SUNSHINE S ECOPOLIS is a residential apartment project in GANDIPET, Gandipet Mandal, Ranga Reddy District, developed by registered promoter SUNSHINE INFRA PRIVATE LIMITED. The site area is 5,935 sq. m, with two residential blocks, Block A and Block B, each Stilt + 5 upper floors, and an amenities/clubhouse block of Stilt + 3 upper floors. The RERA filing lists 40 2BHK apartments of 112.82 sq. m and 50 3BHK apartments of 148.41 sq. m. It is registered under TG-RERA number P02400000518, and the promoter declared completion by 15th December 2024.

More from Sunshine Infra Pvt Ltd · 3 projects →

01What we found

Period endedTG-RERA registration ran to 15 Dec 2024 - check its extension on TG-RERA
10documents on file - each fact links to its page
9court cases on this project's land (survey 25, 26, Gandipet)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameSUNSHINE S ECOPOLIS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; the registration covers the project recorded under this name. RERA record
TG-RERA registrationP02400000518; issued 22/03/2019; recorded validity from 22/03/2019 to 15/12/2024. The certificate states validity may be extended by the Authority under the Act and Rules. RERA record Approvals record
Registered promoterSUNSHINE INFRA PRIVATE LIMITED RERA record Corporate record
RERA statusThe supplied certificate records the registration period above and does not record an extension. Current registration status is not independently established in the supplied evidence.

Land and geographic identity

ItemRecord
Locality / revenue villageRERA record: GANDIPET locality and Gandipet village. The filed HMDA plan and technical approval identify Kokapet Village; the supplied documents do not establish whether this reflects a different land description or administrative usage. RERA record RERA filing
MandalGandipet in the HMDA technical approval and filed plan; mandal is not disclosed in the canonical land identity. Land records
District / PINRanga Reddy; PIN 500075 in the RERA project record. RERA record
Project survey numbersSurvey Nos. 25 and 26. The Form-B declaration further describes Survey No. 26/1, 26/2, 26/3, 26/4 and 26/5; those subdivisions are part of the promoter’s declaration and are not separately identified in the registration certificate.
Site areaRERA land record: 5,935 sq. m total and net area; affected area recorded as 0 sq. m. The HMDA plan also states net plot area 5935.00 SQ.MT. Land records RERA filing
Boundaries (RERA-filed)East: KALUVA; West: 20 WIDE ROAD; North: NEIGHBOURS PROPERTY; South: WATER PIPE LINE ROAD. RERA filing Land records
Additional plan figureThe 2015 HMDA plan also states AREA OF PLOT (Minimum) (A) 6874.25 SQ.MT.

Development identity

ItemRecord
Sanctioning / technical authorityHyderabad Metropolitan Development Authority (HMDA). The technical approval directs that building plans be sanctioned by the Executive Authority in conformity with HMDA’s technically approved plans. Approvals record
Principal approval number / date002307/SKP/R1/U6/HMDA/25072017; HMDA technical approval dated 15 December, 2018. The filed plan is dated 15-12-2015 and carries the same file number. Approvals record
Approved built-up areaHMDA technical approval states Total Built up Area 14711.99 and Total Built up Area (In Sq.mts) 14711.99.
Buildings shownTwo residential blocks—Block A and Block B—each Stilt + 5 upper floors, and an amenities/clubhouse block Stilt + 3 upper floors.
Approved / plan unit countsThe filed plan lists 40 dwelling units in Block A, 50 in Block B and 03 in the amenities block. The RERA unit record identifies 90 homes plus 3 amenities/common-area entries, for 93 total building units; the 3 amenities entries are not homes for sale. RERA unit table RERA unit table
ParkingPlan states required parking area 2531.83 Sq.mt. and proposed parking area 2790.94 Sq.mt.; the supplied extracts do not establish parking-space counts or unit allocations.

Offering and status

ItemRecord
RERA-filed homes40 2BHK and 50 3BHK apartments. RERA unit table RERA unit details
RERA-filed saleable area2BHK: 112.82 sq. m; 3BHK: 148.41 sq. m. RERA unit table RERA unit details
Booked / availableRERA portal-derived figures show 0 booked / 40 available 2BHK and 0 booked / 50 available 3BHK. The portal extract has no as-of date; counts are indicative, not a current inventory confirmation. RERA unit table RERA unit details
Construction stageThe supplied evidence does not establish current physical construction progress. RERA’s registration certificate records a completion undertaking ending 15/12/2024; this is a deadline, not evidence that construction was completed.
Completion datesThe promoter’s Form-B declaration undertakes completion by 15th December 2024. No revised completion date is supplied.
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project documents. The HMDA approval states that an occupancy certificate is compulsory before occupation. Document index

2. The project story

SUNSHINE S ECOPOLIS is recorded with TG-RERA as a residential apartment project promoted by SUNSHINE INFRA PRIVATE LIMITED, on land identified in the registration as Survey Nos. 25 and 26, in Gandipet, Ranga Reddy District. The HMDA plan and technical approval describe the site as Kokapet Village, Gandipet Mandal. The record supplies a site area of 5,935 sq. m and shows two residential blocks alongside a separate amenities/clubhouse block. RERA record Land records

The RERA filing lists 90 homes—40 2BHK and 50 3BHK—and three amenities entries that are not homes for sale. The HMDA plan describes the residential blocks as Stilt + 5 upper floors and the amenities block as Stilt + 3 upper floors. The project’s current construction stage and delivery status are not established by the supplied evidence. The promoter declared a completion date of 15 December 2024; no occupancy or completion certificate is supplied. RERA unit table RERA unit details Document index

3. Master plan, architecture & building design

The HMDA plan depicts two residential blocks, A and B, and a separate amenities/clubhouse building. Both residential blocks are shown as Stilt + 5 upper floors; the amenities block is Stilt + 3 upper floors. The technical approval gives a total approved built-up area of 14711.99 sq. m. The plan separately records Residential Net BUA 11508.30, Proposed Coverage Area (40.56%) 2407.15, and Vacant Plot Area 3518.86; these are distinct plan figures and should not be treated as interchangeable area measures.

The plan records NET AREA OF PLOT (A-Deductions) 5935.00 SQ.MT. and also states AREA OF PLOT (Minimum) (A) 6874.25 SQ.MT. The supplied extracts do not provide a verified floor-by-floor schedule, flats per floor, lift or stair details, building footprints by block, or a complete site-circulation plan.

The HMDA technical approval lists 10.00% of Built Up Area to an extent of 1172.4 Sq.mtrs as mortgaged in the first floor of Block A, Block B and the amenities block. The plan extract separately states MORTGAGE AREA 1170.15 SQ.MTS.

4. Homes, configurations & floor plans

The RERA-filed unit schedule identifies 40 2BHK homes and 50 3BHK homes. Saleable area below is the area stated in the RERA record; it is not a carpet-area measurement. The available drawing extract reports two drawing sheets with no flats measured, so no software-measured carpet area or room dimensions can be reported. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK40040112.82 sq. mNot measured in supplied drawing recordNot supplied
3BHK50050148.41 sq. mNot measured in supplied drawing recordNot supplied

The separate RERA unit schedule also includes 3 AMENITIES entries, each recorded at 99.73 sq. m saleable area; they are common-area/amenity entries, not apartments offered for sale. The portal extract does not provide an as-of date for booking and availability figures. RERA unit table RERA unit table

5. Parking & vehicle circulation

The HMDA plan states Required Parking total area 2531.83 Sq.mt. and Total proposed parking area 2790.94 Sq.mt. It does not provide a verified count of car or two-wheeler spaces, parking level-by-level layout, visitor or accessible-space provision, EV charging details, or unit-wise parking allocation. A parking area figure alone does not establish exclusive parking rights for a particular apartment.

The technical approval states that no parking or construction is to be made in setback areas. The supplied extracts do not establish the project’s ramp arrangement, vehicle entries and exits, internal driveway design, or pedestrian separation.

6. Amenities, recreation & open spaces

The project record and HMDA documents identify some proposed amenities and infrastructure. The amenity-progress register gives 0% for each listed item; these percentages are recorded progress figures, not independent site verification. RERA amenities

Clubhouse / amenities block
Description / sizeShown as Stilt + 3 upper floors; no clubhouse area or facility schedule supplied.
Declared progress / verified statusRERA amenity-progress register: Community Buildings 0%; completion not independently verified. RERA amenities
Tot-lot
Description / sizeIdentified in the HMDA technical approval; no size or equipment details supplied.
Declared progress / verified statusNot separately reported as complete; progress not established.
Green strip / tot lot / park
Description / sizeListed as available “YES” in the RERA infrastructure record; no area or layout detail supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% in the progress register; not independently verified.
Recreational open space
Description / sizeProgress register lists aggregate area of recreational open space, but supplies no area figure.
Evidence sourceRERA amenities
Declared progress / verified status0%; completion not independently verified.

7. Utilities, building services & safety

The HMDA technical approval lists four water tanks—23,000 Ltrs, 21,500 Ltrs, 24,000 Ltrs and 25,750 Ltrs—and a clubhouse water tank of 11,600Ltrs. It also identifies a 3.00x6.00x2.00M SUMP, septic tank, transformer space, garbage house and rain-water-harvesting structures. The supplied material does not establish current installation or operating status.

The RERA infrastructure register lists water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, sewage and sullage treatment/disposal, waste management, rain-water harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. These entries are not evidence of completed or commissioned services; the register shows 0% progress for the listed infrastructure items. RERA amenities

The HMDA technical approval requires rain-water-harvesting structures, transformer space, a garbage house and compliance with the National Building Code, 2005. It also states that an occupancy certificate is compulsory before occupation. No supplied record establishes completed fire systems, lift number or capacity, backup-power provision, CCTV/security arrangements, accessibility features, or service commissioning.

8. Location, access & connectivity

The RERA project record identifies GANDIPET, Ranga Reddy District, PIN 500075, and the project site as Survey Nos. 25 and 26. The HMDA plan and technical approval describe the site as Kokapet Village, Gandipet Mandal. The site boundaries recorded in the RERA filing include a 20 WIDE ROAD to the west and WATER PIPE LINE ROAD to the south. RERA record RERA filing

The HMDA plan records an abutting road width of 30.00. A supplied location record gives Financial District (Nanakramguda) as 1.2 km from a cadastral parcel centroid; this is a measured location-record distance, not a travel-time estimate. Location record

9. Developer & development status

The registered promoter is SUNSHINE INFRA PRIVATE LIMITED, a company. The supplied corporate record identifies the company by CIN U45309TG2016PTC110193. The project record lists the promoter’s address as SAI RAM NILAYAM, AYYAPPA SOCIETY, KOKAPET, GANDIPET, Ranga Reddy, 500075. Corporate record Parties record

The promoter’s Form-B declaration, signed by Managing Director V. Konda Reddy on 19th day of February 2019, describes the project as proposed and undertakes completion by 15th December 2024. No current site-progress assessment or revised completion date is supplied; the declared deadline should not be read as confirmation of completion.

10. Approvals, official records & documents

TG-RERA registration certificate
Evidence availableFORM “C”, registration P02400000518, issued 22/03/2019, with recorded validity to 15/12/2024.
Scope / noteSUNSHINE S ECOPOLIS; certificate states validity may be extended by the Authority under the Act and Rules.
HMDA technical approval
Evidence availableApproval 002307/SKP/R1/U6/HMDA/25072017, dated 15 December, 2018.
Scope / noteTechnical approval for development on Survey Nos. 25 and 26; directs building-plan sanction by the Executive Authority in conformity with the HMDA-approved plans.
HMDA building-plan sheets
Evidence availableFour-sheet plan dated 15-12-2015.
Scope / noteShows Blocks A and B and the clubhouse/amenities block.
Promoter Form-B declaration
Evidence availableDated 19th day of February 2019.
Scope / notePromoter declaration including title, encumbrance and completion statements.
Title report
Evidence availableLegal opinion dated 31/01/2019.
Scope / noteTitle material for the project; full chain and related title issues are addressed in the Land & Title section.
Allotment-letter form
Evidence availableAllotment letter dated 23-01-2019 with apartment particulars, allottee identity, price, payment amounts and RERA number unfilled.
Scope / noteSupplied form is incomplete; it does not evidence an individual allotment.
Sale-agreement form
Evidence availablePartially completed draft agreement for sale.
Scope / notePurchaser and unit details are blank; the document itself does not establish a completed sale.
Other approval-related upload
Evidence availableOCR of a municipal document is insufficient to establish its approval type or terms.
Scope / noteNot treated here as proof of a commencement certificate or other specific approval.
Occupancy / completion certificate
Evidence availableNone identified in the supplied project documents. Document index
Scope / noteThe HMDA technical approval states that an occupancy certificate is compulsory before occupation.

Frequently asked questions

Is SUNSHINE S ECOPOLIS registered with Telangana RERA?

Yes. SUNSHINE S ECOPOLIS is registered with the Telangana Real Estate Regulatory Authority as P02400000518; the registration status is New Project.

Who is the developer of SUNSHINE S ECOPOLIS?

The promoter named in the RERA registration is SUNSHINE INFRA PRIVATE LIMITED.

Where is SUNSHINE S ECOPOLIS located?

SUNSHINE S ECOPOLIS is in GANDIPET, Rangareddy, Telangana (500075).

When will SUNSHINE S ECOPOLIS be completed?

The promoter's proposed date of completion filed with RERA is 15/12/2024. This is the promoter's declaration, not a guarantee.