S-CUBE Lakeside Manor
ORUGANTI · Medchal-Malkajgiri · RERA P02200008179
S-CUBE Lakeside Manor is a residential project at Plot No. 5, Survey No. 102, in Shamirpet Village, Shamirpet Mandal, Medchal-Malkajgiri District. The registered promoter is Oruganti Sreenivasa Murthy. The RERA land record gives an extent of 17,939.54 sq. m and 74 proposed building units; the filed unit rows are labelled FF, GF, SF and TF, and a bedroom-based sale configuration is not disclosed. The project is registered under TG-RERA P02200008179, and the promoter’s Form B declares completion by 13 February 2030.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | S-CUBE Lakeside Manor RERA record |
| Project type | RERA record: Residential; the HMDA approval is for a draft gated-community layout with housing. RERA filing |
| Phase / registered portion | New project; the supplied record does not identify a separately named phase. Registration covers the project identified at Plot No. 5, Survey No. 102. RERA record |
| TG-RERA registration | P02200008179. RERA record |
| Registration validity | Certificate states 05/05/2024–13/02/2030; it also describes the period as “5 years.” No extension is recorded in the supplied certificate extract. Registration validity is separate from the completion undertaking below. |
| Registered promoter | Certificate: Oruganti Sreenivasa Murthy; Form B declarant: SREENIVASA MURTHY ORUGANTI. |
| RERA status | Project record labels this a New Project; registration certificate is Form C under section 5. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Registered site address | Plot No. 5, Shamirpet, Medchal-Malkajgiri District, Telangana, PIN 500078. RERA filing |
| Revenue village / mandal / district | Shamirpet Village, Shamirpet Mandal, Medchal-Malkajgiri District. Land records |
| Project survey number(s) | Survey No. 102; no subdivision is stated in the supplied project record. Land records |
| Extent | RERA land record: 17,939.54 sq. m. HMDA draft layout letter: total site area 19,937.13 sq. m, master-plan road-affected area 1,338.59 sq. m, and net site area 17,939.94 sq. m. Land records |
| Boundaries in RERA record | North: Plot No. 4; South: neighbours’ land; East: neighbours’ land; West: road. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA). Approvals record |
| Principal approval | Layout Permit 000012/LO/Plg/HMDA/2024, approved 13 February 2024; application reference 058291/MED/LT/U6/HMDA/06122022. Approvals record |
| Approved built-up area | The supplied project record lists 14,869.83 sq. m as approved built-up area. RERA filing |
| Buildings / homes | The RERA land details state 74 total building units and 74 proposed building units (as per agreement). The filed unit rows are labelled FF, GF, SF and TF and total 222 entries; these are recorded as floor labels, not as 222 separately identified homes. RERA filing RERA unit details RERA unit table |
| Sanctioned floor configuration | Not established by the supplied extracted approval information. The filed FF/GF/SF/TF labels do not by themselves establish a complete sanctioned floor configuration. RERA unit table |
| Parking levels / provision | No parking level or parking-space count is established in the supplied project record. Document index RERA amenities |
Offering and status
| Item | Record |
|---|---|
| RERA-filed unit rows | FF: 74 at 93.05 sq. m each; GF: 73 at 91.98 sq. m each; SF: 74 at 53.55 sq. m each; TF: 1 at 170.62 sq. m. The filing shows 0 booked and 222 available across these rows, without an as-of date in the supplied data. These rows are floor labels and should not be read as confirmed sale configurations. RERA unit table RERA unit details |
| RERA-filed configuration | A sale configuration such as bedroom count is not disclosed in the supplied TG-RERA unit table. RERA unit details |
| Drawing-measured configurations | Software measured 1BHK and 2BHK plan examples in supplied drawings; these are drawing-derived measurements, not TG-RERA-filed configurations or unit counts. Floor plans RERA unit details |
| Completion undertaking | Form B declares completion within six years from permission, stating 13 February 2030. This is a promoter declaration, not evidence of construction progress or completion. |
| Construction stage | Not established by the supplied evidence; no independently verified site-progress information is provided. Document index RERA amenities |
| Occupancy / completion certificate | No project occupancy or completion certificate is identified in the supplied documents. Document index |
2. The project story
S-CUBE Lakeside Manor is registered as a residential project on Survey No. 102 in Shamirpet, Medchal-Malkajgiri District. The filed HMDA record describes a draft gated-community layout with housing, while the RERA record identifies Plot No. 5 and 74 proposed building units. RERA record RERA filing
The project’s RERA filing does not establish a bedroom-based unit schedule. Its unit rows use FF, GF, SF and TF labels; the drawing-measurement data separately identifies 1BHK and 2BHK examples, but does not establish how many such homes are offered. The supplied records do not establish current construction progress, a completed portion, or an occupancy-certified phase or building. The promoter’s Form B completion date is an undertaking, not a verified delivery status. RERA unit table Floor plans Document index
3. Master plan, architecture & building design
HMDA’s supplied draft layout letter gives a total site area of 19,937.13 sq. m, including 1,338.59 sq. m affected by a master-plan road, and a net site area of 17,939.94 sq. m. Its area statement records 10,546.93 sq. m plotted area, 5,117.58 sq. m layout roads and 2,022.26 sq. m park/open-space area. It also records 253.3 sq. m as open space in a separate area-statement entry.
The draft approval identifies mortgage security over Plot Nos. 5–8 and plots 9–12, and conditions sale of plots other than mortgaged plots; these are approval conditions, not a description of unit-level ownership. The letter requires development to follow the approved draft gated-community layout. The supplied extracted drawings do not provide a verified building-by-building floor schedule, footprint, height, number of homes per floor, lifts, stairs, or phase arrangement.
The project record’s approved built-up area is 14,869.83 sq. m. No separate verified FSI-counted area, gross built-up area, or RERA-filed carpet area is supplied. RERA filing Floor plans
4. Homes, configurations & floor plans
The RERA unit table supplies area and availability against floor labels, not a bedroom-based configuration. Accordingly, those filed rows are shown below without treating floor labels as home types. The filing’s 0 booked / 222 available figures have no supplied as-of date. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| FF (filed floor label; configuration not filed) | 74 | 0 | 74 | 93.05 sq. m each | Not supplied for a matched RERA configuration | Not supplied |
| GF (filed floor label; configuration not filed) | 73 | 0 | 73 | 91.98 sq. m each | Not supplied for a matched RERA configuration | Not supplied |
| SF (filed floor label; configuration not filed) | 74 | 0 | 74 | 53.55 sq. m each | Not supplied for a matched RERA configuration | Not supplied |
| TF (filed floor label; configuration not filed) | 1 | 0 | 1 | 170.62 sq. m | Not supplied for a matched RERA configuration | Not supplied |
Separately, software measured drawing examples of 1BHK plans: carpet area 40.6–68.7 sq. m, median 58.0 sq. m; and 2BHK plans: carpet area 63.8 sq. m. The measurements are software-derived from the supplied drawing geometry, require drawing review, and do not match a RERA-filed configuration in the supplied data. Floor plans RERA unit details
Carpet area is a drawing-measured internal-area figure here; the RERA figures above are labelled saleable area. The supplied note states that saleable area also includes a home’s share of common areas, so the two measures are not interchangeable. A utility area is identified on one measured 1BHK plan and excluded from that plan’s carpet-area measurement. No loading figure is supplied. Floor plans RERA unit details
5. Parking & vehicle circulation
The supplied evidence does not establish a sanctioned parking count, resident or visitor allocation, accessible spaces, parking levels, ramps, EV charging, or a legally documented parking allocation for individual homes. The HMDA layout letter refers to internal layout roads but does not provide a parking schedule. A promoter/vendor listing mentions covered car parking, but this is not evidence of sanctioned provision or a buyer’s exclusive allocation. Promoter website
6. Amenities, recreation & open spaces
The HMDA draft layout letter includes conditions and proposed layout facilities; the RERA amenities table records listed facilities with progress values of 0. Neither source establishes that the facilities are completed or independently verified. RERA amenities
| Description / size | Community buildings listed; no size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA table marks available “YES”; progress is 0. Completion not independently verified. |
| Description / size | HMDA area statement: park 2,022.26 sq. m; open space 253.3 sq. m in a separate entry. |
|---|---|
| Declared progress / verified status | Approved/draft-layout area figures; delivery not independently verified. |
| Description / size | Listed in the RERA amenities table. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Marked available “YES”; progress is 0. Completion not independently verified. |
| Description / size | Identified among HMDA layout facilities. |
|---|---|
| Declared progress / verified status | Required/proposed; completion not independently verified. |
| Description / size | Vendor listing mentions children’s play areas, sand pits, yoga areas, jogging/cycling tracks, indoor games, swimming pool and gym. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Vendor-listed; not established as RERA-declared, sanctioned or delivered in the supplied evidence. |
7. Utilities, building services & safety
HMDA’s draft layout letter identifies an STP, common septic tank, hydro-pneumatic system, transformer/transformer yard, sump/OHT, rainwater-harvesting pits, bio-compost unit and street lighting among the layout facilities or conditions. It specifies 4 rainwater-harvesting pits per acre, requires an STP and sufficient harvesting pits, and calls for LED street lighting. These are approval-record requirements or proposed facilities; the supplied evidence does not verify installation or operation.
| Service | Evidence and status |
|---|---|
| Water | Water supply is listed “YES” in the RERA amenities table; HMDA’s extracted approval records a hydro-pneumatic system and sump/OHT. No source, storage capacity, treatment capacity or completed status is supplied. RERA amenities |
| Sewerage / drainage | RERA lists sewerage and storm-water drains; HMDA identifies an STP and common septic tank. No capacities, reuse details or verified completion are supplied. RERA amenities |
| Electrical | HMDA identifies a transformer/transformer yard and LED street lighting; the RERA table lists an electrical meter room/sub-station/receiving station. No capacity or completed status is supplied. RERA amenities |
| Waste | Bio-compost is listed in HMDA’s facilities; RERA lists solid-waste management and disposal. No operating details or verified completion are supplied. RERA amenities |
| Fire / life safety | Fire protection and fire-safety requirements appear in the RERA amenities table; no specific installed systems, clearance or verified compliance evidence is supplied. RERA amenities |
| Lifts, access and accessibility | No lift schedule, lift capacity, accessible route, ramp or other accessibility detail is supplied. Document index Floor plans |
8. Location, access & connectivity
The registered location is Plot No. 5, Shamirpet Village and Mandal, Medchal-Malkajgiri District, Telangana, PIN 500078. The supplied cadastral centroid is 17.604504490754845, 78.57182045028395. The recorded nearest sampled Outer Ring Road interchange is approximately 7.3 km away; this is a sampled distance, not a travel-time claim. Land records Cadastral map Location record
The supplied records do not identify a public-transport service, approach-road name, or measured distance to other landmarks. The HMDA layout letter records a proposed 30mtrs road and internal layout roads.
9. Developer & development status
The TG-RERA certificate names Oruganti Sreenivasa Murthy as promoter; Form B is signed by SREENIVASA MURTHY ORUGANTI, described there as promoter. The legal entity type and corporate identifiers are not established in the supplied evidence. The certificate gives the promoter’s office as Unit 2, 3rd Floor, Begumpet-I, Secunderabad Mandal, Hyderabad District, PIN 500016, Telangana. No official contact details or website are supplied. Corporate record
Form B declares a six-year completion period from permission, stating 13 February 2030. The supplied evidence does not establish current construction progress or completion of any building, phase, or common facility; no occupancy/completion certificate is identified. Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for P02200008179, issued 05/05/2024, for Survey No. 102; stated validity ends 13/02/2030. |
| HMDA layout approval | Draft layout letter, Layout Permit 000012/LO/Plg/HMDA/2024, approved 13 February 2024, for Sy. No. 102, Shamirpet. |
| Registration declaration | Form B affidavit by SREENIVASA MURTHY ORUGANTI, dated 15 March 2024; includes the promoter’s completion undertaking to 13 February 2030. |
| Layout / drawing records | Layout drawings are on file as documents 440475, 440476 and 440477; the supplied drawing measurements are software-derived and require review. |
| Occupancy / completion evidence | No project occupancy or completion certificate is identified in the supplied evidence. Document index |
1. Project at a glance
Project identity
Registered project name: S-CUBE Lakeside Manor
Project type: RERA record: Residential; the HMDA approval is for a draft gated-community layout with housing.
Phase / registered portion: New project; the supplied record does not identify a separately named phase. Registration covers the project identified at Plot No. 5, Survey No. 102.
TG-RERA registration: P02200008179.
Registration validity: Certificate states 05/05/2024–13/02/2030; it also describes the period as “5 years.” No extension is recorded in the supplied certificate extract. Registration validity is separate from the completion undertaking below.
Registered promoter: Certificate: Oruganti Sreenivasa Murthy; Form B declarant: SREENIVASA MURTHY ORUGANTI.
RERA status: Project record labels this a New Project; registration certificate is Form C under section 5.
Land and geographic identity
Registered site address: Plot No. 5, Shamirpet, Medchal-Malkajgiri District, Telangana, PIN 500078.
Revenue village / mandal / district: Shamirpet Village, Shamirpet Mandal, Medchal-Malkajgiri District.
Project survey number(s): Survey No. 102; no subdivision is stated in the supplied project record.
Extent: RERA land record: 17,939.54 sq. m. HMDA draft layout letter: total site area 19,937.13 sq. m, master-plan road-affected area 1,338.59 sq. m, and net site area 17,939.94 sq. m.
Boundaries in RERA record: North: Plot No. 4; South: neighbours’ land; East: neighbours’ land; West: road.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA).
Principal approval: Layout Permit 000012/LO/Plg/HMDA/2024, approved 13 February 2024; application reference 058291/MED/LT/U6/HMDA/06122022.
Approved built-up area: The supplied project record lists 14,869.83 sq. m as approved built-up area.
Buildings / homes: The RERA land details state 74 total building units and 74 proposed building units (as per agreement). The filed unit rows are labelled FF, GF, SF and TF and total 222 entries; these are recorded as floor labels, not as 222 separately identified homes.
Sanctioned floor configuration: Not established by the supplied extracted approval information. The filed FF/GF/SF/TF labels do not by themselves establish a complete sanctioned floor configuration.
Parking levels / provision: No parking level or parking-space count is established in the supplied project record.
Offering and status
RERA-filed unit rows: FF: 74 at 93.05 sq. m each; GF: 73 at 91.98 sq. m each; SF: 74 at 53.55 sq. m each; TF: 1 at 170.62 sq. m. The filing shows 0 booked and 222 available across these rows, without an as-of date in the supplied data. These rows are floor labels and should not be read as confirmed sale configurations.
RERA-filed configuration: A sale configuration such as bedroom count is not disclosed in the supplied TG-RERA unit table.
Drawing-measured configurations: Software measured 1BHK and 2BHK plan examples in supplied drawings; these are drawing-derived measurements, not TG-RERA-filed configurations or unit counts.
Completion undertaking: Form B declares completion within six years from permission, stating 13 February 2030. This is a promoter declaration, not evidence of construction progress or completion.
Construction stage: Not established by the supplied evidence; no independently verified site-progress information is provided.
Occupancy / completion certificate: No project occupancy or completion certificate is identified in the supplied documents.
2. The project story
S-CUBE Lakeside Manor is registered as a residential project on Survey No. 102 in Shamirpet, Medchal-Malkajgiri District. The filed HMDA record describes a draft gated-community layout with housing, while the RERA record identifies Plot No. 5 and 74 proposed building units.
The project’s RERA filing does not establish a bedroom-based unit schedule. Its unit rows use FF, GF, SF and TF labels; the drawing-measurement data separately identifies 1BHK and 2BHK examples, but does not establish how many such homes are offered. The supplied records do not establish current construction progress, a completed portion, or an occupancy-certified phase or building. The promoter’s Form B completion date is an undertaking, not a verified delivery status.
3. Master plan, architecture & building design
HMDA’s supplied draft layout letter gives a total site area of 19,937.13 sq. m, including 1,338.59 sq. m affected by a master-plan road, and a net site area of 17,939.94 sq. m. Its area statement records 10,546.93 sq. m plotted area, 5,117.58 sq. m layout roads and 2,022.26 sq. m park/open-space area. It also records 253.3 sq. m as open space in a separate area-statement entry.
The draft approval identifies mortgage security over Plot Nos. 5–8 and plots 9–12, and conditions sale of plots other than mortgaged plots; these are approval conditions, not a description of unit-level ownership. The letter requires development to follow the approved draft gated-community layout. The supplied extracted drawings do not provide a verified building-by-building floor schedule, footprint, height, number of homes per floor, lifts, stairs, or phase arrangement.
The project record’s approved built-up area is 14,869.83 sq. m. No separate verified FSI-counted area, gross built-up area, or RERA-filed carpet area is supplied.
4. Homes, configurations & floor plans
The RERA unit table supplies area and availability against floor labels, not a bedroom-based configuration. Accordingly, those filed rows are shown below without treating floor labels as home types. The filing’s 0 booked / 222 available figures have no supplied as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| FF (filed floor label; configuration not filed) | 74 | 0 | 74 | 93.05 sq. m each | Not supplied for a matched RERA configuration | Not supplied |
| GF (filed floor label; configuration not filed) | 73 | 0 | 73 | 91.98 sq. m each | Not supplied for a matched RERA configuration | Not supplied |
| SF (filed floor label; configuration not filed) | 74 | 0 | 74 | 53.55 sq. m each | Not supplied for a matched RERA configuration | Not supplied |
| TF (filed floor label; configuration not filed) | 1 | 0 | 1 | 170.62 sq. m | Not supplied for a matched RERA configuration | Not supplied |
Separately, software measured drawing examples of 1BHK plans: carpet area 40.6–68.7 sq. m, median 58.0 sq. m; and 2BHK plans: carpet area 63.8 sq. m. The measurements are software-derived from the supplied drawing geometry, require drawing review, and do not match a RERA-filed configuration in the supplied data.
Carpet area is a drawing-measured internal-area figure here; the RERA figures above are labelled saleable area. The supplied note states that saleable area also includes a home’s share of common areas, so the two measures are not interchangeable. A utility area is identified on one measured 1BHK plan and excluded from that plan’s carpet-area measurement. No loading figure is supplied.
5. Parking & vehicle circulation
The supplied evidence does not establish a sanctioned parking count, resident or visitor allocation, accessible spaces, parking levels, ramps, EV charging, or a legally documented parking allocation for individual homes. The HMDA layout letter refers to internal layout roads but does not provide a parking schedule. A promoter/vendor listing mentions covered car parking, but this is not evidence of sanctioned provision or a buyer’s exclusive allocation.
6. Amenities, recreation & open spaces
The HMDA draft layout letter includes conditions and proposed layout facilities; the RERA amenities table records listed facilities with progress values of 0. Neither source establishes that the facilities are completed or independently verified.
| Description / size | Community buildings listed; no size supplied. |
|---|---|
| Declared progress / verified status | RERA table marks available “YES”; progress is 0. Completion not independently verified. |
| Description / size | HMDA area statement: park 2,022.26 sq. m; open space 253.3 sq. m in a separate entry. |
|---|---|
| Declared progress / verified status | Approved/draft-layout area figures; delivery not independently verified. |
| Description / size | Listed in the RERA amenities table. |
|---|---|
| Declared progress / verified status | Marked available “YES”; progress is 0. Completion not independently verified. |
| Description / size | Identified among HMDA layout facilities. |
|---|---|
| Declared progress / verified status | Required/proposed; completion not independently verified. |
| Description / size | Vendor listing mentions children’s play areas, sand pits, yoga areas, jogging/cycling tracks, indoor games, swimming pool and gym. |
|---|---|
| Declared progress / verified status | Vendor-listed; not established as RERA-declared, sanctioned or delivered in the supplied evidence. |
7. Utilities, building services & safety
HMDA’s draft layout letter identifies an STP, common septic tank, hydro-pneumatic system, transformer/transformer yard, sump/OHT, rainwater-harvesting pits, bio-compost unit and street lighting among the layout facilities or conditions. It specifies 4 rainwater-harvesting pits per acre, requires an STP and sufficient harvesting pits, and calls for LED street lighting. These are approval-record requirements or proposed facilities; the supplied evidence does not verify installation or operation.
Water: Water supply is listed “YES” in the RERA amenities table; HMDA’s extracted approval records a hydro-pneumatic system and sump/OHT. No source, storage capacity, treatment capacity or completed status is supplied.
Sewerage / drainage: RERA lists sewerage and storm-water drains; HMDA identifies an STP and common septic tank. No capacities, reuse details or verified completion are supplied.
Electrical: HMDA identifies a transformer/transformer yard and LED street lighting; the RERA table lists an electrical meter room/sub-station/receiving station. No capacity or completed status is supplied.
Waste: Bio-compost is listed in HMDA’s facilities; RERA lists solid-waste management and disposal. No operating details or verified completion are supplied.
Fire / life safety: Fire protection and fire-safety requirements appear in the RERA amenities table; no specific installed systems, clearance or verified compliance evidence is supplied.
Lifts, access and accessibility: No lift schedule, lift capacity, accessible route, ramp or other accessibility detail is supplied.
8. Location, access & connectivity
The registered location is Plot No. 5, Shamirpet Village and Mandal, Medchal-Malkajgiri District, Telangana, PIN 500078. The supplied cadastral centroid is 17.604504490754845, 78.57182045028395. The recorded nearest sampled Outer Ring Road interchange is approximately 7.3 km away; this is a sampled distance, not a travel-time claim.
The supplied records do not identify a public-transport service, approach-road name, or measured distance to other landmarks. The HMDA layout letter records a proposed 30mtrs road and internal layout roads.
9. Developer & development status
The TG-RERA certificate names Oruganti Sreenivasa Murthy as promoter; Form B is signed by SREENIVASA MURTHY ORUGANTI, described there as promoter. The legal entity type and corporate identifiers are not established in the supplied evidence. The certificate gives the promoter’s office as Unit 2, 3rd Floor, Begumpet-I, Secunderabad Mandal, Hyderabad District, PIN 500016, Telangana. No official contact details or website are supplied.
Form B declares a six-year completion period from permission, stating 13 February 2030. The supplied evidence does not establish current construction progress or completion of any building, phase, or common facility; no occupancy/completion certificate is identified.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for P02200008179, issued 05/05/2024, for Survey No. 102; stated validity ends 13/02/2030.
HMDA layout approval: Draft layout letter, Layout Permit 000012/LO/Plg/HMDA/2024, approved 13 February 2024, for Sy. No. 102, Shamirpet.
Registration declaration: Form B affidavit by SREENIVASA MURTHY ORUGANTI, dated 15 March 2024; includes the promoter’s completion undertaking to 13 February 2030.
Layout / drawing records: Layout drawings are on file as documents 440475, 440476 and 440477; the supplied drawing measurements are software-derived and require review.
Occupancy / completion evidence: No project occupancy or completion certificate is identified in the supplied evidence.
Frequently asked questions
Is S-CUBE Lakeside Manor registered with Telangana RERA?
Yes. S-CUBE Lakeside Manor is registered with the Telangana Real Estate Regulatory Authority as P02200008179; the registration status is New Project.
Who is the developer of S-CUBE Lakeside Manor?
The promoter named in the RERA registration is ORUGANTI.
Where is S-CUBE Lakeside Manor located?
S-CUBE Lakeside Manor is in Shamirpet, Medchal-Malkajgiri, Telangana (500078).
When will S-CUBE Lakeside Manor be completed?
The promoter's proposed date of completion filed with RERA is 13/02/2030. This is the promoter's declaration, not a guarantee.