Sign in

Venkateswara Westside

VASUDEVA INFRA DEVELOPERS · Khammam · RERA P00800005778

VENKATESWARA WESTSIDE is a plotted development in Maddulapalli Grampanchayat, Khammam (Urban) Mandal, Khammam District. It is being developed by registered promoter VASUDEVA INFRA DEVELOPERS, a partnership. The project covers 55,625.63 sq.m and comprises 177 plots, with plot areas ranging from 96.33 sq.m (115.2 sq.yd) to 545.64 sq.m (652.6 sq.yd); no tower or floor configuration is stated. It is registered with TG-RERA under P00800005778, and the promoter’s Form B declares completion by 02/01/2026.

01What we found

Period endedTG-RERA registration ran to 2 Jan 2026 - check its extension on TG-RERA
17documents on file - each fact links to its page
2court cases on this project's land (survey 181, 182, Maddulapalli)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldRecord
Registered projectVENKATESWARA WESTSIDE
Project typePlotted development / plotted layout
Phase or registered portionNot identified as a separate phase in the supplied record
TG-RERA registrationP00800005778; Form C records registration from 15/03/2023 to 02/01/2026. Registration validity is distinct from the completion undertaking and does not, by itself, establish completion or occupancy certification. RERA record
Registered promoterVASUDEVA INFRA DEVELOPERS, a partnership RERA record Corporate record
RERA status in supplied recordStatus is recorded as “New Project”; the registration certificate’s stated validity ended on 02/01/2026. No extension or current registration status is provided in the supplied material. RERA record

Land and geographic identity

FieldRecord
LocalityMaddulapalli Grampanchayat RERA record RERA filing
Revenue villageMaddulapalli / Maddulapalli Revenue Village RERA filing
MandalKhammam (Rural) Mandal in the layout approval; the RERA registration certificate states Khammam (Urban) Mandal. The project’s mandal identity therefore requires confirmation against the parcel records.
District and PINKhammam; 507002 RERA record
Project survey numbersSy. Nos. 181/PART and 182/PART RERA record
Site extentRERA land details state total area 55,625.63 sq.m and net area 55,625.63 sq.m. The layout drawing’s area statement totals 56,189.07 sq.m; the layout-area table states 55,625.15 sq.m. Land records Layout record
Boundaries in RERA land detailsEast: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: ROAD WIDTH Land records
Supplied geographic referenceCadastral parcel centroid (17.41528, 78.35459) Location record

Development identity

FieldRecord
Layout sanctionTentative Layout Plan approval 221718/LP/GP/202415/0001/2022, dated 02-01-2023, by SUDA; the approval records delegation to Maddulapalli Grampanchayat. Approvals record
Development type and scaleTentative plotted layout with 177 plots Layout record
Approved built-up areaRERA filing records 35,204.95 sq.m; no building/tower configuration is supplied for this plotted layout. RERA filing
Floor/building configurationNot applicable to the plotted offering as described in the supplied layout record; no building floor schedule is provided.
Approved parking provisionNo parking-space count or parking-level arrangement is supplied. RERA filing

Offering and status

FieldRecord
Offering177 plots; software-measured from the approved layout drawing, plot areas range from 96.33 sq.m (115.2 sq.yd) to 545.64 sq.m (652.6 sq.yd). Layout record
Booked/available countsNot supplied in the evidence provided for this Overview. RERA filing
Completion undertakingPromoter’s Form B declares completion by 02/01/2026.
RERA registration validity15/03/2023–02/01/2026 as stated in Form C; this is the registration period, not evidence of completion.
Construction/development stageThe RERA record labels the project “New Project” and records 70% completeness in the project header. No dated, independently verified site inspection or detailed work-progress evidence is supplied here. RERA record
Final layout / occupancy certificationThe supplied approval is for a Tentative Layout Plan. No final layout approval or occupancy/completion certificate is identified in the supplied documents. Document index

The project story

VENKATESWARA WESTSIDE is registered with TG-RERA as a plotted development on Sy. Nos. 181/PART and 182/PART at Maddulapalli. Its filed layout approval describes a tentative arrangement of 177 plots, with internal roads and areas allocated for open space, utilities and social infrastructure. The record is therefore of a land-layout project, not an apartment or multi-tower development. RERA record

The promoter’s Form B undertakes completion by 02/01/2026. The project header records 70% completeness, but the material supplied does not establish the measurement date or independently verify site progress. The approval remains described as tentative; no final layout approval or occupancy/completion certificate is supplied. RERA record

Master plan, architecture & building design

The approved drawing-derived record describes a plotted layout rather than buildings. Its plot schedule contains 177 plots; software measurement of the drawing identifies plot areas from 96.33 sq.m to 545.64 sq.m. These are drawing-measured plot areas, not RERA-filed carpet or saleable areas. Layout record

The layout area statement records 35,204.66 sq.m as plotted area, 13,436.06 sq.m as roads, 5,025.85 sq.m as parks/open space, 562.19 sq.m as utilities and 1,396.39 sq.m as social infrastructure. It records amenities area as 0.00 sq.m. These are the drawing’s land-use figures; they do not describe building floor area. Layout record

The approval separately identifies a mortgage area of Ac 1.61 cents / 7,791.856 sq.yd, comprising Plot Nos. 80–83, 113–116 and 144–177, in favour of the Grampanchayat, pending completion conditions and final-layout release. The approval also requires infrastructure and development works before final layout approval.

Homes, configurations & floor plans

This is a plotted offering, so apartment configurations, carpet-area measurements, balcony/utility areas and apartment loading do not apply. The supplied layout drawing lists 177 plots. Its software-measured size bands are:

Plot size band (sq.yd)Equivalent band shown (sq.m)Plots
100–15084–1253
150–200125–1678
200–250167–209117
250–300209–25129
300–400251–33410
400–500334–4188
500–1000418–8362

The drawing-derived plot-size measurements are software-measured, not RERA-filed; the supplied data says the plot-area sum matches the drawing’s plotted-area statement and advises verification against the drawing. No booked or available plot count is supplied. Layout record

Parking & vehicle circulation

The supplied evidence does not state a parking-space count, parking allocation by plot, visitor or accessible parking, or a parking-level arrangement. The tentative layout approval includes roads and requires roads to be opened for access to neighbouring sites; it does not establish exclusive parking rights for any buyer.

Amenities, recreation & open spaces

The RERA-filed amenity information marks several layout infrastructure items “YES,” but gives 0% progress for the listed items. That filing indicates declared provision, not verified completion. The tentative layout approval also sets out land-use allocations and required development works. RERA amenities

Clubhouse / indoor
Description / sizeNo clubhouse or indoor facility is identified in the supplied evidence.
Evidence sourceRERA amenities
Declared progress / verified statusNot established
Sports / recreation
Description / sizeNo specific sports facility is identified. The drawing allocates 5,025.85 sq.m to parks/open space.
Evidence sourceLayout record
Declared progress / verified statusRERA amenity progress shown as 0%; no independent completion evidence supplied
Landscape / open space
Description / sizeOpen space/park: Ac 1.242 cents / 6,010.917 sq.yd in the approval; the drawing-derived area statement records 5,025.85 sq.m for parks/open space.
Evidence sourceLayout record
Declared progress / verified statusApproval requires development and handover; completion is not verified
Convenience / community
Description / sizeApproval lists social infrastructure and refers to possible facilities including pharmacy, clinic, school, play school, creche, dispensary and convenient shops; the supplied area statement records social infrastructure as 1,396.39 sq.m.
Evidence sourceLayout record
Declared progress / verified statusListed in approval material; no evidence supplied that these facilities are built or operating
Internal roads and footpaths
Description / sizeRERA amenity filing marks “YES”; approval allocates Ac 3.32 cents / 16,069.528 sq.yd to roads.
Evidence sourceRERA amenities
Declared progress / verified statusFiling progress shown as 0%; independent completion not verified
Green strip / tot lot / park
Description / sizeRERA amenity filing marks “YES.”
Evidence sourceRERA amenities
Declared progress / verified statusFiling progress shown as 0%; independent completion not verified

Utilities, building services & safety

The tentative layout approval describes infrastructure works to be undertaken by the applicant, including roads, drains and nala channelization, greenery, open-space fencing, street lighting, sewerage disposal and protected water supply. It also specifies construction of an overhead tank or sump, septic tank as applicable, and harvesting pits. These are approval conditions, not evidence that the works have been completed.

The approval’s utilities allocation is Ac 0.139 cents / 672.379 sq.yd and refers to a water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management. The RERA amenity filing marks water supply, sewerage, storm-water drains, street lighting, solid-waste management and water conservation/rainwater harvesting “YES,” with 0% progress recorded. Capacities, operational status and completed safety or accessibility systems are not established in the supplied evidence. RERA amenities

Location, access & connectivity

The registered location is Maddulapalli Grampanchayat, Maddulapalli, Khammam District, Telangana 507002. The layout approval identifies Maddulapalli Revenue Village and Khammam (Rural) Mandal; the RERA registration certificate instead states Khammam (Urban) Mandal. RERA record

The approval requires roads to be opened for accessibility to neighbouring sites. No project approach-road measurements, public-transport details or nearby landmarks are provided in the official project records supplied. A connectivity record gives Financial District (Nanakramguda): 1.2 km, but the supplied location data does not establish a verified route or travel time. Location record

Developer & development status

The registered promoter is VASUDEVA INFRA DEVELOPERS, recorded as a partnership with GSTIN 36AAVFV3459M1Z5. The promoter’s project address is recorded as B, KHAMMAM URBAN, MADDULAPALLI GRAMPANCHAYAT, MADDULAPALLI GRAMPANCHAYAT, Khammam, 507002. The supplied evidence identifies partner UPPUGANDLA VEERABHADRAM, partner TULLURI KOTESWARA RAO, and authorized signatory ALLA SRINIVASA RAO. Corporate record RERA filing Parties record

The promoter’s Form B declares a completion undertaking of 02/01/2026. The project header records 70% completeness, but no independently verified progress report or site inspection is supplied here. The RERA registration certificate states a validity period ending 02/01/2026; no extension record is supplied. RERA record

Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for VENKATESWARA WESTSIDE, registration P00800005778, issued 15/03/2023, with stated validity to 02/01/2026.
Principal layout approvalSUDA tentative layout approval 221718/LP/GP/202415/0001/2022, dated 02-01-2023, for the plotted layout on Sy. Nos. 181/PART and 182/PART.
Layout drawingTwo layout sheets are recorded; drawing-derived plot schedule and land-use details are available. Layout record
Promoter declarationForm B by authorized signatory ALLA SRINIVASA RAO, including the promoter’s completion undertaking of 02/01/2026.
Completion/final layout/occupancy documentsNo final layout approval or occupancy/completion certificate is identified in the supplied material. The approval on file is expressly for a Tentative Layout Plan. Document index
Other project recordsRERA-filed encumbrance statements and title-related documents are listed in the project evidence; their detailed review is outside this Overview. Document index

Frequently asked questions

Is VENKATESWARA WESTSIDE registered with Telangana RERA?

Yes. VENKATESWARA WESTSIDE is registered with the Telangana Real Estate Regulatory Authority as P00800005778; the registration status is New Project.

Who is the developer of VENKATESWARA WESTSIDE?

The promoter named in the RERA registration is VASUDEVA INFRA DEVELOPERS.

Where is VENKATESWARA WESTSIDE located?

VENKATESWARA WESTSIDE is in MADDULAPALLI GRAMPANCHAYAT, Khammam, Telangana (507002).

When will VENKATESWARA WESTSIDE be completed?

The promoter's proposed date of completion filed with RERA is 02/01/2026. This is the promoter's declaration, not a guarantee.

More projects in Khammam