions: 120/1/1/1/1/1/1/1/1; 121 AA; 121 AA/1.
Registered site extent: 6,085.4 sq.m total/gross plot area; 107.01 sq.m is identified as road-affected area; net plot area is 5,978.39 sq.m.
Boundaries in the RERA filing: East: existing road; West: existing road; North: other land; South: existing road.
Plan identifier: 004126/HMDA/01206/SWBP/SHZ/2025.
Development identity
Sanctioning authority / principal sanction: HMDA; building permit file 004126/HMDA/01206/SWBP/SHZ/2025, dated 27 February 2026.
Subsequent permit record: GHMC permit/proceedings 1787/HMDA/SWBP/2026, dated 17 March 2026; the supplied record says it records HMDA technical approval and releases plans and proceedings.
Building count / configuration: One residential building: 2 Cellars + 1 Stilt + 14 upper floors; the plan identifies the 13th and 14th floors as TDR floors.
Building height: The supplied plan states 46.74 m total height and 40.74 m excluding stilt.
Approved built-up area: The filing records approved built-up area of 35,748.37 sq.m. The plan separately labels 25,391.02 sq.m as proposed BUA excluding parking and gives other BUA labels; those categories are not interchangeable.
Parking provision: The plan lists 237.00 car parking spaces and 9,814.91 sq.m proposed parking area. It does not list two-wheeler spaces.
Unit count: The RERA filing records 191 units; the sanctioned plan records 192 dwelling units. The scope of that difference is not analysed here.
Offering and status
Configurations: 2BHK and 3BHK apartments.
RERA-filed saleable area: 2BHK: 125.42–126.24 sq.m; 3BHK: 156.08 sq.m.
Booked / available: Portal figures read as 0 booked and 191 available: 124 2BHK and 67 3BHK. The portal record supplies no as-of date, so these figures are indicative rather than a live availability confirmation.
Construction stage: The project is described as new; no independently verified on-site construction progress is supplied.
Completion deadline: Promoter’s Form B undertaking states completion by 27 February 2031. The permit record also states construction to be completed before 27 February 2031.
Original / revised dates: No separate original-versus-revised completion history is supplied.
Occupancy / completion certificate: No OC or completion certificate is supplied; the permit is for proposed construction and makes OC a later requirement.
2. The project story
SKYLINE ORCHID is a registered residential apartment development at Adibatla Village, Ibrahimpatnam Mandal, Ranga Reddy District, on the three survey descriptions listed above. The sanctioned plans show one residential building with two cellar levels, a stilt and 14 upper floors. The plan characterises the 13th and 14th floors as TDR floors.
The RERA record offers 2BHK and 3BHK configurations. It records 191 units in total, while the sanctioned plan states 192 dwelling units; the figures are presented as recorded, without resolving the difference.
The record is for a new project, and the building permit is for proposed construction. No independent site inspection or verified construction-progress evidence is supplied. The promoter’s Form B and the permit state a completion deadline of 27 February 2031. The supplied documents do not establish that the building, any floor, or any unit is complete or occupancy-certified.
3. Master plan, architecture & building design
The sanctioned plan gives a gross plot area of 6,085.4 sq.m, identifies 107.01 sq.m as road-affected, and records a net plot area of 5,978.39 sq.m. It lists proposed coverage of 2,113.99 sq.m (35%) and vacant plot area of 3,833.82 sq.m. These are plan figures, not measurements of completed works.
The approved scheme is one residential building, with 2 Cellars + 1 Stilt + 14 upper floors. The sanctioned drawing identifies a RESIDENTIAL BUILDING and lists 2,113.99 sq.m at the building anchor. The plan’s area schedule distinguishes 25,391.02 sq.m proposed BUA excluding parking from 35,748.37 sq.m proposed BUA including parking. The permit extraction also contains a separate gross BUA figure of 36,602.76 sq.m; these labels are retained as stated and should not be treated as the same measurement.
The plan records 36.0 m as the building road width and shows road-width labels including 18 m and 36 m. It provides for periphery green strips and three tot-lots, and identifies service features including STP, a transformer space, garbage facilities, rainwater harvesting, creche, indoor games, yoga, gym and multipurpose hall. The supplied material does not establish the completed layout of circulation, lift or stair cores, or the delivered condition of these facilities.
The approved plan’s conditions include maintaining the tot-lot as greenery, providing rainwater-harvesting structures and transformer space, and keeping the cellars and stilt for parking. They also require an occupancy certificate before occupation. These are approval conditions, not evidence that the works are complete.
4. Homes, configurations & floor plans
RERA-filed saleable areas and unit counts are shown below. The separate carpet-area figures come from software measurement of the approved floor-plan drawing, not from a RERA carpet-area disclosure; the drawing-based measurements are flagged as needing review. Saleable area and carpet area are different measures: the supplied floor-plan analysis says saleable area also includes the home’s share of common areas. Balconies and utility areas shown on the drawing are excluded from the measured carpet area.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 124 | 0 | 124 | 125.42–126.24 sq.m | 63.8–71.7 sq.m; median 65.1 sq.m (software-measured) | 48% |
| 3BHK | 67 | 0 | 67 | 156.08 sq.m | 76.3–86.3 sq.m; median 82.5 sq.m (software-measured) | 47% |
The drawing analysis measured 43 2BHK and 23 3BHK flat designs from the approved plan. One illustrated 2BHK includes living, dining, kitchen, two bedrooms, two toilets and three balcony/open-to-air balcony spaces. One illustrated 3BHK includes living/dining, kitchen, bedrooms, three toilets, utility area and balcony/open-to-air balcony spaces. Room dimensions are not complete across all rooms in the supplied measurements; these examples should therefore be checked against the drawing before relying on them for a particular unit.
5. Parking & vehicle circulation
The sanctioned plan records 237.00 car parking spaces and a proposed parking area of 9,814.91 sq.m. It also gives a visitor-parking area of 542.44 sq.m (10.53%). The permit record states that the cellars and stilt approved for parking are to be used exclusively for vehicle parking. No sanctioned two-wheeler-space count or RERA-filed unit-by-unit parking allocation is supplied.
The brochure describes “3 Level Parking,” but that is a promoter-marketed claim and does not establish a specific unit’s parking entitlement. A parking bay shown or counted in a plan does not, by itself, establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
The RERA portal lists 14 project infrastructure items, each with 0% progress in the supplied record. That is the reported portal status, not an independent site verification. The sanctioned plan also lists the facilities below.
| Description / size | Three listed areas: 249.01 sq.m, 322.8 sq.m and 50.77 sq.m; the permit also gives aggregate tot-lot area of 622.57 sq.m. |
|---|---|
| Evidence source | Sanctioned plan / permit |
| Declared progress / verified status | Proposed in plan; no independent completion verification. RERA portal’s Green Strip/TOT LOT/Park entry: 0%. |
| Description / size | Four listed areas: 130.75 sq.m, 156.51 sq.m, 152.99 sq.m and 96.83 sq.m. |
|---|---|
| Evidence source | Sanctioned plan |
| Declared progress / verified status | Proposed in plan; no independent completion verification. |
| Description / size | Facility named in the plan; no size supplied. |
|---|---|
| Evidence source | Sanctioned plan |
| Declared progress / verified status | Proposed; no progress or completion evidence supplied. |
| Description / size | Named in the plan; no sizes or capacities supplied. |
|---|---|
| Evidence source | Sanctioned plan |
| Declared progress / verified status | Proposed; no progress or completion evidence supplied. |
| Description / size | RERA portal lists community buildings; no size or description supplied. |
|---|---|
| Evidence source | RERA portal |
| Declared progress / verified status | Portal progress 0%; no independent completion verification. |
| Description / size | Promoter-marketed features; brochure says the swimming pool is to be constructed after OC. |
|---|---|
| Evidence source | Brochure |
| Declared progress / verified status | Marketing claims only; no sanctioned or delivered status established here. |
7. Utilities, building services & safety
The RERA portal marks water supply, sewerage/treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection and safety, electrical meter room/substation/receiving station, and street lighting as available; each listed item has 0% progress in the supplied record. “Available” is a portal entry, not independent evidence of operational or completed services.
The permit and plan identify an STP/sewerage network plan, 11 rainwater-harvesting pits, space for a transformer, garbage facilities and 290 trees. These are approval/document disclosures; the materials do not give water sources or storage capacities, STP capacity, generator capacity, lift count or capacity, fire-system equipment specifications, or accessible-route details.
Permit conditions require fire-fighting installations and safety/means-of-escape provision, and specify that an occupancy fire NOC is to be obtained before issue of an OC. The plan also states that parking places are to have EV-charging infrastructure and that specified digital-connectivity infrastructure is required for OC. These conditions do not establish installation or compliance at the site.
The brochure markets lifts, generator backup, CCTV and round-the-clock security; these are not treated as sanctioned or delivered facilities in this Overview.
8. Location, access & connectivity
The registered location is Adibatla, Ibrahimpatnam Mandal, Ranga Reddy District, Telangana, PIN 501510. The sanctioned plan identifies the site on the project survey numbers and shows existing roads on the east, west and south boundaries in the RERA land details.
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 0.9 km. This is a database distance from the location record; no travel time or public-transport information is supplied.
9. Developer & development status
The TG-RERA certificate identifies VUPPALA VENKATESH as promoter; the project header records the promoter as VUPPALA. The supplied data does not identify the legal entity type, corporate registration number, registered office, official promoter contact details or official website.
The permit names the landowners as applicants represented by their DAGPA holder, Vuppala Venkatesh, and identifies VENKATESHWARA ENTERPRISES, represented by Venkatesh Vuppala, as developer/builder. The RERA-filed supplementary clarification says the residential portion is allocated to the developer and the commercial building portion to the landowners; it states there is no sharing of residential flats.
The project is recorded as new, with no independently verified construction-progress report supplied. The promoter’s Form B undertakes completion by 27 February 2031. No OC or completion certificate is present in the supplied project documents.
10. Approvals, official records & documents
| Identifier / date | P02400010713; issued 7 April 2026; valid 27 February 2026–27 February 2031 |
|---|---|
| What the supplied record establishes | Registration of SKYLINE ORCHID under section 5 and the stated validity period. |
| Identifier / date | File 004126/HMDA/01206/SWBP/SHZ/2025; dated 27 February 2026 |
|---|---|
| What the supplied record establishes | Sanctioned building plan for the proposed residential apartment building on the stated survey numbers. |
| Identifier / date | 1787/HMDA/SWBP/2026; dated 17 March 2026 |
|---|---|
| What the supplied record establishes | Permit record stating HMDA technical approval, with building-plan and project conditions. |
| Identifier / date | 1778/2026; 4 February 2026 |
|---|---|
| What the supplied record establishes | The supplied permit record describes a mortgage of built-up area on the first, second and third floors. |
| Identifier / date | 1777/2026; 4 February 2026 |
|---|---|
| What the supplied record establishes | Permit record says 107.01 sq.m of road-affected land was handed over to the Deputy Commissioner, Adibatla Circle. |
| Identifier / date | JNTU/CEH/CIVIL/PC/11292/2026; 23 February 2026 |
|---|---|
| What the supplied record establishes | Cited in the building permit record. |
| Identifier / date | SEIAA file SIA/TG/INFRA2/551076/2025 |
|---|---|
| What the supplied record establishes | Cited in the building permit record; this Overview does not independently verify the clearance or its scope. |
| Identifier / date | Form B; completion undertaking 27 February 2031 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, separate-account obligations and completion timeline. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The permit describes OC and completion notice as requirements after construction; no project OC is established by the supplied documents. |
The HMDA DPMS approved-layout lookup is recorded as unavailable through the public channel described in the supplied data; that limitation is not evidence of approval refusal.
Frequently asked questions
Is SKYLINE ORCHID registered with Telangana RERA?
Yes. SKYLINE ORCHID is registered with the Telangana Real Estate Regulatory Authority as P02400010713; the registration status is New Project.
Who is the developer of SKYLINE ORCHID?
The promoter named in the RERA registration is VUPPALA.
Where is SKYLINE ORCHID located?
SKYLINE ORCHID is in IBRAHIMPATNAM, Adibatla, Rangareddy, Telangana (501510).
When will SKYLINE ORCHID be completed?
The promoter's proposed date of completion filed with RERA is 27/06/2031. This is the promoter's declaration, not a guarantee.