STHIRA is a residential apartment project in Shamirpet, Shamirpet Mandal, Medchal-Malkajgiri District, developed by the registered promoter TERAMOR DEVELOPERS PRIVATE LIMITED. The project site is 17,441.92 sq. m and comprises seven residential blocks, A–G, each recorded as 1 Stilt + 5, and one amenity block recorded as 1 Ground + 2. It has 320 homes: 193 2BHK and 127 3BHK. Its TG-RERA registration is P02200005136, and its proposed completion date is 09/05/2027.

01What we found

RegisteredTG-RERA - valid till 9 Jan 2027
171documents on file - each fact links to its page
3court cases on this project's land (survey 1060, 1077, Shamirpet)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameSTHIRA
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied registration record; the registered project is STHIRA.
TG-RERA registrationP02200005136
Registration validity09/01/2021 to 09/01/2027; the certificate records a six-year period and no extension. This is registration validity, not the construction completion deadline.
Registered promoterTERAMOR DEVELOPERS PRIVATE LIMITED Corporate record
RERA statusRecorded as an ongoing project. RERA record

Land and geographic identity

FieldProject record
Locality / revenue villageShamirpet / Shamirpet RERA record RERA filing
MandalShamirpet RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500101
Project survey numbers as filed1050/P, 1060/P, 1076 and 1077
Registered site extent17,441.92 sq. m is stated for the project site in the HMDA intimation; the RERA land record separately gives total area 20,331.82 sq. m, area affected by road widening/FTL/nala widening 2,889.9 sq. m, and net area 17,441.92 sq. m. Land records
BoundariesNorth, south, east and west: “OTHERS LAND” in the RERA filing. Land records

Development identity

FieldProject record
Sanctioning authority shown in project recordHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal approval referenceHMDA application 040475/MED/R1/U6/HMDA/11112020, application dated 11/11/2020. The supplied document is an intimation for payment of charges and fulfilment of conditions for further processing; it expressly says it is not approval of the proposal or permission for development. Approvals record
Buildings listed in that intimationSeven residential blocks, A–G, each recorded as 1 Stilt + 5; one amenity block recorded as 1 Ground + 2.
Approved built-up areaNot established by the supplied approval evidence. The intimation lists several charge-calculation areas, including 36,583.75 sq. m for built-up area, but is not itself an approval.
RERA building / block count8 total: 7 home blocks and 1 amenity block. RERA unit table
Parking levels and approved parking countNot disclosed in the supplied material.
UnitsRERA unit table records 320 residential units: 193 2BHK and 127 3BHK; it also lists 3 club-house entries, which are not homes for sale. RERA unit table RERA unit table

Offering and status

FieldProject record
Home configurations2BHK and 3BHK. RERA unit table
RERA-filed saleable area2BHK: 105.08–116.13 sq. m; 3BHK: 152.32 sq. m. RERA unit table
Booked / available countsRERA portal extract shows 0 booked and 193 available 2BHKs, and 0 booked and 127 available 3BHKs. These counts have no supplied as-of date and should be treated as indicative. RERA unit table
Construction stageRERA amenities/infrastructure progress entries show, among other entries, internal roads/footpaths at 15%, water supply at 10%, community buildings at 3%, and several other listed items at 0%. These are filed progress figures, not independent site verification. RERA amenities
Original / revised completion datesThe project record gives 09/01/2027 as the completion date at registration and 09/05/2027 as the proposed and revised completion date. RERA filing RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The project is recorded as ongoing; the scope of any future phased or tower-wise certificate is not established in the supplied evidence. RERA record Document index

2. The project story

STHIRA is registered as a residential apartment development in Shamirpet village, Shamirpet Mandal, Medchal-Malkajgiri District, on land identified in the project record as Survey Nos. 1050/P, 1060/P, 1076 and 1077. Its RERA record describes eight blocks: seven residential blocks and one amenity block. The HMDA document lists Blocks A–G as stilt-plus-five and the amenity block as ground-plus-two, but that document is a processing intimation rather than a development permission. RERA record Land records RERA unit table

The RERA filing records 320 homes across 2BHK and 3BHK configurations. Its portal extract reports all 320 as available and none booked, but provides no date for those inventory counts. The project is recorded as ongoing. Filed progress percentages indicate partial progress for some infrastructure items; they do not independently establish the physical condition of the site or any completed building. No occupancy or completion certificate is included in the supplied documents. RERA unit table RERA unit table RERA amenities Document index

3. Master plan, architecture & building design

The project filing identifies seven residential blocks, A–G, and one amenity block. The HMDA intimation describes each residential block as 1 Stilt + 5 and the amenity block as 1 Ground + 2. The supplied extract does not establish building footprints, flats per floor, tower heights, lift or stair arrangements, internal circulation, open-space layout, or phase-by-phase organization. RERA unit table

The project land record gives a total area of 20,331.82 sq. m, an affected area of 2,889.9 sq. m for road widening/FTL/nala widening, and a net area of 17,441.92 sq. m. The HMDA intimation also uses 17,441.92 sq. m as the site area. These are filed figures; the supplied intimation does not establish an approved site plan. Land records

The HMDA intimation lists charge-calculation amounts for several area bases, including built-up area of 36,583.75 sq. m, processing-charge built-up area of 37,889.66 sq. m, capitalization area of 20,860.53 sq. m, and amenity-building built-up area of 1,305.95 sq. m. These figures are not presented here as approved built-up area because the document says it is not approval or permission for development.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1930193105.08–116.13 sq. mNot measured in supplied drawingsNot supplied
3BHK1270127152.32 sq. mNot measured in supplied drawingsNot supplied

Counts and saleable areas are from the TG-RERA unit record; the booking/availability extract has no as-of date. RERA unit table RERA unit details

The floor-plan review record states that carpet area is to be software-measured from drawing geometry and is not a RERA disclosure. Of five drawings, zero were measured, one scan is pending and four contain no flats. Accordingly, no drawing-based carpet areas or room dimensions can be reported. RERA saleable area is reported separately and should not be treated as measured carpet area. Floor plans

5. Parking & vehicle circulation

The supplied material does not establish a sanctioned parking-space count, parking allocation by unit, visitor or accessible parking, parking levels, ramps, driveways, pedestrian separation, or EV charging provision. The HMDA intimation lists stilt floors for the seven residential blocks but does not provide a parking schedule or confirm the use or capacity of those areas. Document index

6. Amenities, recreation & open spaces

The RERA amenity schedule marks facilities as available/proposed and includes progress percentages. The percentage is a filed progress entry, not independent verification of completion. No facility capacities or dimensions are supplied.

Clubhouse / indoor
FacilityCommunity buildings
Description / sizeNo size or capacity supplied
Evidence sourceRERA amenities
Declared progress / verified status3% in one entry; not independently verified
Clubhouse / indoor
FacilityIndoor Gym, Meditation Hall, Multi Purpose Hall, Guest Rooms, Library, Indoor Games, Visitors Lounge, Provisional Store
Description / sizeNo sizes or capacities supplied; these are promoter-listed amenities
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor listing; delivery not established
Sports / recreation
FacilitySwimming Pool, Walking Track, Children’s Play Area, Senior Citizen Space, Car Wash Area
Description / sizeNo sizes or capacities supplied; these are promoter-listed amenities
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor listing; delivery not established
Landscape / open space
FacilityGreen Strip/TOT LOT/Park; aggregate recreational open space
Description / sizeNo area or dimensions supplied
Evidence sourceRERA amenities
Declared progress / verified statusListed in the RERA schedule; progress recorded as 0%
Convenience / community
Facility24/7 Security, CCTV Surveillance, Generator Backup
Description / sizeNo system specifications or capacities supplied; these are promoter-listed amenities
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor listing; delivery not established

7. Utilities, building services & safety

The RERA schedule lists water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection and safety, and electrical meter/substation/receiving facilities. The supplied progress entries include water supply at 10% and several of the other listed services at 0%. These are filed status figures, not independent verification. RERA amenities

The HMDA intimation specifies provision of an STP and septic tank, compliance with fire-service norms, and worker-safety and insurance conditions. Because the document is a processing intimation and expressly not development permission, it should not be read as proof that these services have been installed, approved or completed. No water-source or storage capacity, STP capacity, power-backup capacity, lift details, fire-system specifications, accessibility provisions or waste-management capacity are supplied.

8. Location, access & connectivity

The registered project location is Shamirpet, Shamirpet Mandal, Medchal-Malkajgiri District, PIN 500101. The supplied location record gives a cadastral parcel centroid at 17.61436402238666, 78.59328637219686 and an approximate 9.0 km distance to the nearest sampled Outer Ring Road interchange. The distance is a sampled location measure, not a travel-time claim. RERA record Location record

No registered approach-road description, public-transport information or verified distances to other landmarks are supplied. Location record

9. Developer & development status

The registered legal promoter is TERAMOR DEVELOPERS PRIVATE LIMITED, a private limited company; the supplied company identifier is CIN: U68200TS2024PTC186929, and the GSTIN is 36AALCT0961H1Z5. Corporate record Parties record

The RERA registration certificate lists the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500015.” The supplied project record also provides the promoter’s website, teramor.in/sthira. No additional verified contact details are supplied. Parties record

The promoter’s Form B declaration states a completion undertaking of 9 January 2027. The RERA project record gives a revised proposed completion date of 09/05/2027. No independent construction inspection report or occupancy/completion certificate is supplied. RERA filing Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Reference / dateP02200005136; valid 09/01/2021–09/01/2027; certificate issued 03/06/2025
What the supplied evidence establishesRegistration of STHIRA promoted by Teramor Developers Private Limited, subject to the certificate’s listed conditions.
HMDA planning intimation
Reference / dateApplication 040475/MED/R1/U6/HMDA/11112020, dated 11/11/2020
What the supplied evidence establishesAn intimation concerning charges and conditions for further processing, covering 17,441.92 sq. m and listing Blocks A–G and an amenity block. It expressly states that it is not approval of the proposal or permission for development.
Form B declaration
Reference / dateTeramor Developers Private Limited; dated 1/11/2024
What the supplied evidence establishesPromoter declaration concerning title, encumbrances, project accounts, approvals and a 9 January 2027 completion undertaking.
Floor-plan evidence
Reference / dateFive drawings in the supplied review record
What the supplied evidence establishesNo drawings were software-measured; one scan is pending and four contain no flats. Floor plans
Completion / occupancy record
Reference / dateNot supplied
What the supplied evidence establishesNo completion certificate or occupancy certificate is established by the supplied material. Document index

Frequently asked questions

Is STHIRA registered with Telangana RERA?

Yes. STHIRA is registered with the Telangana Real Estate Regulatory Authority as P02200005136; the registration status is On-Going Project.

Who is the developer of STHIRA?

The promoter named in the RERA registration is TERAMOR DEVELOPERS PRIVATE LIMITED.

Where is STHIRA located?

STHIRA is in SHAMIRPET, Medchal-Malkajgiri, Telangana (500101).

When will STHIRA be completed?

The promoter's proposed date of completion filed with RERA is 09/05/2027. This is the promoter's declaration, not a guarantee.