Sign in

Srivathsa Constructions

MADDULA GOPAL REDDY ,SWARGAM MALLESHAM & SWARGAM PRATHIBHA · Karimnagar · RERA P02700007673

SRIVATHSA CONSTRUCTIONS is a new plotted development in Nagunur, Karimnagar -I, Karimnagar district. The registered promoter is MADDULA GOPAL REDDY, SWARGAM MALLESHAM & SWARGAM PRATHIBHA. The layout covers 33993.12 sq.m. and comprises 117 residential plots, with software-read plot sizes ranging from 121.89–299.31 sq.m.; towers and floors are not applicable to this plotted development. It is registered under TG-RERA number P02700007673, and the promoter’s declared completion date is 24-07-2024.

01What we found

Period endedTG-RERA registration ran to 24 Jul 2024 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Nagunur, Karimnagar I, Karimnagar · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameSRIVATHSA CONSTRUCTIONS RERA record
Project type and phaseNew plotted development; phase or separately identified registered portion: not disclosed RERA record RERA filing
TG-RERA registrationP02700007673 RERA record
Registration validity31/01/2024 to 24/07/2024, unless extended by the Authority Approvals record
Registered promoterMADDULA GOPAL REDDY, SWARGAM MALLESHAM & SWARGAM PRATHIBHA RERA record
RERA/project status in supplied recordRERA filing identifies the project as “New Project”; the supplied registration certificate gives the validity above. No extension or current registration-status record is supplied. RERA record Approvals record

Land and geographic identity

ItemRecord
Locality and revenue villageNagunur; the registration certificate identifies village Nagunur. The layout-plan record says NAGUNUR VILLAGE.
MandalKarimnagar -I on the RERA identity record; the layout-plan extraction says KARIMNAGAR MANDAL. RERA record
District / PINKarimnagar / 505415 RERA record
All project survey numbers362/A, 362/B, 359/B/2 Land records
Site extent33993.12 sq.m. (layout-plan record)
Land-area figures in RERA filingTotal area 33993.12 sq.m.; affected in road widening/FTL of tanks/nala widening 9931.83 sq.m.; net area 24061.29 sq.m. RERA filing
BoundariesEast: 30M WIDE ROAD; West: LAND OF OTHERS; North: LAND OF OTHERS; South: VAGU RERA filing

Development identity

ItemRecord
Sanctioning authoritySatavahana Urban Development Authority (Karimnagar), also referred to in the record as Shatavahana Urban Development Authority Approvals record
Principal layout approvalDraft Technical Layout Pattern TLP.NO.3145/Nagunur/2020/0722 UDA; approval communication dated 24 July, 2021. The layout-plan extraction also records approval no. G1/18/2020, dated 12-03-2021. Approvals record
Approved layout scale117 plots; layout-plan extraction records a total extent of 33993.12 SQ.MT.
Approved built-up area / building count and floorsNET BUA BUILT UP AREA: 0.00 and PROPOSED COVERAGE AREA: 0.00 in the layout-plan parameters. Building count and floor configuration are not applicable/disclosed for this plotted layout.
Roads and reserved landThe layout plan records road widths of 12.00 mt., 9.14 mt., 30.00 MT, 100'-0". The approval communication specifies an open space/park, social infrastructure area, utility area and roads.
ParkingLayout-plan parameters state PROPOSED NUMBER OF PARKINGS: 0; no separate plot-level parking allocation is supplied.

Offering and status

ItemRecord
OfferingResidential plots; the RERA-filed layout plan records 117 plots. RERA filing
Plot size rangeSoftware-read from the approved layout drawing: 121.89–299.31 sq.m. (145.8–358.0 sq.yd.); sizes should be checked against the drawing. Layout record
Booked / available plotsNot supplied. Document index
Development stageThe approval communication permits layout development works and requires them to be completed within THREE (3) YEARS; no independently verified current site-progress assessment is supplied.
Completion datePromoter’s Form B declaration gives 24-07-2024 as the project completion date. This is distinct from the registration-validity end date, also 24/07/2024.
Occupancy/completion certificateNo occupancy or completion certificate is supplied. For a plotted layout, the final-layout release is separately addressed in the approval conditions; evidence of final-layout release is not supplied. Document index

2. The project story

SRIVATHSA CONSTRUCTIONS is registered as a plotted residential development in Nagunur, Karimnagar, covering survey numbers 362/A, 362/B and 359/B/2. The RERA-filed layout plan shows 117 plots within a stated site extent of 33993.12 sq.m. It allocates land to plotted area, roads, open space/park, social infrastructure and utilities; it does not describe apartment buildings or a residential tower programme. RERA record Land records

The approval communication describes a draft technical layout pattern and permits sale of plots other than those mortgaged to SUDA-Satavahana. It also sets out a staged process involving completion of layout infrastructure, release of mortgaged plots and approval of a final layout. The supplied documents do not establish that those development works have been completed, that the mortgaged area has been released, or that a final layout has been issued.

The promoter declared a completion date of 24-07-2024. That declaration is not independent verification of construction or infrastructure progress. No current site inspection, plot inventory, completion certificate or final-layout release record is included in the supplied evidence. Document index

3. Master plan, architecture & building design

This is a plotted layout, not a building scheme. The layout drawing records 33993.12 sq.m. total site area and lists the following land-use areas and printed percentages: Layout record

Layout componentAreaPrinted share
Plotted Area19161.26 sq.m.56.37%
Road Area9931.83 sq.m.29.22%
Organized open space/park Area2549.68 sq.m.7.50%
Social Infrastructure Area851.80 sq.m.2.51%
Utility Area340.02 sq.m.1.00%
LIG Plotted Area0.00 sq.m.0.00%
EWS Plotted Area0.00 sq.m.0.00%
Total net layout, as printed32834.59 sq.m.96.59%

The drawing-derived layout record identifies 117 plots. Software-read plot areas range from 121.89 sq.m. (145.8 sq.yd.) to 299.31 sq.m. (358.0 sq.yd.); the median is 153.31 sq.m. (183.4 sq.yd.). These are software-measured from the drawing, not RERA-filed plot-by-plot measurements, and should be verified against the approved drawing and plot schedule. Layout record

The approval communication lists internal layout development works including road formation, storm-water drains, underground drainage lines and common septic tank/STP, internal water-supply pipelines and overhead tank, an assured water-supply source, electrical lines and street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval-specified works; the supplied record does not verify their completion.

4. Homes, configurations & floor plans

The recorded offering is plots, not flats or villas. The layout plan records 117 plots. The drawing-derived size information below is software-measured and should be verified against the layout drawing; no plot-by-plot booked or available inventory is provided. Layout record

Plot-size bandNumber of plots
100–150 sq.yd. (84–125 sq.m.)1
150–200 sq.yd. (125–167 sq.m.)97
200–250 sq.yd. (167–209 sq.m.)9
250–300 sq.yd. (209–251 sq.m.)3
300–400 sq.yd. (251–334 sq.m.)7

No apartment configuration, RERA-filed saleable area, measured carpet area, or loading figure is supplied. The available floor-plan record contains two layout sheets and no flat plans; therefore, apartment room arrangements and carpet-area comparisons do not apply to this plotted development. Floor plans

5. Parking & vehicle circulation

The layout-plan parameters state PROPOSED NUMBER OF PARKINGS: 0. The available evidence does not give a separate resident or visitor parking count, parking levels, plot-specific parking allocation, or documented exclusive parking rights.

The layout plan records road widths of 12.00 mt., 9.14 mt., 30.00 MT, 100'-0". These are drawing/plan-recorded road widths; the supplied material does not describe vehicle entry and exit points, pedestrian separation, ramps, or EV charging.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space2549.68 sq.m., printed as 7.50% of layout areaIncluded in the layout records; completion and handover are not verified.
Social infrastructure area851.80 sq.m., printed as 2.51%Area is recorded in the plan; the specific facility or its delivery status is not supplied.
Utility area340.02 sq.m., printed as 1.00%Area is recorded in the plan; the particular utility installation and completion status are not supplied.
Tot-lotNamed in the layout-plan amenities/utilities list; no size or quantity statedListed in the plan record; completion is not verified.
Avenue plantationRequired/listed as a layout development work; no quantity statedApproval-specified work; completion is not verified.

The layout approval communication requires the park/open space, social infrastructure, roads and utility areas to be handed over to the Local Body by registered gift deed before final-layout release. No handover or final-layout-release evidence is supplied.

7. Utilities, building services & safety

The approval communication specifies layout infrastructure comprising an assured water-supply source, internal water-supply pipelines and an overhead tank; storm-water drains; underground drainage lines and a common septic tank/STP; electrical supply lines, street lights and a transformer; and rainwater-harvesting pits. These are approval-specified development works, not evidence that the systems are installed, operational or independently inspected. No capacities, treatment specifications, service-provider details or completion certificates are supplied.

The RERA amenity record marks internal roads and footpaths, water supply, sewerage (chamber, lines, septic tank, STP), green strip/tot-lot/park and street lighting as available, while showing 0% for each listed item. Other listed categories include storm-water drains, community buildings, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and safety, electrical meter/sub-station/receiving station and recreational open space; no project-specific capacities or verified completed status are supplied. RERA amenities

No building fire-system design, fire clearance, lift system, accessibility arrangements, security system or waste-management details are supplied for this plotted layout. Document index RERA amenities

8. Location, access & connectivity

The registered project location is Nagunur, Karimnagar -I, Karimnagar, 505415, in revenue village Nagunur, survey numbers 362/A, 362/B and 359/B/2. The layout plan identifies an adjoining 30M WIDE ROAD on the east and VAGU on the south. RERA record Land records RERA filing

The supplied location record gives a geocoded point of 18.4348122, 79.1328042 and an approximate nearest sampled Outer Ring Road interchange distance of 113.0 km. No project-specific public-transport details, approach-route description or travel times are supplied. Location record

9. Developer & development status

The registered promoter is MADDULA GOPAL REDDY, SWARGAM MALLESHAM & SWARGAM PRATHIBHA. The RERA record describes the organization type as “Others”; the legal entity type is not established in the supplied information. The RERA certificate lists the three promoters and gives the address fields only as Karimnagar district, PIN 505001; a complete registered-office address, official contact details, website and corporate identification number are not supplied. RERA record Corporate record

The promoter’s Form B declaration, made by MADDULA GOPAL REDDY on 17th day of SEPTEMBER, 2022, declares a project completion date of 24-07-2024. The registration certificate separately states validity from 31/01/2024 to 24/07/2024. The supplied record contains no extension order, current construction-progress certification, final-layout release, or completion/occupancy certificate; therefore, the promoter’s declared deadline should not be read as proof of completion.

10. Approvals, official records & documents

TG-RERA registration certificate
DetailsSRIVATHSA CONSTRUCTIONS, registration no. P02700007673; validity stated as 31/01/2024 to 24/07/2024
Layout plan
DetailsLayout plan for 117 plots; extent 33993.12 SQ.MT.; survey numbers 362/A, 362/B, 359/B/2; approval no. G1/18/2020, dated 12-03-2021
Draft Technical Layout Pattern communication
DetailsTLP.NO.3145/Nagunur/2020/0722 UDA; Satavahana Urban Development Authority (Karimnagar); dated 24 July, 2021; describes a draft layout and development conditions
Promoter declaration (Form B)
DetailsPromoter-declared title/encumbrance statements, separate-account undertakings and completion date 24-07-2024
Final-layout release / completion evidence
DetailsNo final-layout release, mortgage-release record, completion certificate or occupancy certificate supplied
EvidenceDocument index

Frequently asked questions

Is SRIVATHSA CONSTRUCTIONS registered with Telangana RERA?

Yes. SRIVATHSA CONSTRUCTIONS is registered with the Telangana Real Estate Regulatory Authority as P02700007673; the registration status is New Project.

Who is the developer of SRIVATHSA CONSTRUCTIONS?

The promoter named in the RERA registration is MADDULA GOPAL REDDY ,SWARGAM MALLESHAM & SWARGAM PRATHIBHA.

Where is SRIVATHSA CONSTRUCTIONS located?

SRIVATHSA CONSTRUCTIONS is in NAGUNUR, Karimnagar -I, Karimnagar, Telangana (505415).

When will SRIVATHSA CONSTRUCTIONS be completed?

The promoter's proposed date of completion filed with RERA is 24/07/2024. This is the promoter's declaration, not a guarantee.

More projects in Nagunur