ANANYA TOWNSHIP is a plotted development in Bhongir Town, Bhongir Mandal, Yadadri Bhuvanagiri District. The registered promoter is SUSHAR CONSTRUCTIONS PRIVATE LIMITED AND OTHERS. The project covers 34,950.26 sq.m of total site area and 27,734.47 sq.m of net layout area, with 77 plots shown in the layout drawing; plot configurations and RERA-filed plot areas are not disclosed. It is registered with TG-RERA as P02000010228, with a proposed completion date of 28 January 2029.

01What we found

RegisteredTG-RERA - valid till 28 Sep 2028
37documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameANANYA TOWNSHIP RERA record
Project typePlotted development / open-plot layout RERA record RERA filing
Phase or registered portionNew project; the registration record covers the stated project land. A separate phase description is not disclosed. RERA record RERA filing
TG-RERA registrationP02000010228; registered 28 September 2025 and valid through 28 September 2028, unless extended by the Authority RERA record Approvals record
Registered promoterSUSHAR CONSTRUCTIONS PRIVATE LIMITED AND OTHERS RERA record
RERA statusRegistration certificate recorded; the registration’s stated validity is separate from the promoter’s completion undertaking. Approvals record

Land and geographic identity

FieldProject record
Locality / townBhongir Town; the filed layout documents describe Bhongir locality. RERA record RERA filing
Revenue villageBhongir Village RERA filing
MandalBhongir RERA record RERA filing
DistrictYadadri Bhuvanagiri RERA record RERA filing
PIN508116 RERA record RERA filing
Project surveys / subdivisions575/PART, 576/PART and 658/PART RERA record RERA filing
Registered site extent34,950.26 sq.m total site area; 27,734.47 sq.m net layout area RERA filing Layout record
Road widening / affected area7,215.79 sq.m in the RERA land details; the layout approval extract records road-affected area of 6,853.1 sq.m. RERA filing
BoundariesNorth: existing 30 feet road; east, west and south: other land RERA filing

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the draft layout letter delegates release of proceedings and plans to Bhongir Municipality. Approvals record
Principal approval identifiersApplication/file no. 001861/HMDA/00535/SWDL/GTK/2025; layout permit no. 0139/HMDA/SWDL/2025 Approvals record
Approval date recordedDraft layout letter dated/approved 28/09/2025; a related approval-plan extract also records 14/07/2025. Approvals record
Approved built-up areaNot disclosed as a building-area figure; this is a plotted layout. The RERA filing separately records 17,320.77 sq.m as approved built-up area, while the drawing identifies that amount as plotted area. RERA filing Layout record
Buildings / floor configurationNo buildings, floors, towers or building commencement certificates are evidenced in the supplied project record.
Unit count77 plots, as read from the layout plot schedule; the schedule count is software-read from the drawing and should be checked against the approved plan. Layout record
Roads and open spaceLayout extract records proposed roads, organized open space, utility and social-infrastructure areas; see the master-plan section.

Offering and status

FieldProject record
OfferingPlots; plot sizes and booking/availability counts are not disclosed in the supplied RERA unit data. RERA record RERA filing
Completion dateThe Form-B declaration gives 28 September 2028; the RERA project header records proposed completion 28 January 2029. These are reported as distinct supplied records, not reconciled here. RERA record
Registration validityThrough 28 September 2028, unless extended by TG-RERA.
Construction / development stageNo independently verified site-progress evidence is supplied. The HMDA letter is a draft layout letter and says development works are to be completed within three years.
Occupancy / completion certificateNot evidenced. The record concerns a plotted layout; an OC status for any building is not supplied.

2. The project story

ANANYA TOWNSHIP is registered with TG-RERA as a plotted-development project on land identified in the filing as 575/PART, 576/PART and 658/PART, in Bhongir Village, Bhongir Mandal, Yadadri Bhuvanagiri District. The project is laid out for open plots rather than apartments or villas. RERA record

The HMDA-filed layout material describes a net layout area of 27,734.47 sq.m and a proposed schedule of 77 plots. It also shows roads, open space, utility and social-infrastructure land. The approval material is identified as a draft layout letter; the supplied record does not establish that final layout proceedings have been released or that development works have been completed. The RERA-filed proposed completion date is 28 January 2029; the promoter’s Form-B completion undertaking states 28 September 2028. Layout record RERA record

The project is registered as P02000010228, valid through 28 September 2028 unless extended. Registration validity is not itself a completion date or evidence of completed development.

3. Master plan, architecture & building design

This is a plotted layout, so the drawing evidence concerns plot arrangement and land use rather than building design. The approved-plan extract states a total site area of 34,950.26 sq.m and a net layout area of 27,734.47 sq.m. Its land-use schedule is:

Layout componentAreaShare shown in the filed drawing
Plotted area17,320.77 sq.m62.45%
Road area6,928.40 sq.m24.98%
Open space / park area2,089.46 sq.m7.53%
Buffer-zone area834.43 sq.m3.01%
Social-infrastructure area709.67 sq.m2.56%
Utility area214.44 sq.m0.77%
Common parking area0.00 sq.m0%

The layout drawing indicates road widths including 9.14 m, 30 m and 9.11 m; the draft layout letter also refers to roads of 18 mts and above. The layout material identifies open space/park, social infrastructure, utility land and a cycle track. The records do not describe a building arrangement, building footprints, floors, lifts or residential/commercial building areas.

The drawing-derived plot schedule contains 77 plots. Software-read plot sizes range from 150.43 sq.m to 622.2 sq.m, with a median of 162.91 sq.m; these measurements are extracted from the drawing and are not RERA-filed unit areas. Layout record

4. Homes, configurations & floor plans

The offering is plots, not apartment configurations. The supplied RERA data does not provide plot-wise saleable areas, booked or available counts, or plot allocations by allottee. The layout drawing’s plot count and size measurements are software-read from the drawing and require verification against the approved plan. RERA record Layout record

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots77 plots shown in the drawing scheduleNot disclosedNot disclosedNot disclosedNot applicableNot supplied

The drawing-derived size bands are: 40 plots at 150–200 sq.yd, 17 at 200–250 sq.yd, 2 at 250–300 sq.yd, 4 at 300–400 sq.yd, 6 at 400–500 sq.yd, and 8 at 500–1000 sq.yd. These are software-read bands from the drawing, not RERA-filed saleable-area figures. Layout record

The floor-plan dataset contains two layout sheets and no measured floor plans or flats. Carpet-area measurements and room configurations therefore are not applicable or established by the supplied evidence. Floor plans

5. Parking & vehicle circulation

The layout land-use schedule shows 0.00 sq.m as common parking area. A RERA-filed layout condition says that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, but the supplied project materials do not establish building parking levels or a sanctioned number of parking spaces.

The vendor record lists “Open Parking,” but no plot-wise parking allocation, visitor parking count, accessible parking provision, vehicle-entry arrangement, or EV-charging provision for the layout is established in the supplied project evidence. Promoter website No exclusive ownership of a parking space can be inferred from the available record.

6. Amenities, recreation & open spaces

The layout materials identify open space/park, social infrastructure, utility land and a cycle track. The TG-RERA amenity fields mark several proposed infrastructure categories as available, but record 0% progress; that does not establish completed delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open space / park2,089.46 sq.m; drawing schedule states 7.53%Identified in layout; no completion verification supplied
Social infrastructure709.67 sq.mIdentified in layout; no facility specification or completion verification supplied
Utility land214.44 sq.mIdentified in layout; no completion verification supplied
Cycle trackShown among layout amenities/utilities; size not suppliedNo progress or completion evidence supplied
Green strip / tot-lot / parkRERA amenity field identifies this category; HMDA layout conditions refer to maintaining greenery and fencing the tot-lotRERA amenitiesNo completion verification supplied
Community buildingsRERA amenity category is listed; no size or specification suppliedRERA amenitiesNo progress or completion evidence supplied

7. Utilities, building services & safety

The RERA amenity fields list internal roads and footpaths, water supply, sewerage including septic tank/STP, storm-water drains, rainwater harvesting, an electrical meter room/substation/receiving station, and recreational open space. The layout documents also identify a sump, septic tank, garbage facility and transformer; the draft layout letter lists an STP and overhead tank. These are filed or drawing-identified provisions, not evidence that the services are installed or operational. RERA amenities

The layout approval conditions call for a rainwater-harvesting structure, transformer space and a garbage house. They also state that public utility connections are tied to production of an occupancy certificate, and that the tot-lot and greenery are to be maintained. No capacities, water source, treatment process, reuse arrangement, electrical backup, security system, accessibility design, or completed service-connection evidence is supplied.

8. Location, access & connectivity

The registered location is Bhongir Town, Bhongir Village, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116. The project boundary description identifies an existing 30 feet road to the north; the layout materials also show proposed internal roads. RERA record RERA filing RERA filing

A location record provides a sampled Outer Ring Road interchange distance of 23.1 km. No other measured distances, public-transport details, landmarks or travel times are supplied. Location record

9. Developer & development status

The registered promoter is SUSHAR CONSTRUCTIONS PRIVATE LIMITED AND OTHERS. The RERA certificate identifies SUSHAR CONSTRUCTIONS PRIVATE LIMITED as promoter and gives an address in Amberpet, Hyderabad; a project-site address in Bhongir is also filed. RERA record Parties record

The project documents identify Vuduta Susmitha as an authorized signatory. The supplied corporate record does not provide a company registration number, registered-office address, official website or contact details sufficient to further identify the entity.

The RERA filing records a proposed completion date of 28 January 2029; the promoter’s Form-B declaration gives 28 September 2028. No independently verified construction-progress report is supplied. The HMDA draft layout letter states that developmental works are to be completed within three years. Registration validity through 28 September 2028 is a separate matter and is not proof of physical completion. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02000010228; valid 28 September 2025–28 September 2028 unless extended
What the supplied record establishesForm C registration for ANANYA TOWNSHIP and the stated survey numbers and location.
HMDA layout application / file
Identifier / date001861/HMDA/00535/SWDL/GTK/2025; application date 30 May 2025
What the supplied record establishesLayout application and associated plan material for the project land.
HMDA draft layout letter / permit
Identifier / date0139/HMDA/SWDL/2025; letter records 28 September 2025
What the supplied record establishesDraft layout letter for the plotted layout, with development conditions and delegation to Bhongir Municipality for release of proceedings and plans.
Layout plan
Identifier / dateFile no. 001861/HMDA/00535/SWDL/GTK/2025; plan extract records 14 July 2025
What the supplied record establishesDrawing-derived layout, road and land-use information.
Registered gift deed
Identifier / date4891/2025, dated 4 July 2025
What the supplied record establishesListed in the draft layout letter in connection with road-affected and buffer areas handed over to the local body.
Registered mortgage deeds
Identifier / date4892/2025 and 4893/2025, dated 4 July 2025
What the supplied record establishesDraft layout letter lists mortgaged plots 12–17 and 10–11 respectively in favour of HMDA.
Promoter Form-B declaration
Identifier / dateDated 28 September 2025
What the supplied record establishesPromoter declaration on title basis, encumbrances, project funds, approvals and completion undertaking.

The supplied approval record is a draft layout letter; the file does not establish release of final layout proceedings, completion of development works, or an occupancy/completion certificate. No building-specific commencement or occupancy certificate is evidenced for this plotted development.

Frequently asked questions

Is ANANYA TOWNSHIP registered with Telangana RERA?

Yes. ANANYA TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P02000010228; the registration status is New Project.

Who is the developer of ANANYA TOWNSHIP?

The promoter named in the RERA registration is SUSHAR CONSTRUCTIONS PRIVATE LIMITED AND OTHERS.

Where is ANANYA TOWNSHIP located?

ANANYA TOWNSHIP is in Bhongir Town, Bhongir, Yadadri Bhuvanagiri, Telangana (508116).

When will ANANYA TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 28/01/2029. This is the promoter's declaration, not a guarantee.