Madhava Hills 2
MANJU INFRA AVENUES · Rangareddy · RERA P02400010311
MADHAVA HILLS 2 is a residential apartment project on Plots 90 and 91 in Kondapur, Serilingampally Mandal, Ranga Reddy District. The registered promoter is MANJU INFRA AVENUES. The project occupies 525.84 sq.m and comprises one residential building with 1 Stilt + 5 Floors and 10 3BHK units. Its TG-RERA registration number is P02400010311, and the promoter’s declared completion date is 31-07-2028.
More from Manju Infra Avenues · 23 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | MADHAVA HILLS 2 RERA record |
| Project type / phase | Residential apartment project; the registration identifies the project land as Plots 90 and 91. A separate phase-wise unit or completion breakdown is not provided. RERA record RERA filing |
| TG-RERA registration | P02400010311; registered 31 July 2025, valid through 31 July 2028, unless extended by the Authority. Registration validity is distinct from the completion undertaking and from occupancy certification. RERA record Approvals record |
| Registered promoter | MANJU INFRA AVENUES RERA record |
| RERA status | Registered; the project is recorded as “New Project.” RERA record RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Kondapur; the filed locality also identifies Madhava Hills, Phase-II. RERA record RERA filing |
| Revenue village | Kondapur Village RERA record RERA filing |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500084 RERA record RERA filing |
| Survey number(s) and subdivision(s) | Sy. No. 218/3. No further subdivision is specified in the project identity. RERA record RERA filing |
| Site plots and area | Plots 90 and 91; gross plot area 525.84 sq.m and net plot area 525.84 sq.m. The filed plan records 0 sq.m road-affected area, 0 sq.m nala-widening area, and 0 sq.m water-bodies area. RERA filing |
| Boundaries | North: Plot No. 92; south: Plot No. 89; east: 40 feet wide road; west: neighbours’ land and Sy. No. 218/4. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit reference | Building Permit Order No. 0630/GHMC/SWBP/SLP2/2025, dated 31 July 2025; filed plan number 000240/GHMC/00217/SWBP/SLP2/2025. Approvals record |
| Building and floors | One residential building, Building - 1: 1 Stilt + 5 Floors (stilt and first through fifth floors). The supplied record does not specify a basement or podium. |
| Approved built-up area | 1,295.91 sq.m excluding parking; 1,537.37 sq.m including parking. Parking area: 241.46 sq.m. These are plan figures, not carpet or saleable area. |
| Coverage and open plot area | Proposed coverage area 257.06 sq.m (49%); vacant plot area 261.57 sq.m. |
| Units | 10 dwelling units in the sanctioned plan and 10 units in the RERA-filed 3BHK configuration. RERA unit table |
| Parking | Sanctioned plan records 8 car-parking spaces; the stilt is approved for parking. |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 3BHK; 10 units. RERA-filed saleable area: 157.93 sq.m per unit. RERA unit table RERA unit table |
| Booked / available | 0 booked and 10 available in the portal data supplied. The portal extract gives no as-of date, so counts are indicative rather than a dated live inventory confirmation. RERA unit table |
| Construction stage | No independently verified construction-progress report or site-stage evidence is supplied. The RERA status is “New Project”; the permit records a construction commencement deadline but does not establish that construction has commenced. RERA record |
| Completion timeline | Promoter’s Form-B declaration states completion by 31-07-2028; the GHMC permit states construction to be completed before 31/07/2028. |
| OC / completion certificate | No occupancy or completion certificate is supplied. The permit requires a completion notice and occupancy certificate before occupation. |
2. The project story
MADHAVA HILLS 2 is a registered residential apartment project on Plots 90 and 91 in Sy. No. 218/3, Kondapur Village, Serilingampally Mandal, Ranga Reddy District. The project record describes a single residential building rather than a multi-tower development: one stilt level and five upper floors, with 10 sanctioned dwelling units.
The RERA-filed offering is 3BHK apartments, with 10 units shown as available in the supplied portal data; the booking figures have no stated as-of date. The promoter has declared a completion date of 31 July 2028, and the GHMC permit carries the same completion deadline. The supplied records do not establish construction progress or show an occupancy certificate, so the project should not be described as completed or occupied on this evidence. RERA unit table
3. Master plan, architecture & building design
The filed GHMC plan is for one residential building on a 525.84 sq.m plot. It records 257.06 sq.m of proposed coverage, 261.57 sq.m of vacant plot area, and 1,295.91 sq.m of proposed built-up area excluding parking. The stated proposed built-up area including parking is 1,537.37 sq.m, with 241.46 sq.m identified as parking area.
The sanctioned configuration is 1 Stilt + 5 Floors, with residential use on the upper floors and parking at stilt level. The supplied extraction records a proposed building height of 14.9 m, permissible height of 15.00 m, height from ground level of 17.86 m, and total height of 20.36 m; these are reproduced as separate plan fields. The plan also specifies front, rear and side setbacks of 3.0 m, 3.5 m and 3.5 m respectively.
The drawing-derived record identifies six measured 3BHK flat designs across the supplied floor-plan drawings. It does not provide a supported account of lifts, stairs, unit count per floor, building entrances, detailed circulation, or a phase arrangement. The plan lists a tot-lot, greenery requirements and rainwater-harvesting pits; no separate site-area schedule for recreational open space is supplied. Floor plans RERA amenities
4. Homes, configurations & floor plans
The TG-RERA filing lists 10 3BHK units, each with saleable area of 157.93 sq.m. The supplied portal counts show 0 booked and 10 available, without an as-of date. RERA unit table RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 157.93 sq.m | 88.8–90.8 sq.m; median 89.8 sq.m, software-measured from drawings | 43% |
The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed carpet-area disclosures; six flat designs were measured and all six require review. RERA saleable area and drawing-measured carpet area are different measures: saleable area may include the unit’s share of common areas, while carpet area reflects the measured internal area under the drawing-based method. The measured sample shows a typical plan panel with a living/dining room, kitchen, bedrooms, toilets, wash area and balcony; the balcony is excluded from the measured carpet area. Verify dimensions against the drawing before relying on them. Floor plans RERA unit details
5. Parking & vehicle circulation
The sanctioned plan records 8 car-parking spaces and 241.46 sq.m of parking area, with the stilt approved for vehicle parking. The permit conditions state that the approved stilt/cellar parking area is to be used exclusively for parking, without partition walls or rolling shutters, and not converted to another use. The supplied plan extraction does not establish visitor or accessible-space counts, two-wheeler provision, parking allocation to individual units, ramp configuration, pedestrian separation, or EV chargers installed on site. The permit contains an EV-charging infrastructure requirement for parking places, but that condition is not evidence of completed installation.
6. Amenities, recreation & open spaces
The project’s RERA amenities record reports 14 amenity/infrastructure categories, with progress fields at 0%. “YES” entries denote listed availability in the filing, not independently verified completion. RERA amenities
| Description / size | Tot-lot is identified in the GHMC plan conditions; the plan also records a requirement for peripheral greenery. No area or capacity is supplied. |
|---|---|
| Declared progress / verified status | Required/plan-listed; no completion verification supplied. |
| Description / size | Four rainwater-harvesting pits are recorded in the building-permit extraction; the RERA amenities record lists water conservation/rainwater harvesting as YES. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed; RERA progress field is 0%; no completion verification supplied. |
| Description / size | RERA amenity category; no project-specific dimensions or internal-road plan are supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress field 0%; completion not verified. |
| Description / size | RERA amenity category; no facility details or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress field 0%; completion not verified. |
| Description / size | RERA amenity category; no aggregate area supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress field 0%; completion not verified. |
No clubhouse, gymnasium, or other indoor recreation facility is identified in the supplied TG-RERA amenity record or sanctioned-plan extraction.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, street lighting, solid-waste management, sewage and sullage treatment/disposal, energy management, fire protection, and an electrical meter room/sub-station/receiving station. Water supply, sewerage, street lighting, rainwater harvesting, energy management, fire protection, and electrical-room/substation categories are marked “YES”; their progress fields are 0%. These are filing entries, not verified installations or operational services. RERA amenities
The GHMC plan calls for a transformer space, a garbage house and rainwater-harvesting structures; the building-permit extraction specifies four rainwater-harvesting pits. The permit also requires fire-safety measures and an occupancy fire NOC before issue of an occupancy certificate. The supplied records do not provide water-source or storage capacities, STP capacity or reuse arrangements, backup-power capacity, lift count or capacity, detailed fire-system specifications, CCTV/access-control installation, or accessibility details. RERA amenities
8. Location, access & connectivity
The registered location is Kondapur Village, Serilingampally Mandal, Ranga Reddy District, PIN 500084; the site is identified as Plots 90 and 91 in Sy. No. 218/3. The filed site boundaries identify a 40-feet-wide road on the east, Plot No. 92 to the north, Plot No. 89 to the south, and neighbours’ land and Sy. No. 218/4 to the west. RERA record RERA filing
A location record provides a distance of 5.6 km to HITEC City. No further verified road route, public-transport distance, or travel-time information is supplied. Location record
9. Developer & development status
The registered promoter is MANJU INFRA AVENUES, recorded as a partnership. Its supplied GSTIN is 36AAWFM4454C1Z1. The RERA project record gives the promoter’s address as Plot No. 28, Srikrishna Devaraya Nagar, Madhava Hills, Phase-II, Kondapur, Serilingampally, Ranga Reddy, PIN 500084. RERA record RERA filing Corporate record Parties record
The project’s Form-B declaration, made by P PRADEEP on behalf of MANJU INFRA AVENUES, states that the promoter will complete the project by 31-07-2028 and makes the filed title, encumbrance and project-fund declarations. The GHMC permit gives a construction commencement deadline before 27 January 2026 and a completion deadline before 31 July 2028. No construction-progress verification or occupancy certificate is included in the supplied evidence.
10. Approvals, official records & documents
| Identifier / date | P02400010311; valid 31 July 2025–31 July 2028 |
|---|---|
| What the supplied evidence establishes | Form C certificate for MADHAVA HILLS 2, promoter MANJU INFRA AVENUES, identifying Sy. No. 218/3 and Plots 90 and 91 at Kondapur. |
| Identifier / date | 0630/GHMC/SWBP/SLP2/2025; 31 July 2025 |
|---|---|
| What the supplied evidence establishes | Building Permit Order for one residential building, 1 Stilt + 5 Floors, with 10 dwelling units. |
| Identifier / date | 000240/GHMC/00217/SWBP/SLP2/2025 |
|---|---|
| What the supplied evidence establishes | Plan record includes the plot-area, building-area, parking and configuration figures summarized above. |
| Identifier / date | G/177/LP/426/96-97 |
|---|---|
| What the supplied evidence establishes | Referenced in the GHMC permit; no separate approved-layout document is supplied in this extract. |
| Identifier / date | 7331/2025; 24 May 2025 |
|---|---|
| What the supplied evidence establishes | Permit records a mortgage of 132.29 sq.m of built-up area on the fourth floor. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied evidence establishes | The permit requires a completion notice and occupancy certificate; no issued certificate is included in the supplied project documents. |
The supplied drawing-stamp extraction for the filed plan is noted as requiring review; this Overview relies on the extracted plan and building-permit records for the project description. Approvals record
1. Project at a glance
Project identity
Registered name: MADHAVA HILLS 2
Project type / phase: Residential apartment project; the registration identifies the project land as Plots 90 and 91. A separate phase-wise unit or completion breakdown is not provided.
TG-RERA registration: P02400010311; registered 31 July 2025, valid through 31 July 2028, unless extended by the Authority. Registration validity is distinct from the completion undertaking and from occupancy certification.
Registered promoter: MANJU INFRA AVENUES
RERA status: Registered; the project is recorded as “New Project.”
Land and geographic identity
Locality: Kondapur; the filed locality also identifies Madhava Hills, Phase-II.
Revenue village: Kondapur Village
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500084
Survey number(s) and subdivision(s): Sy. No. 218/3. No further subdivision is specified in the project identity.
Site plots and area: Plots 90 and 91; gross plot area 525.84 sq.m and net plot area 525.84 sq.m. The filed plan records 0 sq.m road-affected area, 0 sq.m nala-widening area, and 0 sq.m water-bodies area.
Boundaries: North: Plot No. 92; south: Plot No. 89; east: 40 feet wide road; west: neighbours’ land and Sy. No. 218/4.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit reference: Building Permit Order No. 0630/GHMC/SWBP/SLP2/2025, dated 31 July 2025; filed plan number 000240/GHMC/00217/SWBP/SLP2/2025.
Building and floors: One residential building, Building - 1: 1 Stilt + 5 Floors (stilt and first through fifth floors). The supplied record does not specify a basement or podium.
Approved built-up area: 1,295.91 sq.m excluding parking; 1,537.37 sq.m including parking. Parking area: 241.46 sq.m. These are plan figures, not carpet or saleable area.
Coverage and open plot area: Proposed coverage area 257.06 sq.m (49%); vacant plot area 261.57 sq.m.
Units: 10 dwelling units in the sanctioned plan and 10 units in the RERA-filed 3BHK configuration.
Parking: Sanctioned plan records 8 car-parking spaces; the stilt is approved for parking.
Offering and status
RERA-filed configuration: 3BHK; 10 units. RERA-filed saleable area: 157.93 sq.m per unit.
Booked / available: 0 booked and 10 available in the portal data supplied. The portal extract gives no as-of date, so counts are indicative rather than a dated live inventory confirmation.
Construction stage: No independently verified construction-progress report or site-stage evidence is supplied. The RERA status is “New Project”; the permit records a construction commencement deadline but does not establish that construction has commenced.
Completion timeline: Promoter’s Form-B declaration states completion by 31-07-2028; the GHMC permit states construction to be completed before 31/07/2028.
OC / completion certificate: No occupancy or completion certificate is supplied. The permit requires a completion notice and occupancy certificate before occupation.
2. The project story
MADHAVA HILLS 2 is a registered residential apartment project on Plots 90 and 91 in Sy. No. 218/3, Kondapur Village, Serilingampally Mandal, Ranga Reddy District. The project record describes a single residential building rather than a multi-tower development: one stilt level and five upper floors, with 10 sanctioned dwelling units.
The RERA-filed offering is 3BHK apartments, with 10 units shown as available in the supplied portal data; the booking figures have no stated as-of date. The promoter has declared a completion date of 31 July 2028, and the GHMC permit carries the same completion deadline. The supplied records do not establish construction progress or show an occupancy certificate, so the project should not be described as completed or occupied on this evidence.
3. Master plan, architecture & building design
The filed GHMC plan is for one residential building on a 525.84 sq.m plot. It records 257.06 sq.m of proposed coverage, 261.57 sq.m of vacant plot area, and 1,295.91 sq.m of proposed built-up area excluding parking. The stated proposed built-up area including parking is 1,537.37 sq.m, with 241.46 sq.m identified as parking area.
The sanctioned configuration is 1 Stilt + 5 Floors, with residential use on the upper floors and parking at stilt level. The supplied extraction records a proposed building height of 14.9 m, permissible height of 15.00 m, height from ground level of 17.86 m, and total height of 20.36 m; these are reproduced as separate plan fields. The plan also specifies front, rear and side setbacks of 3.0 m, 3.5 m and 3.5 m respectively.
The drawing-derived record identifies six measured 3BHK flat designs across the supplied floor-plan drawings. It does not provide a supported account of lifts, stairs, unit count per floor, building entrances, detailed circulation, or a phase arrangement. The plan lists a tot-lot, greenery requirements and rainwater-harvesting pits; no separate site-area schedule for recreational open space is supplied.
4. Homes, configurations & floor plans
The TG-RERA filing lists 10 3BHK units, each with saleable area of 157.93 sq.m. The supplied portal counts show 0 booked and 10 available, without an as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 157.93 sq.m | 88.8–90.8 sq.m; median 89.8 sq.m, software-measured from drawings | 43% |
The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed carpet-area disclosures; six flat designs were measured and all six require review. RERA saleable area and drawing-measured carpet area are different measures: saleable area may include the unit’s share of common areas, while carpet area reflects the measured internal area under the drawing-based method. The measured sample shows a typical plan panel with a living/dining room, kitchen, bedrooms, toilets, wash area and balcony; the balcony is excluded from the measured carpet area. Verify dimensions against the drawing before relying on them.
5. Parking & vehicle circulation
The sanctioned plan records 8 car-parking spaces and 241.46 sq.m of parking area, with the stilt approved for vehicle parking. The permit conditions state that the approved stilt/cellar parking area is to be used exclusively for parking, without partition walls or rolling shutters, and not converted to another use. The supplied plan extraction does not establish visitor or accessible-space counts, two-wheeler provision, parking allocation to individual units, ramp configuration, pedestrian separation, or EV chargers installed on site. The permit contains an EV-charging infrastructure requirement for parking places, but that condition is not evidence of completed installation.
6. Amenities, recreation & open spaces
The project’s RERA amenities record reports 14 amenity/infrastructure categories, with progress fields at 0%. “YES” entries denote listed availability in the filing, not independently verified completion.
| Description / size | Tot-lot is identified in the GHMC plan conditions; the plan also records a requirement for peripheral greenery. No area or capacity is supplied. |
|---|---|
| Declared progress / verified status | Required/plan-listed; no completion verification supplied. |
| Description / size | Four rainwater-harvesting pits are recorded in the building-permit extraction; the RERA amenities record lists water conservation/rainwater harvesting as YES. |
|---|---|
| Declared progress / verified status | Listed; RERA progress field is 0%; no completion verification supplied. |
| Description / size | RERA amenity category; no project-specific dimensions or internal-road plan are supplied. |
|---|---|
| Declared progress / verified status | Progress field 0%; completion not verified. |
| Description / size | RERA amenity category; no facility details or size supplied. |
|---|---|
| Declared progress / verified status | Progress field 0%; completion not verified. |
| Description / size | RERA amenity category; no aggregate area supplied. |
|---|---|
| Declared progress / verified status | Progress field 0%; completion not verified. |
No clubhouse, gymnasium, or other indoor recreation facility is identified in the supplied TG-RERA amenity record or sanctioned-plan extraction.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, street lighting, solid-waste management, sewage and sullage treatment/disposal, energy management, fire protection, and an electrical meter room/sub-station/receiving station. Water supply, sewerage, street lighting, rainwater harvesting, energy management, fire protection, and electrical-room/substation categories are marked “YES”; their progress fields are 0%. These are filing entries, not verified installations or operational services.
The GHMC plan calls for a transformer space, a garbage house and rainwater-harvesting structures; the building-permit extraction specifies four rainwater-harvesting pits. The permit also requires fire-safety measures and an occupancy fire NOC before issue of an occupancy certificate. The supplied records do not provide water-source or storage capacities, STP capacity or reuse arrangements, backup-power capacity, lift count or capacity, detailed fire-system specifications, CCTV/access-control installation, or accessibility details.
8. Location, access & connectivity
The registered location is Kondapur Village, Serilingampally Mandal, Ranga Reddy District, PIN 500084; the site is identified as Plots 90 and 91 in Sy. No. 218/3. The filed site boundaries identify a 40-feet-wide road on the east, Plot No. 92 to the north, Plot No. 89 to the south, and neighbours’ land and Sy. No. 218/4 to the west.
A location record provides a distance of 5.6 km to HITEC City. No further verified road route, public-transport distance, or travel-time information is supplied.
9. Developer & development status
The registered promoter is MANJU INFRA AVENUES, recorded as a partnership. Its supplied GSTIN is 36AAWFM4454C1Z1. The RERA project record gives the promoter’s address as Plot No. 28, Srikrishna Devaraya Nagar, Madhava Hills, Phase-II, Kondapur, Serilingampally, Ranga Reddy, PIN 500084.
The project’s Form-B declaration, made by P PRADEEP on behalf of MANJU INFRA AVENUES, states that the promoter will complete the project by 31-07-2028 and makes the filed title, encumbrance and project-fund declarations. The GHMC permit gives a construction commencement deadline before 27 January 2026 and a completion deadline before 31 July 2028. No construction-progress verification or occupancy certificate is included in the supplied evidence.
10. Approvals, official records & documents
| Identifier / date | P02400010311; valid 31 July 2025–31 July 2028 |
|---|---|
| What the supplied evidence establishes | Form C certificate for MADHAVA HILLS 2, promoter MANJU INFRA AVENUES, identifying Sy. No. 218/3 and Plots 90 and 91 at Kondapur. |
| Identifier / date | 0630/GHMC/SWBP/SLP2/2025; 31 July 2025 |
|---|---|
| What the supplied evidence establishes | Building Permit Order for one residential building, 1 Stilt + 5 Floors, with 10 dwelling units. |
| Identifier / date | 000240/GHMC/00217/SWBP/SLP2/2025 |
|---|---|
| What the supplied evidence establishes | Plan record includes the plot-area, building-area, parking and configuration figures summarized above. |
| Identifier / date | G/177/LP/426/96-97 |
|---|---|
| What the supplied evidence establishes | Referenced in the GHMC permit; no separate approved-layout document is supplied in this extract. |
| Identifier / date | 7331/2025; 24 May 2025 |
|---|---|
| What the supplied evidence establishes | Permit records a mortgage of 132.29 sq.m of built-up area on the fourth floor. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied evidence establishes | The permit requires a completion notice and occupancy certificate; no issued certificate is included in the supplied project documents. |
The supplied drawing-stamp extraction for the filed plan is noted as requiring review; this Overview relies on the extracted plan and building-permit records for the project description.
Frequently asked questions
Is MADHAVA HILLS 2 registered with Telangana RERA?
Yes. MADHAVA HILLS 2 is registered with the Telangana Real Estate Regulatory Authority as P02400010311; the registration status is New Project.
Who is the developer of MADHAVA HILLS 2?
The promoter named in the RERA registration is MANJU INFRA AVENUES.
Where is MADHAVA HILLS 2 located?
MADHAVA HILLS 2 is in KONDAPUR, Serilingampally, Rangareddy, Telangana (500084).
When will MADHAVA HILLS 2 be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2028. This is the promoter's declaration, not a guarantee.
More projects in Kondapur