Sign in

Akshara River Edge

Akshara Orchards And Resorts · Rangareddy · RERA P02400004440

Akshara River Edge is a plotted development of residential plots in Chinna Shankarpalle Village, Shankarpalle Mandal, Ranga Reddy District, developed by registered promoter Akshara Orchards And Resorts. The final layout letter records 100 plots and an approved built-up area of 444.05 sq m for utilities; the supplied records do not state plot-size configurations. The project is registered under TG-RERA number P02400004440, with proposed completion 12/12/2024.

01What we found

Period endedTG-RERA registration ran to 12 Dec 2024 - check its extension on TG-RERA
38documents on file - each fact links to its page
2court cases on this project's land (survey 5, Chinna Shankarpalle)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameAkshara River Edge RERA record
Project typePlotted development / open-plot layout RERA record RERA filing
Phase / registered portionNo phase designation is disclosed; TG-RERA registration is P02400004440 Approvals record
TG-RERA registrationP02400004440, issued 02/05/2022; stated validity 02/05/2022–12/12/2024 Approvals record
Registered promoterAkshara Orchards And Resorts RERA record
RERA status in supplied recordRegistration validity ended 12/12/2024; no extension is recorded in the supplied certificate Approvals record

Land and geographic identity

ItemRecord
Locality / revenue villageChinna Shankarpalle Village; the RERA certificate also identifies the locality as Shankarpalle RERA record RERA filing
MandalShankarpalle RERA record RERA filing
DistrictRanga Reddy RERA record RERA filing
PIN501203 RERA record
Project survey numbers and subdivisions5/1, 5/2, 339/EE, 339/E2, 339/A, 339/AA2/2 and 339/AA2/1 Land records
Registered site extent39,529.94 sq m is recorded in the RERA land details; 31,101.05 sq m is recorded as net area RERA filing Land records
Layout drawing area statementTotal site area 43,909.5 sq m; net layout area 31,101.05 sq m; road-widening area 8,428.89 sq m Layout record
Boundaries recorded by RERAEast: Neighbors Land; West: Chinna Shankarpalle Village; North: Cinna Shankarpally-Bhulkapur Village Road; South: Neighbors land RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal layout approvalDraft layout letter 000404/LO/Plg/HMDA/2021, approved 13 December 2021 Approvals record
Final layout release000414/FLT/HMDA/0110/SKP/2025, dated 26 June 2025 Approvals record
Approved built-up area444.05 sq m, identified in the final layout letter as total built-up area
PlotsFinal layout letter records 100 plots
Buildings / floorsNot applicable as a plotted layout; individual homes are not part of the supplied project layout record
ParkingNo project-wide parking count or parking-level arrangement is disclosed in the supplied records RERA filing

Offering and status

ItemRecord
Unit typeResidential plots RERA record RERA filing
RERA-filed plot size / inventoryPlot count and plot-size bands are not available in the supplied RERA unit data. The final layout letter records 100 plots.
Booked / availableNot disclosed in the supplied evidence RERA filing
Construction stageAn architect’s certificate dated 27.06.2025 certifies overall project completion and identifies an HMDA occupancy certificate dated 26.06.2025. This is not a plot-by-plot construction-status record.
Completion deadlineRERA record states proposed completion 12/12/2024; the Form B declaration dated 12 February 2022 undertakes completion within 3 years RERA filing
Occupancy / completion certificateArchitect’s certificate identifies certificate 1.000414/FLT/HMDA/0110/SKP/2025, dated 26.06.2025, issued by HMDA; the certificate’s project-wide scope is stated as overall completion

2. The project story

  • Akshara River Edge is registered as a plotted residential development at Chinna Shankarpalle Village, Shankarpalle Mandal, Ranga Reddy District, across survey subdivisions 5/1, 5/2, 339/EE, 339/E2, 339/A, 339/AA2/2 and 339/AA2/1. The RERA filing identifies Akshara Orchards And Resorts as promoter and HMDA as the sanctioning authority. RERA record Land records Approvals record
  • The HMDA record begins with a draft layout approval in December 2021. That letter describes an open-plot layout and lists roads, parks, social infrastructure and utility works. A final layout letter issued in June 2025 records 100 residential plots and states that roads, open spaces, social infrastructure and utilities were handed over to the local authority by registered gift deed. It also records relinquishment of the mortgaged plots.
  • A separate architect’s certificate dated 27.06.2025 certifies completion in all aspects and cites an HMDA certificate dated 26.06.2025. The supplied material does not provide a plot-by-plot completion or booking schedule.
  • The promoter’s Form B declaration states a three-year completion undertaking, while the RERA record gives 12/12/2024 as the proposed completion date. RERA filing

3. Master plan, architecture & building design

  • This is a plotted layout rather than a multi-storey building project. The final HMDA layout letter records 100 plots and an approved built-up area of 444.05 sq m for utilities; it does not provide building designs for individual plots.
  • The drawing-derived area statement for the earlier layout records a net layout area of 31,101.05 sq m, comprising 19,820.45 sq m of plots, 7,588.86 sq m of roads, 2,906.92 sq m of parks/open space and 784.73 sq m of social infrastructure. These are figures read from the approved layout drawing’s area statement; the drawing-derived record cautions that plot counts and sizes should be verified against the drawing. Layout record
  • The final layout letter lists water supply, sewerage and drainage disposal systems, street lighting, rainwater-harvesting structure and other civic amenities. It records that roads, open spaces, social infrastructure and utilities were transferred to the local authority by registered gift deed No. 2764/2025 dated 06 June 2025.

4. Homes, configurations & floor plans

  • The registered offering is plots, not apartments. The final HMDA layout letter records 100 plots, but the supplied evidence does not include a complete RERA inventory table with plot numbers, size bands, saleable areas, or booked and available counts. RERA filing
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots100 in the final layout letterNot disclosedNot disclosedNot disclosedNot applicableNot supplied
  • The software-measurement record contains no measured floor-plan areas; the drawings include two layout sheets and no flat plans. A vendor listing describes a “saleable 1350 Sq. Ft.” plot configuration, but this is a third-party claim, not a supplied RERA-filed plot-size schedule. Floor plans Promoter website

5. Parking & vehicle circulation

  • The supplied records do not establish a project-wide car- or two-wheeler-parking count, visitor or accessible parking provision, or an allocation of parking to individual plots. The final layout letter concerns open plots and does not establish the design or parking arrangements of homes that may later be built on them. RERA filing
  • The draft HMDA letter requires layout roads to remain open for access to neighbouring sites and prohibits a compound wall or fencing around the site. The final layout letter likewise states that roads are to remain open for public access and that no compound wall is permitted.

6. Amenities, recreation & open spaces

  • The HMDA layout records provide for roads, parks/open space, social infrastructure and utilities. The final-layout letter states that roads, open spaces, social infrastructure and utilities were handed over to the local authority. It does not identify a clubhouse or other indoor community building.
Parks / open space
Description / sizeEarlier drawing area statement: 2,906.92 sq m. Final layout letter: 2,524.65 sq m
Evidence sourceLayout record
Declared progress / verified statusFinal letter records open spaces handed over to local authority; independent site inspection is not supplied
Social infrastructure
Description / sizeEarlier layout statement: 784.73 sq m. Final layout letter: 776.28 sq m
Declared progress / verified statusFinal letter records handover by registered gift deed; facility-specific delivery details not supplied
Internal roads
Description / sizeEarlier layout statement: 7,588.86 sq m
Evidence sourceLayout record
Declared progress / verified statusFinal letter records roads handed over; it requires roads to remain open for public access
Community building / clubhouse
Description / sizeNo area or building is identified in the final layout letter; “Community Buildings” is recorded at 0% in the RERA amenities data
Evidence sourceRERA amenities
Declared progress / verified statusNot recorded as provided in the supplied RERA amenity data
Recreational open-space aggregate
Description / sizeRERA amenities data records 0%
Evidence sourceRERA amenities
Declared progress / verified statusStatus not established beyond the supplied entry
  • A third-party vendor listing advertises a clubhouse, gymnasium, indoor games room, multipurpose hall, children’s play areas, amphitheatre, landscaped parks and security. These are vendor-listed features, not established as sanctioned or delivered by the supplied project records. Promoter website

7. Utilities, building services & safety

  • The final HMDA layout letter lists water supply, sewerage, drainage disposal, street lighting and rainwater-harvesting structure, and records a utilities area of 444.05 sq m. It states that the layout’s water supply, sewerage and drainage disposal systems, street lighting, rainwater harvesting and other civic amenities are to be properly maintained. The supplied records do not specify capacities, water source, treatment plant capacity, electrical backup, or fire-safety systems.
  • The RERA amenities record marks water supply, sewerage, storm-water drains, street lighting, solid-waste management and disposal, water conservation/rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station as “YES” at 100%. It records fire protection and fire-safety requirements at 0%. These are RERA-recorded amenity entries, not a separate technical inspection or statutory-compliance determination. RERA amenities
  • The draft HMDA letter also lists storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, avenue plantation, park development, rainwater-harvesting pits and utilities area.

8. Location, access & connectivity

  • The registered location is Chinna Shankarpalle Village, Shankarpalle Mandal, Ranga Reddy District, Telangana, PIN 501203. The RERA-filed northern boundary is the Cinna Shankarpally-Bhulkapur Village Road. RERA record RERA filing RERA filing
  • The supplied location record identifies the project parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. No further independently measured road distances or public-transport details are supplied. Location record
  • The draft layout approval requires roads to be opened for accessibility to neighbouring sites; the final layout letter requires roads to remain open for public access.

9. Developer & development status

  • The registered promoter is Akshara Orchards And Resorts, identified in the RERA filing as a partnership. The supplied promoter record names Kaiti Ashvani Kanth Rao as authorized signatory and Kaiti Deepika as partner. The promoter’s registered office address and official contact details are not established by the supplied material; the RERA certificate lists a promoter-office address as Village: JOURNALSIT COLONY, Mandal: Shaikpet, District: Hyderabad, PIN 500033. RERA record RERA filing Parties record
  • The Form B affidavit, signed by Mr. K. AshvaniKanth Rao as Managing Partner, is dated 12 February 2022 and declares a three-year completion period, a separate account for 70% of allottee receipts, and other statutory and project obligations. These are promoter declarations.
  • The architect’s certificate dated 27.06.2025 identifies Akshara Orchards and Resorts as developer and certifies overall completion, with HMDA certificate No. 1.000414/FLT/HMDA/0110/SKP/2025 dated 26.06.2025. The supplied registration certificate states that the RERA registration was valid through 12/12/2024 and does not record an extension.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400004440; issued 02/05/2022; valid through 12/12/2024
What the supplied document recordsForm C registration for Akshara River Edge; lists the project survey numbers and registration conditions
HMDA draft layout letter
Identifier / date000404/LO/Plg/HMDA/2021; 13 December 2021
What the supplied document recordsDraft layout approval for the open-plot development; includes layout works and conditions, including mortgage and handover requirements
HMDA final layout letter
Identifier / date000414/FLT/HMDA/0110/SKP/2025; 26 June 2025
What the supplied document recordsFinal residential layout permission; records 100 plots, a 444.05 sq m utilities area, and registered transfer of roads, open spaces, social infrastructure and utilities
HMDA occupancy certificate cited by architect
Identifier / date1.000414/FLT/HMDA/0110/SKP/2025; 26 June 2025
What the supplied document recordsIdentified in the architect’s certificate for Akshara River Edge
Architect’s overall-completion certificate
Identifier / date27 June 2025
What the supplied document recordsCertifies project completion in all aspects and identifies the HMDA certificate above
Promoter Form B declaration
Identifier / date12 February 2022
What the supplied document recordsAffidavit by the Managing Partner, including a three-year completion undertaking and project-account declarations
  • The HMDA DPMS approved-layout lookup is recorded as unavailable through the public portal in the supplied evidence; this is a portal-access limitation, not a finding that approval was refused. HMDA

Frequently asked questions

Is Akshara River Edge registered with Telangana RERA?

Yes. Akshara River Edge is registered with the Telangana Real Estate Regulatory Authority as P02400004440; the registration status is New Project.

Who is the developer of Akshara River Edge?

The promoter named in the RERA registration is Akshara Orchards And Resorts.

Where is Akshara River Edge located?

Akshara River Edge is in Chinna Shankarpalle Village, Shankarpalle, Rangareddy, Telangana (501203).

When will Akshara River Edge be completed?

The promoter's proposed date of completion filed with RERA is 12/12/2024. This is the promoter's declaration, not a guarantee.

More projects in Shankarpalle