Thirumala Constructions Developers

THIRUMALA CONSTRUCTIONS DEVELOPERS · Rangareddy · RERA P02400000946

THIRUMALA CONSTRUCTIONS DEVELOPERS is a residential apartment project in Boduppal, Medipally mandal, Ranga Reddy district. The project covers 507.35 sq. m. in Survey No. 141 and comprises one proposed building with 1 stilt + 5 upper floors and 15 “DOUBLE BEDROOM” units. It is registered under TG-RERA P02400000946, granted 24/06/2019, and the promoter declared completion by 30th October, 2024.

More from Thirumala Constructions Developers · 6 projects →

01What we found

Period endedTG-RERA registration ran to 30 Oct 2024 - check its extension on TG-RERA
8documents on file - each fact links to its page
2court cases on this project's land (survey 141, Boduppal)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRERA-filed / recorded information
Registered project nameTHIRUMALA CONSTRUCTIONS DEVELOPERS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; the filing concerns the building on Plot Nos. 49, 54 and 55, Survey No. 141 RERA filing
TG-RERA registrationP02400000946; granted 24/06/2019; stated validity to 30/10/2024 RERA record
Registered promoterTHIRUMALA CONSTRUCTIONS DEVELOPERS RERA record Corporate record
Recorded status“New Project” in the RERA project record. Registration validity and completion deadline are separate: the certificate states validity to 30/10/2024, and the Form B declaration undertakes completion by that date. No extension is recorded in the supplied certificate RERA filing

Land and geographic identity

FieldRERA-filed / recorded information
LocalityBoduppal; plots identified as Plot Nos. 49, 54 and 55 RERA filing
Revenue villageBoduppal RERA filing
MandalMedipally, as stated in the HMDA technical approval
DistrictRanga Reddy in the project record RERA record RERA filing
PIN500039 RERA record
Survey number(s)Survey No. 141; no subdivision is specified in the supplied project record RERA filing
Site extent507.35 sq. m. in the HMDA technical approval; RERA land details state total area 507.35 sq. m. and net area 507.35 sq. m. RERA filing
Boundaries recordedEast: Plot No. 56; west: Plot No. 48; north: neighbours’ land and land of B. Rajalingam; south: 30 wide road RERA filing

Development identity

FieldRERA-filed / recorded information
Sanctioning / technical approval authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal approvalTechnical Approval Accorded, No. 011596/GHT/R1/U6/HMDA/11052018, dated 30/10/2018 Approvals record
Approval scopeProposed residential building on Plot Nos. 49, 54 and 55 in Survey No. 141, Boduppal; the letter says building plans are to be sanctioned by the Executive Authority in conformity with HMDA’s technical approval
Building count and configurationOne proposed building; 1 stilt + 5 upper floors RERA filing
Approved built-up area1312.61 sq. m. total built-up area recorded in the technical approval RERA filing
Approved area figures separately statedThe same approval lists “Built up Area 1073.5” and “Total Built up Area (In Sq.mts) 1312.61”; the supplied material does not explain the relationship between those figures
Units1 total building unit in the land details; 1 proposed building unit as per agreement; the RERA unit record lists 15 “DOUBLE BEDROOM” units RERA filing RERA unit table RERA unit details
Parking / mortgage recordThe approval records mortgage areas, including 124.38 sq. m. relating to flats 201 and 202 on the second floor; the supplied evidence does not establish a complete parking count or parking layout

Offering and status

FieldRERA-filed / recorded information
Unit type“DOUBLE BEDROOM” (normalised as 2BHK in the unit summary) RERA unit table RERA unit details
RERA saleable area770.13 sq. m. as filed for each listed unit type; this is the filed figure and is not a measured carpet area RERA unit table RERA unit details
Booked / available0 booked and 15 available in the portal-derived unit record; the source gives no as-of date, so counts are indicative RERA unit table RERA unit details
Construction stageNo construction-progress percentage or independently verified site-stage evidence is supplied. The amenity progress fields shown in the RERA-derived record are 0%; they do not establish the building’s overall construction stage RERA amenities
Completion deadlinePromoter-declared in Form B as 30th October, 2024
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied documents; status is not established by this evidence Document index

2. The project story

The RERA record describes a residential apartment development on 507.35 sq. m. in Survey No. 141, Boduppal village, at Plot Nos. 49, 54 and 55. HMDA’s technical approval describes one proposed building with a stilt level and five upper floors. The TG-RERA unit record lists 15 “DOUBLE BEDROOM” units, with bookings and availability recorded as 0 and 15 respectively, without an as-of date for those counts. RERA filing RERA unit table

The promoter’s Form B affidavit declares a completion deadline of 30th October, 2024. The supplied evidence does not include a current construction-progress assessment, a site inspection, or an occupancy/completion certificate; therefore it does not establish whether the building is under construction, complete, or certified for occupation. The project’s registration validity, stated completion deadline and certificate status should be read as distinct records. Document index

3. Master plan, architecture & building design

HMDA’s technical approval describes a proposed residential building of 1 stilt + 5 upper floors on the project’s 507.35 sq. m. site. It records total built-up area of 1312.61 sq. m. and separately lists “Built up Area 1073.5”; the supplied approval extract does not explain the basis or relationship of those two area figures. The RERA land record describes one building unit, while the unit record lists 15 apartments. RERA filing RERA unit table

The approval letter identifies a technical approval rather than confirming, in the supplied extract, a later building-plan sanction by the local Executive Authority. It expressly says the building plans shall be sanctioned by that authority in conformity with the HMDA technical approval. No approved floor plan is available for measurement in the supplied drawing data: two drawings are recorded, but neither contains a measured flat plan. Consequently, the evidence supplied does not establish flat arrangements per floor, footprint, stair or lift configuration, internal circulation, or open-space distribution. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
DOUBLE BEDROOM (normalised as 2BHK)15015770.13 sq. m.Not measured in supplied drawing dataNot supplied

The 770.13 sq. m. figure is the area recorded in the TG-RERA unit data; the supplied record does not label it as carpet area. Carpet area, balcony or utility area, and a unit’s share of common areas are distinct measurement concepts, and no software-measured carpet or room dimensions are available here. The drawing register reports two drawings but zero measured plans and two sheets with no flats identified. Unit counts and booking figures are portal-derived and lack an as-of date. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The supplied RERA records do not establish the total number of car or two-wheeler parking spaces, visitor or accessible parking provision, parking levels beyond the stilt identified in the technical approval, ramp or driveway arrangement, or unit-specific parking allocations. The vendor material lists “Dedicated bike parking” and “covered car parking,” but provides no counts or allocation evidence; these are vendor-described features, not confirmation of sanctioned or legally allocated spaces. Promoter website

The HMDA approval records mortgages affecting built-up area: it identifies 124.38 sq. m. relating to flats 201 and 202 on the second floor in favour of the Executive Authority, Boduppal Municipality, and also records 121.2 sq. m. as 10% of built-up area in favour of HMDA. These are mortgage entries, not evidence of a parking allocation.

6. Amenities, recreation & open spaces

Rainwater harvesting
Description / sizeHMDA technical approval requires rainwater-harvesting structures on site
Declared progress / verified statusRequired by approval; completion not verified
Transformer
Description / sizeApproval requires provision for a transformer within the premises
Declared progress / verified statusRequired by approval; completion not verified
Garbage house
Description / sizeApproval requires provision for a garbage house within the premises
Declared progress / verified statusRequired by approval; completion not verified
Green strip / tot lot / park
Description / sizeRERA amenity record marks “YES”; no size supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA record shows 0% progress; completion not verified
Water supply; sewerage; water conservation / rainwater harvesting
Description / sizeRERA amenity record marks these “YES”; no capacities or system details supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA record shows 0% progress; completion not verified
Internal roads and footpaths; storm-water drains; street lighting; community buildings; sewage/sullage treatment and disposal; solid-waste management; energy management; fire protection; electrical meter room/sub-station/receiving station; recreational open space
Description / sizeListed in the RERA amenity record; no dimensions or capacities supplied
Evidence sourceRERA amenities
Declared progress / verified statusEach is recorded at 0% progress; completion not verified
Pool, gym, children’s play area, clubhouse, security and CCTV
Description / sizeListed in vendor-supplied amenity material; no size, quantity or project-document confirmation supplied
Evidence sourcePromoter website
Declared progress / verified statusVendor-described only; not established as sanctioned or delivered

7. Utilities, building services & safety

HMDA’s technical approval requires rainwater-harvesting structures, a transformer and a garbage house, and states that the applicant is responsible for structural safety and safety requirements under the National Building Code of 2005. It also requires the local authority to ensure that effluent or drainage does not overflow onto a road or public place, and states that an occupancy certificate is compulsory before occupying a building. These are approval conditions; the supplied evidence does not show their completion or a project-specific compliance certificate.

The RERA amenity record marks water supply, sewerage and rainwater harvesting as available, but records 0% progress and provides no source, storage, treatment or capacity details. It lists storm-water drainage, fire protection, electrical meter room/sub-station/receiving station, energy management and waste management, also at 0% progress. No lift count or capacity, backup-power specification, STP capacity, fire-system details, accessibility arrangements, CCTV installation verification or security plan is supplied. Vendor material separately names borewell water, power backup, fire safety, CCTV and a lift; these are vendor-described and not independently verified here. RERA amenities Promoter website

8. Location, access & connectivity

The project is recorded at Boduppal village, Ranga Reddy district, PIN 500039, in Survey No. 141, on Plot Nos. 49, 54 and 55. The HMDA technical approval identifies the mandal as Medipally and records a southern boundary of “30 WIDE ROAD.” The supplied location data also lists the Financial District (Nanakramguda) at 1.2 km as an anchor distance; it does not provide a measured route or travel time. RERA record RERA filing Location record

No further approach-road, public-transport, or landmark distances are supplied. The vendor material names Boduppal as the nearest landmark but gives no distance. Promoter website

9. Developer & development status

The registered promoter is THIRUMALA CONSTRUCTIONS DEVELOPERS. The RERA record identifies it as a partnership and provides GSTIN 36AAGFT3933P1ZL. The supplied promoter information names VENAKTA SUDHAKARA RAO as authorised signatory and PRASANTHI GATTAMANENI as partner; Form B identifies Mr. Gattamaneni Venkata Sudhakar Rao as the authorised signatory making the declaration. RERA record Corporate record Parties record

The promoter’s Form B declares completion by 30th October, 2024 and states that 70% of amounts realised from allottees would be deposited in a separate scheduled-bank account, with withdrawals tied to completion and professional certification. These are promoter declarations; the supplied evidence does not include construction progress, subsequent quarterly progress reports, an extension order, or an occupancy/completion certificate. The project record identifies a designated account at ICICI Bank, Uppal Kalam Branch, with masked account number **3301. Parties record Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Available evidenceForm C; registration P02400000946, issued 24/06/2019, stated valid to 30/10/2024
Scope / noteRegistered project THIRUMALA CONSTRUCTIONS DEVELOPERS
HMDA technical approval
Available evidenceNo. 011596/GHT/R1/U6/HMDA/11052018, dated 30/10/2018
Scope / noteTechnical approval for the proposed residential building on Plot Nos. 49, 54 and 55, Survey No. 141; approval states the local Executive Authority is to sanction plans
Form B declaration
Available evidenceDated 03rd April, 2019
Scope / notePromoter declaration, including completion undertaking and fund-handling statements
Legal title report
Available evidenceDocument 54803
Scope / noteTitle opinion concerning the land and project; detailed title review belongs in Land & Title
Encumbrance statement
Available evidenceDocument 53902
Scope / noteFiled encumbrance material
Agreement-for-sale form
Available evidenceDocument 53932
Scope / notePartially completed proposed form; allottee and apartment-specific particulars are blank
Occupancy / completion certificate
Available evidenceNot present in the supplied project documents Document index
Scope / noteStatus not established by this evidence

Frequently asked questions

Is THIRUMALA CONSTRUCTIONS DEVELOPERS registered with Telangana RERA?

Yes. THIRUMALA CONSTRUCTIONS DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P02400000946; the registration status is New Project.

Who is the developer of THIRUMALA CONSTRUCTIONS DEVELOPERS?

The promoter named in the RERA registration is THIRUMALA CONSTRUCTIONS DEVELOPERS.

Where is THIRUMALA CONSTRUCTIONS DEVELOPERS located?

THIRUMALA CONSTRUCTIONS DEVELOPERS is in BODUPPAL, Rangareddy, Telangana (500039).

When will THIRUMALA CONSTRUCTIONS DEVELOPERS be completed?

The promoter's proposed date of completion filed with RERA is 30/10/2024. This is the promoter's declaration, not a guarantee.