Hi-Way Homes
S P R DEVELOPERS · Sangareddy · RERA P01100005342
HI-WAY HOMES is a plotted development in RANJOLE, ZAHEERABAD Mandal, Sangareddy District, developed by registered promoter S P R DEVELOPERS. The registered site extent is 60,804.01 sq. m, and the DTCP draft technical layout describes 149 plots; no tower, floor or building configuration is supplied. The RERA-filed offering is a plotted layout, with plot-wise areas not supplied. Its TG-RERA registration is P01100005342, and the promoter-declared completion deadline is 14 April 2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | HI-WAY HOMES RERA record |
| Project type | Plotted development / layout RERA record RERA filing |
| Phase or registered portion | No separate phase identified in the supplied record. The registered layout covers Survey Nos. 12, 13/P, 14, 15/P and 18. |
| TG-RERA registration | P01100005342 |
| Registration validity | 25/11/2022 through 14/04/2023; the certificate records no extension. Registration validity is distinct from the project’s completion deadline. |
| Registered promoter | S P R DEVELOPERS RERA record |
| RERA status in supplied record | Registered under section 5; the certificate’s stated validity ended on 14/04/2023. No extension is recorded in the supplied certificate. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | RANJOLE; the layout approval describes Ranjole village in Zaheerabad Municipality. RERA record |
| Mandal | ZAHEERABAD RERA record |
| District | Sangareddy RERA record |
| PIN | 502318 RERA record |
| Project survey numbers and subdivisions | 12, 13/P, 14, 15/P & 18. The approval and registration certificate list these survey numbers; the supplied record does not specify further project subdivisions. RERA record |
| Registered site extent | 60,804.01 sq. m in the RERA land details. RERA filing |
| Total layout area in DTCP draft technical layout | Ac. 15.025 Cents; 72721.00 Sq. Yds. |
| Net area / affected area in RERA land details | Net area: 60,804.01 sq. m; area affected in road widening/FTL of tanks/nala widening: 0. RERA filing |
| Boundaries as filed | East: Others Land; West: “Existiong 40 Feet Wide Road”; North: Others Land; South: Existing 100 Feet Wide Road. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning, Government of Telangana; approval delegated to Zaheerabad Municipality. |
| Principal approval | TLP No./05/2021/H, “Draft Technical Layout Pattern - Approved - Communicated,” approved 28.05.2021. Approvals record |
| Other approval references | File No. DTCP-HT1/OTH/34/2021-HYD Sec-DTCP; Proceedings No. Roc.No.1335/2021/H. Approvals record |
| Approved layout extent and land-use split | Layout area Ac. 15.025 Cents; 72721.00 Sq. Yds.; open space Ac. 1.502 Cents; 7269.68 Sq. Yds (10.00%); roads Ac. 4.850 Cents; 23474.00 Sq. Yds. (32.27%); plotted area Ac. 8.673 Cents; 41977.32 Sq. Yds. (57.73%). |
| Layout plots | The DTCP document describes a proposed 149-plot layout. |
| Mortgage area | DTCP records 15.51%, Ac. 1.346 Cents; 6514.64 Sq. Yds., identifying Plot Nos. 29 and 85 to 107 for mortgage to the Commissioner. |
| Approved built-up area / building configuration | Not disclosed in the supplied project record; this is a plotted layout, and no tower, floor or building configuration is supplied. RERA filing |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed offering | Plotted development; the DTCP draft technical layout describes 149 plots. Plot-wise areas, plot inventory and booking/availability counts are not supplied here. RERA filing |
| Promoter-declared completion deadline | 14 April 2023, as stated in the Form-B declaration. |
| Layout-work completion period | DTCP’s draft technical layout directs the applicant to complete the specified development works within TWO (2) years from the date of approval of Draft Technical Layout Pattern. |
| Construction / development stage | No independently verified current site stage is supplied. The RERA registration extract describes the project as “New Project”; this is a filed status, not a site inspection. RERA filing |
| Occupancy / completion certificate | Not applicable as a building-level status on the evidence supplied for this plotted layout; no project completion certificate or occupancy certificate is included. Document index |
2. The project story
HI-WAY HOMES is registered with TG-RERA as a plotted development at Ranjole, Zaheerabad Mandal, Sangareddy District. The registered land is identified as Survey Nos. 12, 13/P, 14, 15/P and 18, and the DTCP draft technical layout describes the same survey set and a 149-plot layout. The approval allocates land to plotted sites, roads and open space; it also identifies a portion of plots to be mortgaged to the Commissioner as security for development conditions. RERA record
The DTCP document is titled “Draft Technical Layout Pattern - Approved - Communicated.” It calls for layout demarcation, development works and, after compliance, further proposals to obtain a final layout. It specifies roads and open space to be handed over to the Municipality by registered gift deed, and lists works including road formation, drains and nala channelization, greenery, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. These are approval requirements and stated development scope; the supplied evidence does not independently establish that the works have been completed or that the final layout has issued.
The RERA record identifies the project as a new project, while the promoter’s Form-B affidavit undertakes completion by 14 April 2023. Neither item is an independent verification of current physical progress. No current site inspection, completion certification or plot-wise inventory/booking update is supplied. RERA filing
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project in the supplied plans. The DTCP draft technical layout records a total layout area of Ac. 15.025 Cents; 72721.00 Sq. Yds., divided into Ac. 8.673 Cents; 41977.32 Sq. Yds. (57.73%) of plotted area, Ac. 4.850 Cents; 23474.00 Sq. Yds. (32.27%) of roads and Ac. 1.502 Cents; 7269.68 Sq. Yds. (10.00%) of open space. It describes 149 plots.
The approval also identifies Plot Nos. 29 and 85 to 107, measuring Ac. 1.346 Cents or 6514.64 Sq. Yds., as mortgage plots in favour of the Commissioner. The document states that the mortgaged area is not for sale and that the applicant must complete the required development works and seek release of the mortgage and final layout. The supplied material does not include a readable layout drawing from which plot dimensions, road widths beyond the filed boundary descriptions, plot orientation or internal layout arrangement could be reported.
No building count, building footprint, floor configuration, parking levels or apartment plans are evidenced for this plotted development. The two drawing records listed for floor-plan review remain unmeasured scans pending review, so no drawing-based carpet or room measurements are available. Floor plans
4. Homes, configurations & floor plans
The RERA-filed offering is a plotted layout, not an apartment configuration. A plot-wise schedule, plot-size bands, booking counts and availability counts are not included in the supplied evidence.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 149 (as described in DTCP draft layout) | Not supplied | Not supplied | Plot-wise areas not supplied | Not applicable | Not supplied |
The project’s two drawing records are scans pending measurement. No software-measured plot or home areas are available. Floor plans
5. Parking & vehicle circulation
No parking-space count, visitor or accessible parking provision, parking allocation arrangement, or parking-specific drawing is supplied for this plotted layout. The approval identifies roads as part of the layout but does not provide sufficient evidence here to describe internal driveway dimensions, vehicle entry/exit arrangements or pedestrian separation. Document index
6. Amenities, recreation & open spaces
The DTCP draft technical layout sets out an open-space allocation and lists layout infrastructure and greenery works. The RERA amenity record includes progress fields, but those entries are filed status information rather than independent site verification.
| Description / size | Ac. 1.502 Cents; 7269.68 Sq. Yds.; 10.00% of layout area; to be handed over to the Municipality by registered gift deed, free of cost. |
|---|---|
| Declared progress / verified status | Sanctioned allocation / required handover; completion and handover not independently verified. |
| Description / size | Listed in the RERA amenity record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record shows YES, 100%; not independently verified. |
| Description / size | DTCP lists greenery and avenue plantation among development works. |
|---|---|
| Declared progress / verified status | Required work in the approval; completion not independently verified. |
| Description / size | No community building is described in the supplied DTCP extract; RERA amenity record shows this item at 0%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-recorded progress: 0%. |
| Description / size | Roads area: Ac. 4.850 Cents; 23474.00 Sq. Yds. (32.27%). DTCP requires road formation and handover to the Municipality by registered gift deed, free of cost. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record shows YES, 100% for internal roads and footpaths; not independently verified. |
| Description / size | Listed as a layout development work. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA record shows YES, 100%; not independently verified. |
The supplied record does not identify clubhouse or indoor facilities, specific sports facilities, or their sizes and capacities. RERA amenities
7. Utilities, building services & safety
The DTCP draft technical layout lists the following works under the developer’s responsibility and municipal supervision: drains and nala channelization, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. The RERA amenity record also lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. These are approval or RERA-recorded facilities; the supplied evidence does not independently verify installation, operating status or capacity. RERA amenities
| Supplied evidence | DTCP specifies protected water supply; the RERA amenity record lists water supply. No source, storage volume or treatment capacity is supplied. |
|---|---|
| Status shown in supplied record | RERA record: YES, 100% for Water Supply; completion not independently verified. RERA amenities |
| Supplied evidence | DTCP lists sewerage disposal, drains and nala channelization; the RERA amenity record lists sewerage, treatment/disposal of sewage and sullage water, and storm-water drains. No system capacity is supplied. |
|---|---|
| Status shown in supplied record | RERA record: YES, 100% for sewerage, treatment/disposal and storm-water drains; completion not independently verified. RERA amenities |
| Supplied evidence | DTCP specifies rainwater-harvesting pits; the RERA amenity record lists water conservation and rainwater harvesting. |
|---|---|
| Status shown in supplied record | RERA record: YES, 100%; completion not independently verified. RERA amenities |
| Supplied evidence | DTCP lists electricity facilities and street lighting; the RERA amenity record lists an electrical meter room/sub-station/receiving station. |
|---|---|
| Status shown in supplied record | RERA record: YES, 100% for street lighting and meter room/sub-station/receiving station; completion not independently verified. RERA amenities |
| Supplied evidence | RERA amenity record lists solid-waste management and disposal at 0%. |
|---|---|
| Status shown in supplied record | RERA-recorded progress: 0%. RERA amenities |
| Supplied evidence | RERA amenity record shows 0%. |
|---|---|
| Status shown in supplied record | RERA-recorded progress: 0%. RERA amenities |
| Supplied evidence | RERA amenity record shows fire protection and fire-safety requirements at 0%. No fire-system design or clearance is supplied. |
|---|---|
| Status shown in supplied record | RERA-recorded progress: 0%; no independent compliance verification supplied. RERA amenities |
| Supplied evidence | No project-specific information supplied. |
|---|---|
| Status shown in supplied record | Not disclosed in the supplied evidence. |
8. Location, access & connectivity
The registered location is RANJOLE, Zaheerabad Mandal, Sangareddy District, Telangana, PIN 502318. The layout approval describes the site as being at Ranjole village in Zaheerabad Municipality. RERA record
The location record supplies one approximate connectivity measurement: the nearest sampled Outer Ring Road interchange is 66.9 km away. The record labels this as approximate; no public-transport services or additional measured landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is S P R DEVELOPERS, identified in the RERA filing as a proprietorship. The project registration certificate lists the promoter office as Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, PIN: 500084. The RERA project header separately gives a Ranjole address for the promoter; no official contact number, email or website is supplied here. RERA record RERA filing
The Form-B affidavit was made by MALLELA VENKATA RAMANA REDDY, stated to be authorized by S P R DEVELOPERS. It declares a project completion date of 14 April 2023 and describes the promoter’s separate-account, audit and approval undertakings. These are promoter declarations, not independent confirmation of completion.
The evidence identifies no separate construction phase or tower/block program for this plotted layout. No current site-progress verification, final-layout record or completion certificate is supplied. Document index
10. Approvals, official records & documents
| Identifier / date | P01100005342; issued 25/11/2022; stated validity through 14/04/2023 |
|---|---|
| What the supplied record establishes | Form C registration for HI-WAY HOMES under section 5; the supplied certificate records no extension. |
| Identifier / date | TLP No./05/2021/H; approved 28.05.2021 |
|---|---|
| What the supplied record establishes | Draft Technical Layout Pattern for a 149-plot layout at Ranjole, Survey Nos. 12, 13/P, 14, 15/P and 18; approval conditions include development works, mortgage plots, open-space and road handover, and steps toward a final layout. |
| Identifier / date | DTCP-HT1/OTH/34/2021-HYD Sec-DTCP; Roc.No.1335/2021/H |
|---|---|
| What the supplied record establishes | References recorded in the layout approval material. |
| Identifier / date | Declaration date transcribed as “17 day of Lop 2022” |
|---|---|
| What the supplied record establishes | Promoter declaration concerning project landowners, title-document basis, encumbrances and proposed completion by 14 April 2023. |
| Identifier / date | RERA filing document 273308 |
|---|---|
| What the supplied record establishes | Listed as a layout-plan submission, but the supplied record indicates it was not extracted. Document index |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No project completion certificate or occupancy certificate is included in the supplied material. Document index |
1. Project at a glance
Project identity
Registered project name: HI-WAY HOMES
Project type: Plotted development / layout
Phase or registered portion: No separate phase identified in the supplied record. The registered layout covers Survey Nos. 12, 13/P, 14, 15/P and 18.
TG-RERA registration: P01100005342
Registration validity: 25/11/2022 through 14/04/2023; the certificate records no extension. Registration validity is distinct from the project’s completion deadline.
Registered promoter: S P R DEVELOPERS
RERA status in supplied record: Registered under section 5; the certificate’s stated validity ended on 14/04/2023. No extension is recorded in the supplied certificate.
Land and geographic identity
Locality / revenue village: RANJOLE; the layout approval describes Ranjole village in Zaheerabad Municipality.
Mandal: ZAHEERABAD
District: Sangareddy
PIN: 502318
Project survey numbers and subdivisions: 12, 13/P, 14, 15/P & 18. The approval and registration certificate list these survey numbers; the supplied record does not specify further project subdivisions.
Registered site extent: 60,804.01 sq. m in the RERA land details.
Total layout area in DTCP draft technical layout: Ac. 15.025 Cents; 72721.00 Sq. Yds.
Net area / affected area in RERA land details: Net area: 60,804.01 sq. m; area affected in road widening/FTL of tanks/nala widening: 0.
Boundaries as filed: East: Others Land; West: “Existiong 40 Feet Wide Road”; North: Others Land; South: Existing 100 Feet Wide Road.
Development identity
Sanctioning authority: Director of Town and Country Planning, Government of Telangana; approval delegated to Zaheerabad Municipality.
Principal approval: TLP No./05/2021/H, “Draft Technical Layout Pattern - Approved - Communicated,” approved 28.05.2021.
Other approval references: File No. DTCP-HT1/OTH/34/2021-HYD Sec-DTCP; Proceedings No. Roc.No.1335/2021/H.
Approved layout extent and land-use split: Layout area Ac. 15.025 Cents; 72721.00 Sq. Yds.; open space Ac. 1.502 Cents; 7269.68 Sq. Yds (10.00%); roads Ac. 4.850 Cents; 23474.00 Sq. Yds. (32.27%); plotted area Ac. 8.673 Cents; 41977.32 Sq. Yds. (57.73%).
Layout plots: The DTCP document describes a proposed 149-plot layout.
Mortgage area: DTCP records 15.51%, Ac. 1.346 Cents; 6514.64 Sq. Yds., identifying Plot Nos. 29 and 85 to 107 for mortgage to the Commissioner.
Approved built-up area / building configuration: Not disclosed in the supplied project record; this is a plotted layout, and no tower, floor or building configuration is supplied.
Offering and status
RERA-filed offering: Plotted development; the DTCP draft technical layout describes 149 plots. Plot-wise areas, plot inventory and booking/availability counts are not supplied here.
Promoter-declared completion deadline: 14 April 2023, as stated in the Form-B declaration.
Layout-work completion period: DTCP’s draft technical layout directs the applicant to complete the specified development works within TWO (2) years from the date of approval of Draft Technical Layout Pattern.
Construction / development stage: No independently verified current site stage is supplied. The RERA registration extract describes the project as “New Project”; this is a filed status, not a site inspection.
Occupancy / completion certificate: Not applicable as a building-level status on the evidence supplied for this plotted layout; no project completion certificate or occupancy certificate is included.
2. The project story
HI-WAY HOMES is registered with TG-RERA as a plotted development at Ranjole, Zaheerabad Mandal, Sangareddy District. The registered land is identified as Survey Nos. 12, 13/P, 14, 15/P and 18, and the DTCP draft technical layout describes the same survey set and a 149-plot layout. The approval allocates land to plotted sites, roads and open space; it also identifies a portion of plots to be mortgaged to the Commissioner as security for development conditions.
The DTCP document is titled “Draft Technical Layout Pattern - Approved - Communicated.” It calls for layout demarcation, development works and, after compliance, further proposals to obtain a final layout. It specifies roads and open space to be handed over to the Municipality by registered gift deed, and lists works including road formation, drains and nala channelization, greenery, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. These are approval requirements and stated development scope; the supplied evidence does not independently establish that the works have been completed or that the final layout has issued.
The RERA record identifies the project as a new project, while the promoter’s Form-B affidavit undertakes completion by 14 April 2023. Neither item is an independent verification of current physical progress. No current site inspection, completion certification or plot-wise inventory/booking update is supplied.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project in the supplied plans. The DTCP draft technical layout records a total layout area of Ac. 15.025 Cents; 72721.00 Sq. Yds., divided into Ac. 8.673 Cents; 41977.32 Sq. Yds. (57.73%) of plotted area, Ac. 4.850 Cents; 23474.00 Sq. Yds. (32.27%) of roads and Ac. 1.502 Cents; 7269.68 Sq. Yds. (10.00%) of open space. It describes 149 plots.
The approval also identifies Plot Nos. 29 and 85 to 107, measuring Ac. 1.346 Cents or 6514.64 Sq. Yds., as mortgage plots in favour of the Commissioner. The document states that the mortgaged area is not for sale and that the applicant must complete the required development works and seek release of the mortgage and final layout. The supplied material does not include a readable layout drawing from which plot dimensions, road widths beyond the filed boundary descriptions, plot orientation or internal layout arrangement could be reported.
No building count, building footprint, floor configuration, parking levels or apartment plans are evidenced for this plotted development. The two drawing records listed for floor-plan review remain unmeasured scans pending review, so no drawing-based carpet or room measurements are available.
4. Homes, configurations & floor plans
The RERA-filed offering is a plotted layout, not an apartment configuration. A plot-wise schedule, plot-size bands, booking counts and availability counts are not included in the supplied evidence.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 149 (as described in DTCP draft layout) | Not supplied | Not supplied | Plot-wise areas not supplied | Not applicable | Not supplied |
The project’s two drawing records are scans pending measurement. No software-measured plot or home areas are available.
5. Parking & vehicle circulation
No parking-space count, visitor or accessible parking provision, parking allocation arrangement, or parking-specific drawing is supplied for this plotted layout. The approval identifies roads as part of the layout but does not provide sufficient evidence here to describe internal driveway dimensions, vehicle entry/exit arrangements or pedestrian separation.
6. Amenities, recreation & open spaces
The DTCP draft technical layout sets out an open-space allocation and lists layout infrastructure and greenery works. The RERA amenity record includes progress fields, but those entries are filed status information rather than independent site verification.
| Description / size | Ac. 1.502 Cents; 7269.68 Sq. Yds.; 10.00% of layout area; to be handed over to the Municipality by registered gift deed, free of cost. |
|---|---|
| Declared progress / verified status | Sanctioned allocation / required handover; completion and handover not independently verified. |
| Description / size | Listed in the RERA amenity record. |
|---|---|
| Declared progress / verified status | RERA record shows YES, 100%; not independently verified. |
| Description / size | DTCP lists greenery and avenue plantation among development works. |
|---|---|
| Declared progress / verified status | Required work in the approval; completion not independently verified. |
| Description / size | No community building is described in the supplied DTCP extract; RERA amenity record shows this item at 0%. |
|---|---|
| Declared progress / verified status | RERA-recorded progress: 0%. |
| Description / size | Roads area: Ac. 4.850 Cents; 23474.00 Sq. Yds. (32.27%). DTCP requires road formation and handover to the Municipality by registered gift deed, free of cost. |
|---|---|
| Declared progress / verified status | RERA record shows YES, 100% for internal roads and footpaths; not independently verified. |
| Description / size | Listed as a layout development work. |
|---|---|
| Declared progress / verified status | RERA record shows YES, 100%; not independently verified. |
The supplied record does not identify clubhouse or indoor facilities, specific sports facilities, or their sizes and capacities.
7. Utilities, building services & safety
The DTCP draft technical layout lists the following works under the developer’s responsibility and municipal supervision: drains and nala channelization, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. The RERA amenity record also lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. These are approval or RERA-recorded facilities; the supplied evidence does not independently verify installation, operating status or capacity.
| Supplied evidence | DTCP specifies protected water supply; the RERA amenity record lists water supply. No source, storage volume or treatment capacity is supplied. |
|---|---|
| Status shown in supplied record | RERA record: YES, 100% for Water Supply; completion not independently verified. |
| Supplied evidence | DTCP lists sewerage disposal, drains and nala channelization; the RERA amenity record lists sewerage, treatment/disposal of sewage and sullage water, and storm-water drains. No system capacity is supplied. |
|---|---|
| Status shown in supplied record | RERA record: YES, 100% for sewerage, treatment/disposal and storm-water drains; completion not independently verified. |
| Supplied evidence | DTCP specifies rainwater-harvesting pits; the RERA amenity record lists water conservation and rainwater harvesting. |
|---|---|
| Status shown in supplied record | RERA record: YES, 100%; completion not independently verified. |
| Supplied evidence | DTCP lists electricity facilities and street lighting; the RERA amenity record lists an electrical meter room/sub-station/receiving station. |
|---|---|
| Status shown in supplied record | RERA record: YES, 100% for street lighting and meter room/sub-station/receiving station; completion not independently verified. |
| Supplied evidence | RERA amenity record lists solid-waste management and disposal at 0%. |
|---|---|
| Status shown in supplied record | RERA-recorded progress: 0%. |
| Supplied evidence | RERA amenity record shows 0%. |
|---|---|
| Status shown in supplied record | RERA-recorded progress: 0%. |
| Supplied evidence | RERA amenity record shows fire protection and fire-safety requirements at 0%. No fire-system design or clearance is supplied. |
|---|---|
| Status shown in supplied record | RERA-recorded progress: 0%; no independent compliance verification supplied. |
| Supplied evidence | No project-specific information supplied. |
|---|---|
| Status shown in supplied record | Not disclosed in the supplied evidence. |
8. Location, access & connectivity
The registered location is RANJOLE, Zaheerabad Mandal, Sangareddy District, Telangana, PIN 502318. The layout approval describes the site as being at Ranjole village in Zaheerabad Municipality.
The location record supplies one approximate connectivity measurement: the nearest sampled Outer Ring Road interchange is 66.9 km away. The record labels this as approximate; no public-transport services or additional measured landmark distances are supplied.
9. Developer & development status
The registered promoter is S P R DEVELOPERS, identified in the RERA filing as a proprietorship. The project registration certificate lists the promoter office as Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, PIN: 500084. The RERA project header separately gives a Ranjole address for the promoter; no official contact number, email or website is supplied here.
The Form-B affidavit was made by MALLELA VENKATA RAMANA REDDY, stated to be authorized by S P R DEVELOPERS. It declares a project completion date of 14 April 2023 and describes the promoter’s separate-account, audit and approval undertakings. These are promoter declarations, not independent confirmation of completion.
The evidence identifies no separate construction phase or tower/block program for this plotted layout. No current site-progress verification, final-layout record or completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P01100005342; issued 25/11/2022; stated validity through 14/04/2023 |
|---|---|
| What the supplied record establishes | Form C registration for HI-WAY HOMES under section 5; the supplied certificate records no extension. |
| Identifier / date | TLP No./05/2021/H; approved 28.05.2021 |
|---|---|
| What the supplied record establishes | Draft Technical Layout Pattern for a 149-plot layout at Ranjole, Survey Nos. 12, 13/P, 14, 15/P and 18; approval conditions include development works, mortgage plots, open-space and road handover, and steps toward a final layout. |
| Identifier / date | DTCP-HT1/OTH/34/2021-HYD Sec-DTCP; Roc.No.1335/2021/H |
|---|---|
| What the supplied record establishes | References recorded in the layout approval material. |
| Identifier / date | Declaration date transcribed as “17 day of Lop 2022” |
|---|---|
| What the supplied record establishes | Promoter declaration concerning project landowners, title-document basis, encumbrances and proposed completion by 14 April 2023. |
| Identifier / date | RERA filing document 273308 |
|---|---|
| What the supplied record establishes | Listed as a layout-plan submission, but the supplied record indicates it was not extracted. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No project completion certificate or occupancy certificate is included in the supplied material. |
Frequently asked questions
Is HI-WAY HOMES registered with Telangana RERA?
Yes. HI-WAY HOMES is registered with the Telangana Real Estate Regulatory Authority as P01100005342; the registration status is New Project.
Who is the developer of HI-WAY HOMES?
The promoter named in the RERA registration is S P R DEVELOPERS.
Where is HI-WAY HOMES located?
HI-WAY HOMES is in RANJOLE, ZAHEERABAD, Sangareddy, Telangana (502318).
When will HI-WAY HOMES be completed?
The promoter's proposed date of completion filed with RERA is 14/04/2023. This is the promoter's declaration, not a guarantee.
More projects in Ranjole