Pearl City
SAI BALAJI PROJECTS · Sangareddy · RERA P01100001426
PEARL CITY is a plotted development in Indrakaran, Kandi mandal, Sangareddy district. The registered promoter is Sai Balaji Projects. The site area is 42435.35 sq.m, and the project is an open-plot layout; the supplied records do not state a plot count or individual plot sizes. It is registered under TG-RERA number P01100001426, with a proposed completion date of 22nd February 2022.
More from Sai Balaji Projects · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | PEARL CITY |
| Project type | Plotted development / open-plot layout RERA record |
| Phase or registered portion | A separate phase is not identified in the supplied record; the registration is for PEARL CITY |
| TG-RERA registration | P01100001426 |
| Registration validity | 25/11/2019–22/02/2022; the certificate states two years and no extension is recorded in the supplied certificate |
| Registered promoter | Sai Balaji Projects; entity type stated as partnership Corporate record RERA filing |
| RERA status | The supplied certificate records registration; its stated validity period has ended. Current portal status is not established by the supplied record. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Indrakaran RERA record |
| Revenue village | Indrakaran RERA record |
| Mandal / district / PIN | Kandi / Sangareddy / 502329 RERA record |
| Project survey numbers | 441, 445 and 439; no subdivisions are specified in the project filing RERA record |
| Site area and deductions | Total site area 42435.35 sq.m; road-widening area 253.59 sq.m; net layout area 42181.76 sq.m RERA filing |
| Boundaries | East: “VAGU SURVEY NO 439 AA 1”; West: “ROAD INDRAKARAN TO CHERIYAL”; North: “LAND OF OWNERS AND KANDI NARAYANA”; South: “NAGAIAH SURVAY NO 437 AND MALLAIAH” RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) |
| Principal layout approval | HMDA Layout Permit 000047/LO/Plg/HMDA/2019, dated 22 February 2019 |
| Approved built-up area | Not stated in the supplied layout approval; the project is a plotted layout, and no building or residential tower configuration is provided Approvals record |
| Layout land-use figures | Plotted area 26022.80 sq.m; layout roads 11385.72 sq.m; organized open space/park/utility area 3381.66 sq.m; social infrastructure 1108.48 sq.m; amenity area 0.00 sq.m |
| HMDA-mortgaged plots | Plots 1 to 3, 5 to 7 and 150 to 161—18 plots, totaling 3946.82 sq.m—are identified as mortgaged to HMDA |
Offering and status
| Item | Record |
|---|---|
| Unit type | Open plots; the RERA registration identifies a plotted development RERA record |
| Plot count and sizes | Not established by the supplied records. The layout extraction says the plot details are incomplete and no plot-size measurements are available. Layout record |
| Booked / available counts | Not established in the supplied data. Layout record |
| Construction / development stage | The RERA-filed amenity progress data reports internal roads and footpaths at 80% and sewerage at 60%; other reported items are at 0%. These are filed progress figures, not independent site verification. RERA amenities |
| Completion deadline | The promoter’s Form B states a completion undertaking of 22nd February 2022 for the open-plot layout. |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied records. For this plotted layout, the supplied documents identify layout permission and development works, not a building-phase OC. Document index Approvals record |
2. The project story
PEARL CITY is a proposed residential plotted layout in Indrakaran village, Kandi mandal, Sangareddy district. The RERA registration covers plots rather than apartments or villas, and the filed site identity comprises survey numbers 441, 445 and 439. RERA record
The HMDA layout plan allocates land to plots, internal roads, open space/parks and utility areas, and social infrastructure. It also identifies 18 plots mortgaged to HMDA. The approval describes required layout development works, including roads and open spaces; it does not establish that these works have since been completed.
The RERA-filed progress figures report 80% completion for internal roads and footpaths and 60% for sewerage; several other infrastructure categories are recorded at 0%. These are promoter-submitted progress indicators in the supplied RERA data and are not an independent inspection of the site. RERA amenities
3. Master plan, architecture & building design
The HMDA-approved layout is a plotted plan, not a building or floor plan. Its stated total site area is 42435.35 sq.m, with 253.59 sq.m identified as road-widening area and a net layout area of 42181.76 sq.m. The area statement allocates 26022.80 sq.m to plots, 11385.72 sq.m to layout roads, 3381.66 sq.m to organized open space/park/utility area, 1108.48 sq.m to social infrastructure and 0.00 sq.m to amenity area. Layout record
The plan identifies PARK-1 438.00 Sq.Mtrs, PARK-2 1885.74 Sq.Mtrs, and UTILITY AREAS 213.34 Sq. Mtrs within the open-space/utility description. The plan also specifies road widths of 9.00, 9.92 and 12.00 M. These are drawing-derived approval details; the supplied material does not provide a complete, verified plot schedule or individual plot dimensions.
No buildings, building footprints, floors, parking levels, apartment layouts or building count are evidenced in the supplied project record. Approvals record Document index
4. Homes, configurations & floor plans
This is a plotted development; apartment configuration, apartment saleable area and measured carpet area are not applicable based on the supplied RERA project record. RERA record
| Count | Not established |
|---|---|
| Booked | Not established |
| Available | Not established |
| Plot area / size bands | Individual plot sizes and size bands are not established in the supplied data. Layout record |
The approved layout drawing extraction is incomplete for plot-by-plot measurements, and the supplied floor-plan dataset contains no measured homes. A third-party vendor record lists “Plot” with “built-up 1,313 - 4,068 sq ft,” but the RERA-filed record does not establish those as approved plot sizes or a complete plot schedule; this Overview therefore does not present them as the project’s verified offering. Layout record Floor plans Promoter website
5. Parking & vehicle circulation
The supplied records do not establish sanctioned parking counts, visitor or accessible parking, parking allocation to individual plots, or EV charging. The approval plan identifies internal layout roads and road widths of 9.00, 9.92 and 12.00 M; it does not establish individual parking rights or spaces.
6. Amenities, recreation & open spaces
The HMDA layout approval identifies parks and open-space/utility land. The progress percentages below are RERA-filed figures; a recorded percentage is not independent confirmation of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park 1 | 438.00 Sq.Mtrs | HMDA layout plan | RERA amenity category “Green Strip/TOT LOT/Park”: 0%; not independently verified RERA amenities |
| Park 2 | 1885.74 Sq.Mtrs | HMDA layout plan | RERA amenity category “Green Strip/TOT LOT/Park”: 0%; not independently verified RERA amenities |
| Organized open space / park / utility area | 3381.66 sq.m in the layout area statement | HMDA layout plan | No independent completion verification supplied |
| Utility areas | 213.34 Sq. Mtrs | HMDA layout plan | No independent completion verification supplied |
| Social infrastructure | 1108.48 Sq. Mtrs | HMDA layout plan | RERA-filed “Community Buildings”: 0%; no facility-specific completion verification supplied RERA amenities |
| Amenity area | 0.00 sq.m in the layout area statement | HMDA layout plan | Not applicable as a separately allocated amenity-area figure in that statement |
| Internal roads and footpaths | Layout roads total 11385.72 sq.m | HMDA layout plan | RERA-filed progress: 80%; not independently verified RERA amenities |
A vendor record lists a clubhouse, power backup, security, reserved parking, water storage, street lighting, parks and other amenities. These are vendor-listed claims, not established here as HMDA-sanctioned or delivered facilities. Promoter website
7. Utilities, building services & safety
The HMDA approval-document extraction lists proposed layout infrastructure including storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, a transformer, avenue plantation, park development and rainwater-harvesting pits. The extracted approval information identifies these as layout provisions; the supplied record does not establish their capacities or independent completion.
| Evidence in the supplied record | Internal water-supply pipelines and an overhead tank are listed in the approval-document extraction. |
|---|---|
| Status limitation | Source, storage capacity, treatment and independently verified operation are not established. |
| Evidence in the supplied record | Underground drainage lines, a common septic tank/STP and storm-water drains are listed. |
|---|---|
| Status limitation | RERA-filed sewerage progress is 60%; treatment/disposal is reported at 0%. No independent completion evidence is supplied. RERA amenities |
| Evidence in the supplied record | A transformer is listed; the RERA progress record includes electrical meter room, sub-station and receiving station at 0%. RERA amenities |
|---|---|
| Status limitation | Installed capacity, backup and completion are not established. |
| Evidence in the supplied record | Rainwater-harvesting pits are listed; RERA-filed water conservation/rainwater harvesting progress is 0%. RERA amenities |
|---|---|
| Status limitation | Completion and operating details are not established. |
| Evidence in the supplied record | RERA-filed fire-protection and fire-safety progress is 0%. RERA amenities |
|---|---|
| Status limitation | No fire-system design, clearance or independent compliance evidence is supplied. |
| Evidence in the supplied record | No project-specific details are established in the supplied RERA or approval records. RERA amenities Document index |
|---|---|
| Status limitation | No verified facilities or capacities stated. |
8. Location, access & connectivity
The registered project location is Indrakaran, Kandi, Sangareddy, 502329, in Indrakaran revenue village, Kandi mandal. RERA record
The layout plan describes an approach at the west boundary as “ROAD INDRAKARAN TO CHERIYAL” and identifies layout-road widths of 9.00, 9.92 and 12.00 M. A supplied location record reports the nearest sampled Outer Ring Road interchange at approximately 11.8 km; no travel time is supplied. RERA filing Location record
A vendor record separately lists two “Type 1 Bus Stop” points at 2.28 Km and 2.29 Km, HP Petrol Pump at 2.64 Km, and Ordnance Factory at 3.32 Km. These are vendor-supplied connectivity claims, not independently verified distances. Promoter website
9. Developer & development status
The registered promoter is Sai Balaji Projects, identified in the project record as a partnership. The listed partners are Prasad Sakhamuri and Manohar Shakamuri; Venkatadri Naidu Pothugunta is identified as the authorized signatory. Corporate record RERA filing
The project filing lists the promoter address as Madhura Residency, Rajeev Nagar, Indrakaran, Kandi, Sangareddy, 502329. No verified corporate registration number, official website or contact details are established in the supplied data. Corporate record
In Form B, the promoter’s authorized signatory declared a completion undertaking of 22nd February 2022 and described the project as an open-plot layout. RERA-filed progress data reports internal roads and footpaths at 80% and sewerage at 60%; these are filed declarations, not independent site findings. RERA amenities
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C records PEARL CITY, registration P01100001426, granted under section 5, valid from 25/11/2019 to 22/02/2022. |
| HMDA layout approval | Layout Permit 000047/LO/Plg/HMDA/2019, dated 22 February 2019, for the plotted layout on survey numbers 441, 445 and 439 in Indrakaran village, Kandi mandal. |
| HMDA draft layout letter | Document describes HMDA’s draft layout letter and layout conditions, including roads, open spaces and mortgage plots. |
| RERA Form B | Promoter declaration dated 24th day of May 2019, naming the landowners and referring to Development Agreement-cum-GPA No. 10068/2019. |
| Completion / occupancy certificate | None is identified in the supplied project documents. Document index |
| Development agreement | The supplied title-report extraction identifies a registered Development Agreement-cum-GPA dated 01 March 2019, No. 10068 of 2019, relating to Ac. 10-20 Guntas in survey numbers 441, 445 and 439. |
1. Project at a glance
Project identity
Registered project name: PEARL CITY
Project type: Plotted development / open-plot layout
Phase or registered portion: A separate phase is not identified in the supplied record; the registration is for PEARL CITY
TG-RERA registration: P01100001426
Registration validity: 25/11/2019–22/02/2022; the certificate states two years and no extension is recorded in the supplied certificate
Registered promoter: Sai Balaji Projects; entity type stated as partnership
RERA status: The supplied certificate records registration; its stated validity period has ended. Current portal status is not established by the supplied record.
Land and geographic identity
Locality: Indrakaran
Revenue village: Indrakaran
Mandal / district / PIN: Kandi / Sangareddy / 502329
Project survey numbers: 441, 445 and 439; no subdivisions are specified in the project filing
Site area and deductions: Total site area 42435.35 sq.m; road-widening area 253.59 sq.m; net layout area 42181.76 sq.m
Boundaries: East: “VAGU SURVEY NO 439 AA 1”; West: “ROAD INDRAKARAN TO CHERIYAL”; North: “LAND OF OWNERS AND KANDI NARAYANA”; South: “NAGAIAH SURVAY NO 437 AND MALLAIAH”
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: HMDA Layout Permit 000047/LO/Plg/HMDA/2019, dated 22 February 2019
Approved built-up area: Not stated in the supplied layout approval; the project is a plotted layout, and no building or residential tower configuration is provided
Layout land-use figures: Plotted area 26022.80 sq.m; layout roads 11385.72 sq.m; organized open space/park/utility area 3381.66 sq.m; social infrastructure 1108.48 sq.m; amenity area 0.00 sq.m
HMDA-mortgaged plots: Plots 1 to 3, 5 to 7 and 150 to 161—18 plots, totaling 3946.82 sq.m—are identified as mortgaged to HMDA
Offering and status
Unit type: Open plots; the RERA registration identifies a plotted development
Plot count and sizes: Not established by the supplied records. The layout extraction says the plot details are incomplete and no plot-size measurements are available.
Booked / available counts: Not established in the supplied data.
Construction / development stage: The RERA-filed amenity progress data reports internal roads and footpaths at 80% and sewerage at 60%; other reported items are at 0%. These are filed progress figures, not independent site verification.
Completion deadline: The promoter’s Form B states a completion undertaking of 22nd February 2022 for the open-plot layout.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied records. For this plotted layout, the supplied documents identify layout permission and development works, not a building-phase OC.
2. The project story
PEARL CITY is a proposed residential plotted layout in Indrakaran village, Kandi mandal, Sangareddy district. The RERA registration covers plots rather than apartments or villas, and the filed site identity comprises survey numbers 441, 445 and 439.
The HMDA layout plan allocates land to plots, internal roads, open space/parks and utility areas, and social infrastructure. It also identifies 18 plots mortgaged to HMDA. The approval describes required layout development works, including roads and open spaces; it does not establish that these works have since been completed.
The RERA-filed progress figures report 80% completion for internal roads and footpaths and 60% for sewerage; several other infrastructure categories are recorded at 0%. These are promoter-submitted progress indicators in the supplied RERA data and are not an independent inspection of the site.
3. Master plan, architecture & building design
The HMDA-approved layout is a plotted plan, not a building or floor plan. Its stated total site area is 42435.35 sq.m, with 253.59 sq.m identified as road-widening area and a net layout area of 42181.76 sq.m. The area statement allocates 26022.80 sq.m to plots, 11385.72 sq.m to layout roads, 3381.66 sq.m to organized open space/park/utility area, 1108.48 sq.m to social infrastructure and 0.00 sq.m to amenity area.
The plan identifies PARK-1 438.00 Sq.Mtrs, PARK-2 1885.74 Sq.Mtrs, and UTILITY AREAS 213.34 Sq. Mtrs within the open-space/utility description. The plan also specifies road widths of 9.00, 9.92 and 12.00 M. These are drawing-derived approval details; the supplied material does not provide a complete, verified plot schedule or individual plot dimensions.
No buildings, building footprints, floors, parking levels, apartment layouts or building count are evidenced in the supplied project record.
4. Homes, configurations & floor plans
This is a plotted development; apartment configuration, apartment saleable area and measured carpet area are not applicable based on the supplied RERA project record.
| Count | Not established |
|---|---|
| Booked | Not established |
| Available | Not established |
| Plot area / size bands | Individual plot sizes and size bands are not established in the supplied data. |
The approved layout drawing extraction is incomplete for plot-by-plot measurements, and the supplied floor-plan dataset contains no measured homes. A third-party vendor record lists “Plot” with “built-up 1,313 - 4,068 sq ft,” but the RERA-filed record does not establish those as approved plot sizes or a complete plot schedule; this Overview therefore does not present them as the project’s verified offering.
5. Parking & vehicle circulation
The supplied records do not establish sanctioned parking counts, visitor or accessible parking, parking allocation to individual plots, or EV charging. The approval plan identifies internal layout roads and road widths of 9.00, 9.92 and 12.00 M; it does not establish individual parking rights or spaces.
6. Amenities, recreation & open spaces
The HMDA layout approval identifies parks and open-space/utility land. The progress percentages below are RERA-filed figures; a recorded percentage is not independent confirmation of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park 1 | 438.00 Sq.Mtrs | HMDA layout plan | RERA amenity category “Green Strip/TOT LOT/Park”: 0%; not independently verified |
| Park 2 | 1885.74 Sq.Mtrs | HMDA layout plan | RERA amenity category “Green Strip/TOT LOT/Park”: 0%; not independently verified |
| Organized open space / park / utility area | 3381.66 sq.m in the layout area statement | HMDA layout plan | No independent completion verification supplied |
| Utility areas | 213.34 Sq. Mtrs | HMDA layout plan | No independent completion verification supplied |
| Social infrastructure | 1108.48 Sq. Mtrs | HMDA layout plan | RERA-filed “Community Buildings”: 0%; no facility-specific completion verification supplied |
| Amenity area | 0.00 sq.m in the layout area statement | HMDA layout plan | Not applicable as a separately allocated amenity-area figure in that statement |
| Internal roads and footpaths | Layout roads total 11385.72 sq.m | HMDA layout plan | RERA-filed progress: 80%; not independently verified |
A vendor record lists a clubhouse, power backup, security, reserved parking, water storage, street lighting, parks and other amenities. These are vendor-listed claims, not established here as HMDA-sanctioned or delivered facilities.
7. Utilities, building services & safety
The HMDA approval-document extraction lists proposed layout infrastructure including storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, a transformer, avenue plantation, park development and rainwater-harvesting pits. The extracted approval information identifies these as layout provisions; the supplied record does not establish their capacities or independent completion.
| Evidence in the supplied record | Internal water-supply pipelines and an overhead tank are listed in the approval-document extraction. |
|---|---|
| Status limitation | Source, storage capacity, treatment and independently verified operation are not established. |
| Evidence in the supplied record | Underground drainage lines, a common septic tank/STP and storm-water drains are listed. |
|---|---|
| Status limitation | RERA-filed sewerage progress is 60%; treatment/disposal is reported at 0%. No independent completion evidence is supplied. |
| Evidence in the supplied record | A transformer is listed; the RERA progress record includes electrical meter room, sub-station and receiving station at 0%. |
|---|---|
| Status limitation | Installed capacity, backup and completion are not established. |
| Evidence in the supplied record | Rainwater-harvesting pits are listed; RERA-filed water conservation/rainwater harvesting progress is 0%. |
|---|---|
| Status limitation | Completion and operating details are not established. |
| Evidence in the supplied record | RERA-filed fire-protection and fire-safety progress is 0%. |
|---|---|
| Status limitation | No fire-system design, clearance or independent compliance evidence is supplied. |
| Evidence in the supplied record | No project-specific details are established in the supplied RERA or approval records. |
|---|---|
| Status limitation | No verified facilities or capacities stated. |
8. Location, access & connectivity
The registered project location is Indrakaran, Kandi, Sangareddy, 502329, in Indrakaran revenue village, Kandi mandal.
The layout plan describes an approach at the west boundary as “ROAD INDRAKARAN TO CHERIYAL” and identifies layout-road widths of 9.00, 9.92 and 12.00 M. A supplied location record reports the nearest sampled Outer Ring Road interchange at approximately 11.8 km; no travel time is supplied.
A vendor record separately lists two “Type 1 Bus Stop” points at 2.28 Km and 2.29 Km, HP Petrol Pump at 2.64 Km, and Ordnance Factory at 3.32 Km. These are vendor-supplied connectivity claims, not independently verified distances.
9. Developer & development status
The registered promoter is Sai Balaji Projects, identified in the project record as a partnership. The listed partners are Prasad Sakhamuri and Manohar Shakamuri; Venkatadri Naidu Pothugunta is identified as the authorized signatory.
The project filing lists the promoter address as Madhura Residency, Rajeev Nagar, Indrakaran, Kandi, Sangareddy, 502329. No verified corporate registration number, official website or contact details are established in the supplied data.
In Form B, the promoter’s authorized signatory declared a completion undertaking of 22nd February 2022 and described the project as an open-plot layout. RERA-filed progress data reports internal roads and footpaths at 80% and sewerage at 60%; these are filed declarations, not independent site findings.
10. Approvals, official records & documents
TG-RERA registration: Form C records PEARL CITY, registration P01100001426, granted under section 5, valid from 25/11/2019 to 22/02/2022.
HMDA layout approval: Layout Permit 000047/LO/Plg/HMDA/2019, dated 22 February 2019, for the plotted layout on survey numbers 441, 445 and 439 in Indrakaran village, Kandi mandal.
HMDA draft layout letter: Document describes HMDA’s draft layout letter and layout conditions, including roads, open spaces and mortgage plots.
RERA Form B: Promoter declaration dated 24th day of May 2019, naming the landowners and referring to Development Agreement-cum-GPA No. 10068/2019.
Completion / occupancy certificate: None is identified in the supplied project documents.
Development agreement: The supplied title-report extraction identifies a registered Development Agreement-cum-GPA dated 01 March 2019, No. 10068 of 2019, relating to Ac. 10-20 Guntas in survey numbers 441, 445 and 439.
Frequently asked questions
Is PEARL CITY registered with Telangana RERA?
Yes. PEARL CITY is registered with the Telangana Real Estate Regulatory Authority as P01100001426; the registration status is New Project.
Who is the developer of PEARL CITY?
The promoter named in the RERA registration is SAI BALAJI PROJECTS.
Where is PEARL CITY located?
PEARL CITY is in INDRAKARAN, KANDI, Sangareddy, Telangana (502329).
When will PEARL CITY be completed?
The promoter's proposed date of completion filed with RERA is 22/02/2022. This is the promoter's declaration, not a guarantee.