The Rise

KIAAN INFRA PROJECTS · Hanamkonda · RERA P00300007353

THE RISE is a residential apartment project in S.R.R.Thota, Khila Warangal, Warangal Urban. It is being developed by the registered promoter KIAAN INFRA PROJECTS on a registered site extent of 5392.17 sq. m., with one building comprising 2 stilts + 9 upper floors and 130 apartments: 53 2BHK and 77 3BHK. The TG-RERA registration number is P00300007353, and the RERA header records a proposed completion date of 31/12/2026.

01What we found

Period endedTG-RERA registration ran to 31 Aug 2026 - check its extension on TG-RERA
26documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project name / typeTHE RISE — residential apartment project RERA record
Phase / registered portionPhase designation not disclosed. TG-RERA records one building and 130 units for the project RERA filing RERA unit table
TG-RERA registrationP00300007353
Registration validityValid from 08/12/2023 to 31/08/2026; the certificate records no extension
Registered promoterKIAAN INFRA PROJECTS
RERA statusRegistered; the supplied certificate states the validity dates above. A current status beyond that certificate has not been independently established

Land and geographic identity

ItemProject record
Locality / revenue villageLocality: S.R.R.Thota. Revenue-village identity is not independently resolved in the supplied records; the registration certificate and project filings use S.R.R.Thota RERA filing
Mandal / district / PINKhila Warangal / Warangal Urban / 506002
Project survey numbers and subdivisions16-2-190, 195; subdivision detail beyond this notation is not disclosed
Plot / application reference82/2022
Registered site extent5392.17 sq. m. (also recorded as total and net area) RERA filing
BoundariesNorth: House of K Iilaiah; South: Sri vijayalaxmi rice and oil mill; East: House of A Sambaiah; West: 60 feet Kareemabad-to-railway-bridge road RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Warangal Municipal Corporation (GWMC)
Principal building permitFile No. TP/449/2023-G2; approved 22-08-2023. Application No. 82/2022; proceedings Rc.No.C3/000331/R1/U61KUON1053/2022 Approvals record
Approved built-up area19798.11 sq. m. in the RERA project information; the building-permit extraction states “Total Area 19798.1 m” RERA filing
Building count and configurationOne building; permit describes 2 stilts + 9 upper floors RERA filing
Height / sanctioned parametersPermit extraction records height 32.99 m, 13 lifts, 30 trees, and a road width of 18M
Parking levels / countPermit describes two stilt levels; the available records do not establish a sanctioned parking-space count or unit-by-unit allocation
Units130 total: 53 2BHK and 77 3BHK in the RERA configuration summary RERA unit table

Offering and status

ItemProject record
Unit types and RERA-filed saleable areas2BHK: 136.29–137.96 sq. m.; 3BHK: 166.29–177.18 sq. m. RERA unit table
Booked / availablePortal-derived counts show 0 booked, 130 available (53 2BHK and 77 3BHK); the counts have no stated as-of date and are indicative RERA unit table
Construction stageRERA-recorded completeness is 70%; this is a filed/record-derived figure, not an independent site inspection RERA record
Completion datesRERA header proposed completion: 31/12/2026. The Form B declaration states completion by 31st AUGUST 2026 RERA record
Occupancy / completion certificateNo completion certificate is recorded in the supplied permit extraction; it states that an occupancy certificate is compulsory before occupation. Project-wide and tower-specific OC status is not otherwise established

2. The project story

THE RISE is a residential apartment development registered at S.R.R.Thota, Khila Warangal, Warangal Urban, on survey numbers 16-2-190 and 195. The project record identifies one building, with apartments intended for residential use, on a registered site extent of 5392.17 sq. m. RERA filing

The RERA configuration summary records 130 apartments: 53 2BHK and 77 3BHK. The building permit describes a high-rise residential building with 2 stilts and 9 upper floors. The RERA record indicates 70% completeness; no independent construction inspection or completion certification is supplied. The permit requires an occupancy certificate before occupation, and the supplied evidence does not establish that one has been issued RERA unit table RERA record.

3. Master plan, architecture & building design

The RERA record gives the site extent as 5392.17 sq. m. and approved built-up area as 19798.11 sq. m. The building-permit extraction records 19798.1 m as total area; its unit is shown in the extraction as “m” and is not further clarified here. These are approval/filing figures, not software-measured areas RERA filing RERA filing.

The permit describes one residential building with 2 stilts + 9 upper floors, a height of 32.99 m, 13 lifts, and 30 trees. It records a 541.94 sq. m. tot-lot area and front and rear setbacks of 11.00 and 7.00, respectively. The permit extract does not specify the setback units. No floor-by-floor apartment arrangement, building footprint, flats per floor, staircase layout, circulation plan, or residential/common-area breakdown is available in the supplied extracted records.

The permit also records a road-affected area of 9 and a net area of 5392.17; the extraction does not make the road-affected-area unit legible. Further approval conditions and plan details are listed in the building permit evidence index below.

4. Homes, configurations & floor plans

The following unit counts and saleable areas are from the TG-RERA filing. Booked/available counts are portal-derived, with no as-of date in the supplied data. Saleable area is not carpet area RERA unit table RERA unit details.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK53053136.29–137.96 sq. m.Not availableNot supplied
3BHK77077166.29–177.18 sq. m.Not availableNot supplied

Four approved floor-plan drawings are listed, but all four are pending scanning; none has been software-measured. Accordingly, no drawing-based carpet-area or room-dimension measurements can be reported. Carpet area, balcony/utility areas, and any common-area component are not separately quantified in the supplied evidence; the RERA-filed saleable-area figures above should not be read as carpet-area figures Floor plans RERA unit details.

5. Parking & vehicle circulation

The building permit describes 2 stilts, but the supplied approval extraction does not provide a parking-space count or confirm a parking allocation for each apartment. A promoter-marketing/vendor description states “two level” parking at ground and first floor and claims one car park per flat; this is not established here as a sanctioned count or a legally documented allocation Promoter website.

No supplied project record establishes visitor or accessible parking, two-wheeler spaces, mechanical parking, ramps, vehicle entry/exit arrangements, or pedestrian separation. A parking bay shown in a drawing, if any, would not by itself establish exclusive ownership.

6. Amenities, recreation & open spaces

The RERA amenities record lists 14 infrastructure/amenity categories. Water supply, sewerage, green strip/tot lot/park, and electrical meter room/sub-station/receiving station are marked “YES”; the listed progress percentages are 0. These entries are filing data, not independent verification that the facilities are complete or operational RERA amenities.

Tot-lot / green area
Description / sizePermit records a 541.94 sq. m. tot-lot area; it also requires the tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate
Evidence sourceSanctioned permit extraction
Declared progress / verified statusCompletion not independently verified
Green strip / tot lot / park
Description / sizeMarked “YES” in the RERA amenities record; no separate size stated there RERA amenities
Evidence sourceRERA amenities record
Declared progress / verified statusProgress shown as 0; not independently verified
Internal roads and footpaths
Description / sizeListed; no dimensions or detail supplied RERA amenities
Evidence sourceRERA amenities record
Declared progress / verified statusProgress shown as 0
Community buildings
Description / sizeListed; no facility description or size supplied RERA amenities
Evidence sourceRERA amenities record
Declared progress / verified statusProgress shown as 0
Clubhouse, pool, gym, indoor games, courts and other recreational facilities
Description / sizeVendor-marketed list includes these facilities, but no corresponding project-specific sanctioned or RERA-amenity detail, size, or completion evidence is supplied Promoter website
Evidence sourcePromoter/vendor information
Declared progress / verified statusMarketing claims; completion not verified

7. Utilities, building services & safety

The RERA amenities record marks water supply, sewerage and an electrical meter room/sub-station/receiving station as available (“YES”), but lists 0 progress for the relevant amenity categories. The building permit requires rainwater-harvesting structures (percolation pits) and a garbage house within the premises. These records establish listed or required provisions, not completed or operational systems RERA amenities.

The vendor information describes a sewage treatment plant, reuse of treated sewage for landscaping and flushing, 100% DG backup for common areas and inside flats, and fire systems “as per Fire Department norms.” These are vendor claims; the supplied evidence does not provide STP capacity, water source or storage/treatment capacity, generator capacity, fire-system drawings or clearance, lift capacity, or independent commissioning evidence Promoter website.

The building-permit extraction records 13 lifts. It does not identify their type, capacity, service-lift provision, or operating status. Detailed storm-water, waste-management, CCTV/security, accessibility, and emergency-access specifications are not established by the supplied project-specific records RERA amenities Document index.

8. Location, access & connectivity

The registered location is S.R.R.Thota, Khila Warangal, Warangal Urban, Telangana, 506002. The building permit identifies the locality as Kareemabad and records the western boundary as a 60 feet Kareemabad-to-railway-bridge road; it also records an 18M road width RERA filing.

The supplied project evidence does not establish measured distances to transport, services, or landmarks. A location geocode in the tab data resolves to an unrelated Greater Hyderabad Municipal Corporation address and is therefore not used as the project location or as connectivity evidence Location record.

9. Developer & development status

The registered promoter is KIAAN INFRA PROJECTS, recorded as a partnership. The supplied corporate identifier is GSTIN 36AAXFK6407C1Z5. The RERA registration certificate lists the promoter office at Village S.R.R.Thota, Mandal Khila Warangal, District Warangal Urban, PIN 506002; no separate registered-office address or official contact details are provided in the supplied records Corporate record.

The Form B declaration is made by ADABOINA UDAY KIRAN REDDY, authorized by KIAAN INFRA PROJECTS, and states completion by 31st AUGUST 2026. The RERA header separately records proposed completion as 31/12/2026; both recorded dates are presented here as supplied, without determining their relationship. RERA-recorded completeness is 70%, not an independently verified site measurement RERA record.

The permit describes the building as residential and identifies Sri A. Rajender Reddy as applicant, the rice-mills entity as represented owner, and Sri A. Uday Kiran Reddy as builder/developer.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP00300007353; issued 08/12/2023; valid to 31/08/2026
Scope and evidenceTHE RISE; survey numbers 16-2-190, 195; registration certificate states promoter, location and registration conditions
GWMC building permit order
Identifier / dateFile TP/449/2023-G2; approved 22-08-2023
Scope and evidenceOne high-rise residential building; permit extraction describes 2 stilts + 9 upper floors and records permit conditions
Related approval references
Identifier / dateApplication 82/2022; proceedings Rc.No.C3/000331/R1/U61KUON1053/2022; D.P. No. 82/2022
Scope and evidenceReferences recorded in the building permit and project approvals data Approvals record
Form B declaration
Identifier / dateFiled for THE RISE by authorized signatory ADABOINA UDAY KIRAN REDDY
Scope and evidenceContains promoter declarations, including completion and project-fund undertakings; the encumbrance clause is present, but the extracted text does not contain filled-in encumbrance particulars
Approved floor-plan drawings
Identifier / dateFour drawings listed; scanning pending for all four
Scope and evidenceNo software-measured room or carpet-area data is available Floor plans
Occupancy / completion certificate
Identifier / dateNot established in supplied records
Scope and evidenceThe building permit requires an occupancy certificate before occupation; the permit extraction does not record a completion certificate

Frequently asked questions

Is THE RISE registered with Telangana RERA?

Yes. THE RISE is registered with the Telangana Real Estate Regulatory Authority as P00300007353; the registration status is New Project.

Who is the developer of THE RISE?

The promoter named in the RERA registration is KIAAN INFRA PROJECTS.

Where is THE RISE located?

THE RISE is in Warangal, S.R.R.Thota, Khila Warangal, Hanamkonda, Telangana (506002).

When will THE RISE be completed?

The promoter's proposed date of completion filed with RERA is 31/12/2026. This is the promoter's declaration, not a guarantee.