SUPRABHAT TOWNSHIP BHONGIRI is a plotted development in Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District. The registered promoter is Narasimha Reddy Nalla. The layout covers 133542.98 sq.m.; the record does not disclose a tower or block count, floors, plot count, plot-size range, or plot configurations. It is registered with TG-RERA under P02000007668, with a proposed completion date of 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 26 Apr 2026 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameSUPRABHAT TOWNSHIP BHONGIRI RERA record
Project typePlotted development / plotted layout RERA record RERA filing
Phase / registered portionNo separate phase name is disclosed. The registration covers land identified as Survey Nos. 24/Part and 25/Part at Bhongir.
TG-RERA registrationP02000007668 RERA record
Registration validityCertificate states validity from 31/01/2024 to 26/04/2026, unless extended by the Authority. This is registration validity, not a statement of current registration status or a completion certificate. RERA record
Registered promoterNarasimha Reddy Nalla (certificate); project filings also identify NALLA NARASIMHA REDDY and NALLA LEELA as promoters/applicants.
Legal entity typeNot disclosed; the RERA record names individuals. Corporate record
RERA statusThe supplied record identifies the project as “New Project.” It does not establish whether registration was extended after the stated expiry. RERA record Approvals record

Land and geographic identity

ItemRecord
Locality / streetBUVANAGIRI; NH 163 RERA filing
Revenue villageBhongir in the registration record. The layout-letter extraction uses “Buvanagiri” and “Bhuvanagiri”; these are recorded here as document wording, not as separately established revenue villages.
MandalBhongir in the project record; “Buvanagiri” in the layout-letter extraction. RERA record
DistrictYadadri Bhuvanagiri in the project record; “Yadadri” in the layout-letter extraction. RERA record
PIN508116 RERA record RERA filing
Survey numbers / subdivisions24/Part, 25/Part; the layout document also writes these as 24/PART, 25/PART. RERA record
Total site area133542.98 sq.m. (RERA land details and layout-letter extraction). RERA filing
Area affected by road11800.82 sq.m. RERA filing
Net area121742.16 sq.m. RERA filing
Boundaries in RERA land detailsNorth: 24P; South: 30; East: 26; West: 24P. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal approvalDraft layout letter 000085/LO/Plg/HMDA/2023, dated 26 April, 2023. Approvals record
Related layout-permit number on file000088/LO/Plg/HMDA/2019, shown in the filed layout-permit material. Approvals record
Approved built-up areaNot disclosed as an applicable project measurement for this plotted layout. RERA filing
Building / tower count and floorsNot disclosed; the registered offering is a plotted layout. RERA filing
Layout areas stated in the draft letterLayout roads: 34439.91 sq.m.; organised open space: 10315.56 sq.m.; social infrastructure: 3340.37 sq.m.
Mortgage area11531.38 sq.m., associated with designated plots in the layout and a mortgage to HMDA. RERA filing

Offering and status

ItemRecord
Purchasable productPlots; plot count and plot-size range are not disclosed in the supplied RERA data. RERA filing Layout record
Booked / available countsNot disclosed. RERA unit table
Construction / development stageRERA record labels the project “New Project”; no independently verified site-progress measurement is supplied. RERA record RERA amenities
Completion dateRERA header gives 30/11/2026 as proposed completion. The filed Form B declarations state 26 April 2026. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied documents. The project is a plotted layout; final layout release is distinct from an occupancy certificate. Document index

2. The project story

SUPRABHAT TOWNSHIP BHONGIRI is registered as a plotted-development project covering Survey Nos. 24/Part and 25/Part, with the project record locating it in Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116. Its RERA land details state a total area of 133542.98 sq.m., including 11800.82 sq.m. affected by road and a net area of 121742.16 sq.m. RERA record RERA filing

The HMDA document supplied is a draft layout letter, not evidence of final layout release. It describes a plotted layout and records that roads, open space and social-infrastructure land are to be gifted to the local body before final layout plans are released. It also identifies plots reserved as mortgage security for HMDA.

The available materials do not provide plot inventory, plot-size bands, booked/available counts, or a verified site-progress report. The RERA proposed completion date and the Form B completion undertakings are reported separately above because they are different recorded statements. RERA record

3. Master plan, architecture & building design

The supplied plan evidence concerns layout planning, not apartment or building design. The HMDA draft letter records the following land-use areas: total site 133542.98 sq.m.; road-affected area 11800.82 sq.m.; net site area 121742.16 sq.m.; layout roads 34439.91 sq.m.; organised open space 10315.56 sq.m.; and social infrastructure 3340.37 sq.m.

The draft letter describes the proposal as a plotted layout and includes conditions for road access, open-space and social-infrastructure handover, underground utilities, storm-water drainage, cycling tracks, LED street lighting and planting. It states that the roads and specified open-space and social-infrastructure areas are to be transferred to the local body by registered gift deed before final layout release.

No final layout drawing or plot schedule is supplied here from which plot arrangement, individual plot dimensions, or detailed circulation can be confirmed. No building count, floor configuration, tower height, apartment layout or building-area schedule is disclosed.

4. Homes, configurations & floor plans

This is a plotted development, not an apartment configuration in the supplied RERA record. Plot counts, plot-size bands, booked/available inventory, RERA saleable areas and plot-specific measurements are not supplied. RERA record RERA filing RERA unit table Layout record

The two supplied drawing files are still marked as scans pending measurement; no software-measured carpet areas or room measurements are available. Carpet-area measurements for apartments are therefore not applicable to the evidence supplied for this plotted layout. Floor plans

5. Parking & vehicle circulation

The draft layout material refers to roads and access but does not provide a parking-space count, visitor or accessible parking provision, parking allocation by plot, or a detailed vehicle-circulation plan. No individual drawn parking bay or exclusive parking entitlement is established by the supplied evidence. RERA unit table

6. Amenities, recreation & open spaces

The following facilities appear in the filed draft-layout conditions or RERA amenity checklist. The checklist records 0% progress for the listed items; those percentages are declarations in the record, not independent site verification. RERA amenities

Landscape / open space — organised open space
Description / size10315.56 sq.m.; the draft letter states it is to be handed over to the local body before final layout release.
Declared progress / verified statusDraft-layout requirement; no completed-handover evidence supplied.
Landscape / open space — park development and avenue plantation
Description / sizeListed in the layout-letter utilities and amenity provisions; no separate size or quantity provided.
Declared progress / verified statusRequired/planned in the draft material; no independent completion verification.
Sports / recreation — cycling tracks
Description / sizeRequired within the layout; no length or specification provided.
Declared progress / verified statusDraft condition; no independent completion verification.
Convenience / community — social infrastructure
Description / size3340.37 sq.m.; the draft letter states it is to be handed over to the local body before final layout release.
Declared progress / verified statusDraft-layout requirement; no completed-handover evidence supplied.
Community buildings
Description / sizeListed in the RERA amenity checklist; no building type, size or capacity provided.
Evidence sourceRERA amenities
Declared progress / verified statusChecklist progress: 0%; not independently verified.
Green strip / tot lot / park
Description / sizeListed in the RERA amenity checklist; no separate size or quantity provided.
Evidence sourceRERA amenities
Declared progress / verified statusChecklist progress: 0%; not independently verified.

7. Utilities, building services & safety

The draft layout letter lists proposed or required site infrastructure including underground storm-water drainage; underground drainage lines and a common septic tank/STP; internal water-supply pipelines and an overhead tank; electrical supply lines and a transformer; street lighting; rainwater-harvesting pits; a utilities area; and a bio-compost unit. These are features stated in the layout material, not evidence that the facilities are complete or operational.

The RERA amenity checklist also lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, solid-waste management, energy management, fire-protection/fire-safety requirements, and electrical meter/sub-station/receiving-station facilities. It records 0% progress for the listed items. No capacities, technical specifications, clearance documents, or independent completion verification are supplied. RERA amenities

8. Location, access & connectivity

The registered location is Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116, with NH 163 recorded as the street. The supplied location record gives coordinates 17.5172789, 78.8863383 and one sampled connectivity point: Outer Ring Road nearest sampled interchange, approximately 23.1 km. RERA record RERA filing Location record

The draft layout letter identifies a proposed 100ft wide road affecting 11800.82 sq.m. and records that the affected area was handed over by gift deed document 359/2023, dated 13/01/2023, to the Commissioner, Bhongiri Municipality, as stated in that letter. This is the document’s statement; the supplied materials do not include independent confirmation of the road’s current delivery or access conditions.

9. Developer & development status

The TG-RERA certificate names Narasimha Reddy Nalla as promoter and gives an address of FLAT NO 202, BLOCK D, Hyderabad, 500033, Telangana. The filed Form B declarations are made separately by NALLA NARASIMHA REDDY and NALLA LEELA; the layout letter also names both as applicants. The legal entity type, corporate identifier, official contact details and promoter website are not disclosed in the supplied project evidence. Corporate record

The RERA header records a proposed completion date of 30/11/2026; the two Form B declarations record a completion undertaking of 26 April 2026. No verified construction-progress report, final layout release or completion/occupancy certificate is supplied. The registration certificate’s stated validity ended on 26/04/2026; the materials provided do not show a later extension or current registration status. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for SUPRABHAT TOWNSHIP BHONGIRI, registration P02000007668, covering Survey Nos. 24/Part and 25/Part; certificate states validity from 31/01/2024 to 26/04/2026 unless extended.
Principal HMDA layout recordDraft layout letter 000085/LO/Plg/HMDA/2023, dated 26 April, 2023, for Survey Nos. 24/PART and 25/PART.
Related layout-permit recordLayout Permit No. 000088/LO/Plg/HMDA/2019 appears in the supplied HMDA material.
HMDA mortgage / reserved plotsDraft letter identifies Plots 204 to 215, 219 to 230 and 234 to 260, extent 11531.38 sq.m., as mortgaged to HMDA; mortgage deed number 360/2023 is cited.
Road-affected-area gift deedDraft letter states the 11800.82 sq.m. area affected by the proposed 100ft road was handed over by gift deed document 359/2023, dated 13/01/2023.
Promoter declarationsForm B declarations by NALLA NARASIMHA REDDY and NALLA LEELA, each dated October 2023 in the supplied extraction.
Final layout / occupancy evidenceNo final layout-release document or occupancy/completion certificate is supplied in this evidence set. Document index

The HMDA letter is described in the filed extraction as a draft layout and expressly states that the permission is not proof of land title. Its listed release conditions and other sanction details are addressed in the Approvals and Land & Title sections.

Frequently asked questions

Is SUPRABHAT TOWNSHIP BHONGIRI registered with Telangana RERA?

Yes. SUPRABHAT TOWNSHIP BHONGIRI is registered with the Telangana Real Estate Regulatory Authority as P02000007668; the registration status is New Project.

Who is the developer of SUPRABHAT TOWNSHIP BHONGIRI?

The promoter named in the RERA registration is NARASIMHA.

Where is SUPRABHAT TOWNSHIP BHONGIRI located?

SUPRABHAT TOWNSHIP BHONGIRI is in BUVANAGIRI, Bhongir, Yadadri Bhuvanagiri, Telangana (508116).

When will SUPRABHAT TOWNSHIP BHONGIRI be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.