V City Township
V CITY TOWNSHIP · Hanamkonda · RERA P00300008377
V CITY TOWNSHIP is a plotted development in Vanchanagiri (V) and Geesugonda (V), Geesugonda Mandal, Warangal Urban district, developed by the registered promoter V CITY TOWNSHIP. The layout covers a total site/layout area of 53,652.04 sq.m and has 155 plots; no building or floor configuration is specified. The project is registered with TG-RERA under P00300008377, with proposed completion by 20/07/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | V CITY TOWNSHIP RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase or registered portion | No separate phase is identified; the registration covers the plotted project on the stated Vanchanagiri and Geesugonda land. RERA record |
| TG-RERA registration | P00300008377 RERA record |
| Registration validity | 22 June 2024–20 July 2025, unless extended by the Authority; the supplied record does not establish whether an extension was granted. RERA record |
| Registered promoter | V CITY TOWNSHIP; entity type recorded as Partnership. RERA record RERA filing |
| RERA status | The supplied record identifies this as a “New Project”; current registration status is not established by the registration certificate’s original validity dates alone. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Geesugonda / Vanchanagiri and Geesugonda RERA record |
| Revenue villages | Vanchanagiri (V) and Geesugonda (V) |
| Mandal | Geesugonda Mandal |
| District | Warangal Urban (the layout approval also states Warangal District) RERA record |
| PIN | 506330 RERA record |
| Survey numbers and subdivisions | Vanchanagiri: Sy. Nos. 39, 40/A/1, 40/A/2, 40/A/3, 40/B/3, 40/B/4, 40/B/3/A. Geesugonda: Sy. Nos. 744/A/1/1, 744/B, 744/B1. RERA record Land records |
| Site and layout areas | Total layout/site area: 53,652.04 sq.m; road-affected/road-widening area: 4,011.86 sq.m; net layout area is recorded as 49,640.18 sq.m in the approval parameters and 49,641.91 sq.m in the layout land-use table. |
| Boundaries | East: agricultural land of Ramarao and Balaswamy; west: 30M road; north: 45M road; south: agricultural land of Rayapu Reddy. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Kakatiya Urban Development Authority (KUDA); the tentative layout approval records delegation to Vanchangiri Grampanchayat. |
| Principal layout approval | 295146/LP/GP/213516/0002/2023, dated 20-07-2023; the application/permit reference also includes TS/035854/2023. Approvals record |
| Approved built-up area | 0.00 proposed built-up area, both excluding and including parking, in the layout approval parameters. |
| Building count and floors | Not applicable to the plotted layout as documented; no buildings, floor configuration or parking levels are specified in the supplied project record. |
| Plots | 155 plots in the layout approval. |
| Parking | Approval parameters state 0 proposed number of parkings; common parking area is also recorded as 0.00. |
Offering and status
| Field | Record |
|---|---|
| Offering | Plots; no RERA-filed unit-type schedule, plot-wise booking/availability schedule or RERA saleable-area schedule is supplied here. RERA record |
| Layout-derived plot information | The drawing-derived schedule identifies 155 plots; plot areas range from 92.05 sq.m to 681.03 sq.m, with a median of 168.69 sq.m. These are software-measured from the drawing and should be checked against it. Layout record |
| Construction/development stage | A Form–1A architect certificate dated 12/11/2025 certifies overall project completion; this is a professional certificate, not an independent site inspection in the supplied evidence. |
| Completion dates | RERA filing states proposed completion by 20/07/2025; the Form B declaration also undertakes completion by 20-7-2025. RERA record |
| Occupancy certificate | The architect’s Form–1A records an occupancy certificate for the plotted development issued by Vanchanagiri Grampanchayat on 10-11-2024, number 295146/LP/GP/213516/00012/2024/FLT. The supplied certificate identifies the registered project, not a separate tower or phase. |
2. The project story
V CITY TOWNSHIP is a plotted layout spanning land in Vanchanagiri and Geesugonda villages, in Geesugonda Mandal, Warangal Urban district. Its RERA-filed identity is a plotted development—not a residential apartment project—and the layout approval identifies 155 plots. The approval’s area schedule allocates land to plots, roads, parks/open space, utilities and social infrastructure; it records no proposed built-up area or common parking area. RERA record
The registration certificate records a proposed completion date of 20/07/2025. An architect’s Form–1A dated 12/11/2025 certifies overall completion and records a Grampanchayat occupancy certificate dated 10-11-2024. These are filed records; the material supplied does not include an independent inspection verifying present on-site condition or the completion of each individual infrastructure item. RERA record
3. Master plan, architecture & building design
This is a land layout, not a building scheme in the supplied approval. The layout record gives total site/layout area of 53,652.04 sq.m and identifies road-affected/widening land of 4,011.86 sq.m. The approved parameters state a net layout area of 49,640.18 sq.m, while the drawing-derived land-use table totals 49,641.91 sq.m; both figures are reproduced as recorded. No proposed built-up area is recorded (0.00), and the supplied material does not specify buildings, floors or building-level design.
The layout drawing’s land-use table gives the following split:
| Layout use | Area | Share |
|---|---|---|
| Plotted area | 31,973.65 sq.m | 64.41% |
| Roads | 11,436.90 sq.m | 23.04% |
| Organized open space/park | 4,484.87 sq.m | 9.03% |
| Social infrastructure | 1,243.73 sq.m | 2.51% |
| Utility area | 502.76 sq.m | 1.01% |
| Amenity area | 0.00 sq.m | 0.00% |
| Total net layout (as printed) | 49,641.91 sq.m | 100.00% |
The approval drawing identifies internal road widths of 12.20 m, 10.060 m and 9.14 m, and notes connections to existing roads proposed for widening: a 30.48 m existing road to 45.73 m, and an 18.29 m existing road to 30.48 m, under the stated Master Plan 2041 reference. The layout approval also identifies a 4,836.51 sq.m mortgage area, described in the project record as plots mortgaged to the approving authority until layout works are completed.
4. Homes, configurations & floor plans
The registered offering is plots. The supplied evidence contains no RERA-filed schedule of plot-wise saleable areas, bookings or availability, and no reliable unit-level sale agreement or allotment schedule from which to report those figures. RERA record
The approved layout drawing’s plot schedule was software-read. The stated plot-area measurements are not a RERA-filed saleable-area schedule and should be verified against the drawing. The supplied floor-plan dataset contains two layout sheets and no measured home floor plans. Layout record Floor plans
| Plot information | Drawing-derived figure |
|---|---|
| Plots identified | 155 |
| Smallest plot | 92.05 sq.m (110.1 sq.yd) |
| Median plot | 168.69 sq.m (201.8 sq.yd) |
| Largest plot | 681.03 sq.m (814.5 sq.yd) |
Layout record
5. Parking & vehicle circulation
The layout approval records 0 proposed number of parkings and 0.00 common parking area. It does not establish any allocated or exclusive parking entitlement for an individual plot. Internal roads are shown at widths of 12.20 m, 10.060 m and 9.14 m; the supplied evidence does not specify vehicle entry/exit arrangements, visitor bays, accessible parking, pedestrian separation, ramps or EV charging.
6. Amenities, recreation & open spaces
The layout approval identifies open space/park, social-infrastructure and utility land. A separate amenities record marks several infrastructure and recreation categories as “YES” at 100%; those entries are RERA-recorded status fields, not independent verification of delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 4,484.87 sq.m; layout table states 9.03%. | Approved layout area statement | Land-use allocation is shown in the layout; completed condition not independently verified. |
| Green strip / tot-lot / park | Area not separately stated in the amenities record. | RERA amenities record RERA amenities | Marked YES, 100%; not independently verified. |
| Community buildings | No size or capacity stated. | RERA amenities record RERA amenities | Marked YES, 100%; not independently verified. |
| Social infrastructure | 1,243.73 sq.m in the layout land-use table. | Approved layout area statement | Land allocation shown; particular facility and completion status not specified. |
| Tot-lot | No size stated. | Layout approval | Listed among amenities/utilities; delivered status not independently verified. |
7. Utilities, building services & safety
The layout approval requires infrastructure works including a protected water supply system, water reservoir/sump, septic tank or sewerage treatment plant as applicable, storm-water drains and nala channelisation, rainwater-harvesting pits, street lighting, electricity facilities, solid-waste management, and levelling and formation of roads. These are approval requirements; the supplied evidence does not establish the installed capacity or independently verify completion of each item.
| Service | Supplied record |
|---|---|
| Water | Water supply is marked YES, 100% in the RERA amenities record. The approval refers to protected water supply and a water reservoir/sump; source and capacity are not stated. RERA amenities |
| Sewerage and drainage | Sewerage (chamber, lines, septic tank, STP) and storm-water drains are marked YES, 100% in the amenities record. The approval requires a sewerage-disposal system and storm-water/nala works; capacity and independent completion verification are not supplied. RERA amenities |
| Rainwater harvesting | Marked YES, 100% in the amenities record; the approval requires rainwater-harvesting pits. RERA amenities |
| Electrical | Electrical meter room/sub-station/receiving station is marked YES, 100%; the approval lists an electric transformer and street lighting. Capacity and installation verification are not supplied. RERA amenities |
| Solid waste | Solid-waste management and disposal is marked 0% in the amenities record; the approval lists solid-waste management among utility works. RERA amenities |
| Energy management and fire safety | Each is recorded as 0% in the amenities record. The supplied evidence does not detail a fire system or project-specific fire clearance. RERA amenities |
| Lifts, accessibility and building safety systems | Not applicable to the documented plotted layout or not specified in the supplied evidence. |
8. Location, access & connectivity
The registered project location is in Vanchanagiri (V) and Geesugonda (V), Geesugonda Mandal, Warangal Urban district, PIN 506330. The layout record identifies a 45M road to the north, a 30M road to the west, and agricultural land along the east and south boundaries. RERA record RERA filing
The location dataset supplies a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km as an anchor. The supplied data does not establish public-transport access, measured approach routes or travel times. Location record
9. Developer & development status
The registered promoter is V CITY TOWNSHIP, recorded as a partnership. The RERA record lists its address as 11-23-2330/8, Srinivasa Colony, Vanchangiri, Geesugonda, Warangal Urban, 506330. The registration certificate separately gives a registered-office address with Warangal Urban and PIN 506006, but no street or village details. RERA filing Parties record
The RERA-recorded partners are Sri Rangineni Venkateshwar Rao, Ettineni Sudhakar, Kakkerla Suresh Babu, Ponugoti Mangapathi Rao, Etineni Aparna, Kasarla Taraka Ramu, Mundada Uma and Mundada Giridhar Gopal. Sri Rangineni Venkateshwar Rao is listed as authorised signatory. Parties record
The RERA record names Appala Abhilash as a landowner with an area-share agreement. The promoter’s Form B declaration undertakes completion by 20-7-2025. The supplied Form–1A architect certificate dated 12/11/2025 certifies overall completion; it is not an independent site inspection. Parties record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for V CITY TOWNSHIP, registration P00300008377; validity stated as 22/06/2024 to 20/07/2025 unless extended. |
| Layout approval | KUDA tentative layout approval 295146/LP/GP/213516/0002/2023, dated 20-07-2023; records 155 plots and approval conditions. |
| Layout drawing / application reference | Layout plan filed under TS/035854/2023; drawing identifies plot schedule, roads and land-use areas. |
| Occupancy certificate and completion certificate | Architect’s Form–1A records Grampanchayat occupancy certificate 295146/LP/GP/213516/00012/2024/FLT, dated 10-11-2024, and certifies overall completion. |
| Promoter declaration | Form B affidavit declares the title basis and absence of encumbrances, includes the separate-account commitments, and undertakes completion by 20-7-2025. |
| Other filed project records | Registration certificate, layout plan, tentative layout approval, and architect’s completion certificate are available in the supplied evidence. Document index |
The supplied approval materials do not establish the current TG-RERA registration status or whether any registration extension was granted.
1. Project at a glance
Project identity
Registered project name: V CITY TOWNSHIP
Project type: Plotted development / plotted layout
Phase or registered portion: No separate phase is identified; the registration covers the plotted project on the stated Vanchanagiri and Geesugonda land.
TG-RERA registration: P00300008377
Registration validity: 22 June 2024–20 July 2025, unless extended by the Authority; the supplied record does not establish whether an extension was granted.
Registered promoter: V CITY TOWNSHIP; entity type recorded as Partnership.
RERA status: The supplied record identifies this as a “New Project”; current registration status is not established by the registration certificate’s original validity dates alone.
Land and geographic identity
Locality: Geesugonda / Vanchanagiri and Geesugonda
Revenue villages: Vanchanagiri (V) and Geesugonda (V)
Mandal: Geesugonda Mandal
District: Warangal Urban (the layout approval also states Warangal District)
PIN: 506330
Survey numbers and subdivisions: Vanchanagiri: Sy. Nos. 39, 40/A/1, 40/A/2, 40/A/3, 40/B/3, 40/B/4, 40/B/3/A. Geesugonda: Sy. Nos. 744/A/1/1, 744/B, 744/B1.
Site and layout areas: Total layout/site area: 53,652.04 sq.m; road-affected/road-widening area: 4,011.86 sq.m; net layout area is recorded as 49,640.18 sq.m in the approval parameters and 49,641.91 sq.m in the layout land-use table.
Boundaries: East: agricultural land of Ramarao and Balaswamy; west: 30M road; north: 45M road; south: agricultural land of Rayapu Reddy.
Development identity
Sanctioning authority: Kakatiya Urban Development Authority (KUDA); the tentative layout approval records delegation to Vanchangiri Grampanchayat.
Principal layout approval: 295146/LP/GP/213516/0002/2023, dated 20-07-2023; the application/permit reference also includes TS/035854/2023.
Approved built-up area: 0.00 proposed built-up area, both excluding and including parking, in the layout approval parameters.
Building count and floors: Not applicable to the plotted layout as documented; no buildings, floor configuration or parking levels are specified in the supplied project record.
Plots: 155 plots in the layout approval.
Parking: Approval parameters state 0 proposed number of parkings; common parking area is also recorded as 0.00.
Offering and status
Offering: Plots; no RERA-filed unit-type schedule, plot-wise booking/availability schedule or RERA saleable-area schedule is supplied here.
Layout-derived plot information: The drawing-derived schedule identifies 155 plots; plot areas range from 92.05 sq.m to 681.03 sq.m, with a median of 168.69 sq.m. These are software-measured from the drawing and should be checked against it.
Construction/development stage: A Form–1A architect certificate dated 12/11/2025 certifies overall project completion; this is a professional certificate, not an independent site inspection in the supplied evidence.
Completion dates: RERA filing states proposed completion by 20/07/2025; the Form B declaration also undertakes completion by 20-7-2025.
Occupancy certificate: The architect’s Form–1A records an occupancy certificate for the plotted development issued by Vanchanagiri Grampanchayat on 10-11-2024, number 295146/LP/GP/213516/00012/2024/FLT. The supplied certificate identifies the registered project, not a separate tower or phase.
2. The project story
V CITY TOWNSHIP is a plotted layout spanning land in Vanchanagiri and Geesugonda villages, in Geesugonda Mandal, Warangal Urban district. Its RERA-filed identity is a plotted development—not a residential apartment project—and the layout approval identifies 155 plots. The approval’s area schedule allocates land to plots, roads, parks/open space, utilities and social infrastructure; it records no proposed built-up area or common parking area.
The registration certificate records a proposed completion date of 20/07/2025. An architect’s Form–1A dated 12/11/2025 certifies overall completion and records a Grampanchayat occupancy certificate dated 10-11-2024. These are filed records; the material supplied does not include an independent inspection verifying present on-site condition or the completion of each individual infrastructure item.
3. Master plan, architecture & building design
This is a land layout, not a building scheme in the supplied approval. The layout record gives total site/layout area of 53,652.04 sq.m and identifies road-affected/widening land of 4,011.86 sq.m. The approved parameters state a net layout area of 49,640.18 sq.m, while the drawing-derived land-use table totals 49,641.91 sq.m; both figures are reproduced as recorded. No proposed built-up area is recorded (0.00), and the supplied material does not specify buildings, floors or building-level design.
The layout drawing’s land-use table gives the following split:
| Layout use | Area | Share |
|---|---|---|
| Plotted area | 31,973.65 sq.m | 64.41% |
| Roads | 11,436.90 sq.m | 23.04% |
| Organized open space/park | 4,484.87 sq.m | 9.03% |
| Social infrastructure | 1,243.73 sq.m | 2.51% |
| Utility area | 502.76 sq.m | 1.01% |
| Amenity area | 0.00 sq.m | 0.00% |
| Total net layout (as printed) | 49,641.91 sq.m | 100.00% |
The approval drawing identifies internal road widths of 12.20 m, 10.060 m and 9.14 m, and notes connections to existing roads proposed for widening: a 30.48 m existing road to 45.73 m, and an 18.29 m existing road to 30.48 m, under the stated Master Plan 2041 reference. The layout approval also identifies a 4,836.51 sq.m mortgage area, described in the project record as plots mortgaged to the approving authority until layout works are completed.
4. Homes, configurations & floor plans
The registered offering is plots. The supplied evidence contains no RERA-filed schedule of plot-wise saleable areas, bookings or availability, and no reliable unit-level sale agreement or allotment schedule from which to report those figures.
The approved layout drawing’s plot schedule was software-read. The stated plot-area measurements are not a RERA-filed saleable-area schedule and should be verified against the drawing. The supplied floor-plan dataset contains two layout sheets and no measured home floor plans.
Plots identified: 155
Smallest plot: 92.05 sq.m (110.1 sq.yd)
Median plot: 168.69 sq.m (201.8 sq.yd)
Largest plot: 681.03 sq.m (814.5 sq.yd)
5. Parking & vehicle circulation
The layout approval records 0 proposed number of parkings and 0.00 common parking area. It does not establish any allocated or exclusive parking entitlement for an individual plot. Internal roads are shown at widths of 12.20 m, 10.060 m and 9.14 m; the supplied evidence does not specify vehicle entry/exit arrangements, visitor bays, accessible parking, pedestrian separation, ramps or EV charging.
6. Amenities, recreation & open spaces
The layout approval identifies open space/park, social-infrastructure and utility land. A separate amenities record marks several infrastructure and recreation categories as “YES” at 100%; those entries are RERA-recorded status fields, not independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 4,484.87 sq.m; layout table states 9.03%. | Approved layout area statement | Land-use allocation is shown in the layout; completed condition not independently verified. |
| Green strip / tot-lot / park | Area not separately stated in the amenities record. | RERA amenities record | Marked YES, 100%; not independently verified. |
| Community buildings | No size or capacity stated. | RERA amenities record | Marked YES, 100%; not independently verified. |
| Social infrastructure | 1,243.73 sq.m in the layout land-use table. | Approved layout area statement | Land allocation shown; particular facility and completion status not specified. |
| Tot-lot | No size stated. | Layout approval | Listed among amenities/utilities; delivered status not independently verified. |
7. Utilities, building services & safety
The layout approval requires infrastructure works including a protected water supply system, water reservoir/sump, septic tank or sewerage treatment plant as applicable, storm-water drains and nala channelisation, rainwater-harvesting pits, street lighting, electricity facilities, solid-waste management, and levelling and formation of roads. These are approval requirements; the supplied evidence does not establish the installed capacity or independently verify completion of each item.
Water: Water supply is marked YES, 100% in the RERA amenities record. The approval refers to protected water supply and a water reservoir/sump; source and capacity are not stated.
Sewerage and drainage: Sewerage (chamber, lines, septic tank, STP) and storm-water drains are marked YES, 100% in the amenities record. The approval requires a sewerage-disposal system and storm-water/nala works; capacity and independent completion verification are not supplied.
Rainwater harvesting: Marked YES, 100% in the amenities record; the approval requires rainwater-harvesting pits.
Electrical: Electrical meter room/sub-station/receiving station is marked YES, 100%; the approval lists an electric transformer and street lighting. Capacity and installation verification are not supplied.
Solid waste: Solid-waste management and disposal is marked 0% in the amenities record; the approval lists solid-waste management among utility works.
Energy management and fire safety: Each is recorded as 0% in the amenities record. The supplied evidence does not detail a fire system or project-specific fire clearance.
Lifts, accessibility and building safety systems: Not applicable to the documented plotted layout or not specified in the supplied evidence.
8. Location, access & connectivity
The registered project location is in Vanchanagiri (V) and Geesugonda (V), Geesugonda Mandal, Warangal Urban district, PIN 506330. The layout record identifies a 45M road to the north, a 30M road to the west, and agricultural land along the east and south boundaries.
The location dataset supplies a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km as an anchor. The supplied data does not establish public-transport access, measured approach routes or travel times.
9. Developer & development status
The registered promoter is V CITY TOWNSHIP, recorded as a partnership. The RERA record lists its address as 11-23-2330/8, Srinivasa Colony, Vanchangiri, Geesugonda, Warangal Urban, 506330. The registration certificate separately gives a registered-office address with Warangal Urban and PIN 506006, but no street or village details.
The RERA-recorded partners are Sri Rangineni Venkateshwar Rao, Ettineni Sudhakar, Kakkerla Suresh Babu, Ponugoti Mangapathi Rao, Etineni Aparna, Kasarla Taraka Ramu, Mundada Uma and Mundada Giridhar Gopal. Sri Rangineni Venkateshwar Rao is listed as authorised signatory.
The RERA record names Appala Abhilash as a landowner with an area-share agreement. The promoter’s Form B declaration undertakes completion by 20-7-2025. The supplied Form–1A architect certificate dated 12/11/2025 certifies overall completion; it is not an independent site inspection.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for V CITY TOWNSHIP, registration P00300008377; validity stated as 22/06/2024 to 20/07/2025 unless extended.
Layout approval: KUDA tentative layout approval 295146/LP/GP/213516/0002/2023, dated 20-07-2023; records 155 plots and approval conditions.
Layout drawing / application reference: Layout plan filed under TS/035854/2023; drawing identifies plot schedule, roads and land-use areas.
Occupancy certificate and completion certificate: Architect’s Form–1A records Grampanchayat occupancy certificate 295146/LP/GP/213516/00012/2024/FLT, dated 10-11-2024, and certifies overall completion.
Promoter declaration: Form B affidavit declares the title basis and absence of encumbrances, includes the separate-account commitments, and undertakes completion by 20-7-2025.
Other filed project records: Registration certificate, layout plan, tentative layout approval, and architect’s completion certificate are available in the supplied evidence.
The supplied approval materials do not establish the current TG-RERA registration status or whether any registration extension was granted.
Frequently asked questions
Is V CITY TOWNSHIP registered with Telangana RERA?
Yes. V CITY TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P00300008377; the registration status is New Project.
Who is the developer of V CITY TOWNSHIP?
The promoter named in the RERA registration is V CITY TOWNSHIP.
Where is V CITY TOWNSHIP located?
V CITY TOWNSHIP is in GEESUGONDA, Hanamkonda, Telangana (506330).
When will V CITY TOWNSHIP be completed?
The promoter's proposed date of completion filed with RERA is 20/07/2025. This is the promoter's declaration, not a guarantee.