GIGA CITY is a plotted development in Tukkuguda Municipality, Mankhal revenue Village, Maheshwaram Mandal, Ranga Reddy District, developed by registered promoter VERTEX KLR DEVELOPERS LLP. The site extent is 417893.06 sq.m., and the HMDA draft-layout letter states a total of 108 plots. The project offers residential plots in an open-plot layout; plot-size configurations are not supplied. It is registered with TG-RERA under P02400002792, with a proposed completion date of 26/02/2024.

More from Vertex Klr Developers LLP · 9 projects →

01What we found

RegisteredTG-RERA
19documents on file - each fact links to its page
7court cases on this project's land (survey 82, 84, 85, 86, 93, 94 and 4 more, Tukkuguda)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameGIGA CITY
Project typePlotted development / residential open-plot layout RERA record
Phase / registered portionThe RERA certificate identifies the registered project as GIGA CITY; it does not specify a phase in the certificate extract. A separate title certificate refers to “GIGA CITY Phase-I,” but the supplied records do not establish that this is the precise registered-phase description.
TG-RERA registrationP02400002792
Registration validity30/04/2021–26/02/2024; the supplied certificate records no extension. This is the registration period, distinct from the completion undertaking and any occupancy/completion certification.
Registered promoterVERTEX KLR DEVELOPERS LLP
RERA statusProject data records status as New Project; registration was granted under Form C. RERA record

Land and geographic identity

FieldRecord
Locality / municipalityTukkuguda Municipality; the RERA land description identifies Mankhal revenue Village. RERA record
Revenue villageMankhal (also recorded as Mankhal Village).
MandalMaheshwaram; the layout documents also use “Thukkuguda” / “Thukkuguda Municipality.” RERA record
DistrictRanga Reddy RERA record
PIN501359 RERA record
Project survey numbersRERA certificate: Part of Sy No. 82, 83, 84, 85, 86, 90, 92, 93, 94, 95, 773, 778, 779, 774 and 777. The filed layout drawing specifies 82/P, 83/P, 84/P, 85/P, 86/P, 90, 92, 93, 94, 95, 773, 778, 779/P, 774/P and 777/P.
Registered site extent417893.06 sq.m. RERA record
Total / net areaTotal site area 417893.06 sq.m.; net site area 417893.06 sq.m. in the HMDA draft-layout record.
Boundaries in RERA project informationNorth: 50 Feet Road and Airport Boundary Wall; South: 100 Ft Road and part of land in Sy Nos. 774, 82, 88 and 87; East: part of land in Sy No. 92; West: part of land in Sy No. 779 and RERA record

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the final-layout record states delegation to Thukkuguda Municipality.
Principal layout approvalLayout Permit 000064/LO/Plg/HMDA/2021, dated 25 January 2021; the final-layout letter is dated 02 December 2021.
Approved site / built-up areaThe layout records site area 417893.06 sq.m. This is a plotted layout; no building-plan approval or approved built-up area for buildings is supplied. Approvals record
Buildings, floors and parking levelsNo tower/block count, building-floor configuration or building parking levels are disclosed in the supplied project record. RERA filing Document index
Plot / unit countThe HMDA draft-layout letter states TOTAL 108 PLOTS; the supplied layout drawing is not complete for independently establishing the full plot inventory or plot-size bands. Layout record
RERA-declared sale inventoryPlot-level booked and available counts and plot-size range are not supplied in the evidence provided. RERA filing Document index

Offering and status

FieldRecord
OfferingResidential plots in an open-plot layout; individual plot numbers, saleable sizes and current availability are not established by the supplied RERA inventory data. RERA unit table Layout record
Declared completion date26/02/2024 in the project record; the Form B declaration also undertakes completion by 2024. RERA record
Construction/development stageProject data records 80% completeness; the supplied evidence does not identify the measurement date or independently verify site progress. RERA record
Occupancy / completion certificateNo occupancy or completion certificate for the project is included. The evidence includes an HMDA final-layout letter, which is a layout approval/release document, not an occupancy certificate. Document index
Registration validity vs completionRERA registration ended 26/02/2024; that date is also the stated proposed completion date. The supplied registration certificate records no extension. RERA record

2. The project story

GIGA CITY is registered as a residential plotted development on land identified in the project record as Mankhal revenue Village, Tukkuguda Municipality, Maheshwaram Mandal, Ranga Reddy District. The site extent is 417893.06 sq.m., and the RERA filing lists the project surveys and subdivisions shown in the identity table above. RERA record

The project is organised as an open-plot layout rather than an apartment or tower development. HMDA’s records describe residential plot use, internal roads, open space/park and utility land, and social infrastructure land. The draft-layout letter states a total of 108 plots; the supplied evidence does not provide a complete plot-by-plot schedule or reliable current sold/unsold inventory. Layout record RERA unit table

The project data reports 80% completeness, but the supplied record does not state when that percentage was assessed or provide independent site verification. The RERA certificate’s validity ended on 26/02/2024, the same date as the recorded proposed completion date. No project occupancy/completion certificate is supplied; the HMDA final-layout letter concerns layout approval and release, not occupancy certification. RERA record

3. Master plan, architecture & building design

The project is a plotted layout, so the available design evidence concerns land allocation, roads and open areas rather than building architecture. The HMDA draft-layout record gives total and net site area as 417893.06 sq.m.; it records no master-plan road-affected area.

Layout land useAreaDrawing / record description
Plotted area285214.38 sq.m.“Plotted Area” in the layout drawing
Roads88234.20 sq.m.“Road Area” in the layout drawing
Organized open space / park / utility area33856.70 sq.m.Drawing label combines organized open space, park and utility area
Social infrastructure area10584.76 sq.m.“Social Infrastructure Area”
Amenity area0.00 sq.m.Recorded as amenity area in the layout record

The draft-layout document identifies road widths including 45.00, 15, 45 and 12; it also refers to an abutting road width of 45.00. The drawings mention cycle tracks and utilities, but the supplied material does not describe plot dimensions, a complete plot arrangement, or building footprints.

4. Homes, configurations & floor plans

This is a plotted project, not an apartment configuration offering. No RERA unit-type schedule, plot-size bands, plot-wise saleable areas, booked/available counts or unit-level carpet-area measurements are supplied. The HMDA draft-layout letter states TOTAL 108 PLOTS, but the supplied drawing extraction is not sufficient to verify a complete plot inventory. RERA unit table Layout record

The available drawing-review record reports two layout sheets and no flats; no individual plot measurements were produced by the floor-plan measurement process. Floor plans The layout’s land-use schedule identifies 285214.38 sq.m. as plotted area, which is not a plot-by-plot saleable-area schedule.

5. Parking & vehicle circulation

The supplied records do not establish a total parking-space count, visitor or accessible parking, or exclusive parking allocations. The project is a plotted layout, and no unit-specific parking allocation documents are supplied. Document index

HMDA’s draft-layout conditions refer to opening all roads for access to neighbouring sites, pedestrian footpaths, and cycle tracks. The record does not provide a detailed vehicle-circulation plan, parking layout or EV-charging provision.

6. Amenities, recreation & open spaces

The RERA filing lists layout facilities and infrastructure items, with the supplied amenity progress percentages recorded as 0. These are filed facility descriptions, not evidence that the facilities have been completed or independently verified. RERA amenities

Green strip / tot lot / park
Description / sizeLayout drawing records 33856.70 sq.m. as organized open space/park/utility area; the amenity register separately lists “Green Strip/TOT LOT/Park.”
Evidence sourceRERA amenity register and layout drawing RERA amenities Layout record
Declared progress / verified statusAmenity register: 0%; completion not independently verified. RERA amenities
Aggregate recreational open space
Description / sizeNo separate size beyond the layout land-use area is supplied.
Evidence sourceRERA amenity register RERA amenities
Declared progress / verified status0% recorded; not independently verified. RERA amenities
Community buildings / social infrastructure
Description / sizeSocial infrastructure area 10584.76 sq.m.; no building description or facility schedule supplied.
Evidence sourceLayout drawing and RERA amenity register Layout record RERA amenities
Declared progress / verified status0% recorded for community buildings; completion not independently verified. RERA amenities
Internal roads and footpaths
Description / sizeRoad area 88234.20 sq.m.; HMDA conditions also refer to paved footpaths.
Evidence sourceLayout drawing and HMDA draft-layout conditions Layout record
Declared progress / verified statusRERA amenity register: 0%; completion not independently verified. RERA amenities
Cycle tracks
Description / sizeMentioned as a layout feature; no length or area supplied.
Evidence sourceLayout drawing and HMDA draft-layout conditions
Declared progress / verified statusNo completion status supplied.
Promoter-marketed facilities
Description / sizeInternational school, 6-hole executive golf course, multispeciality hospital, sports academy, retail/commercial spaces, shopping mall, clubhouse, restaurant and landscaped gardens. Promoter website
Evidence sourcePromoter website/vendor information Promoter website
Declared progress / verified statusMarketing claims; the supplied RERA layout and amenity records do not establish these as approved or delivered project facilities.

7. Utilities, building services & safety

The RERA amenity register lists water supply, sewerage/septic tank/STP, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire-protection requirements, and electrical meter/substation/receiving-station facilities. Each listed amenity has 0% recorded progress; the evidence does not establish completed operation or capacity. RERA amenities

HMDA’s draft-layout conditions describe proposed potable-water pipeline connectivity to Mission Bhagiratha or another approved source; underground utility ducting; solid-waste disposal space and a bio-compost unit; underground storm-water drainage; transformer yard; LED street lighting; and rainwater-harvesting pits. The final-layout letter describes the layout as provided with water supply, sewerage and drainage disposal systems, street lighting, rainwater-harvesting structure and other civic amenities, and assigns maintenance responsibility to the local body. These are descriptions in approval records, not independent confirmation of current service or operating status.

No capacities are supplied for water storage, treatment, sewage treatment, electrical supply or backup. The records do not provide a detailed fire-safety design, emergency access plan, CCTV/security specification, or accessibility design. RERA amenities Document index

8. Location, access & connectivity

The official project location is recorded as Tukkuguda Municipality, Mankhal revenue Village, Maheshwaram Mandal, Ranga Reddy District, PIN 501359. The layout documents describe the site as residential open-plot land at Mankhal and identify an abutting road width of 45.00. RERA record

The RERA project record gives boundaries including a 50 Feet Road and Airport Boundary Wall to the north and a 100 Ft Road to the south. The layout approval conditions refer to roads being opened for neighbouring-site access and to internal roads and footpaths. RERA record

The supplied location record gives these measured distances: IndusInd Bank 0.4 km; Nanakramguda Government Primary School 0.5 km; Financial District (Nanakramguda) 1.2 km; an unnamed park 1.2 km; Manuu Polytechnic Hyderabad 1.6 km; Sankaraya Eye Hospital 1.6 km; an unnamed bus station 2.2 km; and South India Shopping Mall 2.6 km. Location record

9. Developer & development status

The registered promoter is VERTEX KLR DEVELOPERS LLP, an LLP, identified in the project record as the legal promoter. The RERA certificate lists its promoter office as Village: Madhapur, Mandal: Serilingampally, District: Ranga Reddy, PIN 500081. The project record separately gives an address at Vertex Corporate, Jubilee Enclave, Tukkuguda Municipality, Mankhal revenue Village, Maheshwaram, Ranga Reddy, PIN 501359. Corporate record RERA record

The project data reports 80% completeness, without a dated progress certificate in the supplied evidence. The promoter’s Form B declaration undertakes completion by 2024; the RERA project record gives 26/02/2024 as the proposed completion date. These are declared/project-record timelines and do not independently establish actual completion. RERA record

The supplied records do not establish current booked or available plot counts, a revised completion date, or an occupancy/completion certificate. RERA unit table Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400002792; issued 30/04/2021; valid to 26/02/2024
What the supplied evidence establishesForm C registration for GIGA CITY and its stated validity period.
HMDA draft-layout letter
Identifier / dateApproval 000064/LO/Plg/HMDA/2021; dated 25 January 2021
What the supplied evidence establishesDraft residential open-plot layout record for 417893.06 sq.m., with conditions and infrastructure requirements.
HMDA final-layout letter
Identifier / datePermit 000064/LO/Plg/HMDA/2021; dated 02 December 2021
What the supplied evidence establishesFinal residential layout approval/release record; it refers to roads, open spaces and social infrastructure being taken over by the local authority under registered gift deed 11842/2021, dated 15-06-2021.
Registered relinquishment deed
Identifier / date18444/2021; date recorded as 09/13/2021
What the supplied evidence establishesReferenced in the final-layout record.
HMDA mortgage documents
Identifier / date522/2021 and additional mortgage 521/2021
What the supplied evidence establishesThe HMDA draft-layout record describes plots mortgaged to the authority as security for development obligations.
Layout drawings
Identifier / dateDocuments 150681 and 158079
What the supplied evidence establishesDraft-layout drawings and land-use details; the supplied extracted plot schedule is incomplete.
Promoter declaration (Form B)
Identifier / dateDocument 161459
What the supplied evidence establishesPromoter declaration concerning title basis, encumbrances, separate-account and other RERA obligations, and completion undertaking.
Occupancy/completion certificate
Identifier / dateNot supplied Document index
What the supplied evidence establishesNo project OC or completion certificate is included in the supplied evidence.

The HMDA final-layout letter describes a layout approval; it does not provide evidence of individual building permissions or project occupancy certification.

Frequently asked questions

Is GIGA CITY registered with Telangana RERA?

Yes. GIGA CITY is registered with the Telangana Real Estate Regulatory Authority as P02400002792; the registration status is New Project.

Who is the developer of GIGA CITY?

The promoter named in the RERA registration is VERTEX KLR DEVELOPERS LLP.

Where is GIGA CITY located?

GIGA CITY is in Tukkuguda Municipality, Mankhal revenue Village, Maheshwaram, Rangareddy, Telangana (501359).

When will GIGA CITY be completed?

The promoter's proposed date of completion filed with RERA is 26/02/2024. This is the promoter's declaration, not a guarantee.

More projects in Tukkuguda