TRIDENT RAMSAROJ is a residential apartment project in EAST MARREDPALLY-18, Maredpally mandal, Hyderabad district. It is being developed by the registered promoter Trident Infra, a partnership. The project is on a total plot area of 1114.39 sq. m and comprises one building with 1 Cellar + 1 Stilt + 5 upper floors, with 30 3BHK apartments. It is registered with TG-RERA under P02500006427, with a proposed completion date of 14/07/2025.

01What we found

Period endedTG-RERA registration ran to 14 Jul 2025 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

FieldRecord
Registered project nameTRIDENT RAMSAROJ RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo separate phase name or phase-wise scope is disclosed; the registration is for the project at Plot No. 10-3-73/1, E & E/1
TG-RERA registrationP02500006427, issued 07/07/2023; certificate validity stated as 07/07/2023 to 14/07/2025 Approvals record
RERA statusThe certificate says “unless extended by the Authority”; it records no extension. Current registration status is not established by the supplied record
Registered promoterTrident Infra (also recorded as TRIDENT INFRA); entity type: partnership RERA record RERA filing Parties record

Land and geographic identity

FieldRecord
LocalityEAST MARREDPALLY-18; the building permit describes the locality as EAST MARREDPALLY 18 RERA record RERA filing
Revenue villageEast Marredpally RERA record Land records
MandalMaredpally in the project and RERA records RERA record. The permit extraction separately describes the mandal as “Secunderabad Mandal”
District / PINHyderabad / 500026 RERA record
Site identifierHouse No. 10-3-73/1, Plot E & E/1; the building permit identifies “Plot E AND E/1” Land records
Survey numbers / subdivisionsNot disclosed in the supplied project record Land records
Approved layout / subdivision reference506/E, recorded as an “Approved Layout No. / LRS Proceeding No. / Sub division No” Approvals record
Site areaTotal plot area 1114.39 sq. m; road-affected area 36.58 sq. m; net plot area 1077.81 sq. m Land records
BoundariesNorth: Plot No. 6; South: Plot No. 2; East: Plot No. 1; West: Road Land records

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order 2321/GHMC/SEC/2022-BP, approved 14 July 2022; file no. 004197/GHMC/2137/SEC1/2022-BP Approvals record
Approved built-up area3778.54 sq. m is recorded as “Approved Built up Area” in the RERA project fields RERA filing. The permit extraction separately lists residential upper-floors area 2,434.65, cellar area 759.5, and stilt area 471.8; the supplied extraction labels those figures but does not state their units in that table
Building countOne building / one tower is recorded RERA filing RERA unit table
Sanctioned configuration1 Cellar + 1 Stilt + 5 upper floors; permit extraction records building height as 14.99 without a unit in the extracted field
Parking provisionCellar and stilt are approved for parking; permit extraction records total parking area 1260.5 without a unit in the extracted field. No parking-space count is supplied
Unit countGHMC permit condition says sanctioned unit numbers must not be increased, but the extracted permit does not state the sanctioned count. RERA filing records 30 apartments RERA unit table

Offering and status

FieldRecord
RERA-filed configuration3BHK; 30 units RERA unit table RERA unit details
RERA-filed saleable area108.83 sq. m per recorded configuration RERA unit table RERA unit details
Booking / availabilityPortal snapshot lists 0 booked / 30 available; the booking record has no supplied as-of date and is indicative only RERA unit table
Completion deadlinePromoter’s RERA declaration and project record state 14/07/2025 as the proposed completion date RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. The GHMC permit requires an occupancy certificate before occupation Document index
Construction stageNo independently verified construction-stage or site-progress evidence is supplied Document index RERA amenities

2. The project story

TRIDENT RAMSAROJ is registered with TG-RERA as a residential apartment project on Plot E & E/1, House No. 10-3-73/1, in East Marredpally, Hyderabad. The RERA filing records one building and 30 3BHK apartments. The GHMC building permit sanctions one residential building with a cellar, stilt and five upper floors. RERA record Land records RERA unit table

The registration certificate and promoter’s Form B state a completion date of 14 July 2025. The supplied record does not establish whether construction is complete, whether any part has been handed over, or whether an occupancy certificate has been issued. The GHMC permit makes an occupancy certificate a prerequisite to occupation.

3. Master plan, architecture & building design

The filed development is a single residential building on a plot recorded as 1114.39 sq. m before the road-affected portion and 1077.81 sq. m net. The permit extraction lists 36.58 sq. m as road-affected and identifies a 59.52 tot lot; the extraction does not specify units beside those individual figures. Land records

GHMC’s permit describes 1 Cellar + 1 Stilt + 5 upper floors and records an approved building height of 14.99 (unit not shown in the extracted field). The RERA record gives 3778.54 sq. m as approved built-up area. The permit extraction separately lists residential upper-floors area 2,434.65, cellar area 759.5, stilt area 471.8, and total parking area 1260.5; units for these extracted permit figures are not stated in the supplied table. RERA filing

The permit identifies cellar and stilt as parking levels and includes a tot lot, rainwater-harvesting pits, transformer space and a garbage house. The supplied material does not provide a detailed drawing-derived account of floor-by-floor apartment arrangements, footprint, number of flats per floor, lifts, stairs, entries or internal circulation. No FSI-counted area or RERA-filed carpet area is supplied. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK30030108.83 sq. mNot available: no flat designs were measuredNot supplied

The unit count, booking status and saleable area are from the TG-RERA filing; the booking figures have no supplied as-of date. The floor-plan record reports two drawings reviewed but zero measured flat designs for the 3BHK configuration, so no software-measured carpet area or room dimensions can be reported. RERA saleable area is the filed area figure; it is not a measured carpet-area figure. No separate balcony, utility or common-area loading measurements are supplied. RERA unit details Floor plans RERA unit table

5. Parking & vehicle circulation

GHMC’s permit identifies the cellar and stilt as parking areas and records a total parking area of 1260.5 (unit not stated in the extracted field). The permit condition says these areas are to be used exclusively for parking, without partition walls or rolling shutters, and not converted to another use.

No count of car or two-wheeler spaces, visitor or accessible parking, EV charging provision, ramp or driveway arrangement, or unit-wise parking allocation is established by the supplied record. A vendor listing mentions covered car parking and visitor parking, but the project documents supplied do not establish the number or legal allocation of spaces. Promoter website

6. Amenities, recreation & open spaces

Tot lot / green space
Description / size59.52 (unit not stated in the extracted permit field); permit requires it to be fenced and maintained as greenery
Evidence sourceGHMC permit
Declared progress / verified statusSanctioned condition; completion not verified
Rainwater-harvesting pits
Description / size2
Evidence sourceGHMC permit
Declared progress / verified statusIncluded in permit extraction; completion not verified
Children’s play area, jogging track, indoor games, swimming pool, gym, clubhouse, common garden and landscape garden
Description / sizeNo sizes or capacities supplied
Evidence sourceVendor listing Promoter website
Declared progress / verified statusVendor-listed; not established as sanctioned or delivered in the supplied project records

The RERA amenities record lists a green strip/tot lot, water conservation/rainwater harvesting and other common infrastructure, with 0% progress shown for the listed amenities. The record does not establish independent completion or inspection. RERA amenities

7. Utilities, building services & safety

ServiceSupplied evidence and status
WaterThe RERA amenities record marks water supply “YES,” with 0% progress shown. The permit says public water supply connections are to be provided only on production of an occupancy certificate. No source, storage capacity or treatment capacity is supplied. RERA amenities
Sewerage / drainageThe RERA amenities record marks sewerage, including STP, “YES,” with 0% progress. No STP capacity, reuse scheme, or detailed storm-water system is supplied. RERA amenities
Rainwater harvestingGHMC permit lists 2 rainwater-harvesting pits and requires a rainwater-harvesting structure (percolation pit). Completion is not verified.
ElectricalThe RERA amenities record marks an electrical meter room / sub-station / receiving station “YES,” with 0% progress. GHMC’s permit requires space for a transformer; no supply or backup capacity is given. RERA amenities
Lifts / vertical transportA vendor listing mentions a lift and service lift; the supplied permit extraction does not establish number, capacity or sanction details. Promoter website
Fire and life safetyThe RERA amenities record lists fire protection and fire safety requirements with 0% progress. The permit requires fire-fighting installations and an Occupancy Fire NOC before the occupancy certificate; no issued Fire NOC is supplied. RERA amenities
WasteGHMC’s permit requires a garbage house within the premises. The RERA amenities record lists solid-waste management with 0% progress. RERA amenities
SecurityCCTV and security are vendor-listed; no project-document evidence of installation or completion is supplied. Promoter website
AccessibilityThe permit includes a condition concerning facilities for physically handicapped persons for public and semi-public buildings above 300 sq. m. The supplied record does not establish a project-specific accessibility design or completed facilities.

8. Location, access & connectivity

The registered location is EAST MARREDPALLY-18, revenue village East Marredpally, Maredpally mandal, Hyderabad district, PIN 500026. The building permit identifies the site as House No. 10-3-73/1, Plot E AND E/1, with the west boundary abutting a road; it describes that road as 18 mt. wide. RERA record Land records

The supplied location record lists Financial District (Nanakramguda) at 1.2 km. No further approach-road, public-transport or landmark distances are documented in the supplied data. Location record

9. Developer & development status

The TG-RERA-registered promoter is Trident Infra / TRIDENT INFRA, recorded as a partnership, with GSTIN 36AASFT9106G1ZR. The RERA record gives a promoter address in East Marredpally, Maredpally, Hyderabad, PIN 500026. RERA record RERA filing Parties record Corporate record

The RERA registration certificate states validity from 07/07/2023 through 14/07/2025 and records no extension in the supplied certificate. The promoter’s Form B declares completion by 14-7-25. No supplied project record confirms construction progress, completion or an occupancy certificate. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500006427; issued 07/07/2023
What the supplied record establishesForm C registration for TRIDENT RAMSAROJ; validity stated through 14/07/2025; certificate records no extension.
GHMC building permit order
Identifier / date2321/GHMC/SEC/2022-BP; 14 July 2022; file no. 004197/GHMC/2137/SEC1/2022-BP
What the supplied record establishesSanctions one residential building with 1 Cellar + 1 Stilt + 5 upper floors at Plot E and E/1, House No. 10-3-73/1.
Legal title report
Identifier / dateDocument 276179
What the supplied record establishesTitle report filed with TG-RERA; the supplied record does not reproduce the complete underlying chain or opinion text here.
Encumbrance statements
Identifier / dateDocuments 276180, 316174 and 316175
What the supplied record establishesEncumbrance statements filed with the project record.
Form B declaration
Identifier / dateDocument 276182
What the supplied record establishesPromoter declaration includes a completion undertaking of 14-7-25.
Layout-plan document
Identifier / dateDocument 276170 Document index
What the supplied record establishesA layout-plan document is listed, but the supplied record says it was not extracted.
Occupancy / completion certificate
Identifier / dateNot supplied Document index
What the supplied record establishesNo certificate is established by the reviewed documents.

The supplied record does not disclose the project’s survey number or subdivision, and does not provide an extracted approved floor-plan drawing or an occupancy certificate. The permit also identifies the approved layout / LRS / subdivision reference as 506/E. Land records Approvals record Document index

Frequently asked questions

Is TRIDENT RAMSAROJ registered with Telangana RERA?

Yes. TRIDENT RAMSAROJ is registered with the Telangana Real Estate Regulatory Authority as P02500006427; the registration status is New Project.

Who is the developer of TRIDENT RAMSAROJ?

The promoter named in the RERA registration is TRIDENT INFRA.

Where is TRIDENT RAMSAROJ located?

TRIDENT RAMSAROJ is in EAST MARREDPALLY-18, Maredpally, Hyderabad, Telangana (500026).

When will TRIDENT RAMSAROJ be completed?

The promoter's proposed date of completion filed with RERA is 14/07/2025. This is the promoter's declaration, not a guarantee.