Tulip
K V K PROJECTS · Rangareddy · RERA P02400004321
TULIP is a residential apartment project in Goutham Nagar (Gaddiannaram-3C), Ranga Reddy district; the mandal is not disclosed in the supplied RERA land record. The registered promoter is K V K PROJECTS, recorded as a partnership. The project covers 445.93 sq m and comprises one residential building with 1 Stilt + 5 upper floors and 10 3BHK apartments, each with a RERA-filed saleable area of 143.37 sq m. Its TG-RERA registration is P02400004321, and its proposed completion is 27/12/2027.
More from K V K Projects · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | TULIP RERA record |
| Project type and RERA-record status | Residential apartment project; status recorded as New Project RERA record RERA filing |
| Phase / registered portion | Phase not stated in the supplied record. The registration and building sanction identify one proposed building. RERA record |
| TG-RERA registration | P02400004321; Form C issued 24/03/2022. Registration validity is stated as five years, from 24/03/2022 to 27/08/2027, unless extended. RERA record |
| Registered promoter | K V K PROJECTS, recorded as a partnership. RERA filing Parties record |
| RERA status | Registration certificate supplied; the record says it is valid through 27/08/2027. This is the registration-validity period, not the construction-completion date. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / registered site description | Goutham Nagar (Gaddiannaram-3C); Plot No. 25. RERA record RERA filing |
| Revenue village | Gaddiannaram is named in the title-report and building-permit extracts. The RERA land record’s village field is not disclosed. Land records |
| Mandal | Not disclosed in the supplied RERA land record. Land records |
| District / PIN | Ranga Reddy; 500060. RERA record RERA filing |
| Survey numbers and subdivisions | 274/1, 284/1 and 284/3. RERA record Land records |
| Site extent | Total and net area: 445.93 sq m. RERA filing |
| Boundaries | East: PLOT NO 26; West: PLOT NO 24; North: PLOT NO 18; South: 40 FEET WIDE ROAD. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Revised Building Permit Order 2/C5/09337/2021, file 2/C5/05190/2021, approved 27 August, 2021. Approvals record |
| Approved building configuration | One residential building, 1 Stilt + 5 upper floors; the permit extract also records residential upper floors: 1 and stilt parking floors: 1. |
| Building height | 15 m, as recorded in the permit extract. |
| Approved built-up area | The permit extraction lists “Proposed Covered builtup area 12,546.00”; its units/format are not clear in the supplied extraction, so this is not treated here as a verified area measurement. Other figures shown in the same extracted schedule include 250.93 for residential upper floors and 219.47 for stilt parking, each labelled Area (m2). |
| Building / unit counts | RERA land fields record 1 total building unit and 1 proposed building unit; the unit record lists 10 apartments. RERA filing RERA unit table |
| Parking | One stilt parking floor is shown in the permit extract. A parking-space count or unit-by-unit allocation is not supplied. RERA amenities |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units. RERA unit table |
| RERA-filed saleable area | 143.37 sq m per unit. RERA unit table |
| Booking / availability | 0 booked; 10 available, according to the supplied TG-RERA unit record. The record has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | The project is recorded as a New Project. The supplied materials do not establish current construction progress or independently verify the site stage. RERA filing |
| Completion timeline | Proposed completion: 27/12/2027 in the project record. The Form B declaration states completion by 27/08/2027. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied documents. The building-permit conditions require a completion notice and occupancy certificate before occupation. Document index |
2. The project story
TULIP is registered as a residential apartment project on Plot No. 25 in Goutham Nagar (Gaddiannaram-3C), Ranga Reddy district, on Survey Nos. 274/1, 284/1 and 284/3. The GHMC permit describes one proposed residential building of 1 Stilt + 5 upper floors, with a recorded height of 15 m. RERA record Land records
The RERA unit record lists 10 three-bedroom apartments, with 0 booked and 10 available in the supplied snapshot; the portal record has no as-of date. This is a record of the filed offering, not confirmation of current availability. RERA unit table
The supplied evidence includes the building permit and the RERA registration certificate but does not establish actual construction progress, completion, or an issued occupancy certificate. The project’s proposed completion date is recorded as 27/12/2027; the promoter’s Form B declaration separately undertakes completion by 27/08/2027. RERA record
3. Master plan, architecture & building design
The sanctioned building-permit extract identifies a single residential building, Building - PROPOSED-1 (K VIJAYAKUMAR), on a 445.93 m2 site, with 1 Stilt + 5 upper floors and a recorded height of 15 m. The permit extract lists 20 Trees, a compound wall of 81.9 RM, and a 0 m2 tot-lot. These are permit-record details, not confirmation of installed or completed site features.
The permit extraction also records 250.93 as residential upper-floor area and 219.47 as stilt-parking area, both labelled “Area (m2),” and “Proposed Covered builtup area 12,546.00.” Because the extracted schedule’s presentation and units are unclear for the latter figure, it should not be relied on as a verified built-up-area measurement. No reliable plan-derived information is supplied on flats per floor, lifts, stairs, entrances, circulation, or common-area distribution.
4. Homes, configurations & floor plans
The TG-RERA unit record lists ten 3BHK apartments, each with a filed saleable area of 143.37 sq m. The floor-plan review provides software-measured carpet-area estimates from the supplied drawing: a median of 89.4 sq m, ranging from 87.2 to 91.5 sq m across two measured designs. These drawing measurements are not RERA-filed carpet-area disclosures and are marked as needing review. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 143.37 sq m | Software-measured: median 89.4 sq m; range 87.2–91.5 sq m | 38% |
The supplied drawing extract identifies a living/dining area, kitchen, three bedrooms, two toilets, and two balconies labelled 1.25 M. WIDE BALC for one flat design. The room dimensions are drawing-derived measurements, not RERA disclosures; the drawings and measurements should be checked directly before relying on them. RERA unit details
Carpet area measures the home’s internal floor area; saleable area is the RERA-filed figure and may include the home’s share of common areas. The software-measured carpet figures and the filed saleable area are therefore distinct measures. RERA unit table Floor plans
5. Parking & vehicle circulation
The GHMC permit extract shows one stilt parking floor. It does not provide a count of parking spaces, their size or type, or whether spaces are resident, visitor, accessible, or mechanically operated. The supplied record also does not establish individual parking allocations or document a specific bay as exclusively attached to a unit. RERA amenities
A 3BHK unit plan is not evidence of an allocated parking space. The permit refers to road widths of 12 M ROAD and 18 mt. road widths, but the supplied material does not establish the project’s internal driveway or vehicle-circulation arrangement.
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 amenity and infrastructure categories. For most, the progress field is 0; these entries do not independently establish that facilities are built or operational. The GHMC permit also specifies certain site requirements. RERA amenities
| Facility | Green Strip/TOT LOT/Park |
|---|---|
| Description / size | Permit extract records tot-lot area as 0 m2 and requires the tot-lot to be fenced and maintained as greenery before occupancy certificate. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0; completion not verified. |
| Facility | Aggregate area of recreational Open Space |
|---|---|
| Description / size | No area supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0; completion not verified. |
| Facility | Internal Roads & Footpaths |
|---|---|
| Description / size | No dimensions supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0; completion not verified. |
| Facility | Street Lighting |
|---|---|
| Description / size | No details supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0; completion not verified. |
| Facility | Community Buildings |
|---|---|
| Description / size | No details supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress 0; completion not verified. |
No clubhouse or indoor recreation facilities, sports facilities, or further community amenities are evidenced in the supplied project records. RERA amenities Promoter website
7. Utilities, building services & safety
| Evidence in the supplied record | RERA amenities record marks Water Supply: YES; no source, storage or treatment capacity is supplied. RERA amenities |
|---|---|
| Status shown | RERA-listed; progress recorded as 0. |
| Evidence in the supplied record | RERA amenities record marks Sewerage (Chamber, Lines, Septic Tank, STP): YES. The permit extract requires an ETP as per standard specification. No capacity or completion evidence is supplied. RERA amenities |
|---|---|
| Status shown | RERA-listed; progress recorded as 0. |
| Evidence in the supplied record | RERA lists water conservation and rainwater harvesting as YES; the permit requires a rainwater-harvesting percolation pit. No capacity or completion evidence is supplied. RERA amenities |
|---|---|
| Status shown | RERA-listed; progress recorded as 0; completion not verified. |
| Evidence in the supplied record | RERA lists an electrical meter room/sub-station/receiving station as YES; the permit requires space for a transformer. No supply or backup capacity is supplied. RERA amenities |
|---|---|
| Status shown | RERA-listed; progress recorded as 0; completion not verified. |
| Evidence in the supplied record | The RERA amenities record includes fire protection and fire safety requirements. The permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate. RERA amenities |
|---|---|
| Status shown | RERA progress 0; no Fire NOC or occupancy certificate is supplied. |
| Evidence in the supplied record | The permit requires a garbage house within the premises; RERA lists solid-waste management and disposal. RERA amenities |
|---|---|
| Status shown | RERA progress 0; completion not verified. |
| Evidence in the supplied record | The permit requires a periphery strip of greenery to be maintained as per rules. No lift, accessibility, CCTV, or security specifications are supplied. |
|---|---|
| Status shown | Not established by the supplied records. |
These listed provisions and conditions describe filed or sanctioned requirements; they do not establish that the facilities are complete or that statutory clearances have been issued. RERA amenities
8. Location, access & connectivity
The registered project location is Goutham Nagar (Gaddiannaram-3C), Plot No. 25, in Ranga Reddy district, PIN 500060; the building-permit extract names Gaddi Annaram. The record does not supply a mandal. RERA record RERA filing
The recorded site boundaries include a 40 FEET WIDE ROAD to the south. The permit extract refers to 12 M ROAD and 18 mt. road widths, but does not establish a complete access route or public-transport arrangement. RERA filing
The supplied location data identifies Financial District (Nanakramguda), 1.2 km from a cadastral parcel centroid at 17.41528, 78.35459; that is the supplied measured-distance record, not a travel-time estimate. Location record
9. Developer & development status
The registered promoter is K V K PROJECTS, identified in the RERA record as a partnership, with GSTIN 36AAVFK4438M1ZJ. The supplied registered office address is KALWA RESIDENCY, ROAD NO 5, 12 M ROAD, GADDI ANNARAM, Goutham Nagar (Gaddiannaram-3C), Ranga Reddy, 500060. Corporate record Parties record RERA filing RERA filing
The RERA file identifies VIJAYA KUMAR K as authorized signatory and partner, and SANDHYA KALWA as partner. No official website or project contact details are supplied in the reviewed records. Parties record
The RERA record describes the project as a new project and records proposed completion as 27/12/2027. Form B states a completion undertaking of 27/08/2027. No independently verified construction-progress figure or occupancy/completion certificate is supplied. RERA filing RERA record Document index
10. Approvals, official records & documents
| Identifier / date | P02400004321; issued 24/03/2022; stated validity to 27/08/2027 |
|---|---|
| What the supplied record establishes | Registration of TULIP and listed registration conditions, including separate-account, agreement-for-sale and conveyance requirements. |
| Identifier / date | Approval 2/C5/09337/2021; file 2/C5/05190/2021; approved 27 August, 2021 |
|---|---|
| What the supplied record establishes | Sanction for a proposed residential building on Survey Nos. 274/1, 284/1 and 284/3. |
| Identifier / date | Verified at Hyderabad on 14* day of September 2021 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, project funds, audits, approvals and completion. |
| Identifier / date | Document 185730 |
|---|---|
| What the supplied record establishes | Advocate’s title and search report concerning Plot No. 25 and the project land. |
| Identifier / date | Document 186002 |
|---|---|
| What the supplied record establishes | Development Agreement cum GPA relating to residential construction on Plot No. 25. |
| Identifier / date | Document 185731 |
|---|---|
| What the supplied record establishes | The RERA file lists a layout-plan document; drawing review is also associated with this document. Document index |
| Identifier / date | Document 185742 |
|---|---|
| What the supplied record establishes | Partially filled template; the supplied extraction does not identify a specific allottee or unit. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No issued certificate is identified in the supplied project documents. Document index |
1. Project at a glance
Project identity
Registered project name: TULIP
Project type and RERA-record status: Residential apartment project; status recorded as New Project
Phase / registered portion: Phase not stated in the supplied record. The registration and building sanction identify one proposed building.
TG-RERA registration: P02400004321; Form C issued 24/03/2022. Registration validity is stated as five years, from 24/03/2022 to 27/08/2027, unless extended.
Registered promoter: K V K PROJECTS, recorded as a partnership.
RERA status: Registration certificate supplied; the record says it is valid through 27/08/2027. This is the registration-validity period, not the construction-completion date.
Land and geographic identity
Locality / registered site description: Goutham Nagar (Gaddiannaram-3C); Plot No. 25.
Revenue village: Gaddiannaram is named in the title-report and building-permit extracts. The RERA land record’s village field is not disclosed.
Mandal: Not disclosed in the supplied RERA land record.
District / PIN: Ranga Reddy; 500060.
Survey numbers and subdivisions: 274/1, 284/1 and 284/3.
Site extent: Total and net area: 445.93 sq m.
Boundaries: East: PLOT NO 26; West: PLOT NO 24; North: PLOT NO 18; South: 40 FEET WIDE ROAD.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Revised Building Permit Order 2/C5/09337/2021, file 2/C5/05190/2021, approved 27 August, 2021.
Approved building configuration: One residential building, 1 Stilt + 5 upper floors; the permit extract also records residential upper floors: 1 and stilt parking floors: 1.
Building height: 15 m, as recorded in the permit extract.
Approved built-up area: The permit extraction lists “Proposed Covered builtup area 12,546.00”; its units/format are not clear in the supplied extraction, so this is not treated here as a verified area measurement. Other figures shown in the same extracted schedule include 250.93 for residential upper floors and 219.47 for stilt parking, each labelled Area (m2).
Building / unit counts: RERA land fields record 1 total building unit and 1 proposed building unit; the unit record lists 10 apartments.
Parking: One stilt parking floor is shown in the permit extract. A parking-space count or unit-by-unit allocation is not supplied.
Offering and status
RERA-filed configuration: 3BHK, 10 units.
RERA-filed saleable area: 143.37 sq m per unit.
Booking / availability: 0 booked; 10 available, according to the supplied TG-RERA unit record. The record has no as-of date, so these counts are indicative.
Construction stage: The project is recorded as a New Project. The supplied materials do not establish current construction progress or independently verify the site stage.
Completion timeline: Proposed completion: 27/12/2027 in the project record. The Form B declaration states completion by 27/08/2027.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied documents. The building-permit conditions require a completion notice and occupancy certificate before occupation.
2. The project story
TULIP is registered as a residential apartment project on Plot No. 25 in Goutham Nagar (Gaddiannaram-3C), Ranga Reddy district, on Survey Nos. 274/1, 284/1 and 284/3. The GHMC permit describes one proposed residential building of 1 Stilt + 5 upper floors, with a recorded height of 15 m.
The RERA unit record lists 10 three-bedroom apartments, with 0 booked and 10 available in the supplied snapshot; the portal record has no as-of date. This is a record of the filed offering, not confirmation of current availability.
The supplied evidence includes the building permit and the RERA registration certificate but does not establish actual construction progress, completion, or an issued occupancy certificate. The project’s proposed completion date is recorded as 27/12/2027; the promoter’s Form B declaration separately undertakes completion by 27/08/2027.
3. Master plan, architecture & building design
The sanctioned building-permit extract identifies a single residential building, Building - PROPOSED-1 (K VIJAYAKUMAR), on a 445.93 m2 site, with 1 Stilt + 5 upper floors and a recorded height of 15 m. The permit extract lists 20 Trees, a compound wall of 81.9 RM, and a 0 m2 tot-lot. These are permit-record details, not confirmation of installed or completed site features.
The permit extraction also records 250.93 as residential upper-floor area and 219.47 as stilt-parking area, both labelled “Area (m2),” and “Proposed Covered builtup area 12,546.00.” Because the extracted schedule’s presentation and units are unclear for the latter figure, it should not be relied on as a verified built-up-area measurement. No reliable plan-derived information is supplied on flats per floor, lifts, stairs, entrances, circulation, or common-area distribution.
4. Homes, configurations & floor plans
The TG-RERA unit record lists ten 3BHK apartments, each with a filed saleable area of 143.37 sq m. The floor-plan review provides software-measured carpet-area estimates from the supplied drawing: a median of 89.4 sq m, ranging from 87.2 to 91.5 sq m across two measured designs. These drawing measurements are not RERA-filed carpet-area disclosures and are marked as needing review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 143.37 sq m | Software-measured: median 89.4 sq m; range 87.2–91.5 sq m | 38% |
The supplied drawing extract identifies a living/dining area, kitchen, three bedrooms, two toilets, and two balconies labelled 1.25 M. WIDE BALC for one flat design. The room dimensions are drawing-derived measurements, not RERA disclosures; the drawings and measurements should be checked directly before relying on them.
Carpet area measures the home’s internal floor area; saleable area is the RERA-filed figure and may include the home’s share of common areas. The software-measured carpet figures and the filed saleable area are therefore distinct measures.
5. Parking & vehicle circulation
The GHMC permit extract shows one stilt parking floor. It does not provide a count of parking spaces, their size or type, or whether spaces are resident, visitor, accessible, or mechanically operated. The supplied record also does not establish individual parking allocations or document a specific bay as exclusively attached to a unit.
A 3BHK unit plan is not evidence of an allocated parking space. The permit refers to road widths of 12 M ROAD and 18 mt. road widths, but the supplied material does not establish the project’s internal driveway or vehicle-circulation arrangement.
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 amenity and infrastructure categories. For most, the progress field is 0; these entries do not independently establish that facilities are built or operational. The GHMC permit also specifies certain site requirements.
| Facility | Green Strip/TOT LOT/Park |
|---|---|
| Description / size | Permit extract records tot-lot area as 0 m2 and requires the tot-lot to be fenced and maintained as greenery before occupancy certificate. |
| Declared progress / verified status | RERA progress 0; completion not verified. |
| Facility | Aggregate area of recreational Open Space |
|---|---|
| Description / size | No area supplied. |
| Declared progress / verified status | RERA progress 0; completion not verified. |
| Facility | Internal Roads & Footpaths |
|---|---|
| Description / size | No dimensions supplied. |
| Declared progress / verified status | RERA progress 0; completion not verified. |
| Facility | Street Lighting |
|---|---|
| Description / size | No details supplied. |
| Declared progress / verified status | RERA progress 0; completion not verified. |
| Facility | Community Buildings |
|---|---|
| Description / size | No details supplied. |
| Declared progress / verified status | RERA progress 0; completion not verified. |
No clubhouse or indoor recreation facilities, sports facilities, or further community amenities are evidenced in the supplied project records.
7. Utilities, building services & safety
| Evidence in the supplied record | RERA amenities record marks Water Supply: YES; no source, storage or treatment capacity is supplied. |
|---|---|
| Status shown | RERA-listed; progress recorded as 0. |
| Evidence in the supplied record | RERA amenities record marks Sewerage (Chamber, Lines, Septic Tank, STP): YES. The permit extract requires an ETP as per standard specification. No capacity or completion evidence is supplied. |
|---|---|
| Status shown | RERA-listed; progress recorded as 0. |
| Evidence in the supplied record | RERA lists water conservation and rainwater harvesting as YES; the permit requires a rainwater-harvesting percolation pit. No capacity or completion evidence is supplied. |
|---|---|
| Status shown | RERA-listed; progress recorded as 0; completion not verified. |
| Evidence in the supplied record | RERA lists an electrical meter room/sub-station/receiving station as YES; the permit requires space for a transformer. No supply or backup capacity is supplied. |
|---|---|
| Status shown | RERA-listed; progress recorded as 0; completion not verified. |
| Evidence in the supplied record | The RERA amenities record includes fire protection and fire safety requirements. The permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of the occupancy certificate. |
|---|---|
| Status shown | RERA progress 0; no Fire NOC or occupancy certificate is supplied. |
| Evidence in the supplied record | The permit requires a garbage house within the premises; RERA lists solid-waste management and disposal. |
|---|---|
| Status shown | RERA progress 0; completion not verified. |
| Evidence in the supplied record | The permit requires a periphery strip of greenery to be maintained as per rules. No lift, accessibility, CCTV, or security specifications are supplied. |
|---|---|
| Status shown | Not established by the supplied records. |
These listed provisions and conditions describe filed or sanctioned requirements; they do not establish that the facilities are complete or that statutory clearances have been issued.
8. Location, access & connectivity
The registered project location is Goutham Nagar (Gaddiannaram-3C), Plot No. 25, in Ranga Reddy district, PIN 500060; the building-permit extract names Gaddi Annaram. The record does not supply a mandal.
The recorded site boundaries include a 40 FEET WIDE ROAD to the south. The permit extract refers to 12 M ROAD and 18 mt. road widths, but does not establish a complete access route or public-transport arrangement.
The supplied location data identifies Financial District (Nanakramguda), 1.2 km from a cadastral parcel centroid at 17.41528, 78.35459; that is the supplied measured-distance record, not a travel-time estimate.
9. Developer & development status
The registered promoter is K V K PROJECTS, identified in the RERA record as a partnership, with GSTIN 36AAVFK4438M1ZJ. The supplied registered office address is KALWA RESIDENCY, ROAD NO 5, 12 M ROAD, GADDI ANNARAM, Goutham Nagar (Gaddiannaram-3C), Ranga Reddy, 500060.
The RERA file identifies VIJAYA KUMAR K as authorized signatory and partner, and SANDHYA KALWA as partner. No official website or project contact details are supplied in the reviewed records.
The RERA record describes the project as a new project and records proposed completion as 27/12/2027. Form B states a completion undertaking of 27/08/2027. No independently verified construction-progress figure or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400004321; issued 24/03/2022; stated validity to 27/08/2027 |
|---|---|
| What the supplied record establishes | Registration of TULIP and listed registration conditions, including separate-account, agreement-for-sale and conveyance requirements. |
| Identifier / date | Approval 2/C5/09337/2021; file 2/C5/05190/2021; approved 27 August, 2021 |
|---|---|
| What the supplied record establishes | Sanction for a proposed residential building on Survey Nos. 274/1, 284/1 and 284/3. |
| Identifier / date | Verified at Hyderabad on 14* day of September 2021 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, project funds, audits, approvals and completion. |
| Identifier / date | Document 185730 |
|---|---|
| What the supplied record establishes | Advocate’s title and search report concerning Plot No. 25 and the project land. |
| Identifier / date | Document 186002 |
|---|---|
| What the supplied record establishes | Development Agreement cum GPA relating to residential construction on Plot No. 25. |
| Identifier / date | Document 185731 |
|---|---|
| What the supplied record establishes | The RERA file lists a layout-plan document; drawing review is also associated with this document. |
| Identifier / date | Document 185742 |
|---|---|
| What the supplied record establishes | Partially filled template; the supplied extraction does not identify a specific allottee or unit. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No issued certificate is identified in the supplied project documents. |
Frequently asked questions
Is TULIP registered with Telangana RERA?
Yes. TULIP is registered with the Telangana Real Estate Regulatory Authority as P02400004321; the registration status is New Project.
Who is the developer of TULIP?
The promoter named in the RERA registration is K V K PROJECTS.
Where is TULIP located?
TULIP is in Goutham Nagar (Gaddiannaram-3C), Rangareddy, Telangana (500060).
When will TULIP be completed?
The promoter's proposed date of completion filed with RERA is 27/12/2027. This is the promoter's declaration, not a guarantee.