Sign in

Hi-Way Homes

S P R DEVELOPERS · Sangareddy · RERA P01100005342

HI-WAY HOMES is a plotted development in RANJOLE, ZAHEERABAD Mandal, Sangareddy District, developed by registered promoter S P R DEVELOPERS. The registered site extent is 60,804.01 sq. m, and the DTCP draft technical layout describes 149 plots; no tower, floor or building configuration is supplied. The RERA-filed offering is a plotted layout, with plot-wise areas not supplied. Its TG-RERA registration is P01100005342, and the promoter-declared completion deadline is 14 April 2023.

01What we found

Period endedTG-RERA registration ran to 14 Apr 2023 - check its extension on TG-RERA
28documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameHI-WAY HOMES RERA record
Project typePlotted development / layout RERA record RERA filing
Phase or registered portionNo separate phase identified in the supplied record. The registered layout covers Survey Nos. 12, 13/P, 14, 15/P and 18.
TG-RERA registrationP01100005342
Registration validity25/11/2022 through 14/04/2023; the certificate records no extension. Registration validity is distinct from the project’s completion deadline.
Registered promoterS P R DEVELOPERS RERA record
RERA status in supplied recordRegistered under section 5; the certificate’s stated validity ended on 14/04/2023. No extension is recorded in the supplied certificate.

Land and geographic identity

FieldProject record
Locality / revenue villageRANJOLE; the layout approval describes Ranjole village in Zaheerabad Municipality. RERA record
MandalZAHEERABAD RERA record
DistrictSangareddy RERA record
PIN502318 RERA record
Project survey numbers and subdivisions12, 13/P, 14, 15/P & 18. The approval and registration certificate list these survey numbers; the supplied record does not specify further project subdivisions. RERA record
Registered site extent60,804.01 sq. m in the RERA land details. RERA filing
Total layout area in DTCP draft technical layoutAc. 15.025 Cents; 72721.00 Sq. Yds.
Net area / affected area in RERA land detailsNet area: 60,804.01 sq. m; area affected in road widening/FTL of tanks/nala widening: 0. RERA filing
Boundaries as filedEast: Others Land; West: “Existiong 40 Feet Wide Road”; North: Others Land; South: Existing 100 Feet Wide Road. RERA filing

Development identity

FieldProject record
Sanctioning authorityDirector of Town and Country Planning, Government of Telangana; approval delegated to Zaheerabad Municipality.
Principal approvalTLP No./05/2021/H, “Draft Technical Layout Pattern - Approved - Communicated,” approved 28.05.2021. Approvals record
Other approval referencesFile No. DTCP-HT1/OTH/34/2021-HYD Sec-DTCP; Proceedings No. Roc.No.1335/2021/H. Approvals record
Approved layout extent and land-use splitLayout area Ac. 15.025 Cents; 72721.00 Sq. Yds.; open space Ac. 1.502 Cents; 7269.68 Sq. Yds (10.00%); roads Ac. 4.850 Cents; 23474.00 Sq. Yds. (32.27%); plotted area Ac. 8.673 Cents; 41977.32 Sq. Yds. (57.73%).
Layout plotsThe DTCP document describes a proposed 149-plot layout.
Mortgage areaDTCP records 15.51%, Ac. 1.346 Cents; 6514.64 Sq. Yds., identifying Plot Nos. 29 and 85 to 107 for mortgage to the Commissioner.
Approved built-up area / building configurationNot disclosed in the supplied project record; this is a plotted layout, and no tower, floor or building configuration is supplied. RERA filing

Offering and status

FieldProject record
RERA-filed offeringPlotted development; the DTCP draft technical layout describes 149 plots. Plot-wise areas, plot inventory and booking/availability counts are not supplied here. RERA filing
Promoter-declared completion deadline14 April 2023, as stated in the Form-B declaration.
Layout-work completion periodDTCP’s draft technical layout directs the applicant to complete the specified development works within TWO (2) years from the date of approval of Draft Technical Layout Pattern.
Construction / development stageNo independently verified current site stage is supplied. The RERA registration extract describes the project as “New Project”; this is a filed status, not a site inspection. RERA filing
Occupancy / completion certificateNot applicable as a building-level status on the evidence supplied for this plotted layout; no project completion certificate or occupancy certificate is included. Document index

2. The project story

HI-WAY HOMES is registered with TG-RERA as a plotted development at Ranjole, Zaheerabad Mandal, Sangareddy District. The registered land is identified as Survey Nos. 12, 13/P, 14, 15/P and 18, and the DTCP draft technical layout describes the same survey set and a 149-plot layout. The approval allocates land to plotted sites, roads and open space; it also identifies a portion of plots to be mortgaged to the Commissioner as security for development conditions. RERA record

The DTCP document is titled “Draft Technical Layout Pattern - Approved - Communicated.” It calls for layout demarcation, development works and, after compliance, further proposals to obtain a final layout. It specifies roads and open space to be handed over to the Municipality by registered gift deed, and lists works including road formation, drains and nala channelization, greenery, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. These are approval requirements and stated development scope; the supplied evidence does not independently establish that the works have been completed or that the final layout has issued.

The RERA record identifies the project as a new project, while the promoter’s Form-B affidavit undertakes completion by 14 April 2023. Neither item is an independent verification of current physical progress. No current site inspection, completion certification or plot-wise inventory/booking update is supplied. RERA filing

3. Master plan, architecture & building design

This is a plotted layout rather than a multi-storey building project in the supplied plans. The DTCP draft technical layout records a total layout area of Ac. 15.025 Cents; 72721.00 Sq. Yds., divided into Ac. 8.673 Cents; 41977.32 Sq. Yds. (57.73%) of plotted area, Ac. 4.850 Cents; 23474.00 Sq. Yds. (32.27%) of roads and Ac. 1.502 Cents; 7269.68 Sq. Yds. (10.00%) of open space. It describes 149 plots.

The approval also identifies Plot Nos. 29 and 85 to 107, measuring Ac. 1.346 Cents or 6514.64 Sq. Yds., as mortgage plots in favour of the Commissioner. The document states that the mortgaged area is not for sale and that the applicant must complete the required development works and seek release of the mortgage and final layout. The supplied material does not include a readable layout drawing from which plot dimensions, road widths beyond the filed boundary descriptions, plot orientation or internal layout arrangement could be reported.

No building count, building footprint, floor configuration, parking levels or apartment plans are evidenced for this plotted development. The two drawing records listed for floor-plan review remain unmeasured scans pending review, so no drawing-based carpet or room measurements are available. Floor plans

4. Homes, configurations & floor plans

The RERA-filed offering is a plotted layout, not an apartment configuration. A plot-wise schedule, plot-size bands, booking counts and availability counts are not included in the supplied evidence.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots149 (as described in DTCP draft layout)Not suppliedNot suppliedPlot-wise areas not suppliedNot applicableNot supplied

The project’s two drawing records are scans pending measurement. No software-measured plot or home areas are available. Floor plans

5. Parking & vehicle circulation

No parking-space count, visitor or accessible parking provision, parking allocation arrangement, or parking-specific drawing is supplied for this plotted layout. The approval identifies roads as part of the layout but does not provide sufficient evidence here to describe internal driveway dimensions, vehicle entry/exit arrangements or pedestrian separation. Document index

6. Amenities, recreation & open spaces

The DTCP draft technical layout sets out an open-space allocation and lists layout infrastructure and greenery works. The RERA amenity record includes progress fields, but those entries are filed status information rather than independent site verification.

Open space
Description / sizeAc. 1.502 Cents; 7269.68 Sq. Yds.; 10.00% of layout area; to be handed over to the Municipality by registered gift deed, free of cost.
Declared progress / verified statusSanctioned allocation / required handover; completion and handover not independently verified.
Green strip / tot lot / park
Description / sizeListed in the RERA amenity record.
Evidence sourceRERA amenities
Declared progress / verified statusRERA record shows YES, 100%; not independently verified.
Avenue plantation / greenery
Description / sizeDTCP lists greenery and avenue plantation among development works.
Declared progress / verified statusRequired work in the approval; completion not independently verified.
Community buildings
Description / sizeNo community building is described in the supplied DTCP extract; RERA amenity record shows this item at 0%.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded progress: 0%.
Internal roads and footpaths
Description / sizeRoads area: Ac. 4.850 Cents; 23474.00 Sq. Yds. (32.27%). DTCP requires road formation and handover to the Municipality by registered gift deed, free of cost.
Evidence sourceRERA amenities
Declared progress / verified statusRERA record shows YES, 100% for internal roads and footpaths; not independently verified.
Street lighting
Description / sizeListed as a layout development work.
Evidence sourceRERA amenities
Declared progress / verified statusRERA record shows YES, 100%; not independently verified.

The supplied record does not identify clubhouse or indoor facilities, specific sports facilities, or their sizes and capacities. RERA amenities

7. Utilities, building services & safety

The DTCP draft technical layout lists the following works under the developer’s responsibility and municipal supervision: drains and nala channelization, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. The RERA amenity record also lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. These are approval or RERA-recorded facilities; the supplied evidence does not independently verify installation, operating status or capacity. RERA amenities

Water
Supplied evidenceDTCP specifies protected water supply; the RERA amenity record lists water supply. No source, storage volume or treatment capacity is supplied.
Status shown in supplied recordRERA record: YES, 100% for Water Supply; completion not independently verified. RERA amenities
Sewerage and drainage
Supplied evidenceDTCP lists sewerage disposal, drains and nala channelization; the RERA amenity record lists sewerage, treatment/disposal of sewage and sullage water, and storm-water drains. No system capacity is supplied.
Status shown in supplied recordRERA record: YES, 100% for sewerage, treatment/disposal and storm-water drains; completion not independently verified. RERA amenities
Rainwater management
Supplied evidenceDTCP specifies rainwater-harvesting pits; the RERA amenity record lists water conservation and rainwater harvesting.
Status shown in supplied recordRERA record: YES, 100%; completion not independently verified. RERA amenities
Electricity and lighting
Supplied evidenceDTCP lists electricity facilities and street lighting; the RERA amenity record lists an electrical meter room/sub-station/receiving station.
Status shown in supplied recordRERA record: YES, 100% for street lighting and meter room/sub-station/receiving station; completion not independently verified. RERA amenities
Solid-waste management
Supplied evidenceRERA amenity record lists solid-waste management and disposal at 0%.
Status shown in supplied recordRERA-recorded progress: 0%. RERA amenities
Energy management
Supplied evidenceRERA amenity record shows 0%.
Status shown in supplied recordRERA-recorded progress: 0%. RERA amenities
Fire and life safety
Supplied evidenceRERA amenity record shows fire protection and fire-safety requirements at 0%. No fire-system design or clearance is supplied.
Status shown in supplied recordRERA-recorded progress: 0%; no independent compliance verification supplied. RERA amenities
Lifts, accessibility, backup power, security
Supplied evidenceNo project-specific information supplied.
Status shown in supplied recordNot disclosed in the supplied evidence.

8. Location, access & connectivity

The registered location is RANJOLE, Zaheerabad Mandal, Sangareddy District, Telangana, PIN 502318. The layout approval describes the site as being at Ranjole village in Zaheerabad Municipality. RERA record

The location record supplies one approximate connectivity measurement: the nearest sampled Outer Ring Road interchange is 66.9 km away. The record labels this as approximate; no public-transport services or additional measured landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is S P R DEVELOPERS, identified in the RERA filing as a proprietorship. The project registration certificate lists the promoter office as Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, PIN: 500084. The RERA project header separately gives a Ranjole address for the promoter; no official contact number, email or website is supplied here. RERA record RERA filing

The Form-B affidavit was made by MALLELA VENKATA RAMANA REDDY, stated to be authorized by S P R DEVELOPERS. It declares a project completion date of 14 April 2023 and describes the promoter’s separate-account, audit and approval undertakings. These are promoter declarations, not independent confirmation of completion.

The evidence identifies no separate construction phase or tower/block program for this plotted layout. No current site-progress verification, final-layout record or completion certificate is supplied. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100005342; issued 25/11/2022; stated validity through 14/04/2023
What the supplied record establishesForm C registration for HI-WAY HOMES under section 5; the supplied certificate records no extension.
DTCP layout approval communication
Identifier / dateTLP No./05/2021/H; approved 28.05.2021
What the supplied record establishesDraft Technical Layout Pattern for a 149-plot layout at Ranjole, Survey Nos. 12, 13/P, 14, 15/P and 18; approval conditions include development works, mortgage plots, open-space and road handover, and steps toward a final layout.
DTCP file and proceedings references
Identifier / dateDTCP-HT1/OTH/34/2021-HYD Sec-DTCP; Roc.No.1335/2021/H
What the supplied record establishesReferences recorded in the layout approval material.
Form-B affidavit-cum-declaration
Identifier / dateDeclaration date transcribed as “17 day of Lop 2022”
What the supplied record establishesPromoter declaration concerning project landowners, title-document basis, encumbrances and proposed completion by 14 April 2023.
Project layout-plan document
Identifier / dateRERA filing document 273308
What the supplied record establishesListed as a layout-plan submission, but the supplied record indicates it was not extracted. Document index
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesNo project completion certificate or occupancy certificate is included in the supplied material. Document index

Frequently asked questions

Is HI-WAY HOMES registered with Telangana RERA?

Yes. HI-WAY HOMES is registered with the Telangana Real Estate Regulatory Authority as P01100005342; the registration status is New Project.

Who is the developer of HI-WAY HOMES?

The promoter named in the RERA registration is S P R DEVELOPERS.

Where is HI-WAY HOMES located?

HI-WAY HOMES is in RANJOLE, ZAHEERABAD, Sangareddy, Telangana (502318).

When will HI-WAY HOMES be completed?

The promoter's proposed date of completion filed with RERA is 14/04/2023. This is the promoter's declaration, not a guarantee.