Reves Township
EAGLE INFRA · Rangareddy · RERA P02400010118
REVES TOWNSHIP is a plotted development in Mansanpalle, Maheshwaram Mandal, Ranga Reddy District, developed by registered promoter EAGLE INFRA. The project covers 31925.63 sq.m. and is a residential open-plot layout; the number of plots and their sizes are not disclosed. It is registered under TG-RERA registration P02400010118, with the promoter’s completion undertaking by 03-Sep-2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | REVES TOWNSHIP RERA record |
| Project type | Plotted development / open-plot residential layout RERA record |
| Phase / registered portion | Phase not separately identified; registration describes the project land in the survey numbers below. RERA record |
| TG-RERA registration | P02400010118; registered promoter EAGLE INFRA; status recorded as New Project. RERA record |
| Registration validity | 03/09/2024 to 03/09/2027, unless extended by the Authority. This is the registration period, not a statement of project completion or occupancy certification. RERA record |
| RERA completion undertaking | Promoter’s Form B declares completion by 03-Sep-2027. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Mansanpalle; the layout document describes Mansanpalle Village. RERA record |
| Mandal / district / PIN | Maheshwaram / Ranga Reddy / 502345. RERA record |
| Project survey numbers | 139 and 139/A/2; the RERA certificate prints these as “SY NOS 139,139/A/2.” RERA record |
| Total site area | 31925.63 sq.m. RERA filing |
| Net layout area | 29821.72 sq.m. |
| Road-widening area | 1984.13 sq.m., described in the layout approval material as affected under a proposed 100 Mts wide road. RERA filing |
| Boundary descriptions in RERA filing | East: AGRICULTURE LAND; West: ROAD AND OTHERS LAND; North: LAND LORDS LAND; South: ROAD AND NEIGHBOURS LAND. RERA filing |
| Boundary descriptions in layout drawing | North, South and East: VACANT LAND; West: ROAD WIDTH - 10.05. |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA). Approvals record |
| Principal layout approval | 000041/LO/Plg/HMDA/2024, dated 03 September, 2024; the filed material identifies it as a draft layout letter for an open-plot layout. Approvals record |
| Approved built-up area | 17214.24 sq.m. is recorded in the RERA filing as approved built-up area; the layout drawing also labels 17214.24 sq.m. as plotted area. RERA filing |
| Layout arrangement | Residential plots, internal roads, open-space/park and utility land, social-infrastructure land and amenity-area entries are shown in the layout material. |
| Building count / floors | Not applicable to the offering as a plotted layout; no building or floor configuration is disclosed. RERA record |
| Parking provision | No project parking count or parking-level arrangement is identified in the supplied layout evidence. |
Offering and status
| Item | Record |
|---|---|
| Product offered | Residential plots; plot-wise unit count, sizes and inventory are not established in the supplied RERA data. RERA record |
| Plot count / booked / available | Not disclosed in the supplied RERA evidence. The drawing extraction does not provide a complete plot schedule. Layout record |
| Construction stage | RERA classifies the project as a New Project. No project-specific, verified site-progress percentage is supplied. RERA record |
| Completion date | Promoter-declared completion undertaking: 03-Sep-2027. |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied records; this is a plotted-layout project. Document index |
2. The project story
REVES TOWNSHIP is registered as a residential plotted development in Mansanpalle, Maheshwaram Mandal, Ranga Reddy District, covering Survey Nos. 139 and 139/A/2. Its HMDA-filed layout material describes a draft open-plot layout, rather than apartment blocks or villas. The proposed site includes residential plots and a network of internal roads, with designated open-space/park, social-infrastructure and amenity areas. RERA record
The RERA registration began on 03/09/2024 and is valid to 03/09/2027; separately, the promoter’s Form B states a completion undertaking of 03-Sep-2027. The documents supplied do not establish a construction-progress percentage or an independently verified completion status. The HMDA document is identified as a draft layout letter and sets out development and handover conditions before final layout release.
3. Master plan, architecture & building design
This is a plotted layout, so the relevant design evidence is the layout plan and its land-use schedule rather than floor plans or building elevations. The drawing identifies a total site area of 31925.63 sq.m. and a net layout area of 29821.72 sq.m.
| Layout component | Area recorded | Evidence |
|---|---|---|
| Plotted area | 17214.24 sq.m. | |
| Layout roads | 9252.52 sq.m. | |
| Organized open space / park / utility area | 2602.69 sq.m. | |
| Social infrastructure area | 752.13 sq.m. | |
| Road-widening area | 1984.13 sq.m. | |
| Amenity area total | 2103.91 sq.m. in the layout-plan extraction |
The supplied drawing material also describes a 10.05 road width and a proposed 30.48 M [100'-0"] wide road. The draft layout letter refers to a proposed 100 Mts wide road and records the 1984.13 sq.m. road-affected area. These are descriptions from the filed approval materials, not measurements independently checked on site.
The drawing extraction reports two layout sheets and does not provide a complete plot schedule or plot-size breakdown. No building count, building footprint, residential/commercial floor distribution, or apartment floor-plan information is established by the supplied evidence. Layout record Floor plans
4. Homes, configurations & floor plans
The registered offering is plots, not apartments. The supplied RERA material does not establish the plot count, individual plot sizes, booked/available inventory or a RERA-filed plot-size range. RERA record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The layout extraction indicates that plot details are incomplete; it should not be treated as a verified plot schedule. Apartment floor-plan measurements and carpet-area comparisons are not applicable on the evidence supplied. Layout record Floor plans
5. Parking & vehicle circulation
The layout material identifies internal roads, including a stated road width of 10.05 and a proposed 30.48 M [100'-0"] wide road. The draft layout conditions also state that all roads should be opened for access to neighbouring sites and that the site is not to be enclosed by a compound wall or fencing. These are approval-document statements; the supplied evidence does not verify their implementation on site.
No sanctioned parking-space count, visitor or accessible-parking provision, parking levels, parking-allocation terms, vehicle ramp arrangement, EV charging provision or resident/visitor parking split is established in the supplied records.
6. Amenities, recreation & open spaces
The layout approval material lists proposed infrastructure and facilities. The supplied records do not establish that any of these have been completed or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 2602.69 sq.m. | Included in the layout material; completion not verified. | |
| Social infrastructure | 752.13 sq.m. | Included in the layout material; completion not verified. | |
| Amenity area | 2103.91 sq.m. in the layout-plan extraction | Area recorded in the drawing extraction; facility-specific use and completion are not established. | |
| Avenue plantation and park development | No size or quantity stated | Listed in the draft layout letter; completion not verified. | |
| Cycling tracks | No size or quantity stated | Listed in the draft layout letter; completion not verified. | |
| Community buildings | No size or quantity stated | Not established as delivered. | |
| Indoor / clubhouse facilities | No RERA-filed facility details supplied | Document index | Not established by the supplied project records. |
7. Utilities, building services & safety
The draft layout letter lists infrastructure and utility works intended for the layout. The amenity record also marks certain utility categories as available, but the supplied data contains no verified completion percentages for this project; the listed facilities should therefore be read as recorded or proposed, not as independently confirmed working services. RERA amenities
| What the project record identifies | Internal water-supply pipelines and an overhead tank (OHT) are listed. |
|---|---|
| Status supported by supplied evidence | Listed in the draft layout material; capacity and completion not established. |
| What the project record identifies | Storm-water drains, underground drainage lines and a common septic tank / STP are listed. |
|---|---|
| Status supported by supplied evidence | Listed in the draft layout material; capacity, treatment arrangements and completion not established. |
| What the project record identifies | Rainwater-harvesting pits are listed. |
|---|---|
| Status supported by supplied evidence | Listed; completion not verified. |
| What the project record identifies | Electrical supply lines, transformer and street lights are listed. |
|---|---|
| Status supported by supplied evidence | Listed; capacity and completion not established. |
| What the project record identifies | A solid-waste bio-compost unit is listed; the layout drawing also mentions bio-compost and garbage. |
|---|---|
| Status supported by supplied evidence | Listed; operating status not verified. |
| What the project record identifies | No project-specific fire system, fire clearance or safety design is established in the supplied evidence. |
|---|---|
| Status supported by supplied evidence | Not disclosed in the supplied project records. |
| What the project record identifies | Not applicable to the plotted-layout evidence supplied; no accessible circulation or accessibility design details are established. |
|---|---|
| Status supported by supplied evidence | Not disclosed. |
8. Location, access & connectivity
The RERA-registered location is Mansanpalle, Maheshwaram, Ranga Reddy, 502345, in Survey Nos. 139 and 139/A/2. The supplied cadastral location record gives a parcel centroid of 17.139247293716082, 78.40503996351748. RERA record Cadastral map
The layout material describes an abutting road width of 10.05 and a proposed 30.48 M [100'-0"] wide road. The draft layout conditions also state that roads should be opened for accessibility to neighbouring sites. The nearest sampled Outer Ring Road interchange is recorded at approximately 10.4 km; this is a mapped/sample distance, not a travel-time estimate. Location record
No project-verified public-transport routes, travel times or additional landmark distances are established in the supplied location evidence.
9. Developer & development status
The TG-RERA record identifies EAGLE INFRA as the registered promoter and describes the organization as a Partnership. The supplied corporate identifier is GSTIN 36AAGFE1208C1Z3. The RERA filing names SHAIK IBRAHIM as authorized signatory and AISHA ANJUM as a partner. RERA record Corporate record Parties record
The promoter’s Form B, signed by Shaik Ibrahim as authorized signatory, declares completion by 03-Sep-2027 and includes declarations about project funds, pending approvals and annual audit. These are promoter declarations, not independent evidence of construction progress or completion.
The supplied certificate records registration validity from 03/09/2024 to 03/09/2027. No project-specific site-progress figure or completion certificate is established in the materials reviewed for this Overview. Document index
10. Approvals, official records & documents
| Record | What it establishes in the supplied material |
|---|---|
| TG-RERA Form C certificate, registration P02400010118 | Names REVES TOWNSHIP and EAGLE INFRA; records the registered location and survey numbers; states validity from 03/09/2024 to 03/09/2027. |
| HMDA draft layout letter, approval 000041/LO/Plg/HMDA/2024 | Draft layout approval for an open-plot layout in Survey Nos. 139 and 139/A/2, dated 03 September, 2024; includes development and land-handover conditions. |
| HMDA layout plan | Layout drawing for the proposed residential draft layout; records site and land-use information and identifies sheet 01/01. |
| Promoter Form B declaration | Promoter declaration dated 24-October-2024, including the completion undertaking of 03-Sep-2027. |
| HMDA mortgage recorded in approval material | The draft layout letter identifies mortgage deed 4618/2024 over Plot Nos. 51–60 and 96–101, with stated extent 2662.98 Sq.Mt., in favour of HMDA. |
| Public-purpose gift recorded in approval material | The draft layout letter identifies gift deed 14016/2024, dated 27/08/2024, for the area affected under the proposed 100 Mts wide road, stated as 1984.13 Sq.mtrs, in favour of the Grampanchayat, Mansanpally. |
The supplied records identify the layout approval as draft and describe conditions to be met before final layout-plan release. No final layout release document or project occupancy/completion certificate is identified in the evidence supplied for this Overview.
1. Project at a glance
Project identity
Registered project name: REVES TOWNSHIP
Project type: Plotted development / open-plot residential layout
Phase / registered portion: Phase not separately identified; registration describes the project land in the survey numbers below.
TG-RERA registration: P02400010118; registered promoter EAGLE INFRA; status recorded as New Project.
Registration validity: 03/09/2024 to 03/09/2027, unless extended by the Authority. This is the registration period, not a statement of project completion or occupancy certification.
RERA completion undertaking: Promoter’s Form B declares completion by 03-Sep-2027.
Land and geographic identity
Locality / revenue village: Mansanpalle; the layout document describes Mansanpalle Village.
Mandal / district / PIN: Maheshwaram / Ranga Reddy / 502345.
Project survey numbers: 139 and 139/A/2; the RERA certificate prints these as “SY NOS 139,139/A/2.”
Total site area: 31925.63 sq.m.
Net layout area: 29821.72 sq.m.
Road-widening area: 1984.13 sq.m., described in the layout approval material as affected under a proposed 100 Mts wide road.
Boundary descriptions in RERA filing: East: AGRICULTURE LAND; West: ROAD AND OTHERS LAND; North: LAND LORDS LAND; South: ROAD AND NEIGHBOURS LAND.
Boundary descriptions in layout drawing: North, South and East: VACANT LAND; West: ROAD WIDTH - 10.05.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA).
Principal layout approval: 000041/LO/Plg/HMDA/2024, dated 03 September, 2024; the filed material identifies it as a draft layout letter for an open-plot layout.
Approved built-up area: 17214.24 sq.m. is recorded in the RERA filing as approved built-up area; the layout drawing also labels 17214.24 sq.m. as plotted area.
Layout arrangement: Residential plots, internal roads, open-space/park and utility land, social-infrastructure land and amenity-area entries are shown in the layout material.
Building count / floors: Not applicable to the offering as a plotted layout; no building or floor configuration is disclosed.
Parking provision: No project parking count or parking-level arrangement is identified in the supplied layout evidence.
Offering and status
Product offered: Residential plots; plot-wise unit count, sizes and inventory are not established in the supplied RERA data.
Plot count / booked / available: Not disclosed in the supplied RERA evidence. The drawing extraction does not provide a complete plot schedule.
Construction stage: RERA classifies the project as a New Project. No project-specific, verified site-progress percentage is supplied.
Completion date: Promoter-declared completion undertaking: 03-Sep-2027.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied records; this is a plotted-layout project.
2. The project story
REVES TOWNSHIP is registered as a residential plotted development in Mansanpalle, Maheshwaram Mandal, Ranga Reddy District, covering Survey Nos. 139 and 139/A/2. Its HMDA-filed layout material describes a draft open-plot layout, rather than apartment blocks or villas. The proposed site includes residential plots and a network of internal roads, with designated open-space/park, social-infrastructure and amenity areas.
The RERA registration began on 03/09/2024 and is valid to 03/09/2027; separately, the promoter’s Form B states a completion undertaking of 03-Sep-2027. The documents supplied do not establish a construction-progress percentage or an independently verified completion status. The HMDA document is identified as a draft layout letter and sets out development and handover conditions before final layout release.
3. Master plan, architecture & building design
This is a plotted layout, so the relevant design evidence is the layout plan and its land-use schedule rather than floor plans or building elevations. The drawing identifies a total site area of 31925.63 sq.m. and a net layout area of 29821.72 sq.m.
| Layout component | Area recorded | Evidence |
|---|---|---|
| Plotted area | 17214.24 sq.m. | |
| Layout roads | 9252.52 sq.m. | |
| Organized open space / park / utility area | 2602.69 sq.m. | |
| Social infrastructure area | 752.13 sq.m. | |
| Road-widening area | 1984.13 sq.m. | |
| Amenity area total | 2103.91 sq.m. in the layout-plan extraction |
The supplied drawing material also describes a 10.05 road width and a proposed 30.48 M [100'-0"] wide road. The draft layout letter refers to a proposed 100 Mts wide road and records the 1984.13 sq.m. road-affected area. These are descriptions from the filed approval materials, not measurements independently checked on site.
The drawing extraction reports two layout sheets and does not provide a complete plot schedule or plot-size breakdown. No building count, building footprint, residential/commercial floor distribution, or apartment floor-plan information is established by the supplied evidence.
4. Homes, configurations & floor plans
The registered offering is plots, not apartments. The supplied RERA material does not establish the plot count, individual plot sizes, booked/available inventory or a RERA-filed plot-size range.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The layout extraction indicates that plot details are incomplete; it should not be treated as a verified plot schedule. Apartment floor-plan measurements and carpet-area comparisons are not applicable on the evidence supplied.
5. Parking & vehicle circulation
The layout material identifies internal roads, including a stated road width of 10.05 and a proposed 30.48 M [100'-0"] wide road. The draft layout conditions also state that all roads should be opened for access to neighbouring sites and that the site is not to be enclosed by a compound wall or fencing. These are approval-document statements; the supplied evidence does not verify their implementation on site.
No sanctioned parking-space count, visitor or accessible-parking provision, parking levels, parking-allocation terms, vehicle ramp arrangement, EV charging provision or resident/visitor parking split is established in the supplied records.
6. Amenities, recreation & open spaces
The layout approval material lists proposed infrastructure and facilities. The supplied records do not establish that any of these have been completed or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 2602.69 sq.m. | Included in the layout material; completion not verified. | |
| Social infrastructure | 752.13 sq.m. | Included in the layout material; completion not verified. | |
| Amenity area | 2103.91 sq.m. in the layout-plan extraction | Area recorded in the drawing extraction; facility-specific use and completion are not established. | |
| Avenue plantation and park development | No size or quantity stated | Listed in the draft layout letter; completion not verified. | |
| Cycling tracks | No size or quantity stated | Listed in the draft layout letter; completion not verified. | |
| Community buildings | No size or quantity stated | Not established as delivered. | |
| Indoor / clubhouse facilities | No RERA-filed facility details supplied | Not established by the supplied project records. |
7. Utilities, building services & safety
The draft layout letter lists infrastructure and utility works intended for the layout. The amenity record also marks certain utility categories as available, but the supplied data contains no verified completion percentages for this project; the listed facilities should therefore be read as recorded or proposed, not as independently confirmed working services.
| What the project record identifies | Internal water-supply pipelines and an overhead tank (OHT) are listed. |
|---|---|
| Status supported by supplied evidence | Listed in the draft layout material; capacity and completion not established. |
| What the project record identifies | Storm-water drains, underground drainage lines and a common septic tank / STP are listed. |
|---|---|
| Status supported by supplied evidence | Listed in the draft layout material; capacity, treatment arrangements and completion not established. |
| What the project record identifies | Rainwater-harvesting pits are listed. |
|---|---|
| Status supported by supplied evidence | Listed; completion not verified. |
| What the project record identifies | Electrical supply lines, transformer and street lights are listed. |
|---|---|
| Status supported by supplied evidence | Listed; capacity and completion not established. |
| What the project record identifies | A solid-waste bio-compost unit is listed; the layout drawing also mentions bio-compost and garbage. |
|---|---|
| Status supported by supplied evidence | Listed; operating status not verified. |
| What the project record identifies | No project-specific fire system, fire clearance or safety design is established in the supplied evidence. |
|---|---|
| Status supported by supplied evidence | Not disclosed in the supplied project records. |
| What the project record identifies | Not applicable to the plotted-layout evidence supplied; no accessible circulation or accessibility design details are established. |
|---|---|
| Status supported by supplied evidence | Not disclosed. |
8. Location, access & connectivity
The RERA-registered location is Mansanpalle, Maheshwaram, Ranga Reddy, 502345, in Survey Nos. 139 and 139/A/2. The supplied cadastral location record gives a parcel centroid of 17.139247293716082, 78.40503996351748.
The layout material describes an abutting road width of 10.05 and a proposed 30.48 M [100'-0"] wide road. The draft layout conditions also state that roads should be opened for accessibility to neighbouring sites. The nearest sampled Outer Ring Road interchange is recorded at approximately 10.4 km; this is a mapped/sample distance, not a travel-time estimate.
No project-verified public-transport routes, travel times or additional landmark distances are established in the supplied location evidence.
9. Developer & development status
The TG-RERA record identifies EAGLE INFRA as the registered promoter and describes the organization as a Partnership. The supplied corporate identifier is GSTIN 36AAGFE1208C1Z3. The RERA filing names SHAIK IBRAHIM as authorized signatory and AISHA ANJUM as a partner.
The promoter’s Form B, signed by Shaik Ibrahim as authorized signatory, declares completion by 03-Sep-2027 and includes declarations about project funds, pending approvals and annual audit. These are promoter declarations, not independent evidence of construction progress or completion.
The supplied certificate records registration validity from 03/09/2024 to 03/09/2027. No project-specific site-progress figure or completion certificate is established in the materials reviewed for this Overview.
10. Approvals, official records & documents
TG-RERA Form C certificate, registration P02400010118: Names REVES TOWNSHIP and EAGLE INFRA; records the registered location and survey numbers; states validity from 03/09/2024 to 03/09/2027.
HMDA draft layout letter, approval 000041/LO/Plg/HMDA/2024: Draft layout approval for an open-plot layout in Survey Nos. 139 and 139/A/2, dated 03 September, 2024; includes development and land-handover conditions.
HMDA layout plan: Layout drawing for the proposed residential draft layout; records site and land-use information and identifies sheet 01/01.
Promoter Form B declaration: Promoter declaration dated 24-October-2024, including the completion undertaking of 03-Sep-2027.
HMDA mortgage recorded in approval material: The draft layout letter identifies mortgage deed 4618/2024 over Plot Nos. 51–60 and 96–101, with stated extent 2662.98 Sq.Mt., in favour of HMDA.
Public-purpose gift recorded in approval material: The draft layout letter identifies gift deed 14016/2024, dated 27/08/2024, for the area affected under the proposed 100 Mts wide road, stated as 1984.13 Sq.mtrs, in favour of the Grampanchayat, Mansanpally.
The supplied records identify the layout approval as draft and describe conditions to be met before final layout-plan release. No final layout release document or project occupancy/completion certificate is identified in the evidence supplied for this Overview.
Frequently asked questions
Is REVES TOWNSHIP registered with Telangana RERA?
Yes. REVES TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P02400010118; the registration status is New Project.
Who is the developer of REVES TOWNSHIP?
The promoter named in the RERA registration is EAGLE INFRA.
Where is REVES TOWNSHIP located?
REVES TOWNSHIP is in MANSANPALLE, Mansanpally, Maheshwaram, Rangareddy, Telangana (502345).
When will REVES TOWNSHIP be completed?
The promoter's proposed date of completion filed with RERA is 03/09/2027. This is the promoter's declaration, not a guarantee.