Star Township
STAR REALTORS & DEVELOPERS · Mahabubnagar · RERA P01400005795
STAR TOWNSHIP is a plotted development in Yedira (Part), Mahabubnagar Rural, Mahabubnagar District, Telangana, developed by registered promoter STAR REALTORS & DEVELOPERS. The RERA record states a total and net land area of 128419.12 sq m, and the tentative layout approval records 401 residential plots; plot-size configurations are not supplied. The project is registered under TG-RERA number P01400005795, issued 15/03/2023, with a proposed completion date of 04/06/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | STAR TOWNSHIP RERA record |
| Project type | Plotted development / tentative residential layout RERA record RERA filing |
| Phase or registered portion | Phase not identified; the RERA record describes the registered project across the listed survey numbers Approvals record |
| TG-RERA registration | P01400005795, issued 15/03/2023; validity stated as 15/03/2023–04/06/2024 Approvals record |
| RERA status | The supplied certificate shows the validity period above and records no extension. Current status is not established by the supplied records. |
| Registered promoter | STAR REALTORS & DEVELOPERS, partnership RERA record RERA filing |
| Construction completion date | Promoter’s RERA filing gives 04/06/2024 as the proposed completion date; this is separate from the registration-validity end date. RERA filing RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Yedira (Part) in the RERA record; the layout approval identifies YEDIRA Revenue Village. RERA record |
| Mandal | Mahabubnagar Rural in the RERA record; the layout approval says MAHABOOBNAGAR Mandal. RERA record |
| District / PIN | Mahabubnagar, Telangana; PIN 509001 RERA record |
| Project survey numbers | 655P, 656, 657, 658, 659P, 660, 665, 666 RERA record Land records |
| Site extent | RERA land record: 128419.12 sq m total and net area. The layout approval separately states 31 Acer 29.29 Gts 153588 Sq. Yds. Land records RERA filing |
| Boundaries in RERA filing | East: ROAD; West, North and South: OTHERS LAND RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | MAHABOOBNAGAR Municipality/Municipal Corporation; the RERA record lists DTCP as the authority name. Approvals record RERA filing |
| Principal layout approval | Tentative layout plan approval 0035/LO/3063/2022, dated 04 June, 2022; application 003802/LO/DTCP/3063/0042/2022. Approvals record |
| Approved layout content | 401 residential plots in the tentative layout approval. |
| Approved built-up area | RERA filing lists 76764.85 sq m as approved built-up area. No building or floor configuration is supplied for this plotted layout. RERA filing |
| Layout land-use figures in approval | Plotted area 18 Acer 38.74 Gts 91810 Sq. Yds (60.08%); roads 8 Acer 24.01 Gts 41626 Sq. Yds (27.24%); open space 2 Acer 34.77 Gts 13887 Sq. Yds (9.09%); social infrastructure 0 Acer 32.37 Gts 3917 Sq. Yds (2.56%); utilities 0 Acer 13 Gts 1573 Sq. Yds (1.03%). |
| Mortgage entry | RERA filing records mortgage area 12320.33 sq m; approval lists mortgage area 0 Acer 121.78 Gts 14735 Sq. Yds, comprising designated plots in favour of the Municipality/Municipal Corporation. RERA filing |
| Buildings, floors and parking levels | Not disclosed in the supplied records; this is a plotted layout, not a documented apartment-building scheme. Document index |
Offering and status
| Field | Record |
|---|---|
| Offering | Residential plots; the layout approval states 401 plots. Plot-size bands, unit-level RERA inventory and booked/available counts are not supplied. RERA unit table |
| Construction / development stage | The RERA registration record gives a proposed completion date but no independently verified site-progress measurement. The filed amenity progress values are 0%; they do not establish current on-site status. RERA filing RERA amenities |
| Original / revised completion | Promoter-declared proposed completion: 04/06/2024. No revised completion date or extension is recorded in the supplied evidence. RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The available approval is for a tentative layout plan, not an occupancy certificate. Document index |
2. The project story
STAR TOWNSHIP is presented in the TG-RERA record as a residential plotted development at Yedira (Part), Mahabubnagar Rural, Mahabubnagar. The registered land description covers survey numbers 655P, 656, 657, 658, 659P, 660, 665 and 666. RERA record Land records
The filed layout approval describes a tentative scheme of 401 residential plots, with land set aside for plots, roads, open space, social infrastructure and utilities. It also sets out required layout works—including road formation, drainage, water supply, electrical infrastructure, park development and rainwater-harvesting pits—but the documents supplied do not establish how much of this work has been completed.
The promoter declared a two-year completion undertaking in Form B; the RERA project information gives 04/06/2024 as the proposed completion date. Neither the RERA filing nor the supplied approval documents provide independent site verification of progress or a completion/occupancy certificate. RERA filing Document index
3. Master plan, architecture & building design
The available sanctioned drawing record is a tentative layout plan, rather than an apartment-building plan. It identifies 401 residential plots and allocates land to plots, roads, open space, social infrastructure and utilities. The approval states that layout development is the applicant’s responsibility and requires infrastructure works under municipal supervision.
| Layout component | Approval figure |
|---|---|
| Plotted area | 18 Acer 38.74 Gts 91810 Sq. Yds (60.08%) |
| Roads | 8 Acer 24.01 Gts 41626 Sq. Yds (27.24%) |
| Open space (park) | 2 Acer 34.77 Gts 13887 Sq. Yds (9.09%) |
| Social infrastructure | 0 Acer 32.37 Gts 3917 Sq. Yds (2.56%) |
| Utilities | 0 Acer 13 Gts 1573 Sq. Yds (1.03%) |
| Layout extent stated in approval | 31 Acer 29.29 Gts 153588 Sq. Yds |
| RERA-filed total/net site area | 128419.12 sq m |
RERA filing
The RERA form also lists 76764.85 sq m as approved built-up area, but the supplied drawings and extracts do not explain its scope or provide building count, floor configuration, building footprint, plot-size schedule or a phase plan. It should not be read as a plot-area or carpet-area figure. RERA filing Document index
The approval identifies a mortgage area of 0 Acer 121.78 Gts 14735 Sq. Yds within plotted land and lists the plots subject to that mortgage. The RERA form records mortgage area as 12320.33 sq m. RERA filing
4. Homes, configurations & floor plans
This is a plotted development. The supplied layout approval records 401 residential plots, but the available data does not provide plot-by-plot sizes, plot-size bands, RERA unit-type counts, booked/available inventory or unit-level saleable areas. RERA unit table Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 401 in tentative layout approval | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
The two supplied drawing records are layout sheets, not dwelling-unit floor plans; no plot-size measurements were extracted. Floor plans Layout record
5. Parking & vehicle circulation
The supplied records do not establish parking-space counts, visitor or accessible parking, vehicle bays, parking allocation to individual plots, or a dedicated parking arrangement. The layout approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site.
The approval describes roads as part of the layout and requires road formation with black top. Detailed road widths, junction geometry, vehicle entrances and pedestrian separation are not established in the supplied extracts.
6. Amenities, recreation & open spaces
The RERA amenities schedule marks several layout facilities as “YES” and reports 0% progress for each listed item. This is a filed status, not independent confirmation of whether facilities are currently complete. The tentative layout approval also describes development works and handover requirements. RERA amenities
| Description / size | Internal layout access; approval requires road formation with black top. |
|---|---|
| Evidence source | RERA amenities; tentative layout approval RERA amenities |
| Declared progress / verified status | RERA schedule: 0%; completion not independently verified |
| Description / size | Open space: 2 Acer 34.77 Gts 13887 Sq. Yds (9.09%) in the approval. |
|---|---|
| Evidence source | RERA amenities; tentative layout approval RERA amenities |
| Declared progress / verified status | RERA schedule: 0%; approval requires park development and handover |
| Description / size | Reserved area: 0 Acer 32.37 Gts 3917 Sq. Yds (2.56%). |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Completion not established |
| Description / size | Listed in the RERA amenities schedule; no size or description supplied. |
|---|---|
| Evidence source | RERA amenities RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; physical provision not independently verified |
| Description / size | Approval describes rainwater-harvesting pits. |
|---|---|
| Evidence source | RERA amenities; tentative layout approval RERA amenities |
| Declared progress / verified status | RERA schedule: 0%; completion not independently verified |
7. Utilities, building services & safety
The tentative layout approval lists proposed infrastructure works, including internal water-supply pipelines, an overhead tank, an assured water-supply source, storm-water drains, underground drainage lines, a common septic tank or STP, electrical supply lines, street lighting, a transformer and rainwater-harvesting pits. It also includes solid-waste-management facilities among the reserved utility uses. These are approval requirements or listed works; the supplied records do not verify installation, operating capacity or current service status.
| Service | Supplied evidence |
|---|---|
| Water | Internal pipelines, overhead tank and assured water-supply source are described in the approval; capacity and source details are not supplied. |
| Sewerage and drainage | Approval describes storm-water drains, underground drainage lines and a common septic tank/STP; capacity, commissioning and reuse arrangements are not supplied. |
| Electrical | Approval describes supply lines, street lights and an electric transformer; capacity and supply/backup details are not supplied. |
| Waste | Solid-waste management is listed as a utility; operating arrangements are not supplied. |
| Fire, lifts and accessibility | No project-specific fire-system, lift, accessible-circulation or emergency-access details are established in the supplied records. Document index RERA amenities |
8. Location, access & connectivity
The registered project location is Yedira (Part), Mahabubnagar Rural Mandal, Mahabubnagar District, Telangana, PIN 509001. The tentative layout approval identifies YEDIRA Revenue Village in Mahaboobnagar District. RERA record
The RERA filing gives the site boundaries as road to the east and other land to the north, south and west. A supplied location record gives a sampled approximate distance of 80.4 km to the nearest sampled Outer Ring Road interchange; it does not establish a project approach route or travel time. RERA filing Location record
9. Developer & development status
The registered promoter is STAR REALTORS & DEVELOPERS, recorded as a partnership, with GSTIN 36AEVFS6570A1ZN. The supplied promoter address is in Kidwaipet, Mahabubnagar, Telangana, and the registration certificate states PIN 509001. RERA record RERA filing Corporate record
The RERA filing names eight landowners/promoters under revenue-share agreements: MA QUADEER, SYED SHAFIUDDIN, MD ABUBAKAR SIDDIQUE, B PAVAN KUMAR, DAWOOD AHMED, SYED RAZIUDDIN, MD ZAHID AZHARUDDIN and MD MOHID MOHIUDDIN. The supplied records identify M A QUADEER QUADEER as authorized signatory. Parties record
The promoter’s Form B declaration states a two-year completion undertaking; the project-information filing gives 04/06/2024 as the proposed completion date. The supplied project records do not provide a revised completion date, verified construction progress or an occupancy/completion certificate. RERA filing Document index
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate | Form C for STAR TOWNSHIP, registration P01400005795, valid from 15/03/2023 to 04/06/2024; the certificate states a separate-account condition. |
| Tentative layout approval | Approval 0035/LO/3063/2022, dated 04 June, 2022, issued by MAHABOOBNAGAR Municipality/Municipal Corporation; covers a tentative layout of 401 residential plots. |
| Layout application | Application 003802/LO/DTCP/3063/0042/2022, dated 07/04/2022 in the approval extract. |
| Mortgage deed reference | Mortgage Deed 7098/2022, dated 26 May, 2022, cited by the layout approval for specified plots in favour of the Municipality/Municipal Corporation. |
| Form B declaration | Promoter declaration by M.A. Quadeer, authorized by STAR REALTORS & DEVELOPERS, concerning the land and proposed development. |
| Layout plan sheets | Two layout sheets are listed; plot sizes were not extracted from the drawing data. Layout record Floor plans |
| Occupancy/completion certificate | Not present in the supplied project documents. Document index |
1. Project at a glance
Project identity
Registered project name: STAR TOWNSHIP
Project type: Plotted development / tentative residential layout
Phase or registered portion: Phase not identified; the RERA record describes the registered project across the listed survey numbers
TG-RERA registration: P01400005795, issued 15/03/2023; validity stated as 15/03/2023–04/06/2024
RERA status: The supplied certificate shows the validity period above and records no extension. Current status is not established by the supplied records.
Registered promoter: STAR REALTORS & DEVELOPERS, partnership
Construction completion date: Promoter’s RERA filing gives 04/06/2024 as the proposed completion date; this is separate from the registration-validity end date.
Land and geographic identity
Locality / revenue village: Yedira (Part) in the RERA record; the layout approval identifies YEDIRA Revenue Village.
Mandal: Mahabubnagar Rural in the RERA record; the layout approval says MAHABOOBNAGAR Mandal.
District / PIN: Mahabubnagar, Telangana; PIN 509001
Project survey numbers: 655P, 656, 657, 658, 659P, 660, 665, 666
Site extent: RERA land record: 128419.12 sq m total and net area. The layout approval separately states 31 Acer 29.29 Gts 153588 Sq. Yds.
Boundaries in RERA filing: East: ROAD; West, North and South: OTHERS LAND
Development identity
Sanctioning authority: MAHABOOBNAGAR Municipality/Municipal Corporation; the RERA record lists DTCP as the authority name.
Principal layout approval: Tentative layout plan approval 0035/LO/3063/2022, dated 04 June, 2022; application 003802/LO/DTCP/3063/0042/2022.
Approved layout content: 401 residential plots in the tentative layout approval.
Approved built-up area: RERA filing lists 76764.85 sq m as approved built-up area. No building or floor configuration is supplied for this plotted layout.
Layout land-use figures in approval: Plotted area 18 Acer 38.74 Gts 91810 Sq. Yds (60.08%); roads 8 Acer 24.01 Gts 41626 Sq. Yds (27.24%); open space 2 Acer 34.77 Gts 13887 Sq. Yds (9.09%); social infrastructure 0 Acer 32.37 Gts 3917 Sq. Yds (2.56%); utilities 0 Acer 13 Gts 1573 Sq. Yds (1.03%).
Mortgage entry: RERA filing records mortgage area 12320.33 sq m; approval lists mortgage area 0 Acer 121.78 Gts 14735 Sq. Yds, comprising designated plots in favour of the Municipality/Municipal Corporation.
Buildings, floors and parking levels: Not disclosed in the supplied records; this is a plotted layout, not a documented apartment-building scheme.
Offering and status
Offering: Residential plots; the layout approval states 401 plots. Plot-size bands, unit-level RERA inventory and booked/available counts are not supplied.
Construction / development stage: The RERA registration record gives a proposed completion date but no independently verified site-progress measurement. The filed amenity progress values are 0%; they do not establish current on-site status.
Original / revised completion: Promoter-declared proposed completion: 04/06/2024. No revised completion date or extension is recorded in the supplied evidence.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The available approval is for a tentative layout plan, not an occupancy certificate.
2. The project story
STAR TOWNSHIP is presented in the TG-RERA record as a residential plotted development at Yedira (Part), Mahabubnagar Rural, Mahabubnagar. The registered land description covers survey numbers 655P, 656, 657, 658, 659P, 660, 665 and 666.
The filed layout approval describes a tentative scheme of 401 residential plots, with land set aside for plots, roads, open space, social infrastructure and utilities. It also sets out required layout works—including road formation, drainage, water supply, electrical infrastructure, park development and rainwater-harvesting pits—but the documents supplied do not establish how much of this work has been completed.
The promoter declared a two-year completion undertaking in Form B; the RERA project information gives 04/06/2024 as the proposed completion date. Neither the RERA filing nor the supplied approval documents provide independent site verification of progress or a completion/occupancy certificate.
3. Master plan, architecture & building design
The available sanctioned drawing record is a tentative layout plan, rather than an apartment-building plan. It identifies 401 residential plots and allocates land to plots, roads, open space, social infrastructure and utilities. The approval states that layout development is the applicant’s responsibility and requires infrastructure works under municipal supervision.
Plotted area: 18 Acer 38.74 Gts 91810 Sq. Yds (60.08%)
Roads: 8 Acer 24.01 Gts 41626 Sq. Yds (27.24%)
Open space (park): 2 Acer 34.77 Gts 13887 Sq. Yds (9.09%)
Social infrastructure: 0 Acer 32.37 Gts 3917 Sq. Yds (2.56%)
Utilities: 0 Acer 13 Gts 1573 Sq. Yds (1.03%)
Layout extent stated in approval: 31 Acer 29.29 Gts 153588 Sq. Yds
RERA-filed total/net site area: 128419.12 sq m
The RERA form also lists 76764.85 sq m as approved built-up area, but the supplied drawings and extracts do not explain its scope or provide building count, floor configuration, building footprint, plot-size schedule or a phase plan. It should not be read as a plot-area or carpet-area figure.
The approval identifies a mortgage area of 0 Acer 121.78 Gts 14735 Sq. Yds within plotted land and lists the plots subject to that mortgage. The RERA form records mortgage area as 12320.33 sq m.
4. Homes, configurations & floor plans
This is a plotted development. The supplied layout approval records 401 residential plots, but the available data does not provide plot-by-plot sizes, plot-size bands, RERA unit-type counts, booked/available inventory or unit-level saleable areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 401 in tentative layout approval | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
The two supplied drawing records are layout sheets, not dwelling-unit floor plans; no plot-size measurements were extracted.
5. Parking & vehicle circulation
The supplied records do not establish parking-space counts, visitor or accessible parking, vehicle bays, parking allocation to individual plots, or a dedicated parking arrangement. The layout approval requires roads to be opened for access to neighbouring sites and prohibits a compound wall or fencing around the site.
The approval describes roads as part of the layout and requires road formation with black top. Detailed road widths, junction geometry, vehicle entrances and pedestrian separation are not established in the supplied extracts.
6. Amenities, recreation & open spaces
The RERA amenities schedule marks several layout facilities as “YES” and reports 0% progress for each listed item. This is a filed status, not independent confirmation of whether facilities are currently complete. The tentative layout approval also describes development works and handover requirements.
| Description / size | Internal layout access; approval requires road formation with black top. |
|---|---|
| Evidence source | RERA amenities; tentative layout approval |
| Declared progress / verified status | RERA schedule: 0%; completion not independently verified |
| Description / size | Open space: 2 Acer 34.77 Gts 13887 Sq. Yds (9.09%) in the approval. |
|---|---|
| Evidence source | RERA amenities; tentative layout approval |
| Declared progress / verified status | RERA schedule: 0%; approval requires park development and handover |
| Description / size | Reserved area: 0 Acer 32.37 Gts 3917 Sq. Yds (2.56%). |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Completion not established |
| Description / size | Listed in the RERA amenities schedule; no size or description supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; physical provision not independently verified |
| Description / size | Approval describes rainwater-harvesting pits. |
|---|---|
| Evidence source | RERA amenities; tentative layout approval |
| Declared progress / verified status | RERA schedule: 0%; completion not independently verified |
7. Utilities, building services & safety
The tentative layout approval lists proposed infrastructure works, including internal water-supply pipelines, an overhead tank, an assured water-supply source, storm-water drains, underground drainage lines, a common septic tank or STP, electrical supply lines, street lighting, a transformer and rainwater-harvesting pits. It also includes solid-waste-management facilities among the reserved utility uses. These are approval requirements or listed works; the supplied records do not verify installation, operating capacity or current service status.
Water: Internal pipelines, overhead tank and assured water-supply source are described in the approval; capacity and source details are not supplied.
Sewerage and drainage: Approval describes storm-water drains, underground drainage lines and a common septic tank/STP; capacity, commissioning and reuse arrangements are not supplied.
Electrical: Approval describes supply lines, street lights and an electric transformer; capacity and supply/backup details are not supplied.
Waste: Solid-waste management is listed as a utility; operating arrangements are not supplied.
Fire, lifts and accessibility: No project-specific fire-system, lift, accessible-circulation or emergency-access details are established in the supplied records.
8. Location, access & connectivity
The registered project location is Yedira (Part), Mahabubnagar Rural Mandal, Mahabubnagar District, Telangana, PIN 509001. The tentative layout approval identifies YEDIRA Revenue Village in Mahaboobnagar District.
The RERA filing gives the site boundaries as road to the east and other land to the north, south and west. A supplied location record gives a sampled approximate distance of 80.4 km to the nearest sampled Outer Ring Road interchange; it does not establish a project approach route or travel time.
9. Developer & development status
The registered promoter is STAR REALTORS & DEVELOPERS, recorded as a partnership, with GSTIN 36AEVFS6570A1ZN. The supplied promoter address is in Kidwaipet, Mahabubnagar, Telangana, and the registration certificate states PIN 509001.
The RERA filing names eight landowners/promoters under revenue-share agreements: MA QUADEER, SYED SHAFIUDDIN, MD ABUBAKAR SIDDIQUE, B PAVAN KUMAR, DAWOOD AHMED, SYED RAZIUDDIN, MD ZAHID AZHARUDDIN and MD MOHID MOHIUDDIN. The supplied records identify M A QUADEER QUADEER as authorized signatory.
The promoter’s Form B declaration states a two-year completion undertaking; the project-information filing gives 04/06/2024 as the proposed completion date. The supplied project records do not provide a revised completion date, verified construction progress or an occupancy/completion certificate.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for STAR TOWNSHIP, registration P01400005795, valid from 15/03/2023 to 04/06/2024; the certificate states a separate-account condition.
Tentative layout approval: Approval 0035/LO/3063/2022, dated 04 June, 2022, issued by MAHABOOBNAGAR Municipality/Municipal Corporation; covers a tentative layout of 401 residential plots.
Layout application: Application 003802/LO/DTCP/3063/0042/2022, dated 07/04/2022 in the approval extract.
Mortgage deed reference: Mortgage Deed 7098/2022, dated 26 May, 2022, cited by the layout approval for specified plots in favour of the Municipality/Municipal Corporation.
Form B declaration: Promoter declaration by M.A. Quadeer, authorized by STAR REALTORS & DEVELOPERS, concerning the land and proposed development.
Layout plan sheets: Two layout sheets are listed; plot sizes were not extracted from the drawing data.
Occupancy/completion certificate: Not present in the supplied project documents.
Frequently asked questions
Is STAR TOWNSHIP registered with Telangana RERA?
Yes. STAR TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01400005795; the registration status is New Project.
Who is the developer of STAR TOWNSHIP?
The promoter named in the RERA registration is STAR REALTORS & DEVELOPERS.
Where is STAR TOWNSHIP located?
STAR TOWNSHIP is in YEDIRA, Yedira (Part), Mahabubnagar Rural, Mahabubnagar, Telangana (509001).
When will STAR TOWNSHIP be completed?
The promoter's proposed date of completion filed with RERA is 04/06/2024. This is the promoter's declaration, not a guarantee.