ZION ALORA is a residential apartment project in Annapurna Colony, Kapra Cicle, Uppal Mandal, Medchal-Malkajgiri District, developed by the registered promoter ZION CONSTRUCTIONS. The project covers 639.48 sq. m and comprises one building with 1 Stilt + 5 upper floors and 15 2BHK apartments, each with a RERA-listed saleable area of 116.13 sq. m. Its TG-RERA registration number is P02200008442, and the project header proposes completion on 02/09/2027.

More from Zion Constructions · 2 projects →

01What we found

RegisteredTG-RERA - valid till 2 May 2027
11documents on file - each fact links to its page
1court case on this project's land (survey 60, Annapurna Colony, Kapra Cicle)
10items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldRecord
Registered project nameZION ALORA RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified; the registration describes one building RERA record RERA filing
TG-RERA registrationP02200008442 RERA record
Registration validityCertificate states validity commencing 28/06/2024 and ending 02/05/2027, unless extended by the Authority
Registered promoterZION CONSTRUCTIONS, recorded as a partnership RERA record Corporate record
RERA statusProject status recorded as “New Project”; certificate is on file. The supplied record does not state a current registration-status label beyond the certificate and its validity dates. RERA record

Land and geographic identity

FieldRecord
LocalityAnnapurna Colony, Kapra Cicle (as recorded in the project fields); the GHMC permit describes the locality as Meerpet Locality, Annapurna Colony RERA record RERA filing
Revenue villageMeerpet Village in the building permit and title documents; the RERA land record does not disclose a village. The registration certificate says “Uppal.”
MandalUppal RERA record
DistrictMedchal-Malkajgiri in the project record; the GHMC permit states Medchal District RERA record
PIN500097 RERA record
Survey number(s) / subdivisionsSurvey No. 60; no subdivision is identified in the project record. The title materials identify Plot Nos. 68, 69, 82 and 83 within Survey No. 60. RERA filing
Site extentGHMC plan: plot area 639.48 sq. m, road-affected area 25.89 sq. m, net plot area 613.59 sq. m. Title materials describe 765 sq. yards or 639.54 sq. m.
BoundariesNorth: 20 Feet Wide Road; south: 30 Feet Wide Road; east: Plot Nos. 70 and 81; west: neighbours’ land. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building-permit approval0918/GHMC/LBN/2024-BP, approved 02 May 2024
Other permit/file reference000573/GHMC/0262/LBN2/2024-BP
Drawing file referenceTS/075124/2023
Approved built-up areaGHMC extraction states 1,494.20 sq. m excluding parking and 1,793.00 sq. m including parking; the building-permit extraction separately lists residential area 1,494.20 sq. m and stilt area 284.64 sq. m.
Building countOne building, designated A (BUILDING) RERA filing
Sanctioned configuration1 Stilt + 5 upper floors; six floors are also stated in the plan’s “NO OF FLOORS” field. Building height is listed as 14.75 MT.
Parking provisionStilt is identified for parking. The building-permit extraction lists total parking area 197.6 sq. m; the drawing extraction lists 298.80 sq. m. The records do not provide a verified vehicle-space count.
Unit counts15 units in the sanctioned-plan extraction and 15 in the RERA unit record; the RERA record lists one building. RERA unit table

Offering and status

FieldRecord
RERA-listed configuration2BHK, 15 units RERA unit table
RERA saleable area116.13 sq. m per listed 2BHK configuration RERA unit table
Booked / available0 booked / 15 available, as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative. RERA unit table
Construction stageNot established by the supplied project record; no independently verified site-progress evidence is provided. RERA record RERA amenities
Completion datesProject header proposes 02/09/2027; Form B states an undertaking to complete by 02nd May 2027. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. GHMC’s permit requires an occupancy certificate before occupation.

The project story

  • ZION ALORA is registered as a residential apartment project on Survey No. 60, covering Plot Nos. 68, 69, 82 and 83 in Meerpet Village, Uppal Mandal. The project record describes one building, and the GHMC permit is for a stilt parking floor with five upper residential floors. The recorded landowners are represented in the development arrangement by ZION CONSTRUCTIONS; the development agreement grants development rights and does not itself convey ownership. RERA record
  • The RERA record lists 15 two-bedroom apartments. The supplied data does not establish construction progress through a dated site inspection or independent completion report. The RERA unit availability figures are portal-record counts without an as-of date. The project is therefore described here by its registration and sanctioned design, not as completed or occupancy-certified. No occupancy or completion certificate is present in the reviewed documents. RERA unit table RERA amenities

Master plan, architecture & building design

  • The GHMC-approved plan identifies one residential building, A (BUILDING), with 1 Stilt + 5 upper floors. The plan records a plot area of 639.48 sq. m, a road-affected area of 25.89 sq. m, a net plot area of 613.59 sq. m, and a vacant plot area of 314.75 sq. m. It gives proposed built-up area as 1,494.20 sq. m excluding parking and 1,793.00 sq. m including parking, with building height listed as 14.75 MT.
  • The building-permit extraction also lists a stilt area of 284.64 sq. m, total parking area of 197.6 sq. m, and residential area of 1,494.20 sq. m. These are plan-record figures and are reproduced as separately labelled; the supplied extracts do not provide a detailed area schedule explaining their relationship. The drawing extract identifies a mortgaged built-up area of 150.50 sq. m on the third floor and a road-affected portion to be surrendered to GHMC.
  • The permit conditions refer to tree planting and a tot-lot/greenery area, rainwater harvesting, transformer space and a garbage house. The available material does not establish detailed building footprint, floor-by-floor apartment distribution, lifts, stairs, internal circulation, or the sizes and layout of communal open spaces.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK15015116.13 sq. m60.5–71.6 sq. m; median 66.1 sq. m43%
  • Unit counts, booking counts and saleable area are from the TG-RERA unit record; booking figures have no stated as-of date. The carpet-area range, median and loading are software measurements from the approved floor-plan drawing geometry, not RERA-filed area disclosures, and the measurement is identified as needing review. RERA unit table RERA unit details Floor plans
  • The measured typical-plan example shows a living/dining room, two bedrooms, a kitchen, two toilets and balconies. The drawing extraction gives dimensions for those spaces, including a 1.20 M. WIDE BALC; the software-measured carpet-area method excludes balconies. Carpet area, balcony/utility areas and saleable area are distinct measures: the RERA figure is saleable area, while drawing-based carpet figures are software measurements and are not a substitute for a RERA-filed carpet disclosure. RERA unit details Floor plans

Parking & vehicle circulation

  • The sanctioned arrangement places parking at the stilt level. The building-permit extraction records 197.6 sq. m total parking area, while the drawing extraction separately lists 298.80 sq. m parking area; neither supplied record gives a verified number of car or two-wheeler spaces. The plan condition says the cellar and stilts approved for parking must be used exclusively for vehicle parking and not partitioned or repurposed.
  • The GHMC plan also includes a condition that parking places in buildings be provided with electric-vehicle charging infrastructure. No charging-point count, parking allocation schedule, visitor or accessible-bay count, ramp details, or exclusive unit-level parking allocation is supplied. A plan’s depiction or provision of parking does not by itself establish an individual buyer’s exclusive parking rights.

Amenities, recreation & open spaces

Tot-lot / green strip
Description / sizeNo size supplied; plan conditions refer to fencing and maintaining the tot-lot as greenery and to peripheral greenery.
Evidence sourceGHMC building plan; amenities record RERA amenities
Declared progress / verified statusPlan condition / RERA-listed provision; progress shown as 0% in the amenities record; completion not independently verified.
Rainwater harvesting
Description / sizeOne rainwater-harvesting pit is listed in the permit extraction; plan condition specifies a percolation pit.
Evidence sourceGHMC building permit; plan
Declared progress / verified statusSanctioned condition; progress not independently verified.
Community buildings
Description / sizeNo details or size supplied.
Evidence sourceRERA amenities record RERA amenities
Declared progress / verified statusListed with 0% progress; no independent completion evidence.
Swimming pool, gym, children’s play area, clubhouse
Description / sizeNo size or quantity supplied.
Evidence sourceVendor/marketing information Promoter website
Declared progress / verified statusMarketing claims only; not established as sanctioned, RERA-declared or delivered in the project documents.
  • The RERA amenities record lists 14 infrastructure and amenity categories, including internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, community buildings, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire protection, an electrical meter room/sub-station/receiving station, and recreational open space. Entries with stated availability are recorded as YES, but the progress fields shown are 0%; the supplied material does not independently verify completion. RERA amenities

Utilities, building services & safety

  • The RERA amenities record marks water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available YES; it does not establish their installed capacity or completed operational status. RERA amenities
  • The GHMC plan lists separate underground static water storage and terrace tanks, each with a stated capacity of 25,000 litres, along with a transformer space, garbage house, rainwater-harvesting percolation pit, generator, hose reel and down corner. The building-permit conditions place fire-safety and structural-safety provision on the owner/developer and technical professionals, and specify that a Fire NOC is to be obtained before issue of an occupancy certificate. These are plan provisions or conditions, not evidence that systems have been installed, tested or cleared.
  • No supplied record specifies lift count or capacity, service lifts, STP capacity, backup-power capacity, CCTV, access-control arrangements, accessible routes, or completed fire-safety inspection. The permit also states that an occupancy certificate is required before occupation. RERA amenities

Location, access & connectivity

  • The project is recorded in Annapurna Colony, Kapra Cicle, Uppal Mandal, Medchal-Malkajgiri District, PIN 500097. The building permit and title materials place the site at Meerpet Village, and the site is bounded to the north by a 20 Feet Wide Road and to the south by a 30 Feet Wide Road. RERA record RERA filing
  • The supplied location record gives a geocoded cadastral parcel centroid of 17.41528, 78.35459 and lists the Financial District (Nanakramguda) at 1.2 km as an anchor. The source does not explain the measurement method or route. No verified public-transport distances or travel times are supplied. Location record

Developer & development status

  • The TG-RERA-registered promoter is ZION CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AACFZ0224B1ZQ. The project record identifies BALA SHOW REDDY YERUVA as authorized signatory and lists SANDYA RANI YERUVA, PRANAY VIKAS REDDY YERUVA, PRANITHA MARY YERUVA and PRABHAKAR REEDY THUMMA as partners. The supplied material does not provide an independently verified registered-office address or official project contact details. Corporate record Parties record
  • The promoter’s Form B declaration states a completion undertaking of 02nd May 2027; the project header separately records a proposed completion date of 02/09/2027. The registration certificate’s validity runs through 02/05/2027, unless extended by the Authority; registration validity is distinct from a construction-completion deadline and from occupancy certification. No construction-progress certificate or occupancy certificate is supplied. RERA record

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200008442
What is availableForm C certificate for ZION ALORA, identifying ZION CONSTRUCTIONS as promoter and recording the registration validity.
GHMC building permit
Identifier / date0918/GHMC/LBN/2024-BP, approved 02 May 2024
What is availableBuilding permit for one residential building, 1 Stilt + 5 upper floors.
GHMC permit file reference
Identifier / date000573/GHMC/0262/LBN2/2024-BP
What is availableReference shown in the permit extraction.
Drawing file reference
Identifier / dateTS/075124/2023
What is availableReference associated with the supplied GHMC building-plan drawing.
Building plan
Identifier / datePlan sheets 1 / 2 and 2 / 2
What is availableDrawing-derived site, building, floor, area and condition details.
Title report
Identifier / dateDated 20.5.2024
What is availableAdvocate’s title opinion for Plot Nos. 68, 69, 82 and 83 in Survey No. 60, Meerpet Village.
Title deed / development arrangement
Identifier / dateSale deed 3287 of 1980; Development Agreement-cum-GPA 19685 of 2023, dated 22.11.2023
What is availableTitle report and registered development-agreement copy are on file.
Encumbrance statement
Identifier / dateSearch period 01-01-1983 to 02-06-2024
What is availableFiled statement records a mortgage without possession and a development agreement-cum-GPA.
Form B declaration
Identifier / dateMay 2024
What is availablePromoter declaration for the project, including the completion undertaking.
Occupancy / completion certificate
Identifier / dateNot supplied
What is availableThe permit requires an occupancy certificate before occupation; no such certificate is present in the reviewed documents.

Frequently asked questions

Is ZION ALORA registered with Telangana RERA?

Yes. ZION ALORA is registered with the Telangana Real Estate Regulatory Authority as P02200008442; the registration status is New Project.

Who is the developer of ZION ALORA?

The promoter named in the RERA registration is ZION CONSTRUCTIONS.

Where is ZION ALORA located?

ZION ALORA is in Annapurna Colony, Kapra Cicle, Uppal, Medchal-Malkajgiri, Telangana (500097).

When will ZION ALORA be completed?

The promoter's proposed date of completion filed with RERA is 02/09/2027. This is the promoter's declaration, not a guarantee.

More projects in Uppal