Sree Nivasam
SRI VIJAYA VENKATA INFRA DEVELOPERS · Hanamkonda · RERA P00300007116
SREE NIVASAM is a residential apartment project in Gowthami Nagar, Hanamkonda mandal, Warangal Urban district, developed by the registered promoter SRI VIJAYA VENKATA INFRA DEVELOPERS. The project is on 748.18 sq. m of land and comprises one residential building with 1 Stilt + 5 upper floors and 15 apartments: 10 2BHK units and 5 3BHK units. The TG-RERA registration number is P00300007116, and the promoter’s declared completion date is 20 March 2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SREE NIVASAM RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed. The registration concerns the project on the stated site and Survey No. 37; the sanction identifies one residential building. Land records |
| TG-RERA registration | P00300007116 RERA record |
| Registration validity | 18 October 2023 to 20 March 2026; the certificate says it may be extended by the Authority. The supplied record states no extension. Registration validity is separate from the completion undertaking and from occupancy certification. RERA record |
| Registered promoter | SRI VIJAYA VENKATA INFRA DEVELOPERS Corporate record |
| RERA status in supplied record | Registered project; the registration certificate is not marked as extended. The supplied record does not establish the project’s current registration status after 20 March 2026. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Gowthami Nagar; the building approval further describes Doctors Colony Phase-1. RERA record RERA filing |
| Revenue village | Gowthami Nagar is the village recorded in the project identity and land details. The building approval labels its village “HANAMKONDA.” RERA record Land records |
| Mandal / district / PIN | Hanamkonda / Warangal Urban / 506007 RERA record |
| Survey number(s) | Survey No. 37; no subdivision is stated in the supplied project identity. Land records |
| Plot and house numbers | Plot Nos. 72, 73 and 74 PART; House Nos. 22-7-68 PART, 22-7-69, 22-7-70. RERA filing |
| Registered site extent | 748.18 sq. m; the sanction records the same site area and net area. Land records |
| Road-affected area | 0 sq. m in the building-sanction parameters. |
| Boundaries | East: neighbours’ house; West: neighbours’ house; North: municipal park; South: existing 40 feet road. RERA filing Land records |
| Project registration locality / plot details | Hanamkonda; Plot Nos. 72, 73 and 74 PART. |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Warangal Municipal Corporation (GWMC), identified in the filed approval as GWMC Municipality/Municipal Corporation. Approvals record |
| Principal building approval | 0400/BP/3006/2023, approved 20 March 2023; file no. 013906/BP/DTCP/3006/0503/2023. Approvals record |
| Approved built-up area | 1,872.75 sq. m residential upper-floor area, as listed in the sanction parameters. The stilt area is separately stated as 345.01 sq. m; these figures are not interchangeable. |
| Building count and configuration | One residential building, “Building - VV (INFRA)”: 1 Stilt + 5 upper floors; sanctioned height 14.5 m. |
| Parking levels / approved parking count | Stilt is approved for parking under the sanction conditions. A total parking-space count is not established in the supplied record. |
| Unit counts | Sanction parameters identify one building; TG-RERA filing lists 15 units: 10 2BHK and 5 3BHK. RERA filing RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 10 units; 3BHK: 5 units. RERA unit table RERA unit details |
| RERA-filed saleable area | 2BHK: 102.19 sq. m; 3BHK: 140.28 sq. m. RERA unit table RERA unit details |
| Booked / available | Portal figures last read show 0 booked and 10 available 2BHKs, and 0 booked and 5 available 3BHKs. The portal record carries no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | No project-specific construction progress figure or independently verified site-stage evidence is supplied. RERA amenities |
| Completion date | The promoter’s Form B declaration undertakes completion by 20 March 2026. This is a promoter declaration, not evidence of completion. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The building approval requires a completion notice and occupancy certificate before occupation. |
2. The project story
- SREE NIVASAM is a registered residential apartment project on the 748.18 sq. m site recorded as Survey No. 37, Plot Nos. 72, 73 and 74 PART, at Gowthami Nagar, Hanamkonda, Warangal Urban. The building-sanction record describes the site as Doctors Colony Phase-1 and authorizes one residential building of one stilt and five upper floors. RERA record Land records
- The TG-RERA filing lists 15 apartments—10 2BHK and 5 3BHK. It records their saleable areas as 102.19 sq. m and 140.28 sq. m, respectively. These are filed configurations and areas, not confirmation that any particular unit is available for purchase today; portal booking figures have no supplied as-of date. RERA unit table RERA unit details
- The promoter declared a completion date of 20 March 2026. The supplied materials do not establish construction progress, completion, or issuance of an occupancy certificate for the building. The building approval makes occupancy certification a prerequisite to occupation.
3. Master plan, architecture & building design
- The building-construction approval identifies one residential building, “Building - VV (INFRA),” on the 748.18 sq. m site. It sanctions 1 Stilt + 5 upper floors and records a height of 14.5 m. The listed residential upper-floor area is 1,872.75 sq. m, while the stilt area is separately listed as 345.01 sq. m. The approval also records 5% open space.
- The approval identifies Plot Nos. 72, 73 and 74 PART and House Nos. 22-7-68 PART, 22-7-69 and 22-7-70. It lists four rainwater-harvesting structures and requires a transformer space and garbage house. The supplied materials do not provide sufficient drawing-derived information to describe the building footprint, apartment distribution by floor, lifts, staircases, circulation, or the arrangement and dimensions of other common areas.
- The separate layout-plan document entry is not extracted. The sanction references Layout Permit No. 27/79, dated 02/01/1979. No FSI-counted area or carpet-area figure is established by the supplied sanction data. Document index
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 102.19 sq. m | Not measured in supplied drawing measurements | Not supplied |
| 3BHK | 5 | 0 | 5 | 140.28 sq. m | Not established; two drawing measurements were held back as implausible | Not supplied |
- RERA unit counts, booking figures and saleable areas are from the TG-RERA filing; the portal figures have no supplied as-of date. No measured carpet-area figure is available for the RERA-filed 2BHK or 3BHK configurations. RERA unit table RERA unit details Floor plans
- Software measurements from the supplied floor-plan drawing document identify 1BHK layouts, with a measured carpet-area range of 57.2–57.3 sq. m (median 57.3 sq. m, or 616–617 sq. ft.; median 617 sq. ft.). The measurements cover two flat designs and are software-derived from drawing geometry—not a RERA-filed configuration or area disclosure. The drawing measurement identifies a hall, puja room, bedroom and kitchen, and a balcony; the stated balcony area of 14.95 sq. m is excluded from the measured carpet area. Verify any drawing-based measurement against the drawing itself. RERA unit details Floor plans
- Carpet area and saleable area are different measures: the supplied floor-plan note says saleable area also includes the home’s share of common areas. The record does not supply a loading figure. Floor plans
5. Parking & vehicle circulation
- The building sanction identifies a stilt level approved for parking and requires cellar and stilt parking, where shown in the plan, to be used exclusively for vehicle parking. The supplied record does not establish a total number of parking spaces, their allocation to particular apartments, visitor or accessible spaces, two-wheeler provision, or EV charging. A parking bay shown in a drawing, by itself, would not establish an exclusive legal allocation.
- The internal driveway, ramp, vehicle entry and exit arrangements, and pedestrian separation cannot be established from the supplied extracted records.
6. Amenities, recreation & open spaces
- The TG-RERA amenity record marks several project infrastructure categories as available, while recording 0% progress for the listed items. Those entries do not independently verify installation or completion. The building sanction separately specifies certain site provisions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | TG-RERA amenity entry; sanction requires the tot-lot to be fenced and maintained as greenery. The sanction records 5% open space. | RERA amenities | RERA entry: 0%; no independent completion verification supplied. |
| Community buildings | Listed in the RERA amenity record. | RERA amenities | 0%; no description or independent verification supplied. |
| Rainwater harvesting | Sanction requires a percolation pit and lists 4 rainwater-harvesting structures. | Required by sanction; completion not established. | |
| Internal roads and footpaths | Listed in the RERA amenity record. | RERA amenities | 0%; no independent completion verification supplied. |
| Street lighting | Listed in the RERA amenity record. | RERA amenities | 0%; no independent completion verification supplied. |
- No specific clubhouse, indoor recreation, sports facility or convenience facility is established by the project’s supplied RERA amenity data. RERA amenities
7. Utilities, building services & safety
- The TG-RERA amenity record marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station as “YES.” The same record shows 0% progress against the listed categories; it does not establish that these services are complete or operational. RERA amenities
| Service | Evidence in the supplied record |
|---|---|
| Water | RERA amenity entry marked “YES.” Source, storage capacity and treatment arrangements are not specified. RERA amenities |
| Sewerage / drainage | Sewerage and storm-water drains are marked “YES”; treatment and disposal of sewage and sullage water is listed. No plant capacity, reuse arrangement or completion evidence is supplied. RERA amenities |
| Electrical | Electrical meter room/sub-station/receiving station and energy management are marked “YES.” The sanction requires transformer space. Supply capacity and backup provision are not established. RERA amenities |
| Vertical transportation | The sanction refers to lifts as a service to be executed under qualified technical supervision but does not establish the number, capacity or completion status of lifts. |
| Fire and life safety | Fire protection and fire-safety requirements are listed in the RERA amenity record. The sanction assigns responsibility for required fire-fighting installations; the supplied record does not establish particular systems or completed statutory clearances. RERA amenities |
| Waste | Solid-waste management and disposal are listed in the RERA amenity record; the sanction requires a garbage house. Details and completion are not established. RERA amenities |
| Accessibility | No project-specific accessible route, ramp or accessible-unit provision is established in the supplied materials. |
8. Location, access & connectivity
- The registered project location is Gowthami Nagar, Hanamkonda, Warangal Urban, Telangana 506007; the building approval further identifies Doctors Colony Phase-1 and gives the southern boundary as an existing 40 feet road. The other recorded boundaries are neighbours’ houses to the east and west and a municipal park to the north. RERA record RERA filing
- No project-specific public-transport information, measured connectivity distances or approach-road network beyond the stated boundary road is supplied. Location record RERA record
9. Developer & development status
- The registered promoter is SRI VIJAYA VENKATA INFRA DEVELOPERS, identified in the project record as a proprietorship. The RERA filing names VENKATESWARA RAO VUPPALA as an authorized signatory. No separate official project contact details or promoter website are established by the supplied project evidence. Corporate record Parties record
- The registration certificate records a promoter office at Kukatpally, Kukatpally Mandal, Medchal-Malkajgiri District, PIN 500072. This is the office address recorded on the certificate; the project site is separately recorded at Gowthami Nagar, Hanamkonda.
- The promoter’s Form B declaration undertakes completion by 20 March 2026. No construction-progress figure or occupancy certificate is supplied, and the available record does not establish that the declared completion date was achieved.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Certificate for SREE NIVASAM, registration P00300007116, issued 18 October 2023; validity stated to 20 March 2026. |
| Building construction approval | GWMC approval 0400/BP/3006/2023, dated 20 March 2023; file no. 013906/BP/DTCP/3006/0503/2023. It covers one residential building on Survey No. 37. |
| Layout reference | Layout Permit No. 27/79, dated 02/01/1979, cited in the building-approval record. A separate layout-plan document is listed but not extracted. Document index |
| Promoter declaration | Form B affidavit-cum-declaration dated 26 August 2023, including the promoter’s completion undertaking and project declarations. |
| Occupancy / completion certificate | Not supplied. The building approval requires a completion notice and occupancy certificate before occupation. |
| Drawing-based record | Layout-plan document entry 351346; software measurements are available for two 1BHK drawing designs only and are not RERA-filed area disclosures. Document index RERA unit details Floor plans |
The building approval states that the sanctioned plan is to be followed, modifications require prior approval, a completion notice is to be submitted after construction, and an occupancy certificate is required before occupation. These are approval conditions; the supplied evidence does not establish whether the construction has been completed or the required certificate obtained.
1. Project at a glance
Project identity
Registered project name: SREE NIVASAM
Project type: Residential apartment project
Phase / registered portion: No separate phase name is disclosed. The registration concerns the project on the stated site and Survey No. 37; the sanction identifies one residential building.
TG-RERA registration: P00300007116
Registration validity: 18 October 2023 to 20 March 2026; the certificate says it may be extended by the Authority. The supplied record states no extension. Registration validity is separate from the completion undertaking and from occupancy certification.
Registered promoter: SRI VIJAYA VENKATA INFRA DEVELOPERS
RERA status in supplied record: Registered project; the registration certificate is not marked as extended. The supplied record does not establish the project’s current registration status after 20 March 2026.
Land and geographic identity
Locality: Gowthami Nagar; the building approval further describes Doctors Colony Phase-1.
Revenue village: Gowthami Nagar is the village recorded in the project identity and land details. The building approval labels its village “HANAMKONDA.”
Mandal / district / PIN: Hanamkonda / Warangal Urban / 506007
Survey number(s): Survey No. 37; no subdivision is stated in the supplied project identity.
Plot and house numbers: Plot Nos. 72, 73 and 74 PART; House Nos. 22-7-68 PART, 22-7-69, 22-7-70.
Registered site extent: 748.18 sq. m; the sanction records the same site area and net area.
Road-affected area: 0 sq. m in the building-sanction parameters.
Boundaries: East: neighbours’ house; West: neighbours’ house; North: municipal park; South: existing 40 feet road.
Project registration locality / plot details: Hanamkonda; Plot Nos. 72, 73 and 74 PART.
Development identity
Sanctioning authority: Greater Warangal Municipal Corporation (GWMC), identified in the filed approval as GWMC Municipality/Municipal Corporation.
Principal building approval: 0400/BP/3006/2023, approved 20 March 2023; file no. 013906/BP/DTCP/3006/0503/2023.
Approved built-up area: 1,872.75 sq. m residential upper-floor area, as listed in the sanction parameters. The stilt area is separately stated as 345.01 sq. m; these figures are not interchangeable.
Building count and configuration: One residential building, “Building - VV (INFRA)”: 1 Stilt + 5 upper floors; sanctioned height 14.5 m.
Parking levels / approved parking count: Stilt is approved for parking under the sanction conditions. A total parking-space count is not established in the supplied record.
Unit counts: Sanction parameters identify one building; TG-RERA filing lists 15 units: 10 2BHK and 5 3BHK.
Offering and status
RERA-filed configurations: 2BHK: 10 units; 3BHK: 5 units.
RERA-filed saleable area: 2BHK: 102.19 sq. m; 3BHK: 140.28 sq. m.
Booked / available: Portal figures last read show 0 booked and 10 available 2BHKs, and 0 booked and 5 available 3BHKs. The portal record carries no as-of date, so these counts are indicative.
Construction stage: No project-specific construction progress figure or independently verified site-stage evidence is supplied.
Completion date: The promoter’s Form B declaration undertakes completion by 20 March 2026. This is a promoter declaration, not evidence of completion.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The building approval requires a completion notice and occupancy certificate before occupation.
2. The project story
- SREE NIVASAM is a registered residential apartment project on the 748.18 sq. m site recorded as Survey No. 37, Plot Nos. 72, 73 and 74 PART, at Gowthami Nagar, Hanamkonda, Warangal Urban. The building-sanction record describes the site as Doctors Colony Phase-1 and authorizes one residential building of one stilt and five upper floors.
- The TG-RERA filing lists 15 apartments—10 2BHK and 5 3BHK. It records their saleable areas as 102.19 sq. m and 140.28 sq. m, respectively. These are filed configurations and areas, not confirmation that any particular unit is available for purchase today; portal booking figures have no supplied as-of date.
- The promoter declared a completion date of 20 March 2026. The supplied materials do not establish construction progress, completion, or issuance of an occupancy certificate for the building. The building approval makes occupancy certification a prerequisite to occupation.
3. Master plan, architecture & building design
- The building-construction approval identifies one residential building, “Building - VV (INFRA),” on the 748.18 sq. m site. It sanctions 1 Stilt + 5 upper floors and records a height of 14.5 m. The listed residential upper-floor area is 1,872.75 sq. m, while the stilt area is separately listed as 345.01 sq. m. The approval also records 5% open space.
- The approval identifies Plot Nos. 72, 73 and 74 PART and House Nos. 22-7-68 PART, 22-7-69 and 22-7-70. It lists four rainwater-harvesting structures and requires a transformer space and garbage house. The supplied materials do not provide sufficient drawing-derived information to describe the building footprint, apartment distribution by floor, lifts, staircases, circulation, or the arrangement and dimensions of other common areas.
- The separate layout-plan document entry is not extracted. The sanction references Layout Permit No. 27/79, dated 02/01/1979. No FSI-counted area or carpet-area figure is established by the supplied sanction data.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 102.19 sq. m | Not measured in supplied drawing measurements | Not supplied |
| 3BHK | 5 | 0 | 5 | 140.28 sq. m | Not established; two drawing measurements were held back as implausible | Not supplied |
- RERA unit counts, booking figures and saleable areas are from the TG-RERA filing; the portal figures have no supplied as-of date. No measured carpet-area figure is available for the RERA-filed 2BHK or 3BHK configurations.
- Software measurements from the supplied floor-plan drawing document identify 1BHK layouts, with a measured carpet-area range of 57.2–57.3 sq. m (median 57.3 sq. m, or 616–617 sq. ft.; median 617 sq. ft.). The measurements cover two flat designs and are software-derived from drawing geometry—not a RERA-filed configuration or area disclosure. The drawing measurement identifies a hall, puja room, bedroom and kitchen, and a balcony; the stated balcony area of 14.95 sq. m is excluded from the measured carpet area. Verify any drawing-based measurement against the drawing itself.
- Carpet area and saleable area are different measures: the supplied floor-plan note says saleable area also includes the home’s share of common areas. The record does not supply a loading figure.
5. Parking & vehicle circulation
- The building sanction identifies a stilt level approved for parking and requires cellar and stilt parking, where shown in the plan, to be used exclusively for vehicle parking. The supplied record does not establish a total number of parking spaces, their allocation to particular apartments, visitor or accessible spaces, two-wheeler provision, or EV charging. A parking bay shown in a drawing, by itself, would not establish an exclusive legal allocation.
- The internal driveway, ramp, vehicle entry and exit arrangements, and pedestrian separation cannot be established from the supplied extracted records.
6. Amenities, recreation & open spaces
- The TG-RERA amenity record marks several project infrastructure categories as available, while recording 0% progress for the listed items. Those entries do not independently verify installation or completion. The building sanction separately specifies certain site provisions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | TG-RERA amenity entry; sanction requires the tot-lot to be fenced and maintained as greenery. The sanction records 5% open space. | RERA entry: 0%; no independent completion verification supplied. | |
| Community buildings | Listed in the RERA amenity record. | 0%; no description or independent verification supplied. | |
| Rainwater harvesting | Sanction requires a percolation pit and lists 4 rainwater-harvesting structures. | Required by sanction; completion not established. | |
| Internal roads and footpaths | Listed in the RERA amenity record. | 0%; no independent completion verification supplied. | |
| Street lighting | Listed in the RERA amenity record. | 0%; no independent completion verification supplied. |
- No specific clubhouse, indoor recreation, sports facility or convenience facility is established by the project’s supplied RERA amenity data.
7. Utilities, building services & safety
- The TG-RERA amenity record marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station as “YES.” The same record shows 0% progress against the listed categories; it does not establish that these services are complete or operational.
Water: RERA amenity entry marked “YES.” Source, storage capacity and treatment arrangements are not specified.
Sewerage / drainage: Sewerage and storm-water drains are marked “YES”; treatment and disposal of sewage and sullage water is listed. No plant capacity, reuse arrangement or completion evidence is supplied.
Electrical: Electrical meter room/sub-station/receiving station and energy management are marked “YES.” The sanction requires transformer space. Supply capacity and backup provision are not established.
Vertical transportation: The sanction refers to lifts as a service to be executed under qualified technical supervision but does not establish the number, capacity or completion status of lifts.
Fire and life safety: Fire protection and fire-safety requirements are listed in the RERA amenity record. The sanction assigns responsibility for required fire-fighting installations; the supplied record does not establish particular systems or completed statutory clearances.
Waste: Solid-waste management and disposal are listed in the RERA amenity record; the sanction requires a garbage house. Details and completion are not established.
Accessibility: No project-specific accessible route, ramp or accessible-unit provision is established in the supplied materials.
8. Location, access & connectivity
- The registered project location is Gowthami Nagar, Hanamkonda, Warangal Urban, Telangana 506007; the building approval further identifies Doctors Colony Phase-1 and gives the southern boundary as an existing 40 feet road. The other recorded boundaries are neighbours’ houses to the east and west and a municipal park to the north.
- No project-specific public-transport information, measured connectivity distances or approach-road network beyond the stated boundary road is supplied.
9. Developer & development status
- The registered promoter is SRI VIJAYA VENKATA INFRA DEVELOPERS, identified in the project record as a proprietorship. The RERA filing names VENKATESWARA RAO VUPPALA as an authorized signatory. No separate official project contact details or promoter website are established by the supplied project evidence.
- The registration certificate records a promoter office at Kukatpally, Kukatpally Mandal, Medchal-Malkajgiri District, PIN 500072. This is the office address recorded on the certificate; the project site is separately recorded at Gowthami Nagar, Hanamkonda.
- The promoter’s Form B declaration undertakes completion by 20 March 2026. No construction-progress figure or occupancy certificate is supplied, and the available record does not establish that the declared completion date was achieved.
10. Approvals, official records & documents
TG-RERA registration: Certificate for SREE NIVASAM, registration P00300007116, issued 18 October 2023; validity stated to 20 March 2026.
Building construction approval: GWMC approval 0400/BP/3006/2023, dated 20 March 2023; file no. 013906/BP/DTCP/3006/0503/2023. It covers one residential building on Survey No. 37.
Layout reference: Layout Permit No. 27/79, dated 02/01/1979, cited in the building-approval record. A separate layout-plan document is listed but not extracted.
Promoter declaration: Form B affidavit-cum-declaration dated 26 August 2023, including the promoter’s completion undertaking and project declarations.
Occupancy / completion certificate: Not supplied. The building approval requires a completion notice and occupancy certificate before occupation.
Drawing-based record: Layout-plan document entry 351346; software measurements are available for two 1BHK drawing designs only and are not RERA-filed area disclosures.
The building approval states that the sanctioned plan is to be followed, modifications require prior approval, a completion notice is to be submitted after construction, and an occupancy certificate is required before occupation. These are approval conditions; the supplied evidence does not establish whether the construction has been completed or the required certificate obtained.
Frequently asked questions
Is SREE NIVASAM registered with Telangana RERA?
Yes. SREE NIVASAM is registered with the Telangana Real Estate Regulatory Authority as P00300007116; the registration status is New Project.
Who is the developer of SREE NIVASAM?
The promoter named in the RERA registration is SRI VIJAYA VENKATA INFRA DEVELOPERS.
Where is SREE NIVASAM located?
SREE NIVASAM is in Gowthami Nagar, Hanamkonda, Telangana (506007).
When will SREE NIVASAM be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.