Twin Diamond,block-B

INSPIRE INFRA · Medchal-Malkajgiri · RERA P02200006083

TWIN DIAMOND,BLOCK-B is a residential apartment project in GAJULARAMARAM, Qutballapur mandal, Medchal-Malkajgiri district. The registered promoter is Inspire Infra. The project is on 662.99 sq. m and comprises one residential building, A (BUILDING), sanctioned as 1 Stilt + 5 upper floors, with 20 2BHK apartments. It is registered under TG-RERA number P02200006083, and the promoter-declared completion deadline is 24/01/2026.

More from Inspire Infra · 9 projects →

01What we found

Period endedTG-RERA registration ran to 24 Jan 2026 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.com

1. Project at a glance

Project identity

FieldProject record
Registered nameTWIN DIAMOND,BLOCK-B RERA record
Project type / useResidential apartment project RERA record
Phase / registered portionBLOCK-B is the registered project name; the RERA record identifies one building. No broader phase description is disclosed. RERA record
TG-RERA registrationP02200006083, granted under section 5; recorded as valid from 18 April 2023 to 24 January 2026. The certificate states that extension, if any, is subject to the Act and rules. RERA record
Registered promoterInspire Infra; the project record identifies the organization type as a partnership. RERA record RERA filing Corporate record
RERA statusThe project is recorded as New Project. Registration validity is distinct from the completion deadline; see the offering and status table below. RERA record RERA filing

Land and geographic identity

FieldProject record
LocalityGAJULARAMARAM RERA record RERA filing
Revenue villageGajula Ramaram-1; the building-permit document uses GAJULARAMARAM. RERA record
MandalQutballapur; the building-permit document spells it Qutubullapur. RERA record
DistrictMedchal-Malkajgiri; the building-permit document states MEDCHAL. RERA record
PIN500055 RERA record
Project survey number(s)Sy. No. 129; no subdivision is disclosed in the project identity. RERA record Land records
Registered/site extent662.99 sq. m. The filed building-permit extraction reports plot area 662.99 Sq. Mtrs, road affected area 0.0, nala affected area 0.0, and net plot area 662.99 Sq. Mtrs. RERA filing Land records
BoundariesEast: 40 FEET WIDE ROAD; west: LAND BELONGS TO NARASIMHA REDDY AND OTHERS; north: LAND BELONGS TO P RAMAIAH; south: REMAINING PART OF RESIDENTIAL OPEN LAND. RERA filing Land records

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit approval5217/GHMC/KPL/2023-BP, approved 24 January 2023; file number 005039/GHMC/2525/KPL2/2022-BP. Approvals record
Approved buildingOne residential building, A (BUILDING), sanctioned as 1 Stilt + 5 upper floors.
Sanctioned height14.75; the supplied extraction does not state a unit.
Approved built-up area1,557.15 Sq.Mt. residential area. The approval extraction separately records Stilt area 339 Sq.Mt. and Total Parking Area 338.95; no unit is stated for the latter in that extracted field. RERA record
Approved versus RERA-filed unitsThe RERA land details record 1 total building unit and 1 proposed building unit; the unit schedule records 20 2BHK apartments. Do not read the building-unit field as the apartment count. RERA filing RERA unit table
Parking levelsStilt is identified in the sanctioned configuration; the approval also refers to cellar and stilt parking in its conditions. The supplied extraction does not establish a cellar floor in the stated sanctioned floor configuration.

Offering and status

FieldProject record
Unit type2BHK, 20 units recorded RERA unit table RERA unit details
RERA-filed saleable area95.46 sq. m per recorded 2BHK configuration RERA unit table RERA unit details
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; the record does not give an as-of date, so these counts are indicative. RERA unit table RERA unit details
Registration validity18 April 2023–24 January 2026; this is the registration period, not a statement that construction is complete.
Promoter-declared completion deadline24/01/2026 in the Form B declaration and registration record. RERA record
Construction stage / progressNo independently verified construction stage or site progress is supplied. The RERA-filed amenities schedule records water supply at 50% and the other listed items at 0%; these are filed progress entries, not independently verified site findings. RERA amenities
Occupancy / completion certificateNo occupancy certificate or completion certificate is supplied in the reviewed project documents. GHMC’s permit requires an occupancy certificate before occupation. Document index

2. The project story

TWIN DIAMOND,BLOCK-B is registered as a residential apartment project in Gajularamaram, on Sy. No. 129 in the project record. The site is recorded as 662.99 sq. m and is bounded to the east by a 40 FEET WIDE ROAD. The RERA-filed project identifies one building, while the unit schedule records 20 apartments, all in the 2BHK configuration. RERA record Land records RERA unit table RERA filing

GHMC’s building-permit order sanctions one residential building, A (BUILDING), with 1 Stilt + 5 upper floors and 1,557.15 Sq.Mt. of residential area. The supplied material does not establish current physical construction progress or that any part of the building is complete or occupancy-certified. The RERA-filed progress schedule lists water supply at 50% and the other listed development items at 0%; those entries are not independent site verification. RERA amenities

The promoter’s Form B declaration undertakes completion by 24/01/2026. That declared completion deadline is separate from the registration certificate’s stated validity through 24 January 2026. No occupancy or completion certificate is included in the supplied documents. Document index

3. Master plan, architecture & building design

The GHMC building-permit order is the supplied sanctioned design record. It identifies a single residential building, A (BUILDING), on a plot of 662.99 Sq. Mtrs, with net plot area 662.99 Sq. Mtrs and no road- or nala-affected area recorded in the extraction. The permit states 1 Stilt + 5 upper floors, a building height of 14.75 (unit not stated), residential area of 1,557.15 Sq.Mt., and stilt area of 339 Sq.Mt. The approval extraction separately records a Total Parking Area 338.95 (unit not stated in that field) and 2 rainwater-harvesting pits. It also includes conditions requiring a transformer space, a garbage house, tree planting around the perimeter and in front of the premises, and a fenced tot-lot maintained as greenery. These are approval conditions or specified provisions, not confirmation that the items have been delivered.

The supplied RERA record does not provide a verified building footprint, flats-per-floor schedule, lift or stair configuration, internal circulation drawing details, or a quantified split of residential, common and open-space areas. The layout-plan document is listed but not extracted. The floor-plan file is identified as a floor-plan drawing; its software-measured unit information is described below and should not be treated as a RERA disclosure. Document index

4. Homes, configurations & floor plans

The TG-RERA unit schedule records 20 2BHK apartments, with 0 booked and 20 available in the portal data read; the record has no as-of date for those counts. The filed saleable area is 95.46 sq. m per unit. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002095.46 sq. m54.0–66.1 sq. m; median 62.2 sq. m (software-measured from drawings; not RERA-filed)35% (software-derived from drawings)

The carpet-area range and median are measurements from the supplied floor-plan drawing geometry, not figures filed with TG-RERA; the measurement record says six flat designs were measured and calls for review against the drawing. The RERA saleable-area figure is a separate filed measure and is not interchangeable with carpet area. The supplied measurement notes that saleable area also counts the home’s share of common areas. Floor plans RERA unit details

One measured first-floor plan panel, FIRST FLOOR PLAN (SCALE=1:100), identifies flat 02. Its extracted room dimensions include two bedrooms (2.84 × 3.38 m and 3.16 × 4.11 m), a living/kitchen space (4.72 × 6.55 m) and a balcony (1.2 × 2.4 m). The balcony is marked as excluded from the carpet-area measurement. These are drawing-derived measurements, not RERA-filed room dimensions. RERA unit details

5. Parking & vehicle circulation

The sanctioned building-permit extraction records Total Parking Area 338.95 (unit not stated in that extracted field) and a Stilt area 339 Sq.Mt. The permit conditions state that cellar and stilt areas approved for parking are to be used exclusively for parking, without partition walls or rolling shutters, and not converted or misused. The stated building configuration is 1 Stilt + 5 upper floors; the supplied extraction does not specify the number of car or two-wheeler spaces or confirm a cellar floor in that configuration.

No supplied record establishes visitor or accessible-parking counts, mechanical parking, EV charging, ramp details, pedestrian separation, or unit-specific parking allocations. A drawn or sanctioned parking area does not by itself establish exclusive parking rights for a particular apartment. RERA unit table

6. Amenities, recreation & open spaces

The following progress entries come from the RERA-filed amenities schedule. Percentages are filed values; no independent completion verification is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsNo size or quantity statedRERA-filed amenities schedule0%; not independently verified
Water supplyNo source, storage or capacity statedRERA-filed amenities scheduleMarked available “YES”; 50%; not independently verified
Sewerage (chamber, lines, septic tank, STP)No system capacity or configuration statedRERA-filed amenities scheduleMarked available “YES”; 0%; not independently verified
Storm-water drainsNo size or design statedRERA-filed amenities schedule0%; not independently verified
Green strip / tot-lot / parkNo area or capacity statedRERA-filed amenities schedule; GHMC permit condition for tot-lot and perimeter greenery0%; not independently verified
Street lightingNo quantity or specification statedRERA-filed amenities schedule0%; not independently verified
Community buildingsNo facility or size statedRERA-filed amenities schedule0%; not independently verified
Treatment and disposal of sewage and sullage waterNo treatment details statedRERA-filed amenities schedule0%; not independently verified
Solid-waste management and disposalNo method or capacity statedRERA-filed amenities schedule0%; not independently verified
Water conservation / rainwater harvestingNo capacity stated; GHMC permit specifies 2 rainwater-harvesting pitsRERA-filed amenities schedule; GHMC building permitMarked available “YES”; 0%; not independently verified
Energy managementNo system or specification statedRERA-filed amenities scheduleMarked available “YES”; 0%; not independently verified
Fire protection and fire-safety requirementsNo system specification statedRERA-filed amenities schedule; GHMC permit conditions0%; not independently verified
Electrical meter room / substation / receiving stationNo capacity stated; GHMC permit requires space for a transformerRERA-filed amenities schedule; GHMC building permitMarked available “YES”; 0%; not independently verified
Aggregate recreational open spaceNo area statedRERA-filed amenities schedule0%; not independently verified

7. Utilities, building services & safety

The RERA-filed amenities schedule marks Water Supply as “YES” and reports 50% progress, but does not identify the source, storage, treatment or supply capacity. It marks sewerage as “YES” with 0% progress; no STP design, treatment capacity, reuse arrangement or storm-water system details are provided. Rainwater harvesting is marked “YES” in the schedule, and the GHMC permit specifies 2 rainwater-harvesting pits. These entries do not establish that the systems are complete or operating. RERA amenities

The permit requires space for a transformer, a garbage house within the premises, and performance of services such as sanitation, plumbing, fire safety, lifts and electrical installations under qualified technical supervision. It also requires an occupancy fire NOC from the Director (EV&DM) before an occupancy certificate, and states that an occupancy certificate is compulsory before occupation. The supplied evidence does not include the fire NOC, an occupancy certificate, lift details, electrical capacity, backup power, waste-processing details, CCTV/security arrangements, or accessibility provisions.

8. Location, access & connectivity

The registered location is Gajula Ramaram-1, Gajularamaram locality, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055. The project’s recorded eastern boundary is a 40 FEET WIDE ROAD. A cadastral-parcel centroid is supplied at 17.53003, 78.42392; this is a mapped location reference, not a surveyed boundary confirmation. RERA record RERA filing Location record

The supplied location data lists HITEC City — 10.8 km as an anchor distance. No travel time, route, public-transport detail or other measured connectivity is supplied. Location record

9. Developer & development status

The registered promoter is Inspire Infra, identified in the project filing as a partnership, with GSTIN 36AAGFI2208C1ZX. The promoter record gives its address as CHALLAS MY SPACE III, IIIA, ROAD NO 15, GAJULARAMARAM, GAJULARAMARAM, Qutballapur, Medchal-Malkajgiri, 500055. The record names SRINIVASA REDDY BONAM as Authorized Signatory and VIJAYALAKSHMI BONAM as Partner. RERA record RERA filing Corporate record Parties record

The Form B affidavit is attributed to Bonam Sainivasa Reddy, described in the extraction as the Managing Partner, and undertakes completion by 24/01/2026. This is a promoter declaration, not independently verified construction progress. The registration certificate lists a promoter office at Village: Neknapur, Mandal: Gandipet, District: Ranga Reddy, Pin: 500089. The supplied evidence also lists inspireinfra.in as a vendor site; it does not supply a project-specific phone number or email address. Promoter website

10. Approvals, official records & documents

TG-RERA registration certificate
Reference and scopeP02200006083, Form C, issued 18/04/2023; project TWIN DIAMOND,BLOCK-B
What the supplied evidence establishesRegistration under section 5, stated valid through 24/01/2026, with the certificate’s listed conditions.
GHMC building-permit order
Reference and scope5217/GHMC/KPL/2023-BP, approved 24 January 2023; file 005039/GHMC/2525/KPL2/2022-BP
What the supplied evidence establishesSanctions one residential building, A (BUILDING), on 662.99 Sq. Mtrs, with 1 Stilt + 5 upper floors. The permit says it does not confer ownership rights and sets construction and occupancy conditions.
Legal title report
Reference and scopeDocument 306502
What the supplied evidence establishesAn advocate’s title opinion is on file. Its extracted summary describes a stated chain and an opinion concerning construction under the GHMC permit; the underlying title chain is not independently reconstructed in this Overview.
Registered sale deed in title-report filing
Reference and scopeDocument 306501, page 6
What the supplied evidence establishesThe extraction describes a registered sale deed dated 17 March 2022, for 792.92 Sq.yards in Sy. No. 129, Gajularamaram Village, in favour of M/s. INSPIRE INFRA.
Encumbrance statement
Reference and scopeDocument 306503
What the supplied evidence establishesThe supplied statement is described as a search for 01-10-2007 to 12-02-2023 for Survey No. 129, Gajularamaram, at SRO Quthbullapur.
Floor-plan / layout-plan file
Reference and scopeDocument 306504
What the supplied evidence establishesListed as a layout-plan document and used for drawing-based unit measurements; a separate extracted approval stamp or complete layout record is not supplied here.
Form B promoter declaration
Reference and scopeDocument 306500, page 1
What the supplied evidence establishesForm B affidavit-cum-declaration for M/s. INSPIRE INFRA, including the promoter’s completion undertaking and other stated commitments.
Occupancy / completion certificate
Reference and scopeNot supplied Document index
What the supplied evidence establishesNo occupancy or completion certificate is included in the reviewed project documents.

Other registrations of Twin Diamond

Frequently asked questions

Is TWIN DIAMOND,BLOCK-B registered with Telangana RERA?

Yes. TWIN DIAMOND,BLOCK-B is registered with the Telangana Real Estate Regulatory Authority as P02200006083; the registration status is New Project.

Who is the developer of TWIN DIAMOND,BLOCK-B?

The promoter named in the RERA registration is INSPIRE INFRA.

Where is TWIN DIAMOND,BLOCK-B located?

TWIN DIAMOND,BLOCK-B is in GAJULARAMARAM, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, Telangana (500055).

When will TWIN DIAMOND,BLOCK-B be completed?

The promoter's proposed date of completion filed with RERA is 24/01/2026. This is the promoter's declaration, not a guarantee.

More projects in Gajula Ramaram 1