SUKRITHI SUBHAGA PHASE - 5 is a residential plotted development at Veltur, SADASIVPET mandal, Sangareddy district, developed by JOSHITA INFRA HOUSING LLP. The draft-layout record describes 50 plots on Ac. 3-24 Gts; 17424.00 Sq. Yds; no building or floor configuration is stated. The project is registered under TG-RERA registration P01100007959, and the promoter’s Form B undertaking gives 30.12.2025 as the completion deadline.

More from Joshita Infra Housing LLP · 4 projects →

01What we found

Period endedTG-RERA registration ran to 30 Dec 2025 - check its extension on TG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameSUKRITHI SUBHAGA PHASE - 5 RERA record
Project typePlotted development / residential layout RERA record RERA filing
Phase / registered portionPhase 5; the registration record identifies this phase. RERA record
TG-RERA registrationP01100007959 RERA record Approvals record
Registration validityCertificate states validity commencing 23/03/2024 and ending 30/12/2025, unless extended by the Authority. This is the registration-validity period, not a statement of current construction or occupancy status. Approvals record
Registered promoterJOSHITA INFRA HOUSING LLP RERA record Corporate record
RERA statusThe registration certificate records the project as registered. The supplied evidence does not include an extension order or a later status update. Approvals record

Land and geographic identity

FieldProject record
Revenue villageVELTUR RERA record RERA filing
LocalityVeltur / Veltur Gram Panchayat RERA record
MandalSADASIVPET (also rendered “Sadashivpet” in a filed layout-plan extraction) RERA record
DistrictSangareddy RERA record
PIN502306 RERA record RERA filing
Project survey numbers and subdivisions404/P and 405/P RERA record Land records
Registered site extentAc. 3-24 Gts; 17424.00 Sq. Yds in the draft-layout approval record. The RERA land record lists 17424.00 sqmts as total and net area. RERA filing Land records
Layout land-use split in filed draft planOpen space (park): Ac. 0-14.4 Gts; 1742.40 Sq. Yds; 10.00%. Roads: Ac. 0-35.36 Gts; 4278.56 Sq. Yds; 24.56%. Plotted area: Ac. 2-14.24 Gts; 11403.04 Sq. Yds; 65.44%.
Boundaries recorded in RERA land detailsEast: EXISTING 40 WIDE ROAD; West: SURVEY NO 405P; North: EXISTING LAYOUT; South: EXISTING LAYOUT. Land records

Development identity

FieldProject record
Sanctioning authority / recordDraft Technical Layout Pattern approval by the Regional Deputy Director of Town and Country Planning (DT&CP), delegated to Veltur Gram Panchayat; the filed documents also include a Panchayat Secretary document headed “TLP NO. 113/2023/HRO/H1”. Approvals record
Principal approval identifier and dateDraft - TLP. No. 113/2023/HRO/H1, dated 30.12.2023; file Lr.Roc.No.1085/2023/HRO/H1; application E. Panchayath No. 16487/83. Approvals record
Approved development formResidential plotted layout comprising 50 plots in the draft-layout record.
Approved built-up areaNot disclosed in the supplied layout records; the RERA field gives 17424.00 sqmts as “Approved Built up Area,” but the project is a plotted layout and the record supplied does not explain that field’s meaning. RERA filing
Building / floor configurationNo residential building count, floor configuration or parking levels are established in the supplied project records. The draft conditions refer to detached dwelling houses on individual sites; they do not provide building plans for those future homes.

Offering and status

FieldProject record
Unit type and countPlots; 50 in the draft-layout record. Plot-by-plot dimensions and a RERA inventory schedule are not included in the supplied evidence.
RERA-filed saleable plot-size rangeNot available in the supplied RERA unit data.
Construction / development stageRERA registration records 80% completeness in the shared project header; the supplied material does not state what work this percentage measures or independently verify site progress. RERA record
Promoter-declared completion deadline30.12.2025, in the Form B declaration.
Registration validity23/03/2024–30/12/2025, as stated on the registration certificate; this is separate from the promoter’s completion undertaking.
Original or revised completion datesThe supplied evidence contains the Form B completion undertaking and the certificate validity end date, but no revised completion date or extension order.
Occupancy / completion certificateNo project completion certificate or occupancy certificate is identified in the supplied project evidence. For this plotted development, the supplied material does not establish the completion-certification status of any individual plot or future dwelling. Document index

2. The project story

SUKRITHI SUBHAGA PHASE - 5 is registered as a residential plotted development at Veltur village, Sadasivpet mandal, Sangareddy district, on land identified in the RERA record as Survey Nos. 404/P and 405/P. The draft-layout documents describe a 50-plot scheme over Ac. 3-24 Gts; 17424.00 Sq. Yds, divided on the plan into plotted area, roads and a park/open space. RERA record Land records

The filing describes layout infrastructure and individual residential sites, not a completed apartment or villa building. A layout condition says that only detached dwelling houses designed for one family are to be built on a site, with future development subject to competent-authority approval. The supplied documents do not establish that any homes have been constructed.

The RERA header records 80% completeness, but the evidence supplied does not specify the underlying work items, measurement basis or a site-inspection source; it should therefore be read as a recorded progress figure, not independent confirmation of completed development. The promoter’s Form B undertaking gives 30.12.2025 as the completion deadline. No occupancy/completion certificate or extension order is included in the supplied records. RERA record Document index

3. Master plan, architecture & building design

The filed draft Technical Layout Pattern is for 50 residential plots across Survey Nos. 404/P and 405/P. Its recorded land-use allocation is 65.44% plotted area (Ac. 2-14.24 Gts; 11403.04 Sq. Yds), 24.56% roads (Ac. 0-35.36 Gts; 4278.56 Sq. Yds) and 10.00% open space for park (Ac. 0-14.4 Gts; 1742.40 Sq. Yds). A separate entry identifies Plot Nos. 41 to 49, measuring 1716.67 Sq. Yards, as mortgage land in favour of Veltur Gram Panchayat.

The drawing extractions list road widths including 9'0" WIDE, 33' ROAD, 40' - 0" WIDE ROAD, 50' ROAD, 56'-6" WIDE ROAD, 60'-9", and 66'-6" WIDE ROAD. The filed layout materials also refer to stream realignment and channelisation under an irrigation NOC before development works.

These are layout-level records, not architectural plans for future homes. No home footprints, building elevations, floor configurations, floor-area calculations, room layouts or building-services drawings are available here. The RERA field reports 17424.00 sqmts under “Approved Built up Area”; the supplied documents do not clarify its relationship to the layout’s site-area figures, so it is not treated as a verified building-area measurement. RERA filing Document index

4. Homes, configurations & floor plans

The RERA-filed development is a plotted layout. The draft-layout approval records 50 plots, but the supplied evidence does not provide RERA-filed plot-by-plot dimensions, a saleable-size range, booking/availability counts or plot-specific area schedules.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots50 (draft-layout record)Not suppliedNot suppliedNot suppliedNot applicable; no dwelling floor-plan measurements suppliedNot supplied

The floor-plan review record says 2 drawings are present, with 0 measured, 2 scans pending, and no layout sheets. No software-measured carpet or room dimensions can therefore be reported. A third-party listing describes plot-size figures, but those are not used here as RERA-filed measurements. Floor plans Promoter website

5. Parking & vehicle circulation

The supplied project records do not establish parking-space counts, dedicated visitor or accessible parking, parking levels, vehicle ramps, EV charging, or plot-specific parking allocations. The layout drawings identify roads and road widths; that does not establish an individual purchaser’s parking entitlement. Document index

The draft-layout documents identify Plot Nos. 41 to 49, extent 1716.67 Sq. Yards, as mortgage land in favour of Veltur Gram Panchayat. This is a reserved/mortgage area, not a parking provision.

6. Amenities, recreation & open spaces

The filed layout approval sets aside Ac. 0-14.4 Gts; 1742.40 Sq. Yds (10.00%) as open space for a park. The RERA amenity record marks several layout facilities “YES,” but records 0% progress for each listed item; this is not evidence that those facilities are complete. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / open spaceAc. 0-14.4 Gts; 1742.40 Sq. Yds (10.00%) of layout areaProvided for in the draft-layout allocation; completion not verified.
Internal roads and footpathsLayout roads; filed land-use allocation 24.56%, Ac. 0-35.36 Gts; 4278.56 Sq. YdsRERA amenitiesRERA amenity field marked “YES”; progress recorded as 0%.
Green strip / parkPark/open space allocation; no separate size for a green strip suppliedRERA amenitiesRERA amenity field marked “YES”; progress recorded as 0%.
Street lightingListed as a layout facilityRERA amenitiesRERA amenity field marked “YES”; progress recorded as 0%.
Water conservation / rainwater harvestingRainwater-harvesting pits are included in the filed layout development worksRERA amenitiesRERA amenity field marked “YES”; progress recorded as 0%.
Community buildingsNo description or size suppliedRERA amenitiesProgress recorded as 0%; availability not stated.

No clubhouse or indoor recreation facilities are evidenced in the supplied RERA project records. Marketing-site amenity claims are not treated as filed or delivered facilities. Promoter website Document index

7. Utilities, building services & safety

The draft-layout approval lists infrastructure works including road formation and drains, nala channelisation for storm-water runoff, rainwater-harvesting pits, greenery and avenue planting, fencing of open spaces, street lighting, electricity facilities, sewerage disposal and protected water supply. These are approval-recorded development requirements; the supplied evidence does not confirm their completion, capacities, or operating status.

ServiceWhat the supplied project record says
Water supply“Protected water supply system” is included in the draft-layout works; no source, storage or treatment capacity is supplied.
Sewerage and drainageSewerage disposal, drains and storm-water/nala channelisation are listed; no treatment-plant capacity or reuse details are supplied.
ElectricalStreet lighting and electricity facilities are listed; no substation, backup-power or EV-charging specifications are supplied.
Fire and life safetyThe amenity record includes a fire-protection field, but provides no project-specific system description or completion status. RERA amenities
Waste managementThe RERA amenity record lists solid-waste management and disposal, with progress recorded as 0%; no system details are supplied. RERA amenities
Accessibility and securityNo project-specific accessibility, CCTV, access-control or security-system details are supplied. Document index

8. Location, access & connectivity

The registered location is Veltur, Sadasivpet mandal, Sangareddy district, PIN 502306. The RERA land record describes the eastern boundary as an EXISTING 40 WIDE ROAD, with an existing layout to the north and south and Survey No. 405P to the west. RERA record Land records

The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 29.4 km. The project coordinate is identified as the cadastral parcel centroid at 17.63347, 78.00440; this is a location reference, not a surveyed entrance point. No other verified public-transport, landmark or travel-time details are supplied. Location record Cadastral map

9. Developer & development status

The registered promoter is JOSHITA INFRA HOUSING LLP, a limited liability partnership. The supplied corporate record names partners SRI VENKATESWARA RAO PAPPULA, SATYA VANI SADHANALA and SRI RAMA KRISHNA PRASAD SADHANALA, and identifies VENKATA KIRAN KUMAR KANCHIPALLI as authorized signatory. Corporate record Parties record

The RERA registration certificate records the promoter as Joshita Infra Housing Llp and the project as SUKRITHI SUBHAGA PHASE - 5. The Form B declaration, dated 25.01.2024, is the promoter’s undertaking to complete by 30.12.2025; it is not a certificate of completion. The shared RERA header records 80% completeness, but no supporting site-verification record is supplied. RERA record

The registration certificate gives a promoter address in Journalist Colony, Shaikpet, Hyderabad; the project profile lists an address in Veltur, Sadasivpet, Sangareddy. No official website or contact details are supplied. Parties record Document index

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C certificate for SUKRITHI SUBHAGA PHASE - 5, registration P01100007959, promoter Joshita Infra Housing Llp; certificate records validity 23/03/2024 to 30/12/2025.
Draft layout approvalDraft Technical Layout Pattern 113/2023/HRO/H1, dated 30.12.2023, file Lr.Roc.No.1085/2023/HRO/H1, application E. Panchayath No. 16487/83; records the 50-plot layout and land-use allocation.
Panchayat Secretary documentDocument headed TLP NO. 113/2023/HRO/H1, dated 30.12.2023; the supplied extraction does not include land details or the document’s full terms.
Layout plan / approval uploadFiled as a draft technical layout pattern for residential plots in Survey Nos. 404/P and 405/P at Veltur.
Promoter Form B declarationDated 25.01.2024; records the promoter’s title and encumbrance declarations and 30.12.2025 completion undertaking.
Allotment / agreement templatesA partially completed plot allotment-letter record and a partially filled agreement-for-sale template are identified in the project documents; neither supplies a purchaser-specific executed sale agreement or conveyance in the material provided.

The supplied records do not include a project completion/occupancy certificate, an extension order, or an independently verified completion report.

Frequently asked questions

Is SUKRITHI SUBHAGA PHASE - 5 registered with Telangana RERA?

Yes. SUKRITHI SUBHAGA PHASE - 5 is registered with the Telangana Real Estate Regulatory Authority as P01100007959; the registration status is New Project.

Who is the developer of SUKRITHI SUBHAGA PHASE - 5?

The promoter named in the RERA registration is JOSHITA INFRA HOUSING LLP.

Where is SUKRITHI SUBHAGA PHASE - 5 located?

SUKRITHI SUBHAGA PHASE - 5 is in VELTUR, SADASIVPET, Sangareddy, Telangana (502306).

When will SUKRITHI SUBHAGA PHASE - 5 be completed?

The promoter's proposed date of completion filed with RERA is 30/12/2025. This is the promoter's declaration, not a guarantee.